Traffic Winchester

SLIGHT
SEVERE
FULL SCREEN UPDATED: 13:50 READ ALOUD
×
×

Current traffic in Winchester

CONGESTIONLocation : The M3 eastbound between the M27 eastbound and junction J13 (Eastleigh) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:00 and 14:15 on 20 Aug 2018.
Delay : There are currently delays of 10 minutes against expected traffic.
Earlier Reason : Caused by an earlier accident.

7.7 miles from Winchester.

CONGESTIONLocation : The M27 westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:30 and 13:45 on 20 Aug 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

7.95 miles from Winchester.

CONGESTIONLocation : The M27 eastbound between junctions J3 (Southampton) and J4 (M3) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 20 Aug 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

9.25 miles from Winchester.

CONGESTIONLocation : The M3 eastbound between the M27 eastbound and junction J13 (Eastleigh) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:30 and 13:45 on 20 Aug 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

7.77 miles from Winchester.

ACCIDENTLocation : The M3 eastbound between junctions M27 and J13 (Eastleigh) .
Reason : Road traffic collision.
Status : Cleared.

7.16 miles from Winchester.

CONGESTIONCLEARED @ 13:29Location : The M3 westbound exit slip at junction J9 (Winchester) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:15 and 13:30 on 20 Aug 2018.

1.51 miles from Winchester. CLEARED @ 13:29

CONGESTIONCLEARED @ 10:58Location : The M3 westbound exit slip at junction J9 (Winchester) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 10:45 and 11:00 on 20 Aug 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

1.51 miles from Winchester. CLEARED @ 10:58

Roadworks

ROAD WORKSLocation : westbound between junctions J7 (Hedge End) and J5 (S'ton Airport) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 17:00 on 20 Aug 2018.

9.12 miles from Winchester.

ROAD WORKSLocation : eastbound between junctions J5 (S'ton Airport) and J9 (Fareham) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 20 Aug 2018 to 06:00 on 21 Aug 2018.

9.02 miles from Winchester.

ROAD WORKSLocation : eastbound between junctions J7 (Hedge End) and J8 (Southampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 20 Aug 2018 to 06:00 on 21 Aug 2018.

Lanes Closed : There will be two of four lanes closed.

9.99 miles from Winchester.

ROAD WORKSLocation : eastbound between junctions J5 (S'ton Airport) and J7 (Hedge End) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 20 Aug 2018 to 06:00 on 21 Aug 2018.

Lanes Closed : There will be two of three lanes closed.

9.02 miles from Winchester.

ROAD WORKSLocation : westbound between junctions J7 (Hedge End) and J5 (S'ton Airport) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 Aug 2018 to 06:00 on 21 Aug 2018.

Lanes Closed : There will be two of three lanes closed.

9.97 miles from Winchester.

ROAD WORKSLocation : westbound between junctions J4 (M3) and J3 (Southampton) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 23 Aug 2018 to 06:00 on 24 Aug 2018.

Schedule : From 22:00 on 24 Sep 2018 to 06:00 on 25 Sep 2018.

Lanes Closed : There will be two of four lanes closed.

8.76 miles from Winchester.

ROAD WORKSLocation : westbound exit slip at junction J14 (Southampton) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:54 on 13 Aug 2018 to 06:00 on 24 Aug 2018.

6.4 miles from Winchester.

ROAD WORKSLocation : slip road to the M27 westbound .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 15 Aug 2018 to 06:00 on 16 Aug 2018.

Schedule : From 21:00 on 20 Aug 2018 to 06:00 on 21 Aug 2018.

Lanes Closed : All lanes will be closed.

7.41 miles from Winchester.


Traffic in Nearby Villages

Get a more detailed and granular view of traffic incidents by viewing one of the other local towns and villages nearby.

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways EnglandHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location : eastbound between junctions M27 and J13 (Eastleigh) .

Reason : Road traffic collision.

Status : Cleared.

7.16 miles from Winchester.

50.96--1.39

Location : eastbound between the M27 eastbound and junction J13 (Eastleigh) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:30 and 13:45 on 20 August 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

7.77 miles from Winchester.

50.96--1.4

Location : eastbound between junctions J3 (Southampton) and J4 (M3) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 20 August 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

9.25 miles from Winchester.

50.96--1.45

Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:30 and 13:45 on 20 August 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

7.95 miles from Winchester.

' data-nearesttown='WEST END'>Location : westbound between junctions J5 (S'ton Airport) and J4 (M3) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:30 and 13:45 on 20 August 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

7.95 miles from Winchester.

50.95--1.37

CLEARED @ 13:29Location : westbound exit slip at junction J9 (Winchester) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:15 and 13:30 on 20 August 2018.

1.51 miles from Winchester.

51.07--1.29

Location : eastbound between the M27 eastbound and junction J13 (Eastleigh) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:00 and 14:15 on 20 August 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

Earlier Reason : Caused by an earlier accident.

7.7 miles from Winchester.

50.96--1.4

CLEARED @ 10:58Location : westbound exit slip at junction J9 (Winchester) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 10:45 and 11:00 on 20 August 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

1.51 miles from Winchester.

51.07--1.29

Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 17:00 on 20 August 2018.

9.12 miles from Winchester.

' data-nearesttown='WEST END'>Location : westbound between junctions J7 (Hedge End) and J5 (S'ton Airport) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 17:00 on 20 August 2018.

9.12 miles from Winchester.

50.93--1.32

Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 20 August 2018 to 06:00 on 21 August 2018.

9.02 miles from Winchester.

' data-nearesttown='WEST END'>Location : eastbound between junctions J5 (S'ton Airport) and J9 (Fareham) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 20 August 2018 to 06:00 on 21 August 2018.

9.02 miles from Winchester.

50.93--1.32

Location : eastbound between junctions J7 (Hedge End) and J8 (Southampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be two of four lanes closed.

9.99 miles from Winchester.

50.91--1.32

Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 August 2018 to 06:00 on 21 August 2018.
Lanes Closed : There will be two of three lanes closed.

9.02 miles from Winchester.

' data-nearesttown='WEST END'>Location : eastbound between junctions J5 (S'ton Airport) and J7 (Hedge End) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be two of three lanes closed.

9.02 miles from Winchester.

50.93--1.32

Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 August 2018 to 06:00 on 21 August 2018.
Lanes Closed : There will be two of three lanes closed.

9.97 miles from Winchester.

' data-nearesttown='WEST END'>Location : westbound between junctions J7 (Hedge End) and J5 (S'ton Airport) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : There will be two of three lanes closed.

9.97 miles from Winchester.

50.91--1.32

Location : westbound between junctions J4 (M3) and J3 (Southampton) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 23 August 2018 to 06:00 on 24 August 2018.

Schedule : From 22:00 on 24 September 2018 to 06:00 on 25 September 2018.

Lanes Closed : There will be two of four lanes closed.

8.76 miles from Winchester.

50.96--1.44

Location : westbound exit slip at junction J14 (Southampton) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:54 on 13 August 2018 to 06:00 on 24 August 2018.

6.4 miles from Winchester.

50.97--1.37

Location : slip road to the M27 westbound .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 15 August 2018 to 06:00 on 16 August 2018.

Schedule : From 21:00 on 20 August 2018 to 06:00 on 21 August 2018.

Lanes Closed : All lanes will be closed.

7.41 miles from Winchester.

50.96--1.39

Location : westbound between junctions J4 (M3) and J3 (Southampton) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 05:01 on 13 August 2018 to 06:00 on 25 September 2018.

8.19 miles from Winchester.

50.96--1.42

Location : westbound between junctions J9 (Winchester) and J10 (Winchester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 September 2018 to 06:00 on 11 September 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 8 October 2018 to 13 October 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 October 2018 to 20 October 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 22 October 2018 to 27 October 2018.

Lanes Closed : There will be one of three lanes closed.

1.26 miles from Winchester.

51.07--1.29

Location : westbound exit slip at junction J9 (Winchester) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 10 September 2018 to 06:00 on 10 November 2018.

1.56 miles from Winchester.

51.08--1.29

Location : westbound exit slip at junction J9 (Winchester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 September 2018 to 06:00 on 11 September 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 8 October 2018 to 13 October 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 October 2018 to 20 October 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 22 October 2018 to 27 October 2018.

Lanes Closed : There will be one of two lanes closed.

1.56 miles from Winchester.

51.08--1.29

Location : westbound between junctions J8 (Andover) and J9 (Winchester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 September 2018 to 06:00 on 11 September 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 8 October 2018 to 13 October 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 October 2018 to 20 October 2018.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 22 October 2018 to 27 October 2018.

Lanes Closed : There will be one of two lanes closed.

4.07 miles from Winchester.

51.11--1.27

Location : westbound at junction J4 (M3) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:30 on 21 December 2018 to 06:00 on 22 December 2018.

Lanes Closed : There will be one of two lanes closed.

8.26 miles from Winchester.

50.95--1.4

Location : eastbound between the M27 eastbound and junction J13 (Eastleigh) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:30 on 21 December 2018 to 06:00 on 22 December 2018.

8.29 miles from Winchester.

50.95--1.39

Location : eastbound between junctions M27 and J13 (Eastleigh) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:30 on 21 December 2018 to 06:00 on 22 December 2018.

Lanes Closed : There will be one of three lanes closed.

7.33 miles from Winchester.

50.96--1.39

Location : eastbound between the M27 eastbound and junction J14 (Southampton) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:30 on 21 December 2018 to 06:00 on 22 December 2018.

Lanes Closed : There will be one of two lanes closed.

8.29 miles from Winchester.

50.95--1.39

Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:30 on 21 December 2018 to 06:00 on 22 December 2018.

8.23 miles from Winchester.

' data-nearesttown='WEST END'>Location : westbound between junctions J5 (S'ton Airport) and J4 (M3) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:30 on 21 December 2018 to 06:00 on 22 December 2018.

8.23 miles from Winchester.

50.95--1.39

Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 21 December 2018 to 06:00 on 22 December 2018.
Lanes Closed : There will be one of three lanes closed.

8.23 miles from Winchester.

' data-nearesttown='WEST END'>Location : westbound between junctions J5 (S'ton Airport) and J4 (M3) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:30 on 21 December 2018 to 06:00 on 22 December 2018.

Lanes Closed : There will be one of three lanes closed.

8.23 miles from Winchester.

50.95--1.39

Location : westbound between junction J14 (Southampton) and the M27 .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 6 November 2018 to 8 November 2018.

Lanes Closed : There will be one of two lanes closed.

7.32 miles from Winchester.

50.96--1.39

Lane Closures : Lane one will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 6 November 2018 to 8 November 2018.
Lanes Closed : There will be one of three lanes closed.

8.29 miles from Winchester.

' data-nearesttown='SOUTHAMPTON'>Location : eastbound between junctions J4 (M3) and J5 (S'ton Airport) .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 6 November 2018 to 8 November 2018.

Lanes Closed : There will be one of three lanes closed.

8.29 miles from Winchester.

50.95--1.39

Location : westbound at junction J7 (Hedge End) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 5 December 2018 to 7 December 2018.

Lanes Closed : There will be two of three lanes closed.

9.97 miles from Winchester.

50.91--1.32

Location : slip road to the M27 eastbound .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:30 on 14 November 2018 to 06:00 on 15 November 2018.

Lanes Closed : There will be one of two lanes closed.

7.69 miles from Winchester.

50.96--1.4

Location : westbound at junction J4 (M3) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 21 August 2018 to 22 August 2018.

8.29 miles from Winchester.

50.95--1.39

Location : westbound between junctions J7 (Hedge End) and J4 (M3) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 21 August 2018 to 22 August 2018.

8.23 miles from Winchester.

50.94--1.36

Location : eastbound between junctions J4 (M3) and J7 (Hedge End) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 21 August 2018 to 23 August 2018.

Schedule : From 09:00 on 28 August 2018 to 06:00 on 26 September 2018.

8.29 miles from Winchester.

50.95--1.4

Location : eastbound between junctions J7 (Hedge End) and J8 (Southampton) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 21 August 2018 to 23 August 2018.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 28 August 2018 to 31 August 2018.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 3 September 2018 to 7 September 2018.

9.99 miles from Winchester.

50.91--1.32

Location : eastbound at junction J7 (Hedge End) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 21 August 2018 to 23 August 2018.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 28 August 2018 to 31 August 2018.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 3 September 2018 to 7 September 2018.

9.91 miles from Winchester.

50.91--1.32

Location : eastbound between junctions J4 (M3) and J7 (Hedge End) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 09:00 on 21 August 2018 to 06:00 on 26 September 2018.

8.23 miles from Winchester.

50.95--1.41

Location : eastbound at junction J4 (M3) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 21 August 2018 to 23 August 2018.

Schedule : From 09:00 on 28 August 2018 to 06:00 on 26 September 2018.

8.23 miles from Winchester.

50.95--1.41

Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 09:00 on 30 August 2018 to 17:00 on 30 August 2018.

9.09 miles from Winchester.

' data-nearesttown='WEST END'>Location : eastbound between junctions J5 (S'ton Airport) and J8 (Southampton) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 09:00 on 30 August 2018 to 17:00 on 30 August 2018.

9.09 miles from Winchester.

50.93--1.32

Location : eastbound between junctions J7 (Hedge End) and J8 (Southampton) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 30 August 2018 to 17:00 on 30 August 2018.

9.99 miles from Winchester.

50.91--1.32

Reason : Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 30 August 2018 to 17:00 on 30 August 2018.

9.09 miles from Winchester.

' data-nearesttown='WEST END'>Location : eastbound between junctions J5 (S'ton Airport) and J7 (Hedge End) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 30 August 2018 to 17:00 on 30 August 2018.

9.09 miles from Winchester.

50.93--1.32

Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 17:00 on 20 August 2018.

8.22 miles from Winchester.

' data-nearesttown='WEST END'>Location : eastbound between junctions J5 (S'ton Airport) and J7 (Hedge End) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 17:00 on 20 August 2018.

8.22 miles from Winchester.

50.94--1.36

Location : northbound exit slip to the A303 .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : All lanes will be closed.

8.16 miles from Winchester.

51.18--1.34

Location : northbound between the A272 and the junction with the A343 .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2018 to 06:00 on 23 August 2018.

Lanes Closed : There will be one of two lanes closed.

7.33 miles from Winchester.

51.16--1.34

Location : westbound between junctions J7 (Hedge End) and J4 (M3) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 09:00 on 21 August 2018 to 17:00 on 22 August 2018.

8.23 miles from Winchester.

50.94--1.36

Location : westbound between junctions J7 (Hedge End) and J4 (M3) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 21 August 2018 to 17:00 on 21 August 2018.

8.55 miles from Winchester.

50.94--1.34

Location : slip road to the M27 westbound .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

7.41 miles from Winchester.

50.96--1.39

Location : slip road to the M27 eastbound .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

7.47 miles from Winchester.

50.96--1.39

Location : westbound exit slip at junction J13 (Eastleigh) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

6.46 miles from Winchester.

50.97--1.38

Location : westbound exit slip at junction J14 (Southampton) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 August 2018 to 24 August 2018.

Lanes Closed : All lanes will be closed.

6.4 miles from Winchester.

50.97--1.37

Location : eastbound between junctions J3 (Southampton) and J4 (M3) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 24 September 2018 to 06:00 on 25 September 2018.

Lanes Closed : There will be two of four lanes closed.

9.68 miles from Winchester.

50.95--1.46

Location : westbound between junctions J4 (M3) and J3 (Southampton) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 24 September 2018 to 06:00 on 25 September 2018.

Lanes Closed : There will be one of four lanes closed.

8.3 miles from Winchester.

50.96--1.43

Location : westbound at junction J4 (M3) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 24 September 2018 to 06:00 on 25 September 2018.

Lanes Closed : There will be one of two lanes closed.

8.2 miles from Winchester.

50.96--1.42

Location : eastbound between junctions J7 (Hedge End) and J9 (Fareham) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 09:00 on 21 August 2018 to 17:00 on 7 September 2018.

9.91 miles from Winchester.

50.91--1.32