Location: westbound between the A2038 and the junction with the A293 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.16 miles from Ovingdean.

Location: eastbound between the A293 and the junction with the A2038 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.24 miles from Ovingdean.

Location: westbound between the junctions with the A280 and the A284 Arundel East.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 05:00 on 12 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.18 miles from Ovingdean.

Location: eastbound between the junctions with the A22 Polegate West and the A22 Polegate East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.6 miles from Ovingdean.

Location: westbound between the junctions with the A259 and the A22 Polegate East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 2 July 2025.
Nearest town: 15.93 miles from Ovingdean.

Location: eastbound between the junctions with the A22 Polegate East and the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 2 July 2025.
Nearest town: 15.77 miles from Ovingdean.

Location: westbound between the junctions with the A22 Polegate East and the A22 Polegate West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.73 miles from Ovingdean.

Location: westbound between the junctions with the A2025 and the A24 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 12.35 miles from Ovingdean.

Location: westbound between the A2025 and the junction with the A24 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.11 miles from Ovingdean.

Location: westbound between the A2025 and the junction with the A24 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 10.31 miles from Ovingdean.

Location: eastbound between the A2025 and the junction with the A283 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 10.29 miles from Ovingdean.

Location: eastbound between the junctions with the A24 South and the A2025 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 12.79 miles from Ovingdean.

Location: eastbound between the junctions with the A24 South and the A2025 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 12.42 miles from Ovingdean.

Location: westbound at the junction with the A2025 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 10.29 miles from Ovingdean.

Location: westbound between the A2025 and the junction with the A24 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 12.37 miles from Ovingdean.

Location: eastbound between the A24 South and the junction with the A2025 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 12.35 miles from Ovingdean.

Location: eastbound between the junctions with the A24 South and the A2025 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Nearest town: 10.67 miles from Ovingdean.

Location: westbound between the A283 and the junction with the A2025 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.7 miles from Ovingdean.

Location: northbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 09:00 on 17 June 2025 to 16:00 on 17 June 2025.
Nearest town: 15.2 miles from Ovingdean.

Location: southbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 09:00 on 17 June 2025 to 16:00 on 17 June 2025.
Nearest town: 15.26 miles from Ovingdean.

Location: eastbound between the junctions with the A270 Brighton West and the A293 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.93 miles from Ovingdean.

Location: westbound between the junctions with the A293 and the A270 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.61 miles from Ovingdean.

Location: eastbound between the junctions with the A283 and the A293 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.78 miles from Ovingdean.

Location: westbound between the junctions with the A293 and the A283 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.85 miles from Ovingdean.

Location: eastbound between the A2025 and the junction with the A283 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.42 miles from Ovingdean.

Location: westbound between the A283 and the junction with the A2025 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.03 miles from Ovingdean.

Location: eastbound between the junctions with the A270 Brighton West and the A293 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.89 miles from Ovingdean.

Location: eastbound between the junctions with the A293 and the A2038 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.01 miles from Ovingdean.

Location: westbound between the junctions with the A26 North and the A277 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.31 miles from Ovingdean.

Location: westbound between the junctions with the A24 South and the A24 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 9 June 2025 to 18:00 on 11 June 2025.
Nearest town: 13.3 miles from Ovingdean.

Location: eastbound between the junctions with the A24 North and the A24 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 9 June 2025 to 18:00 on 11 June 2025.
Nearest town: 13.33 miles from Ovingdean.

Location: westbound entry slip from the A23 .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.97 miles from Ovingdean.

Location: northbound at the junction with the A27 .
Lane Closures : Lane two will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.01 miles from Ovingdean.

Location: eastbound exit slip to the A23 .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.09 miles from Ovingdean.

Location: northbound at the junction with the A27 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.01 miles from Ovingdean.

Location: northbound between the junctions with the A27 and the A273 .
Lane Closures : Lane two will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.34 miles from Ovingdean.

Location: northbound between the junctions with the A27 and the A273 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.34 miles from Ovingdean.

Location: westbound between the junctions with the A2270 and the A26 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Nearest town: 11.83 miles from Ovingdean.

Location: eastbound between the junctions with the A26 South and the A2270 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Nearest town: 11.68 miles from Ovingdean.

Location: southbound between the A27 and the junction with the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Nearest town: 6.12 miles from Ovingdean.

Location: northbound between the A259 and the junction with the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Nearest town: 6.08 miles from Ovingdean.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.76 miles from Ovingdean.

Location: northbound between the junctions with the A272 and the M23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 13 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.47 miles from Ovingdean.

Location: westbound between the A24 North and the junction with the A284 Arundel West.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 16 August 2025.
Nearest town: 15.86 miles from Ovingdean.

Location: westbound entry slip from the A280 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.11 miles from Ovingdean.

Location: westbound between the A24 North and the junction with the A284 Arundel East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.86 miles from Ovingdean.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 21 June 2025 to 06:00 on 21 July 2025.
Nearest town: 19.71 miles from Ovingdean.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.71 miles from Ovingdean.

Location: northbound at junction J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.56 miles from Ovingdean.

Location: northbound between the junctions with the A272 and the M23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.49 miles from Ovingdean.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 July 2025 to 06:00 on 4 August 2025.
Nearest town: 19.52 miles from Ovingdean.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 July 2025 to 7 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 July 2025 to 28 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.52 miles from Ovingdean.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.71 miles from Ovingdean.

Location: northbound at junction J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.56 miles from Ovingdean.

Location: northbound between the junctions with the A272 and the M23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.49 miles from Ovingdean.

Location: southbound between the junctions with the M23 and the A272 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.2 miles from Ovingdean.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.52 miles from Ovingdean.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 12 December 2025.
Nearest town: 19.71 miles from Ovingdean.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 16 December 2025.
Nearest town: 19.52 miles from Ovingdean.