Location: westbound between junctions J9 (Fareham) and J8 (Southampton) .
Lane Closures : Lane four is closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 02:30 and 02:45 on 27 July 2024.
Normal traffic conditions are expected between 02:30 and 02:45 on 27 July 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 4.1 miles from Bitterne.
![50.88--1.28](/i/maps/50.88--1.28.jpg)
Location: westbound at junction J3 (Southampton) .
Due to: Congestion.
Normal traffic conditions are expected between 21:45 and 22:00 on 26 July 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.47 miles from Bitterne.
![50.95--1.48](/i/maps/50.95--1.48.jpg)
Location: westbound between junctions J7 (Hedge End) and J4 (M3) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2024 to 06:00 on 3 August 2024.
Nearest town: 1.69 miles from Bitterne.
![50.94--1.36](/i/maps/50.94--1.36.jpg)
Location: eastbound between junctions J10 (Winchester) and J9 (Winchester) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 10.74 miles from Bitterne.
![51.06--1.29](/i/maps/51.06--1.29.jpg)
Location: eastbound exit slip at junction J9 (Winchester) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11 miles from Bitterne.
![51.07--1.29](/i/maps/51.07--1.29.jpg)
Location: westbound between junctions J3 (Southampton) and J2 (Salisbury) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 29 July 2024.
Nearest town: 5.58 miles from Bitterne.
![50.95--1.48](/i/maps/50.95--1.48.jpg)
Location: northbound exit slip to the A272 .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.82 miles from Bitterne.
![51--0.95](/i/maps/51--0.95.jpg)
Location: northbound between the A3M and the junction with the A272 Petersfield North.
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.23 miles from Bitterne.
![50.99--0.96](/i/maps/50.99--0.96.jpg)
Location: northbound entry slip from the A272 .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.86 miles from Bitterne.
![51.01--0.95](/i/maps/51.01--0.95.jpg)
Location: southbound exit slip to the A303 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.96 miles from Bitterne.
![51.17--1.34](/i/maps/51.17--1.34.jpg)
Location: westbound between junctions J3 (Southampton) and J2 (Salisbury) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 5.43 miles from Bitterne.
![50.95--1.48](/i/maps/50.95--1.48.jpg)
Location: westbound between junctions J3 (Southampton) and J2 (Salisbury) .
Due to: Roadworks scheme.
Period : from 23:00 on 26 July 2024 to 06:00 on 27 July 2024.
Nearest town: 5.43 miles from Bitterne.
![50.95--1.48](/i/maps/50.95--1.48.jpg)
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 1.88 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound between junctions J7 (Hedge End) and J5 (S'ton Airport) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 1.88 miles from Bitterne.
![50.92--1.32](/i/maps/50.92--1.32.jpg)
Location: westbound between junctions J9 (Fareham) and J4 (M3) .
Due to: Roadworks scheme.
Period : from 20:05 on 19 July 2024 to 06:00 on 31 July 2024.
Nearest town: 4.3 miles from Bitterne.
![50.88--1.28](/i/maps/50.88--1.28.jpg)
Location: westbound between junctions J11 (Fareham C) and J9 (Fareham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Schedule : From 20:00 on 14 August 2024 to 06:00 on 15 August 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.29 miles from Bitterne.
![50.86--1.17](/i/maps/50.86--1.17.jpg)
Location: westbound at junction J11 (Fareham C) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Schedule : From 20:00 on 14 August 2024 to 06:00 on 15 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.64 miles from Bitterne.
![50.86--1.16](/i/maps/50.86--1.16.jpg)
Location: northbound between the A272 and the junction with the A343 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.17 miles from Bitterne.
![51.16--1.34](/i/maps/51.16--1.34.jpg)
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2024 to 06:00 on 28 July 2024.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 1.69 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound between junctions J7 (Hedge End) and J5 (S'ton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2024 to 06:00 on 28 July 2024.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 1.69 miles from Bitterne.
![50.94--1.36](/i/maps/50.94--1.36.jpg)
Location: westbound at junction J4 (M3) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2024 to 06:00 on 28 July 2024.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 2.66 miles from Bitterne.
![50.95--1.39](/i/maps/50.95--1.39.jpg)
Location: eastbound entry slip at junction J14 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 July 2024 to 06:00 on 28 July 2024.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 3.24 miles from Bitterne.
![50.95--1.4](/i/maps/50.95--1.4.jpg)
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 July 2024 to 06:00 on 28 July 2024.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 2.42 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound entry slip at junction J5 (S'ton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 July 2024 to 06:00 on 28 July 2024.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 2.42 miles from Bitterne.
![50.95--1.37](/i/maps/50.95--1.37.jpg)
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2024 to 06:00 on 28 July 2024.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.29 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound at junction J5 (S'ton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2024 to 06:00 on 28 July 2024.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.29 miles from Bitterne.
![50.95--1.37](/i/maps/50.95--1.37.jpg)
Location: southbound at junction J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 August 2024 to 06:00 on 23 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.11 miles from Bitterne.
![50.94--1.47](/i/maps/50.94--1.47.jpg)
Location: northbound at junction J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.99 miles from Bitterne.
![50.93--1.47](/i/maps/50.93--1.47.jpg)
Location: southbound between junctions J3 and J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 August 2024 to 06:00 on 23 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.4 miles from Bitterne.
![50.95--1.48](/i/maps/50.95--1.48.jpg)
Location: northbound between the A272 and the junction with the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.79 miles from Bitterne.
![51.13--1.35](/i/maps/51.13--1.35.jpg)
Location: southbound between the A303 and the junction with the A272 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.53 miles from Bitterne.
![51.17--1.34](/i/maps/51.17--1.34.jpg)
Location: eastbound exit slip at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.7 miles from Bitterne.
![50.95--1.48](/i/maps/50.95--1.48.jpg)
Location: eastbound between junctions J2 (Salisbury) and J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.16 miles from Bitterne.
![50.95--1.49](/i/maps/50.95--1.49.jpg)
Location: westbound between the M27 and the junction with the A338 North.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.77 miles from Bitterne.
![50.87--1.69](/i/maps/50.87--1.69.jpg)
Location: eastbound at junction J12 (Cosham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 August 2024 to 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.27 miles from Bitterne.
![50.84--1.08](/i/maps/50.84--1.08.jpg)
Location: southbound between the A303 and the junction with the A33 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.28 miles from Bitterne.
![51.12--1.34](/i/maps/51.12--1.34.jpg)
Location: eastbound at junction J12 (Cosham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 3 August 2024.
Nearest town: 13.27 miles from Bitterne.
![50.84--1.08](/i/maps/50.84--1.08.jpg)
Location: eastbound at junction J12 (Cosham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 August 2024 to 3 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.51 miles from Bitterne.
![50.84--1.08](/i/maps/50.84--1.08.jpg)
Location: northbound between the junctions with the A272 and the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.77 miles from Bitterne.
![51.11--1.34](/i/maps/51.11--1.34.jpg)
Location: southbound between the A303 and the junction with the A33 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.27 miles from Bitterne.
![51.12--1.34](/i/maps/51.12--1.34.jpg)
Location: northbound between the A33 and the junction with the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.5 miles from Bitterne.
![51.09--1.31](/i/maps/51.09--1.31.jpg)
Location: northbound between the A272 and the junction with the A303 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Nearest town: 17.28 miles from Bitterne.
![51.16--1.34](/i/maps/51.16--1.34.jpg)
Location: northbound exit slip to the A303 westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.85 miles from Bitterne.
![51.17--1.34](/i/maps/51.17--1.34.jpg)
Location: northbound entry slip from the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.07 miles from Bitterne.
![51.18--1.34](/i/maps/51.18--1.34.jpg)
Location: northbound entry slip from the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.08 miles from Bitterne.
![51.18--1.34](/i/maps/51.18--1.34.jpg)
Location: northbound between the A272 and the junction with the A343 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.28 miles from Bitterne.
![51.16--1.34](/i/maps/51.16--1.34.jpg)
Location: eastbound between junctions J13 (Eastleigh) and J12 (Eastleigh) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 05:00 on 31 July 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.99 miles from Bitterne.
![50.99--1.36](/i/maps/50.99--1.36.jpg)
Location: northbound exit slip to the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.04 miles from Bitterne.
![51.18--1.34](/i/maps/51.18--1.34.jpg)
Location: eastbound between the A3M and the junction with the A259 Chichester West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 August 2024 to 06:00 on 13 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2024 to 16 August 2024.
Schedule : From 21:00 on 9 September 2024 to 06:00 on 10 September 2024.
Schedule : From 21:00 on 12 September 2024 to 06:00 on 13 September 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.66 miles from Bitterne.
![50.85--0.99](/i/maps/50.85--0.99.jpg)
Location: eastbound entry slip from the A3023 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 August 2024 to 06:00 on 13 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2024 to 16 August 2024.
Schedule : From 21:00 on 9 September 2024 to 06:00 on 10 September 2024.
Schedule : From 21:00 on 12 September 2024 to 06:00 on 13 September 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.09 miles from Bitterne.
![50.85--0.98](/i/maps/50.85--0.98.jpg)
Location: westbound between the A259 Chichester West and the junction with the A259 Havant.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 August 2024 to 17 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 August 2024 to 23 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 August 2024 to 31 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 September 2024 to 7 September 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.07 miles from Bitterne.
![50.85--0.96](/i/maps/50.85--0.96.jpg)
Location: westbound exit slip to the A3023 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 August 2024 to 17 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 August 2024 to 23 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 August 2024 to 31 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 September 2024 to 7 September 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.34 miles from Bitterne.
![50.85--0.98](/i/maps/50.85--0.98.jpg)
Location: westbound between the A259 Havant and the junction with the A3023 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 August 2024 to 06:00 on 13 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.95 miles from Bitterne.
![50.85--0.96](/i/maps/50.85--0.96.jpg)
Location: eastbound exit slip to the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 August 2024 to 06:00 on 13 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2024 to 16 August 2024.
Schedule : From 21:00 on 9 September 2024 to 06:00 on 10 September 2024.
Schedule : From 21:00 on 12 September 2024 to 06:00 on 13 September 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.7 miles from Bitterne.
![50.85--0.97](/i/maps/50.85--0.97.jpg)
Location: westbound between the A259 and the junction with the A3M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 August 2024 to 17 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 August 2024 to 23 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 August 2024 to 31 August 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 September 2024 to 7 September 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.9 miles from Bitterne.
![50.85--0.96](/i/maps/50.85--0.96.jpg)
Location: westbound between junctions J12 (Eastleigh) and J13 (Eastleigh) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 05:00 on 30 July 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.98 miles from Bitterne.
![50.99--1.36](/i/maps/50.99--1.36.jpg)
Location: The A3M southbound at junction J5 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 05:00 on 30 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.85 miles from Bitterne.
![50.85--1.01](/i/maps/50.85--1.01.jpg)
Location: westbound at the junction with the A34 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Nearest town: 17.98 miles from Bitterne.
![51.17--1.34](/i/maps/51.17--1.34.jpg)
Location: westbound between the M3 and the junction with the A34 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.27 miles from Bitterne.
![51.18--1.32](/i/maps/51.18--1.32.jpg)
Location: westbound entry slip from the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.98 miles from Bitterne.
![51.17--1.34](/i/maps/51.17--1.34.jpg)
Location: westbound exit slip to the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.03 miles from Bitterne.
![51.18--1.33](/i/maps/51.18--1.33.jpg)
Location: northbound between junctions A35 and J1 (Lordshill) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 31 July 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.77 miles from Bitterne.
![50.92--1.47](/i/maps/50.92--1.47.jpg)
Location: southbound between junctions J3 and J1 (Lordshill) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.4 miles from Bitterne.
![50.95--1.48](/i/maps/50.95--1.48.jpg)
Location: eastbound exit slip at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.7 miles from Bitterne.
![50.95--1.48](/i/maps/50.95--1.48.jpg)
Location: westbound exit slip at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.3 miles from Bitterne.
![50.95--1.47](/i/maps/50.95--1.47.jpg)
Location: eastbound between junctions J2 (Salisbury) and J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 31 July 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.16 miles from Bitterne.
![50.95--1.49](/i/maps/50.95--1.49.jpg)
Location: northbound between junctions J1 (Lordshill) and M27 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.99 miles from Bitterne.
![50.93--1.47](/i/maps/50.93--1.47.jpg)
Location: southbound between junctions J1 (Lordshill) and A35 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 31 July 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.96 miles from Bitterne.
![50.93--1.47](/i/maps/50.93--1.47.jpg)
Location: northbound exit slip to the A33 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.95 miles from Bitterne.
![51.08--1.3](/i/maps/51.08--1.3.jpg)
Location: northbound between the M3 and the junction with the A303 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Nearest town: 11.23 miles from Bitterne.
![51.07--1.29](/i/maps/51.07--1.29.jpg)
Location: northbound between the M3 and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.23 miles from Bitterne.
![51.07--1.29](/i/maps/51.07--1.29.jpg)
Location: northbound exit slip to the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.83 miles from Bitterne.
![51.1--1.34](/i/maps/51.1--1.34.jpg)
Location: slip road to the M3 eastbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 July 2024 to 06:00 on 29 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.01 miles from Bitterne.
![50.96--1.42](/i/maps/50.96--1.42.jpg)
Location: eastbound at junction J14 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 July 2024 to 06:00 on 29 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 3.24 miles from Bitterne.
![50.95--1.4](/i/maps/50.95--1.4.jpg)
Location: southbound at junction J1 (Lordshill) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 22 August 2024 to 06:00 on 23 August 2024.
Nearest town: 5.11 miles from Bitterne.
![50.94--1.47](/i/maps/50.94--1.47.jpg)
Location: eastbound between junctions J12 (Eastleigh) and J11 (Winchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 August 2024 to 06:00 on 7 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.38 miles from Bitterne.
![51.01--1.35](/i/maps/51.01--1.35.jpg)
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2024 to 31 July 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 1.65 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound between junctions J7 (Hedge End) and J5 (S'ton Airport) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2024 to 31 July 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 1.65 miles from Bitterne.
![50.94--1.34](/i/maps/50.94--1.34.jpg)
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2024 to 31 July 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 2.52 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2024 to 31 July 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 2.52 miles from Bitterne.
![50.95--1.38](/i/maps/50.95--1.38.jpg)
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2024 to 31 July 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.29 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound at junction J5 (S'ton Airport) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2024 to 31 July 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.29 miles from Bitterne.
![50.95--1.37](/i/maps/50.95--1.37.jpg)
Location: eastbound between the A3M and the junction with the A259 Chichester West.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 12 August 2024 to 06:00 on 27 September 2024.
Nearest town: 16.66 miles from Bitterne.
![50.85--0.99](/i/maps/50.85--0.99.jpg)
Location: westbound exit slip to the A3023 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 12 August 2024 to 06:00 on 20 September 2024.
Nearest town: 17.07 miles from Bitterne.
![50.85--0.98](/i/maps/50.85--0.98.jpg)
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 31 October 2024 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.06 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 31 October 2024 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.06 miles from Bitterne.
![50.89--1.3](/i/maps/50.89--1.3.jpg)
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 31 October 2024 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.52 miles from Bitterne.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 31 October 2024 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.52 miles from Bitterne.
![50.95--1.38](/i/maps/50.95--1.38.jpg)
Location: eastbound exit slip at junction J12 (Cosham) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 16 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.54 miles from Bitterne.
![50.84--1.1](/i/maps/50.84--1.1.jpg)
Location: westbound between junctions J9 (Fareham) and J4 (M3) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 06:00 on 31 October 2024 to 06:00 on 20 March 2026.
Nearest town: 3.06 miles from Bitterne.
![50.89--1.3](/i/maps/50.89--1.3.jpg)
Location: southbound between junctions M27 and J1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 August 2024 to 17 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 October 2024 to 19 October 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2024 to 14 December 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.27 miles from Bitterne.
![50.83--1.09](/i/maps/50.83--1.09.jpg)
Location: westbound exit slip to the A2030 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 August 2024 to 05:00 on 13 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.18 miles from Bitterne.
![50.84--1.04](/i/maps/50.84--1.04.jpg)
Location: westbound between the A338 South and the junction with the A348 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 10 September 2024.
Nearest town: 19.92 miles from Bitterne.
![50.84--1.8](/i/maps/50.84--1.8.jpg)