Current traffic in Yorkshire

BROKEN DOWN VEHICLELocation : The M62 eastbound exit slip at junction J30 (Rothwell) .
Reason : Broken down vehicle.
Status : Currently Active.
Time To Clear : The event is expected to clear between 08:00 and 08:15 on 20 Aug 2018.
Return To Normal : Normal traffic conditions are expected between 08:00 and 08:15 on 20 Aug 2018.

2.18m from Wakefield.

Yorkshire Roadworks

ROAD WORKSLocation : eastbound between junctions J30 (Rothwell) and J31 (Normanton) .

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 11:00 on 20 Aug 2018 to 18:00 on 24 Aug 2018.

2.47m from Wakefield.

ROAD WORKSLocation : westbound between the A1166 and the junction with the A1034 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 Aug 2018 to 24 Aug 2018.

Lanes Closed : There will be one of two lanes closed.

3.22m from Hull.

ROAD WORKSLocation : eastbound exit slip at junction J35 (M18) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 20 Aug 2018 to 06:00 on 23 Aug 2018.

5.33m from Goole.

ROAD WORKSLocation : eastbound entry slip at junction J35 (M18) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 20 Aug 2018 to 06:00 on 21 Aug 2018.

Lanes Closed : All lanes will be closed.

4.83m from Goole.

ROAD WORKSLocation : southbound between junctions J39 (Denby Dale) and J38 (Huddersfield) .

Lane Closures : Lane three will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 Aug 2018 to 06:00 on 21 Aug 2018.

Lanes Closed : There will be one of three lanes closed.

5.2m from Barnsley.

ROAD WORKSLocation : northbound between junctions J37 (Barnsley) and J38 (Huddersfield) .

Lane Closures : Lane three will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 Aug 2018 to 06:00 on 21 Aug 2018.

Lanes Closed : There will be one of three lanes closed.

3.99m from Barnsley.

ROAD WORKSLocation : The A1M southbound at junction J46 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 10:00 on 20 Aug 2018 to 16:00 on 24 Aug 2018.

2.11m from Wetherby.

ROAD WORKSLocation : The A1M southbound between junctions J48 and J47 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 20 Aug 2018 to 16:00 on 24 Aug 2018.

3.82m from Knaresborough.

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways EnglandHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location : eastbound exit slip at junction J30 (Rothwell) .

Reason : Broken down vehicle.

Status : Currently Active.

Time To Clear : The event is expected to clear between 08:00 and 08:15 on 20 August 2018.

Return To Normal : Normal traffic conditions are expected between 08:00 and 08:15 on 20 August 2018.

2.18m from Wakefield.

53.73--1.46

Levels on the Tidal River Trent are rising with the morning high tide but will fall during the day.

Levels will then rise into this evening once more with the high tide.

This is in result to high tides.

As a result, flooding of low lying agricultural land and roads around Church Laneham to Rampton Road is likely to start after 10am this morning.

Peak high tide is expected between 9:30am and 11:30am.

River levels will begin to fall with the low tide but is expected to rise again this evening with the high tide between approximately 9pm and 11pm, but river levels are not likely to cause flooding.

We urge residents to prepare, remain vigilant and avoid walking and driving through flood water.

We are closely monitoring the situation.

We will endeavour to update this message this evening, 17th April 2018 or as the situation changes.

6.57m from Gainsborough.

53.29--0.76

Location : eastbound between junctions J30 (Rothwell) and J31 (Normanton) .

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 11:00 on 20 August 2018 to 18:00 on 24 August 2018.

2.47m from Wakefield.

53.73--1.45

Location : westbound between the A1166 and the junction with the A1034 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.22m from Hull.

53.72--0.41

Location : eastbound exit slip at junction J35 (M18) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 20 August 2018 to 06:00 on 23 August 2018.

5.33m from Goole.

53.68--0.98

Location : eastbound entry slip at junction J35 (M18) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : All lanes will be closed.

4.83m from Goole.

53.68--0.97

Location : southbound between junctions J39 (Denby Dale) and J38 (Huddersfield) .

Lane Closures : Lane three will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be one of three lanes closed.

5.2m from Barnsley.

53.61--1.55

Location : northbound between junctions J37 (Barnsley) and J38 (Huddersfield) .

Lane Closures : Lane three will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be one of three lanes closed.

3.99m from Barnsley.

53.6--1.54

Location : The A1M southbound at junction J46 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 10:00 on 20 August 2018 to 16:00 on 24 August 2018.

2.11m from Wetherby.

53.95--1.37

Location : The A1M southbound between junctions J48 and J47 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 20 August 2018 to 16:00 on 24 August 2018.

3.82m from Knaresborough.

54.03--1.38

Location : southbound exit slip to the A182 .

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 12:00 on 24 August 2018.

Lanes Closed : There is one of two lanes closed.

6.65m from Sunderland.

54.82--1.37

Location : southbound entry slip from the A182 .

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 12:00 on 24 August 2018.

Lanes Closed : There is one of two lanes closed.

6.86m from Sunderland.

54.81--1.36

Location : northbound exit slip to the A182 .

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 12:00 on 24 August 2018.

Lanes Closed : There is one of two lanes closed.

7.05m from Sunderland.

54.81--1.36

Location : northbound entry slip from the A182 .

Lane Closures : Lane two is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 12:00 on 24 August 2018.

Lanes Closed : There is one of two lanes closed.

6.58m from Sunderland.

54.82--1.37

Location : westbound between the A1039 and the junction with the A169 .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 20 August 2018 to 06:00 on 8 September 2018.

Lanes Closed : There will be one of two lanes closed.

16.58m from Scarborough.

54.14--0.74

Location : The A1M northbound between junctions J48 and J49 .

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 09:00 on 20 August 2018 to 16:00 on 21 August 2018.

4.55m from Ripon.

54.1--1.41

Location : The A1M southbound exit slip at junction J42 .

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 18:00 on 24 August 2018.

Lanes Closed : There is one of two lanes closed.

5.77m from Pontefract.

53.77--1.28

Location : eastbound at junction J38 (North Cave) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.49m from Newport.

53.77--0.68

Location : westbound between junctions J21 (Milnrow) and J20 (Rochdale) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 20 August 2018 to 05:00 on 21 August 2018.

1.86m from Rochdale.

53.6--2.11

Location : westbound entry slip at junction J21 (Milnrow) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 August 2018 to 05:00 on 21 August 2018.

Lanes Closed : All lanes will be closed.

1.86m from Rochdale.

53.6--2.11

Location : westbound between junctions J22 (Ripponden) and J20 (Rochdale) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 August 2018 to 05:00 on 21 August 2018.

Lanes Closed : There will be three of four lanes closed.

2.33m from Rochdale.

53.61--2.09

Location : The A1M southbound exit slip at junction J59 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 August 2018 to 24 September 2018.

Lanes Closed : All lanes will be closed.

3.68m from Darlington.

54.59--1.56

Location : southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be three of four lanes closed.

4.31m from Rotherham.

53.46--1.45

Location : The A1M southbound entry slip at junction J49 .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be one of two lanes closed.

4.64m from Ripon.

54.16--1.42

Location : The A1M northbound exit slip at junction J49 .

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.94m from Ripon.

54.14--1.43

Location : northbound between the A1M and the junction with the A167 .

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be one of two lanes closed.

4.67m from Ripon.

54.16--1.42

Location : southbound between the A167 and the junction with the A1M .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.57m from Thirsk.

54.17--1.38

Location : southbound at junction J34 (Meadowhall) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 08:00 on 20 August 2018 to 23:00 on 21 August 2018.

2.67m from Rotherham.

53.42--1.41

Location : northbound at junction J34 (Meadowhall) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 08:00 on 20 August 2018 to 23:00 on 21 August 2018.

2.54m from Rotherham.

53.41--1.4

Location : The A1M southbound exit slip at junction J50 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 25 August 2018.

Lanes Closed : All lanes will be closed.

5.28m from Ripon.

54.19--1.46

Location : The A1M northbound between junctions J52 and J53 .

Lane Closures : Lanes 1 and 2 are closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 August 2018.

Lanes Closed : There are two of three lanes closed.

3.42m from Richmond.

54.43--1.67

Location : eastbound between junctions J3 and J4 .

Lane Closures : Lane two will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 09:30 on 20 August 2018 to 15:30 on 20 August 2018.

Lanes Closed : There will be one of two lanes closed.

2.71m from Scunthorpe.

53.55--0.63

Location : westbound between junctions J4 and J3 .

Lane Closures : Lane two will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 09:30 on 20 August 2018 to 15:30 on 20 August 2018.

Lanes Closed : There will be one of two lanes closed.

2.91m from Scunthorpe.

53.55--0.61

Location : northbound between junctions J41 (Wakefield) and J42 (Hull) For M62 East.

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:00 on 13 August 2018 to 06:00 on 14 August 2018.

2.4m from Wakefield.

53.72--1.54

Location : southbound between junctions J42 (Hull) and J40 (Wakefield) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:00 on 13 August 2018 to 06:00 on 14 August 2018.

2.98m from Wakefield.

53.74--1.51

Location : westbound entry slip at junction J9 (Burnley) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : All lanes will be closed.

2.38m from Accrington.

53.78--2.3

Location : eastbound between junctions J30 (Rothwell) and J31 (Normanton) .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 August 2018 to 01:00 on 21 August 2018.

Lanes Closed : There will be one of three lanes closed.

2.48m from Wakefield.

53.73--1.45

Location : westbound between junctions J31 (Normanton) and J30 (Rothwell) .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 August 2018 to 01:00 on 21 August 2018.

Lanes Closed : There will be one of three lanes closed.

2.94m from Wakefield.

53.71--1.41

Location : eastbound exit slip at junction J37 (Howden) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 21:40 on 15 August 2018 to 06:00 on 24 August 2018.

1.25m from Goole.

53.73--0.87

Location : southbound between junctions J32 (Doncaster) and J30 (Chesterfield) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 00:00 on 15 August 2018 to 06:00 on 23 August 2018.

4.27m from Rotherham.

53.39--1.28

Location : southbound exit slip to the A182 .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 13:00 on 17 August 2018 to 12:00 on 24 August 2018.

6.65m from Sunderland.

54.82--1.37

Location : northbound between the A182 Easington and the junction with the A182 Murton.

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:01 on 13 August 2018 to 12:00 on 24 August 2018.

7.15m from Sunderland.

54.81--1.36

Location : The A1M southbound between junctions J60 and J58 .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 06:00 on 20 August 2018 to 20:00 on 26 October 2018.

6.1m from Stockton-on-Tees.

54.65--1.51

Location : The A1M northbound between junctions J59 and J60 .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 06:00 on 20 August 2018 to 20:00 on 26 October 2018.

3.54m from Darlington.

54.58--1.56

Location : The A1M northbound entry slip at junction J50 .

Reason : Roadworks.

Status : Currently Active.

Period : from 16:38 on 13 August 2018 to 12:00 on 28 August 2018.

Lanes Closed : All lanes are closed.

5.07m from Ripon.

54.18--1.46

Location : westbound exit slip at junction .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:07 on 23 July 2018 to 06:00 on 29 November 2018.

3.23m from Dewsbury.

53.75--1.63

Location : westbound exit slip at junction .

Reason : Roadworks.

Status : Currently Active.

Period : from 06:08 on 24 July 2018 to 20:00 on 31 August 2018.

3.23m from Dewsbury.

53.75--1.63

Location : westbound exit slip at junction .

Reason : Road repairs.

Status : Currently Active.

Period : from 11:21 on 24 July 2018 to 20:00 on 31 August 2018.

Lanes Closed : There are lane closures.

3.31m from Dewsbury.

53.75--1.64

Location : westbound between junctions J38 (North Cave) and J34 (Selby) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 20 August 2018 to 15:30 on 20 August 2018.

2.57m from Newport.

53.77--0.69

Location : northbound between the A1M and the junction with the A19 .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:01 on 7 July 2018 to 18:00 on 26 April 2019.

4.67m from Ripon.

54.16--1.42

Location : westbound at junction J38 (North Cave) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 20 August 2018 to 15:30 on 20 August 2018.

2.04m from Newport.

53.77--0.67

Location : eastbound at junction J38 (North Cave) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 20 August 2018 to 15:30 on 20 August 2018.

2.49m from Newport.

53.77--0.68

Location : southbound.

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:01 on 7 July 2018 to 18:00 on 26 April 2019.

1.2m from Thirsk.

54.21--1.36

Location : northbound.

Reason : Roadworks.

Status : Currently Active.

Period : from 12:10 on 9 July 2018 to 18:00 on 26 April 2019.

1.33m from Thirsk.

54.2--1.36

Location : southbound.

Reason : Roadworks.

Status : Currently Active.

Period : from 12:10 on 9 July 2018 to 18:00 on 26 April 2019.

1.2m from Thirsk.

54.21--1.36

Location : eastbound between junctions J34 (Selby) and J38 (North Cave) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 20 August 2018 to 15:30 on 20 August 2018.

5.97m from Pontefract.

53.69--1.16

Location : northbound between the junctions with the A6178 and the A6109 .

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 4 November 2018.

Lanes Closed : All lanes are closed.

2.56m from Rotherham.

53.41--1.4

Location : The A1M southbound entry slip at junction J60 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 August 2018 to 24 September 2018.

Lanes Closed : All lanes will be closed.

6.06m from Stockton-on-Tees.

54.65--1.51

Location : The A1M southbound entry slip at junction J49 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 24 August 2018 to 06:00 on 25 August 2018.

Lanes Closed : All lanes will be closed.

4.64m from Ripon.

54.16--1.42

Location : westbound between the A1079 and the junction with the A15 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 3 September 2018 to 06:00 on 4 September 2018.

Lanes Closed : There will be one of two lanes closed.

1.66m from Hull.

53.74--0.35

Location : westbound between the A1079 and the junction with the A15 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 31 August 2018.

Lanes Closed : There will be one of two lanes closed.

1.66m from Hull.

53.74--0.35

Location : eastbound between the A15 and the junction with the A1166 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 31 August 2018.

Lanes Closed : There will be one of two lanes closed.

4.79m from Hull.

53.72--0.45

Location : eastbound between the A15 and the junction with the A1079 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 3 September 2018 to 06:00 on 4 September 2018.

Lanes Closed : There will be one of two lanes closed.

3.82m from Hull.

53.72--0.43

Location : eastbound exit slip at junction J35 (M18) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 August 2018 to 23 August 2018.

Lanes Closed : All lanes will be closed.

5.33m from Goole.

53.68--0.98

Location : eastbound entry slip at junction J35 (M18) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

4.83m from Goole.

53.68--0.97

Location : eastbound between the A659 Tadcaster West and the junction with the A1237 York South .

Lane Closures : Lane two will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

0.58m from Tadcaster.

53.88--1.25

Location : westbound between the A1036 and the junction with the A659 Tadcaster East.

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 1 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 5 September 2018.

Lanes Closed : There will be one of two lanes closed.

4.04m from York.

53.92--1.14

Location : westbound between the A1237 York South and the junction with the A659 .

Lane Closures : Lane two will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.62m from Tadcaster.

53.91--1.19

Location : westbound between the junctions with the A1237 York South and the A659 Tadcaster East.

Lane Closures : Lane two will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

4.1m from Tadcaster.

53.91--1.18

Location : eastbound between the junctions with the A659 Tadcaster East and the A1237 York South .

Lane Closures : Lane two will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.81m from Tadcaster.

53.91--1.18

Location : westbound between the junctions with the A1237 York South and the A659 Tadcaster East.

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 1 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 5 September 2018.

Lanes Closed : There will be one of two lanes closed.

3.62m from Tadcaster.

53.91--1.19

Location : eastbound between the junctions with the A659 Tadcaster East and the A1237 York South .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 1 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 5 September 2018.

Lanes Closed : There will be one of two lanes closed.

3.81m from Tadcaster.

53.91--1.18

Location : eastbound between the A659 Tadcaster East and the junction with the A1237 York South .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 1 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 5 September 2018.

Lanes Closed : There will be one of two lanes closed.

1.77m from Tadcaster.

53.89--1.23

Location : northbound between the A182 Easington and the junction with the A182 Murton.

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

7.15m from Sunderland.

54.81--1.36

Location : westbound between junctions J4 and J3 .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 09:00 on 21 August 2018 to 15:00 on 21 August 2018.

3.14m from Scunthorpe.

53.56--0.71

Location : westbound between junctions J26 (M606 Bradford) and J25 (Brighouse) .

Lane Closures : Lane three will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be one of four lanes closed.

2.97m from Brighouse.

53.73--1.73

Location : westbound at junction J26 (M606 Bradford) .

Lane Closures : Lane three will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be one of three lanes closed.

3.39m from Bradford.

53.74--1.73

Location : westbound entry slip at junction J26 (M606 Bradford) .

Lane Closures : Lane one will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.14m from Brighouse.

53.73--1.73

Location : westbound at junction J29 (M1) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.18m from Wakefield.

53.73--1.5

Location : eastbound at junction J29 (M1) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.5m from Wakefield.

53.73--1.51

Location : westbound between junctions J38 (North Cave) and J32A (A1M) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.57m from Newport.

53.77--0.69

Location : westbound between junctions J32A (A1M) and J32 (Pontefract) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

1.88m from Pontefract.

53.71--1.3

Location : westbound at junction J38 (North Cave) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.12m from Newport.

53.77--0.67

Location : westbound between junctions J28 (Leeds) and J26 (M606 Bradford) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.88m from Dewsbury.

53.73--1.57

Location : eastbound between junctions J29 (M1) and J38 (North Cave) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.21m from Wakefield.

53.73--1.5

Location : westbound between junctions J24 (Huddersfield) and J22 (Ripponden) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.45m from Huddersfield.

53.67--1.83

Location : westbound between junctions J25 (Brighouse) and J24 (Huddersfield) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

1.22m from Brighouse.

53.69--1.76

Location : eastbound between junctions J22 (Ripponden) and J25 (Brighouse) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

5.44m from Rochdale.

53.63--2.02

Location : westbound at junction J25 (Brighouse) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

1.51m from Brighouse.

53.7--1.75

Location : eastbound between junctions J26 (M606 Bradford) and J28 (Leeds) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.97m from Brighouse.

53.73--1.73

Location : westbound between junctions J32 (Pontefract) and J30 (Rothwell) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 20 August 2018 to 24 August 2018.

2.04m from Pontefract.

53.71--1.32

Location : westbound entry slip at junction J27 (M621 Leeds) .

Lane Closures : Lane one will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:30 on 23 August 2018 to 06:00 on 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.45m from Dewsbury.

53.75--1.65

Location : westbound between junctions J27 (M621 Leeds) and J26 (M606 Bradford) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:30 on 23 August 2018 to 06:00 on 24 August 2018.

Lanes Closed : There will be two of three lanes closed.

3.42m from Dewsbury.

53.75--1.64

Location : westbound between junction J1 (Farnley) and the M62 .

Lane Closures : Lane one will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:30 on 23 August 2018 to 06:00 on 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.35m from Dewsbury.

53.75--1.64

Location : The A1M southbound between junctions J62 and J60 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 August 2018 to 05:30 on 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

2.7m from Durham.

54.74--1.51

Location : The A1M northbound between junctions J60 and J62 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 August 2018 to 05:30 on 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

4.87m from Durham.

54.71--1.5

Location : southbound between the A167 and the junction with the A1M .

Lane Closures : Lane one will be closed.

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 15:00 from 20 August 2018 to 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.57m from Thirsk.

54.17--1.38

Location : northbound entry slip at junction J35 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 September 2018 to 15 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 September 2018 to 19 September 2018.

Lanes Closed : All lanes will be closed.

4.27m from Rotherham.

53.46--1.45

Location : northbound entry slip at junction J35 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 August 2018 to 1 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 5 September 2018.

Lanes Closed : All lanes will be closed.

4.27m from Rotherham.

53.46--1.45

Location : northbound between junctions J30 (Chesterfield) and J32 (Doncaster) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 1 September 2018.

Lanes Closed : All lanes will be closed.

5.98m from Rotherham.

53.36--1.29

Location : southbound between junctions J36 (Barnsley) and J34 (Meadowhall) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 5 September 2018.

Lanes Closed : There will be three of four lanes closed.

4.59m from Deepcar.

53.47--1.46

Location : southbound between junctions J36 (Barnsley) and J35 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 30 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 8 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 September 2018 to 15 September 2018.

Schedule : From 20:00 on 17 September 2018 to 06:00 on 18 September 2018.

Lanes Closed : There will be two of four lanes closed.

4.59m from Deepcar.

53.47--1.46

Location : southbound between junctions J36 (Barnsley) and J34 (Meadowhall) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 August 2018 to 1 September 2018.

Lanes Closed : There will be two of four lanes closed.

4.59m from Deepcar.

53.47--1.46

Location : southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 8 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 September 2018 to 15 September 2018.

Lanes Closed : All lanes will be closed.

2.6m from Rotherham.

53.4--1.37

Location : northbound entry slip at junction J31 (Worksop) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 1 September 2018.

Lanes Closed : All lanes will be closed.

5.56m from Rotherham.

53.36--1.28

Location : northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 September 2018 to 22 September 2018.

Lanes Closed : There will be two of four lanes closed.

2.93m from Rotherham.

53.43--1.42

Location : northbound between junctions J34 (Meadowhall) and J36 (Barnsley) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 September 2018 to 15 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 September 2018 to 19 September 2018.

Lanes Closed : There will be two of four lanes closed.

2.93m from Rotherham.

53.43--1.42

Location : southbound between junctions J33 (Sheffield) and J30 (Chesterfield) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 8 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 September 2018 to 15 September 2018.

Lanes Closed : All lanes will be closed.

2.36m from Rotherham.

53.4--1.35

Location : southbound exit slip at junction J31 (Worksop) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 8 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 September 2018 to 15 September 2018.

Lanes Closed : All lanes will be closed.

5.37m from Rotherham.

53.37--1.28

Location : northbound between the M1 southbound and junction J1 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 8 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 September 2018 to 15 September 2018.

Lanes Closed : All lanes will be closed.

3.49m from Rotherham.

53.4--1.29

Location : northbound between the M1 and junction J1 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 1 September 2018.

Lanes Closed : All lanes will be closed.

4.64m from Rotherham.

53.38--1.28

Location : southbound entry slip at junction J32 (Doncaster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 8 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 September 2018 to 15 September 2018.

Lanes Closed : All lanes will be closed.

4.18m from Rotherham.

53.4--1.27

Location : southbound between junction J1 (Rotherham) and the M1 .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 8 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 September 2018 to 15 September 2018.

Lanes Closed : All lanes will be closed.

4.14m from Rotherham.

53.4--1.26

Location : northbound exit slip at junction J35 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 September 2018 to 22 September 2018.

Lanes Closed : All lanes will be closed.

4.08m from Rotherham.

53.45--1.44

Location : northbound exit slip at junction J35 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 August 2018 to 1 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 8 September 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 September 2018 to 15 September 2018.

Schedule : From 20:00 on 17 September 2018 to 06:00 on 18 September 2018.

Lanes Closed : All lanes will be closed.

4.07m from Rotherham.

53.45--1.44

Location : southbound between junctions J30 (Chesterfield) and J29A (Markham Vale) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 28 August 2018 to 06:00 on 29 August 2018.

Lanes Closed : There will be three of four lanes closed.

4.47m from Bolsover.

53.28--1.3

Location : westbound between the junctions with the A1M and the A67 .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 06:00 on 23 August 2018 to 16:00 on 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.85m from Richmond.

54.44--1.67

Location : southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .

Lane Closures : Lane one will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be one of four lanes closed.

2.56m from Rotherham.

53.4--1.39

Location : westbound between the A1130 and the junction with the A135 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 22 August 2018 to 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

5.3m from Middlesbrough.

54.56--1.29

Location : eastbound between the A135 and the junction with the A1045 .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 22 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

4.48m from Stockton-on-Tees.

54.55--1.32

Location : northbound between junctions J3 (Doncaster) and J4 (Doncaster) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2018 to 06:00 on 24 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.5m from Doncaster.

53.49--1.07

Location : northbound between junctions J3 (Doncaster) and J4 (Doncaster) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.5m from Doncaster.

53.49--1.07

Location : The A1M northbound between junctions J61 and J62 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2018 to 05:30 on 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

2.18m from Durham.

54.75--1.52

Location : The A1M southbound between junctions J62 and J61 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2018 to 05:30 on 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

2.41m from Durham.

54.79--1.53

Location : southbound exit slip at junction J1 (M62) to M62 East.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

3.22m from Bradford.

53.74--1.73

Location : eastbound entry slip at junction J26 (M606 Bradford) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

3.28m from Bradford.

53.74--1.73

Location : eastbound at junction J27 (M621 Leeds) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

3.48m from Dewsbury.

53.75--1.65

Location : eastbound between junctions J25 (Brighouse) and J26 (M606 Bradford) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2018 to 24 August 2018.

Lanes Closed : There will be two of four lanes closed.

2.03m from Brighouse.

53.72--1.74

Location : eastbound between junctions J25 (Brighouse) and J27 (M621 Leeds) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

2.28m from Brighouse.

53.72--1.74

Location : The A1M northbound exit slip at junction J59 .

Lane Closures : Lane two is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 20:00 on 20 August 2018.

Lanes Closed : There is one of two lanes closed.

3.28m from Darlington.

54.58--1.57

Location : The A1M southbound between junctions J60 and J58 .

Lane Closures : Lane two is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 20:00 on 20 August 2018.

Lanes Closed : There is one of two lanes closed.

5.72m from Stockton-on-Tees.

54.64--1.52

Location : The A1M southbound between junctions J60 and J58 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 August 2018 to 24 September 2018.

Lanes Closed : All lanes will be closed.

6.1m from Stockton-on-Tees.

54.65--1.51

Location : The A1M northbound between junctions J59 and J60 .

Lane Closures : Lane two is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 20:00 on 20 August 2018.

Lanes Closed : There is one of two lanes closed.

3.54m from Darlington.

54.58--1.56

Location : The A1M northbound between junctions J58 and J59 .

Lane Closures : Lane two is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 20:00 on 20 August 2018.

Lanes Closed : There is one of two lanes closed.

2.78m from Darlington.

54.57--1.57

Location : westbound between junctions J26 (M606 Bradford) and J25 (Brighouse) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 22 August 2018.

Lanes Closed : There will be three of four lanes closed.

2.97m from Brighouse.

53.73--1.73

Location : westbound at junction J25 (Brighouse) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 22 August 2018.

Lanes Closed : There will be two of three lanes closed.

1.51m from Brighouse.

53.7--1.75

Location : westbound between junctions J27 (M621 Leeds) and J26 (M606 Bradford) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 22 August 2018.

Lanes Closed : There will be two of three lanes closed.

3.43m from Bradford.

53.74--1.7

Location : southbound between junctions J32 (Doncaster) and J30 (Chesterfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be two of four lanes closed.

4.62m from Rotherham.

53.38--1.28

Location : southbound at junction J32 (Doncaster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be two of three lanes closed.

4.15m from Rotherham.

53.39--1.28

Location : southbound entry slip at junction J32 (Doncaster) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

4.18m from Rotherham.

53.4--1.27

Location : northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 23 August 2018 to 06:00 on 24 August 2018.

2.68m from Rotherham.

53.42--1.41

Location : northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 August 2018 to 06:00 on 24 August 2018.

Lanes Closed : There will be three of four lanes closed.

2.73m from Rotherham.

53.43--1.41

Location : northbound at junction J34 (Meadowhall) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 August 2018 to 06:00 on 24 August 2018.

Lanes Closed : All lanes will be closed.

2.58m from Rotherham.

53.42--1.41

Location : southbound between junctions J36 (Barnsley) and J35 (Rotherham) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2018 to 06:00 on 23 August 2018.

Schedule : From 21:00 on 13 September 2018 to 06:00 on 14 September 2018.

Schedule : From 21:00 on 3 October 2018 to 06:00 on 4 October 2018.

Lanes Closed : There will be one of four lanes closed.

4.45m from Deepcar.

53.48--1.46

Location : southbound between junctions J36 (Barnsley) and J35A (Manchester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2018 to 06:00 on 23 August 2018.

Schedule : From 21:00 on 13 September 2018 to 06:00 on 14 September 2018.

Schedule : From 21:00 on 3 October 2018 to 06:00 on 4 October 2018.

Lanes Closed : There will be one of three lanes closed.

4.08m from Barnsley.

53.49--1.47

Location : northbound between junctions J35A (Manchester) and J37 (Barnsley) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 7 September 2018 to 06:00 on 8 September 2018.

Lanes Closed : There will be one of three lanes closed.

4.28m from Deepcar.

53.49--1.47

Location : northbound between junctions J35A (Manchester) and J36 (Barnsley) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2018 to 06:00 on 23 August 2018.

Schedule : From 21:00 on 13 September 2018 to 06:00 on 14 September 2018.

Schedule : From 21:00 on 3 October 2018 to 06:00 on 4 October 2018.

Lanes Closed : There will be two of three lanes closed.

4.47m from Deepcar.

53.47--1.46

Location : northbound between junctions J34 (Meadowhall) and J36 (Barnsley) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2018 to 06:00 on 23 August 2018.

Schedule : From 21:00 on 13 September 2018 to 06:00 on 14 September 2018.

Schedule : From 21:00 on 3 October 2018 to 06:00 on 4 October 2018.

Lanes Closed : There will be two of four lanes closed.

4m from Rotherham.

53.45--1.44

Location : northbound between junctions J35A (Manchester) and J37 (Barnsley) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 28 September 2018 to 06:00 on 29 September 2018.

Lanes Closed : There will be two of three lanes closed.

4.28m from Deepcar.

53.49--1.47

Location : northbound between junctions J37 (Barnsley) and J38 (Huddersfield) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 11 September 2018 to 06:00 on 12 September 2018.

Lanes Closed : There will be one of three lanes closed.

1.34m from Barnsley.

53.55--1.52

Location : southbound between junctions J38 (Huddersfield) and J37 (Barnsley) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 11 September 2018 to 06:00 on 12 September 2018.

Lanes Closed : There will be one of three lanes closed.

4.17m from Barnsley.

53.6--1.55

Location : northbound between junctions J36 (Barnsley) and J38 (Huddersfield) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 September 2018 to 06:00 on 11 September 2018.

Lanes Closed : There will be one of three lanes closed.

2.67m from Barnsley.

53.51--1.49

Location : southbound between junctions J38 (Huddersfield) and J36 (Barnsley) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 September 2018 to 06:00 on 11 September 2018.

Lanes Closed : There will be one of three lanes closed.

2.65m from Barnsley.

53.57--1.54

Location : southbound between junctions J37 (Barnsley) and J35A (Manchester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 7 September 2018 to 06:00 on 8 September 2018.

Lanes Closed : There will be one of three lanes closed.

1.59m from Barnsley.

53.53--1.49

Location : northbound between junctions J37 (Barnsley) and J39 (Denby Dale) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 6 September 2018 to 06:00 on 7 September 2018.

Lanes Closed : There will be one of three lanes closed.

4.25m from Barnsley.

53.6--1.55

Location : northbound between junctions J37 (Barnsley) and J39 (Denby Dale) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2018 to 06:00 on 24 August 2018.

Schedule : From 21:00 on 12 September 2018 to 06:00 on 13 September 2018.

Lanes Closed : There will be one of three lanes closed.

3.04m from Barnsley.

53.58--1.54

Location : southbound between junctions J37 (Barnsley) and J35A (Manchester) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 28 September 2018 to 06:00 on 29 September 2018.

Lanes Closed : There will be one of three lanes closed.

1.59m from Barnsley.

53.53--1.49

Location : southbound between junctions J39 (Denby Dale) and J38 (Huddersfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 6 September 2018 to 06:00 on 7 September 2018.

Lanes Closed : There will be two of three lanes closed.

3.64m from Wakefield.

53.65--1.53

Location : southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 6 September 2018 to 06:00 on 7 September 2018.

Lanes Closed : There will be two of four lanes closed.

3.44m from Wakefield.

53.66--1.53

Location : southbound between junctions J39 (Denby Dale) and J37 (Barnsley) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2018 to 06:00 on 24 August 2018.

Schedule : From 21:00 on 12 September 2018 to 06:00 on 13 September 2018.

Lanes Closed : There will be one of three lanes closed.

5.43m from Wakefield.

53.63--1.54

Location : westbound between junctions J38 (North Cave) and J37 (Howden) .

Lane Closures : Lane two will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 09:30 on 22 August 2018 to 15:30 on 22 August 2018.

Lanes Closed : There will be one of three lanes closed.

2.57m from Newport.

53.77--0.69

Location : westbound at junction J38 (North Cave) .

Lane Closures : Lane two will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 09:30 on 22 August 2018 to 15:30 on 22 August 2018.

Lanes Closed : There will be one of two lanes closed.

2.08m from Newport.

53.77--0.67

Location : eastbound between junctions J37 (Howden) and J38 (North Cave) .

Lane Closures : Lane two will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 09:30 on 22 August 2018 to 15:30 on 22 August 2018.

Lanes Closed : There will be one of three lanes closed.

3.03m from Newport.

53.77--0.7

Location : southbound between junctions J31 (Worksop) and J30 (Chesterfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 21 August 2018 to 06:00 on 22 August 2018.

Lanes Closed : There will be two of four lanes closed.

6.05m from Bolsover.

53.3--1.29

Location : The A1M northbound between junctions J57 and J58 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 August 2018 to 05:30 on 22 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.26m from Darlington.

54.5--1.63

Location : The A1M southbound between junctions J58 and J57 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 August 2018 to 05:30 on 22 August 2018.

Lanes Closed : There will be one of two lanes closed.

2.07m from Darlington.

54.53--1.62

Location : southbound between junctions J34 (Meadowhall) and J32 (Doncaster) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 21 August 2018 to 06:00 on 22 August 2018.

2.57m from Rotherham.

53.4--1.38

Location : southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 August 2018 to 06:00 on 22 August 2018.

Lanes Closed : There will be three of four lanes closed.

2.57m from Rotherham.

53.4--1.38

Location : southbound at junction J33 (Sheffield) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 August 2018 to 06:00 on 22 August 2018.

Lanes Closed : All lanes will be closed.

2.47m from Rotherham.

53.4--1.35

Location : southbound between junctions J33 (Sheffield) and J32 (Doncaster) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 August 2018 to 06:00 on 22 August 2018.

Lanes Closed : There will be three of four lanes closed.

2.4m from Rotherham.

53.4--1.34

Location : The A1M southbound between junctions J51 and J50 .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 20:00 on 20 August 2018.

Lanes Closed : There are two of four lanes closed.

5.28m from Catterick.

54.3--1.57

Location : The A1M southbound between junctions J52 and J51 .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 25 August 2018.

Lanes Closed : All lanes will be closed.

4.23m from Catterick.

54.32--1.57

Location : southbound exit slip at junction J45 (Leeds) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 10:00 and 15:00 from 20 August 2018 to 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

5.21m from Leeds.

53.78--1.46

Location : northbound exit slip at junction J45 (Leeds) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 10:00 and 15:00 from 20 August 2018 to 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

4.72m from Leeds.

53.77--1.48

Location : eastbound between the A19 and the junction with the A166 .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

3.06m from York.

53.95--1.02

Location : eastbound between junctions J36 (Goole) and J37 (Howden) .

Lane Closures : Lane three will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 09:30 on 21 August 2018 to 15:30 on 21 August 2018.

Lanes Closed : There will be one of three lanes closed.

0.87m from Goole.

53.72--0.89

Location : westbound between junctions J37 (Howden) and J36 (Goole) .

Lane Closures : Lane three will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 09:30 on 21 August 2018 to 15:30 on 21 August 2018.

Lanes Closed : There will be one of three lanes closed.

1.24m from Goole.

53.73--0.87

Location : westbound between junctions J37 (Howden) and J36 (Goole) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:30 on 20 August 2018 to 15:30 on 20 August 2018.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 10 September 2018 to 14 September 2018.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 17 September 2018 to 21 September 2018.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 24 September 2018 to 25 September 2018.

Lanes Closed : There will be one of three lanes closed.

1.24m from Goole.

53.73--0.87

Location : eastbound between junctions J36 (Goole) and J37 (Howden) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:30 on 20 August 2018 to 15:30 on 20 August 2018.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 10 September 2018 to 14 September 2018.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 17 September 2018 to 21 September 2018.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 24 September 2018 to 25 September 2018.

Lanes Closed : There will be one of three lanes closed.

0.87m from Goole.

53.72--0.89

Location : westbound exit slip at junction J37 (Howden) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 17 August 2018 to 06:00 on 18 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

1.29m from Goole.

53.74--0.86

Location : eastbound exit slip at junction J37 (Howden) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 17 August 2018 to 06:00 on 18 August 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

1.12m from Goole.

53.73--0.87

Location : westbound exit slip to the A19 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 7 September 2018.

Lanes Closed : All lanes will be closed.

4.01m from Middlesbrough.

54.56--1.26

Location : westbound exit slip to the A19 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 October 2018 to 13 October 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 November 2018 to 24 November 2018.

Lanes Closed : All lanes will be closed.

4.07m from Middlesbrough.

54.56--1.26

Location : westbound entry slip from the A19 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 5 September 2018.

Lanes Closed : All lanes will be closed.

4.32m from Middlesbrough.

54.56--1.27

Location : northbound at the junction with the A66 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 October 2018 to 13 October 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 November 2018 to 24 November 2018.

Lanes Closed : All lanes will be closed.

4.36m from Middlesbrough.

54.56--1.27

Location : eastbound entry slip from the A19 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 September 2018 to 5 September 2018.

Lanes Closed : All lanes will be closed.

4.32m from Middlesbrough.

54.56--1.27

Location : southbound entry slip from the A66 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 September 2018 to 7 September 2018.

Lanes Closed : All lanes will be closed.

4.11m from Middlesbrough.

54.56--1.26

Location : northbound entry slip from the A66 West.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 October 2018 to 13 October 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 November 2018 to 24 November 2018.

Lanes Closed : All lanes will be closed.

4.11m from Middlesbrough.

54.56--1.26

Location : northbound between the A66 and the junction with the A1027 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 October 2018 to 13 October 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 November 2018 to 24 November 2018.

Lanes Closed : All lanes will be closed.

4.38m from Middlesbrough.

54.56--1.27

Location : northbound.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 October 2018 to 13 October 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 November 2018 to 24 November 2018.

Lanes Closed : All lanes will be closed.

4.3m from Middlesbrough.

54.57--1.27

Location : southbound between the junctions with the A6178 and the A6178 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 4 February 2019 to 06:00 on 27 April 2019.

Lanes Closed : All lanes will be closed.

2.59m from Rotherham.

53.42--1.41