Location: clockwise between junctions J8 (Reigate) and J9 (Leatherhead) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Vehicle tyre change.
Time To Clear : The event is expected to clear between 09:15 and 09:30 on 12 September 2025.
Normal traffic conditions are expected between 09:15 and 09:30 on 12 September 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.53 miles from Witley.

Location: clockwise exit slip at junction J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 12 September 2025.
Nearest town: 15.32 miles from Witley.

Location: southbound exit slip to the A245 .
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 12 September 2025.
Nearest town: 16.7 miles from Witley.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 12 September 2025.
Nearest town: 15.44 miles from Witley.

Location: southbound exit slip to the A283 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 2.64 miles from Witley.

Location: northbound exit slip to the A333 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 12 September 2025.
Nearest town: 4.58 miles from Witley.

Location: southbound exit slip to the A244 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.23 miles from Witley.

Location: clockwise exit slip at junction J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.32 miles from Witley.

Location: southbound exit slip to the A245 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.7 miles from Witley.

Location: clockwise exit slip at junction J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.32 miles from Witley.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.44 miles from Witley.

Location: anticlockwise exit slip at junction J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.3 miles from Witley.

Location: clockwise exit slip at junction J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 07:30 and 07:45 on 12 September 2025.
Nearest town: 15.32 miles from Witley.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 07:15 and 07:30 on 12 September 2025.
Nearest town: 15.44 miles from Witley.

Location: eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Due to: Roadworks.
Period : from 00:19 on 11 September 2025 to 05:00 on 12 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.73 miles from Witley.

Location: anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .
Due to: Roadworks.
Period : from 23:17 on 11 September 2025 to 05:30 on 12 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.49 miles from Witley.

Location: eastbound entry slip at junction J2 (Gatwick M23) .
Due to: Roadworks.
Period : from 22:55 on 11 September 2025 to 05:00 on 12 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.69 miles from Witley.

Location: eastbound entry slip at junction J2 (Gatwick M23) from M25 clockwise.
Due to: Roadworks.
Period : from 22:19 on 11 September 2025 to 05:00 on 12 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.47 miles from Witley.

Location: westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 05:30 on 13 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.99 miles from Witley.

Location: southbound between the A244 and the junction with the A247 .
Due to: Roadworks scheme.
Period : from 22:01 on 10 September 2025 to 05:30 on 12 September 2025.
Nearest town: 17.4 miles from Witley.

Location: southbound between the junctions with the M25 and the A247 .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 12 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.86 miles from Witley.

Location: southbound at the junction with the M25 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.52 miles from Witley.

Location: southbound between the A244 and the junction with the M25 .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 12 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.4 miles from Witley.

Location: northbound between the A247 and the junction with the A245 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 05:30 on 15 September 2025.
Nearest town: 14.15 miles from Witley.

Location: southbound entry slip from the A245 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.55 miles from Witley.

Location: clockwise exit slip at junction J10 (Guildford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.34 miles from Witley.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14 miles from Witley.

Location: southbound exit slip to the M25 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.52 miles from Witley.

Location: southbound between the A244 and the junction with the M25 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.85 miles from Witley.

Location: southbound between the junctions with the A244 and the A245 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.4 miles from Witley.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Nearest town: 17.4 miles from Witley.

Location: southbound between the M25 and the junction with the A247 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.27 miles from Witley.

Location: southbound exit slip at Wisley Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.85 miles from Witley.

Location: southbound entry slip at Wisley Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 15 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.75 miles from Witley.

Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.69 miles from Witley.

Location: westbound at junction J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.76 miles from Witley.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.96 miles from Witley.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.11 miles from Witley.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.12 miles from Witley.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.14 miles from Witley.

Location: northbound between the A325 and the junction with the A333 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.43 miles from Witley.

Location: westbound between the junctions with the A29 South and the A285 Halnaker.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.83 miles from Witley.

Location: westbound between the junctions with the A284 Arundel West and the A29 North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 20 miles from Witley.

Location: westbound between the junctions with the A29 North and the A29 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.76 miles from Witley.

Location: westbound at the junction with the A29 North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.77 miles from Witley.

Location: eastbound between the A285 Halnaker and the junction with the A284 Arundel West .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.9 miles from Witley.

Location: northbound between the A322 and the junction with the A3100 .
Due to: Roadworks scheme.
Period : from 20:10 on 11 September 2025 to 06:00 on 19 September 2025.
Nearest town: 7.85 miles from Witley.

Location: northbound between the A245 and the junction with the A244 .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Horticultural works.
Period : expect disruption until 05:30 on 12 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.31 miles from Witley.

Location: northbound exit slip to the A244 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:30 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.92 miles from Witley.

Location: anticlockwise between junctions J13 (A30) and J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 19.44 miles from Witley.

Location: clockwise between junctions J11 (Chertsey) and J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.9 miles from Witley.

Location: clockwise at junction J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.3 miles from Witley.

Location: southbound entry slip from the A322 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 September 2025 to 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.82 miles from Witley.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.48 miles from Witley.

Location: anticlockwise entry slip at junction J9 (Leatherhead) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.5 miles from Witley.

Location: anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.42 miles from Witley.

Location: northbound between the A272 Petersfield North and the junction with the A325 .
Due to: Roadworks scheme.
Period : from 20:08 on 28 August 2025 to 06:00 on 7 November 2025.
Nearest town: 12.32 miles from Witley.

Location: southbound between the A325 and the junction with the A272 Petersfield North.
Due to: Roadworks scheme.
Period : from 20:08 on 28 August 2025 to 06:00 on 7 November 2025.
Nearest town: 11.75 miles from Witley.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 15.35 miles from Witley.

Location: anticlockwise at junction J10 (Guildford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 15.26 miles from Witley.

Location: southbound between the A245 and the junction with the M25 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 16.69 miles from Witley.

Location: northbound between the junctions with the A247 and the M25 .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 1 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 14.15 miles from Witley.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Due to: Roadworks scheme.
Period : from 00:02 on 1 January 2024 to 06:00 on 31 December 2025.
Nearest town: 15.26 miles from Witley.

Location: northbound between the junctions with the A247 and the M25 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.45 miles from Witley.

Location: northbound at the junction with the M25 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.1 miles from Witley.

Location: anticlockwise between junctions J13 (A30) and J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 19.44 miles from Witley.

Location: anticlockwise exit slip at junction J12 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.79 miles from Witley.

Location: eastbound entry slip at junction J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.69 miles from Witley.

Location: clockwise between junctions J11 (Chertsey) and J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.9 miles from Witley.

Location: anticlockwise at junction J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.8 miles from Witley.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.4 miles from Witley.

Location: westbound entry slip at junction J2 (Gatwick M23) from M25 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.69 miles from Witley.

Location: westbound entry slip at junction J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.45 miles from Witley.

Location: northbound between the A3M and the junction with the A272 Petersfield South .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 18 September 2025 to 06:00 on 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.34 miles from Witley.

Location: southbound between the junctions with the A272 Petersfield South and the A3M .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 18 September 2025 to 06:00 on 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.84 miles from Witley.

Location: westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.8 miles from Witley.

Location: anticlockwise entry slip at junction J12 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.58 miles from Witley.

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 November 2025 to 06:00 on 20 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.88 miles from Witley.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 November 2025 to 22 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.41 miles from Witley.

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 17 September 2025 to 18 September 2025.
Nearest town: 15.57 miles from Witley.

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 September 2025 to 18 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.22 miles from Witley.

Location: westbound between junctions J5 (Hook) and J7 (Basingstoke) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 16 September 2025 to 06:00 on 17 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.87 miles from Witley.

Location: eastbound between junctions J7 (Basingstoke) and J5 (Hook) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 16 September 2025 to 06:00 on 17 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.99 miles from Witley.

Location: anticlockwise between junctions J11 (Chertsey) and J9 (Leatherhead) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:30 on 19 September 2025.
Nearest town: 15.22 miles from Witley.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.35 miles from Witley.

Location: anticlockwise at junction J10 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.26 miles from Witley.

Location: anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.22 miles from Witley.

Location: northbound entry slip from the A244 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.2 miles from Witley.

Location: northbound between the A247 and the junction with the M25 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.22 miles from Witley.

Location: northbound between the A245 and the junction with the A309 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.31 miles from Witley.

Location: northbound at the junction with the M25 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.1 miles from Witley.

Location: westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.83 miles from Witley.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.28 miles from Witley.

Location: westbound at junction J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.65 miles from Witley.

Location: westbound at junction J2 (Gatwick M23) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.69 miles from Witley.

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.22 miles from Witley.

Location: clockwise exit slip at junction J10 (Guildford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.34 miles from Witley.

Location: southbound at the junction with the M25 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.52 miles from Witley.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14 miles from Witley.

Location: eastbound at junction J2 (Gatwick M23) .
Lane Closures : Lane two will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.35 miles from Witley.

Location: southbound between the A244 and the junction with the M25 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.4 miles from Witley.

Location: southbound between the M25 and the junction with the A247 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.27 miles from Witley.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.75 miles from Witley.

Location: southbound exit slip at Wisley Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.85 miles from Witley.

Location: anticlockwise between junctions J10 (Guildford) and J8 (Reigate) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 22 September 2025 to 26 September 2025.
Schedule : From 23:00 on 26 September 2025 to 06:00 on 27 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.83 miles from Witley.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 15 September 2025 to 06:00 on 16 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.6 miles from Witley.

Location: westbound at junction J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 15 September 2025 to 06:00 on 16 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.92 miles from Witley.

Location: westbound between junctions J6 (Basingstoke) and J7 (Basingstoke) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 September 2025 to 06:00 on 16 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.33 miles from Witley.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 September 2025 to 06:00 on 16 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.89 miles from Witley.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 05:30 on 13 September 2025.
Schedule : From 22:00 on 13 September 2025 to 05:30 on 14 September 2025.
Schedule : From 22:30 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.17 miles from Witley.

Location: northbound between the junctions with the A247 and the M25 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : From 22:00 on 13 September 2025 to 06:00 on 14 September 2025.
Schedule : From 22:30 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.15 miles from Witley.

Location: clockwise entry slip at junction J10 (Guildford) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 05:30 on 13 September 2025.
Schedule : From 22:00 on 13 September 2025 to 05:30 on 14 September 2025.
Schedule : From 22:30 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.27 miles from Witley.

Location: northbound between the junctions with the M25 and the A245 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : From 22:00 on 13 September 2025 to 06:00 on 14 September 2025.
Schedule : From 22:30 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.61 miles from Witley.

Location: northbound exit slip to the M25 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 05:30 on 13 September 2025.
Schedule : From 22:00 on 13 September 2025 to 05:30 on 14 September 2025.
Schedule : From 22:30 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.1 miles from Witley.

Location: northbound at the junction with the M25 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : From 22:00 on 13 September 2025 to 06:00 on 14 September 2025.
Schedule : From 22:30 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.1 miles from Witley.

Location: northbound between the junctions with the A322 and the A3100 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 19 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.25 miles from Witley.

Location: northbound between the A322 and the junction with the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.85 miles from Witley.

Location: southbound between the A3100 and the junction with the A322 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 27 September 2025.
Nearest town: 8.93 miles from Witley.

Location: southbound between the A320 and the junction with the A322 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 September 2025 to 27 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.31 miles from Witley.

Location: southbound between the junctions with the A3100 and the A320 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 September 2025 to 27 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.93 miles from Witley.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.31 miles from Witley.

Location: clockwise at junction J10 (Guildford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.34 miles from Witley.

Location: clockwise entry slip at junction J10 (Guildford) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.27 miles from Witley.

Location: northbound between the junctions with the A247 and the M25 .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 12 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 14.45 miles from Witley.

Location: northbound exit slip to the M25 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.1 miles from Witley.

Location: northbound at the junction with the M25 .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.1 miles from Witley.

Location: clockwise exit slip at junction J11 (Chertsey) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.08 miles from Witley.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 September 2025 to 27 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.94 miles from Witley.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.19 miles from Witley.

Location: clockwise between junctions J8 (Reigate) and J10 (Guildford) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.74 miles from Witley.

Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 4 November 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.94 miles from Witley.

Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 4 November 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.32 miles from Witley.

Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 7 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.97 miles from Witley.

Location: southbound between the junctions with the A325 and the A272 Petersfield North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 7 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.95 miles from Witley.

Location: southbound between the junctions with the A325 and the A272 Petersfield North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 7 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.75 miles from Witley.

Location: southbound between the junctions with the A325 and the A272 Petersfield North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 7 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.98 miles from Witley.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 12 September 2025.
Nearest town: 16.67 miles from Witley.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 22 September 2025 to 06:00 on 27 September 2025.
Nearest town: 13.94 miles from Witley.