Location: eastbound between the junctions with the A26 South and the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 19:15 and 19:30 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.25 miles from Westdene.

Location: westbound between the junctions with the A283 and the A2025 .
Due to: Congestion.
Normal traffic conditions are expected between 18:45 and 19:00 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.88 miles from Westdene.

Location: eastbound between the junctions with the A284 Arundel West and the A284 Arundel East.
Due to: Congestion.
Normal traffic conditions are expected between 18:30 and 18:45 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.9 miles from Westdene.

Location: eastbound between the A29 North and the junction with the A284 Arundel West .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 24 July 2025.
Nearest town: 18.11 miles from Westdene.

Location: westbound between the A22 North and the junction with the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.51 miles from Westdene.

Location: westbound between the A283 and the junction with the A2025 .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.14 miles from Westdene.

Location: eastbound between the junctions with the A26 South and the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 19:00 and 19:15 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.25 miles from Westdene.

Location: eastbound between the junctions with the A277 and the A26 North.
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.43 miles from Westdene.

Location: westbound between the junctions with the A22 North and the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 24 July 2025.
Nearest town: 17.89 miles from Westdene.

Location: westbound between the junctions with the A283 and the A2025 .
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.88 miles from Westdene.

Location: eastbound between the junctions with the A26 South and the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.25 miles from Westdene.

Location: eastbound between the A29 North and the junction with the A284 Arundel West .
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.11 miles from Westdene.

Location: westbound between the junctions with the A277 and the A23 .
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 24 July 2025.
Nearest town: 3.52 miles from Westdene.

Location: westbound between the junctions with the A22 North and the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.89 miles from Westdene.

Location: westbound between the junctions with the A283 and the A2025 .
Due to: Congestion.
Normal traffic conditions are expected between 16:15 and 16:30 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.88 miles from Westdene.

Location: eastbound between the junctions with the A277 and the A26 North.
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 24 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.43 miles from Westdene.

Location: eastbound between the junctions with the A2270 and the A22 North.
Due to: Congestion.
Normal traffic conditions are expected between 15:45 and 16:00 on 24 July 2025.
Nearest town: 17.89 miles from Westdene.

Location: westbound at the junction with the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 15:00 and 15:15 on 24 July 2025.
Nearest town: 17.95 miles from Westdene.

Location: northbound entry slip from the A273 .
Due to: Roadworks.
Period : from 20:07 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 2.85 miles from Westdene.

Location: westbound entry slip from the A293 .
Due to: Roadworks.
Period : from 19:35 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 1.95 miles from Westdene.

Location: westbound between the junctions with the A293 and the A270 .
Due to: Roadworks.
Period : from 19:34 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 2.16 miles from Westdene.

Location: southbound between the junctions with the A27 and the A259 .
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 28 July 2025.
Nearest town: 10.58 miles from Westdene.

Location: northbound between the junctions with the A259 and the A27 .
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 28 July 2025.
Nearest town: 10.4 miles from Westdene.

Location: southbound.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.36 miles from Westdene.

Location: southbound between the M23 and the junction with the A272 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 14.34 miles from Westdene.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.06 miles from Westdene.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.96 miles from Westdene.

Location: westbound at the junction with the A293 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 1.68 miles from Westdene.

Location: eastbound exit slip to the A293 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 2.05 miles from Westdene.

Location: eastbound between the A270 Brighton West and the junction with the A293 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4 miles from Westdene.

Location: westbound between the A293 and the junction with the A283 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 1.87 miles from Westdene.

Location: northbound entry slip from the A273 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 2.81 miles from Westdene.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.87 miles from Westdene.

Location: eastbound between the A23 and the junction with the A277 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.73 miles from Westdene.

Location: westbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.04 miles from Westdene.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.68 miles from Westdene.

Location: westbound between the A277 and the junction with the A23 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.73 miles from Westdene.

Location: westbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.9 miles from Westdene.

Location: southbound at junction J10 (Crawley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 August 2025 to 06:00 on 11 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 August 2025 to 18 August 2025.
Schedule : From 20:00 on 19 August 2025 to 06:00 on 20 August 2025.
Schedule : From 20:00 on 6 September 2025 to 06:00 on 7 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Westdene.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.
Schedule : From 20:00 on 9 August 2025 to 06:00 on 10 August 2025.
Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.
Schedule : From 20:00 on 2 September 2025 to 06:00 on 3 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.95 miles from Westdene.

Location: northbound at junction J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.
Schedule : From 20:00 on 9 August 2025 to 06:00 on 10 August 2025.
Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.
Schedule : From 20:00 on 2 September 2025 to 06:00 on 3 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.77 miles from Westdene.

Location: northbound between the junctions with the A272 and the M23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.
Schedule : From 20:00 on 9 August 2025 to 06:00 on 10 August 2025.
Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.
Schedule : From 20:00 on 2 September 2025 to 06:00 on 3 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.69 miles from Westdene.

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 August 2025 to 06:00 on 11 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 August 2025 to 18 August 2025.
Schedule : From 20:00 on 19 August 2025 to 06:00 on 20 August 2025.
Schedule : From 20:00 on 6 September 2025 to 06:00 on 7 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.03 miles from Westdene.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 August 2025 to 06:00 on 11 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 August 2025 to 18 August 2025.
Schedule : From 20:00 on 19 August 2025 to 06:00 on 20 August 2025.
Schedule : From 20:00 on 6 September 2025 to 06:00 on 7 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from Westdene.

Location: westbound between the A24 North and the junction with the A280 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2025 to 05:00 on 28 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.94 miles from Westdene.

Location: eastbound between the A280 and the junction with the A24 North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2025 to 05:00 on 28 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.61 miles from Westdene.

Location: southbound at junction J10 (Crawley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 September 2025 to 8 September 2025.
Schedule : From 20:00 on 14 September 2025 to 06:00 on 15 September 2025.
Schedule : From 20:00 on 21 September 2025 to 06:00 on 22 September 2025.
Schedule : From 20:00 on 4 October 2025 to 20:00 on 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Westdene.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 15 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 October 2025 to 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 22 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.95 miles from Westdene.

Location: northbound at junction J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 15 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 October 2025 to 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 22 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.77 miles from Westdene.

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 September 2025 to 8 September 2025.
Schedule : From 20:00 on 14 September 2025 to 06:00 on 15 September 2025.
Schedule : From 20:00 on 21 September 2025 to 06:00 on 22 September 2025.
Schedule : From 20:00 on 4 October 2025 to 20:00 on 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.03 miles from Westdene.

Location: northbound between the junctions with the A272 and the M23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 15 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 October 2025 to 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 22 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.69 miles from Westdene.

Location: southbound between the junctions with the M23 and the A272 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 22 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.38 miles from Westdene.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 September 2025 to 8 September 2025.
Schedule : From 20:00 on 14 September 2025 to 06:00 on 15 September 2025.
Schedule : From 20:00 on 21 September 2025 to 06:00 on 22 September 2025.
Schedule : From 20:00 on 4 October 2025 to 20:00 on 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from Westdene.

Location: westbound between the junctions with the A284 Arundel West and the A29 North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 06:00 on 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.88 miles from Westdene.

Location: eastbound between the A23 and the junction with the A26 North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.68 miles from Westdene.

Location: eastbound between the junctions with the A23 and the A277 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.46 miles from Westdene.

Location: westbound at the junction with the A277 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.41 miles from Westdene.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.37 miles from Westdene.

Location: eastbound at the junction with the A277 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.42 miles from Westdene.

Location: westbound between the junctions with the A26 North and the A277 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.7 miles from Westdene.

Location: westbound between the junctions with the A284 Arundel East and the A284 Arundel West.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Nearest town: 16.26 miles from Westdene.

Location: eastbound between the junctions with the A284 Arundel West and the A284 Arundel East.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Nearest town: 16.36 miles from Westdene.

Location: westbound between the A2025 and the junction with the A24 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.06 miles from Westdene.

Location: eastbound exit slip to the A283 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.23 miles from Westdene.

Location: eastbound between the A24 North and the junction with the A283 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 6 September 2025.
Nearest town: 9.85 miles from Westdene.

Location: eastbound between the A24 South and the junction with the A283 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.4 miles from Westdene.

Location: westbound between the A2025 and the junction with the A24 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.63 miles from Westdene.

Location: westbound between the A283 and the junction with the A24 North.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 6 September 2025.
Nearest town: 5.14 miles from Westdene.

Location: westbound between the A2025 and the junction with the A24 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.74 miles from Westdene.

Location: westbound between the A283 and the junction with the A2025 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.14 miles from Westdene.

Location: westbound between the junctions with the A24 South and the A24 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Nearest town: 9.45 miles from Westdene.

Location: westbound between the A283 and the junction with the A2025 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.44 miles from Westdene.

Location: eastbound between the junctions with the A24 North and the A24 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Nearest town: 9.85 miles from Westdene.

Location: westbound between the A2270 and the junction with the A26 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Nearest town: 13.4 miles from Westdene.

Location: eastbound between the A26 South and the junction with the A2270 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Nearest town: 13.25 miles from Westdene.

Location: westbound between the A270 Brighton East and the junction with the A23 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 30 July 2025.
Nearest town: 3.21 miles from Westdene.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.16 miles from Westdene.

Location: westbound between the A270 Brighton East and the junction with the A23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.21 miles from Westdene.

Location: southbound between the A27 and the junction with the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.66 miles from Westdene.

Location: northbound between the A259 and the junction with the A27 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Nearest town: 10.64 miles from Westdene.

Location: northbound between the A259 and the junction with the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.64 miles from Westdene.

Location: The junction of the A26 and the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.65 miles from Westdene.

Location: eastbound between the junctions with the A22 Polegate West and the A22 Polegate East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.35 miles from Westdene.

Location: westbound between the junctions with the A22 Polegate East and the A22 Polegate West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.5 miles from Westdene.

Location: westbound between the junctions with the A259 and the A22 Polegate East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 1 August 2025.
Nearest town: 19.72 miles from Westdene.

Location: eastbound between the junctions with the A22 Polegate East and the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 1 August 2025.
Nearest town: 19.54 miles from Westdene.

Location: eastbound between the junctions with the A26 North and the A26 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Nearest town: 8.56 miles from Westdene.

Location: eastbound between the junctions with the A277 and the A26 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.43 miles from Westdene.

Location: westbound between the junctions with the A26 South and the A26 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Nearest town: 8.77 miles from Westdene.

Location: westbound between the A26 North and the junction with the A277 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.43 miles from Westdene.

Location: westbound at the junction with the A26 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.54 miles from Westdene.

Location: eastbound between the junctions with the A24 South and the A2025 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Nearest town: 9.15 miles from Westdene.

Location: westbound between the junctions with the A2025 and the A24 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Nearest town: 9.01 miles from Westdene.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.23 miles from Westdene.

Location: southbound between the M23 and the junction with the A272 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.38 miles from Westdene.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.26 miles from Westdene.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.2 miles from Westdene.

Location: southbound between the junctions with the A27 and the A259 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Nearest town: 9.03 miles from Westdene.

Location: northbound between the junctions with the A259 and the A27 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Nearest town: 9.16 miles from Westdene.

Location: westbound between the A24 North and the junction with the A284 Arundel East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 17 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.14 miles from Westdene.

Location: westbound entry slip from the A280 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 17 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.43 miles from Westdene.

Location: eastbound between the junctions with the A284 Arundel East and the A280 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 17 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.19 miles from Westdene.

Location: westbound between the junctions with the A280 and the A284 Arundel East.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.88 miles from Westdene.

Location: eastbound at the junction with the A284 Arundel East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 31 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 7 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.25 miles from Westdene.

Location: eastbound between the junctions with the A284 Arundel West and the A284 Arundel East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 31 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 7 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.25 miles from Westdene.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2025 to 06:00 on 3 September 2025.
Nearest town: 15.95 miles from Westdene.

Location: northbound at the junction with the A27 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 0.91 miles from Westdene.

Location: northbound at the junction with the A27 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 0.91 miles from Westdene.

Location: northbound between the junctions with the A27 and the A273 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 1.08 miles from Westdene.

Location: northbound at the junction with the A273 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.24 miles from Westdene.

Location: northbound between the junctions with the A27 and the A273 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 1.08 miles from Westdene.

Location: southbound between the junctions with the A273 and the A27 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.44 miles from Westdene.

Location: southbound between the A2300 and the junction with the A273 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.73 miles from Westdene.

Location: northbound between the A273 and the junction with the A281 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 2.24 miles from Westdene.

Location: northbound between the A273 and the junction with the A281 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.56 miles from Westdene.

Location: westbound between the A24 North and the junction with the A284 Arundel East.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 17 August 2025.
Nearest town: 12.14 miles from Westdene.

Location: eastbound between the A284 Arundel West and the junction with the A280 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 14 September 2025.
Nearest town: 16.27 miles from Westdene.

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 August 2025 to 06:00 on 21 September 2025.
Nearest town: 19.03 miles from Westdene.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 August 2025 to 06:00 on 21 September 2025.
Nearest town: 15.72 miles from Westdene.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 September 2025 to 06:00 on 12 December 2025.
Nearest town: 15.95 miles from Westdene.

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 September 2025 to 06:00 on 16 December 2025.
Nearest town: 19.03 miles from Westdene.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 September 2025 to 06:00 on 16 December 2025.
Nearest town: 15.72 miles from Westdene.