Location: northbound exit slip at junction J26 (Wigan) .
Due to: Roadworks.
Period : from 21:03 on 22 September 2025 to 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.05 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J31 (Preston) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.23 miles from Preston.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 23 September 2025 to 17:00 on 23 September 2025.
Nearest town: 11.67 miles from Preston.

Location: westbound exit slip at junction J4 (Skelmersdale) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.96 miles from Preston.

Location: northbound between junctions J28 (Leyland) and J30 (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 September 2025 to 05:00 on 24 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.9 miles from Preston.

Location: southbound between junctions J28 (Leyland) and J27 (Parbold) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 September 2025 to 05:00 on 24 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.6 miles from Preston.

Location: southbound between junctions J27 (Parbold) and J26 (Wigan) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 23 September 2025 to 05:00 on 24 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.03 miles from Preston.

Location: southbound entry slip at junction J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 23 September 2025 to 05:00 on 24 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.94 miles from Preston.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.16 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.7 miles from Preston.

Location: northbound between junctions J27 (Parbold) and J28 (Leyland) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.16 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 7.89 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.4 miles from Preston.

Location: southbound exit slip at junction J26 (Wigan) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.91 miles from Preston.

Location: northbound at junction J26 (Wigan) .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.16 miles from Preston.

Location: eastbound between junctions J4 (Skelmersdale) and M6 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.88 miles from Preston.

Location: northbound exit slip at junction J26 (Wigan) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.16 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.42 miles from Preston.

Location: eastbound entry slip at junction J5 (Skelmersdale) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.1 miles from Preston.

Location: eastbound entry slip at junction J5 (Skelmersdale) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.86 miles from Preston.

Location: eastbound exit slip at junction J5 (Skelmersdale) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.13 miles from Preston.

Location: eastbound between junctions J3 (Southport) and J4 (Skelmersdale) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.91 miles from Preston.

Location: eastbound entry slip at junction J4 (Skelmersdale) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.88 miles from Preston.

Location: eastbound.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.87 miles from Preston.

Location: westbound.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.62 miles from Preston.

Location: southbound between junction A666 and the M60 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 September 2025 to 06:00 on 27 September 2025.
Nearest town: 19.5 miles from Preston.

Location: southbound between the junctions with the M65 and the A679 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.3 miles from Preston.

Location: westbound exit slip at junction J8 (Bury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.51 miles from Preston.

Location: southbound between the M65 and the junction with the A681 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 September 2025 to 06:00 on 27 September 2025.
Nearest town: 15.3 miles from Preston.

Location: northbound between the junctions with the A681 and the A680 Haslingden North .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.6 miles from Preston.

Location: northbound between the A586 Great Eccleston and the junction with the A588 North.
Due to: Roadworks.
Period : expect disruption until 23:00 on 24 September 2025.
Nearest town: 12.21 miles from Preston.

Location: southbound between the A588 North and the junction with the A586 Great Eccleston.
Due to: Roadworks.
Period : expect disruption until 23:00 on 24 September 2025.
Nearest town: 13.15 miles from Preston.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 23 September 2025 to 20:00 on 24 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.9 miles from Preston.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane three is closed.
Due to: Horticultural works.
Period : expect disruption until 20:00 on 23 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 12.73 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 23 September 2025 to 20:00 on 24 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.95 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane three is closed.
Due to: Horticultural works.
Period : expect disruption until 20:00 on 23 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 9.46 miles from Preston.

Location: northbound between junctions J5 and J6 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.67 miles from Preston.

Location: northbound entry slip at junction J6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.66 miles from Preston.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.91 miles from Preston.

Location: northbound exit slip at junction J8 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.58 miles from Preston.

Location: northbound between junctions J5 and J8 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 23:00 on 23 September 2025 to 06:00 on 26 September 2025.
Nearest town: 15.93 miles from Preston.

Location: northbound between the M66 and the junction with the A679 .
Due to: Roadworks scheme.
Period : from 20:13 on 11 September 2025 to 06:00 on 1 October 2025.
Nearest town: 16.82 miles from Preston.

Location: westbound between junctions J5 (Skelmersdale) and J4 (Skelmersdale) .
Due to: Roadworks scheme.
Period : from 20:07 on 22 September 2025 to 06:00 on 7 October 2025.
Nearest town: 15.16 miles from Preston.

Location: eastbound between junctions J1 (Kirkby) and J5 (Skelmersdale) .
Due to: Roadworks scheme.
Period : from 20:07 on 18 September 2025 to 06:00 on 11 October 2025.
Nearest town: 16.03 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 31 October 2025.
Nearest town: 8.59 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J27 (Parbold) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 23 September 2025 to 06:00 on 2 October 2025.
Nearest town: 13.14 miles from Preston.

Location: northbound between junctions J6 and J9 .
Due to: Roadworks scheme.
Period : from 20:02 on 19 September 2025 to 06:00 on 30 October 2025.
Nearest town: 17.04 miles from Preston.

Location: southbound between junctions J9 and J6 .
Due to: Roadworks scheme.
Period : from 20:02 on 19 September 2025 to 06:00 on 30 October 2025.
Nearest town: 6.11 miles from Preston.

Location: southbound between junctions J31A (Preston) and J31 (Preston) .
Due to: Roadworks scheme.
Period : from 21:00 on 22 September 2025 to 06:00 on 16 October 2025.
Nearest town: 3.41 miles from Preston.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Due to: Roadworks scheme.
Period : from 19:00 on 17 September 2025 to 06:00 on 27 September 2025.
Nearest town: 11.13 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Due to: Roadworks scheme.
Period : from 19:00 on 17 September 2025 to 06:00 on 27 September 2025.
Nearest town: 10.76 miles from Preston.

Location: southbound between junctions J28 (Leyland) and J27 (Parbold) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 30 September 2025.
Nearest town: 9.92 miles from Preston.

Location: eastbound between junctions J1 (Kirkby) and J3 (Southport) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 30 September 2025.
Nearest town: 17.75 miles from Preston.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 19.79 miles from Preston.

Location: southbound between the M6 and junction J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 2.4 miles from Preston.

Location: northbound between junctions J2 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 19.63 miles from Preston.

Location: northbound between junction J9 and the M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 3.76 miles from Preston.

Location: southbound between the M6 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 2.66 miles from Preston.

Location: westbound between junctions J10 (Burnley) and J9 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.92 miles from Preston.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.31 miles from Preston.

Location: eastbound between junctions J6 (Blackburn) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 11.36 miles from Preston.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 3.07 miles from Preston.

Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 2.46 miles from Preston.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.34 miles from Preston.

Location: westbound between junctions J6 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 11.18 miles from Preston.

Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.56 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 6.91 miles from Preston.

Location: eastbound between junctions J2 (Manchester) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 3.36 miles from Preston.

Location: westbound between junctions J4 (Blackburn) and J1A (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.28 miles from Preston.

Location: westbound between junctions J10 (Burnley) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.26 miles from Preston.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 10.44 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.4 miles from Preston.

Location: northbound exit slip at junction J23 (Haydock) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.61 miles from Preston.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.18 miles from Preston.

Location: southbound exit slip at junction J23 (Haydock) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.24 miles from Preston.

Location: southbound exit slip at Rivington Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.41 miles from Preston.

Location: southbound entry slip at Rivington Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.66 miles from Preston.

Location: southbound exit slip at junction J6 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.45 miles from Preston.

Location: eastbound.
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.44 miles from Preston.

Location: southbound between junctions J9 and J8 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.77 miles from Preston.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.56 miles from Preston.

Location: southbound entry slip at junction J8 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.34 miles from Preston.

Location: southbound between junctions J24 (Ashton in Makerfield) and J23 (Haydock) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.98 miles from Preston.

Location: southbound exit slip at junction J26 (Wigan) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.91 miles from Preston.

Location: eastbound between junctions J4 (Skelmersdale) and M6 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.91 miles from Preston.

Location: northbound at junction J26 (Wigan) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.16 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.46 miles from Preston.

Location: northbound exit slip at junction J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.16 miles from Preston.

Location: eastbound entry slip at junction J5 (Skelmersdale) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.1 miles from Preston.

Location: eastbound entry slip at junction J5 (Skelmersdale) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.86 miles from Preston.

Location: eastbound entry slip at junction J4 (Skelmersdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.88 miles from Preston.

Location: eastbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.87 miles from Preston.

Location: westbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 05:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.62 miles from Preston.

Location: southbound between the junctions with the A681 and the M66 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 September 2025 to 06:00 on 30 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.77 miles from Preston.

Location: southbound between junctions A666 and J1 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 September 2025 to 06:00 on 4 October 2025.
Nearest town: 19.48 miles from Preston.

Location: southbound between junctions A666 and J2 from A666 to M60.
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.48 miles from Preston.

Location: northbound exit slip at junction J31 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 September 2025 to 06:00 on 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.7 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J31 (Preston) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 September 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 3.23 miles from Preston.

Location: southbound entry slip at junction J31A (Preston) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 3.41 miles from Preston.

Location: southbound between junctions A666 and J2 from A666 to M60.
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 September 2025 to 27 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.51 miles from Preston.

Location: southbound between junctions A666 and J2 from A666 to M60.
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 September 2025 to 25 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.5 miles from Preston.

Location: northbound at junction J2 for A666.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 September 2025 to 06:00 on 25 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.95 miles from Preston.

Location: northbound between junctions J2 and A666 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 September 2025 to 06:00 on 25 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.59 miles from Preston.

Location: northbound between the junctions with the A680 Haslingden North and the A679 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 September 2025 to 05:00 on 29 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.35 miles from Preston.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:59 on 23 September 2025 to 05:00 on 24 September 2025.
Schedule : From 21:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.08 miles from Preston.

Location: westbound between junctions J8 (Bury) and J7 (Accrington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:59 on 23 September 2025 to 05:00 on 24 September 2025.
Schedule : From 21:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.48 miles from Preston.

Location: eastbound between junctions J6 (Blackburn) and J7 (Accrington) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.96 miles from Preston.

Location: westbound between junctions J7 (Accrington) and J6 (Blackburn) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 12.92 miles from Preston.

Location: eastbound entry slip at junction J6 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:59 on 23 September 2025 to 05:00 on 24 September 2025.
Schedule : From 21:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.55 miles from Preston.

Location: westbound entry slip at junction J7 (Accrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:59 on 23 September 2025 to 05:00 on 24 September 2025.
Schedule : From 21:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.66 miles from Preston.

Location: eastbound exit slip at junction J7 (Accrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:59 on 23 September 2025 to 05:00 on 24 September 2025.
Schedule : From 21:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.46 miles from Preston.

Location: westbound exit slip at junction J6 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:59 on 23 September 2025 to 05:00 on 24 September 2025.
Schedule : From 21:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.18 miles from Preston.

Location: eastbound between junctions J3 (Southport) and J4 (Skelmersdale) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 29 September 2025 to 17:00 on 29 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.2 miles from Preston.

Location: southbound between junctions J8 and J6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 2 October 2025 to 3 October 2025.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 6 October 2025 to 10 October 2025.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 13 October 2025 to 17 October 2025.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 20 October 2025 to 21 October 2025.
Nearest town: 10.67 miles from Preston.

Location: northbound exit slip at junction J27 (Parbold) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 September 2025 to 05:00 on 29 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.32 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.89 miles from Preston.

Location: westbound entry slip at junction J5 (Shadsworth) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.55 miles from Preston.

Location: eastbound at junction J5 (Shadsworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.49 miles from Preston.

Location: westbound exit slip at junction J4 (Blackburn) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.58 miles from Preston.

Location: eastbound entry slip at junction J4 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.33 miles from Preston.

Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.06 miles from Preston.

Location: westbound between junctions J6 (Blackburn) and J5 (Shadsworth) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.77 miles from Preston.

Location: westbound between junctions J5 (Shadsworth) and J4 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.61 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.4 miles from Preston.

Location: eastbound exit slip at junction J5 (Shadsworth) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 September 2025 to 30 September 2025.
Schedule : From 23:59 on 30 September 2025 to 05:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.34 miles from Preston.

Location: eastbound between junctions J3 (Kirkham) and J2 .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 September 2025 to 20:00 on 1 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.46 miles from Preston.

Location: westbound between junctions J2 and J3 (Kirkham) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 September 2025 to 20:00 on 1 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.05 miles from Preston.

Location: eastbound between junctions J4 (Great Marton) and J2 .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 September 2025 to 20:00 on 30 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.82 miles from Preston.

Location: eastbound between junctions J4 (Great Marton) and J3 (Kirkham) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 September 2025 to 20:00 on 29 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.6 miles from Preston.

Location: westbound between junctions J3 (Kirkham) and J4 (Great Marton) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 September 2025 to 20:00 on 29 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.35 miles from Preston.

Location: westbound between junctions J2 and J4 (Great Marton) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 September 2025 to 20:00 on 30 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.94 miles from Preston.

Location: southbound between junctions J9 and J8 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 September 2025 to 29 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.18 miles from Preston.

Location: southbound between junctions J27 (Parbold) and J26 (Wigan) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 September 2025 to 05:00 on 27 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.24 miles from Preston.

Location: northbound exit slip at junction J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:30 on 26 September 2025 to 05:00 on 27 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.16 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:30 on 26 September 2025 to 05:00 on 27 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.14 miles from Preston.

Location: northbound entry slip at junction J24 (Ashton in Makerfield) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 September 2025 to 05:00 on 27 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.3 miles from Preston.

Location: southbound between junctions J28 (Leyland) and J27 (Parbold) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:30 on 25 September 2025 to 05:00 on 26 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.26 miles from Preston.

Location: southbound entry slip at junction J27 (Parbold) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:30 on 25 September 2025 to 05:00 on 26 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.11 miles from Preston.

Location: southbound exit slip at junction J26 (Wigan) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:30 on 25 September 2025 to 05:00 on 26 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.91 miles from Preston.

Location: southbound between junctions J28 (Leyland) and J27 (Parbold) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 2 October 2025 to 05:00 on 3 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.19 miles from Preston.

Location: westbound between junctions J7 (Accrington) and J6 (Blackburn) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.67 miles from Preston.

Location: eastbound entry slip at junction J5 (Shadsworth) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.5 miles from Preston.

Location: westbound between junctions J6 (Blackburn) and J5 (Shadsworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.18 miles from Preston.

Location: westbound entry slip at junction J6 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.59 miles from Preston.

Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.56 miles from Preston.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.49 miles from Preston.

Location: westbound entry slip at junction J7 (Accrington) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.67 miles from Preston.

Location: westbound exit slip at junction J5 (Shadsworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.61 miles from Preston.

Location: eastbound exit slip at junction J6 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 September 2025 to 28 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.96 miles from Preston.

Location: westbound exit slip at junction J3 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 24 September 2025 to 25 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.35 miles from Preston.

Location: eastbound entry slip at junction J5 (Skelmersdale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 October 2025 to 4 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.86 miles from Preston.

Location: eastbound entry slip at junction J5 (Skelmersdale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 September 2025 to 06:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.1 miles from Preston.

Location: eastbound between junctions J4 (Skelmersdale) and J5 (Skelmersdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 September 2025 to 06:00 on 1 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.06 miles from Preston.

Location: westbound entry slip at junction J5 (Skelmersdale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 September 2025 to 06:00 on 26 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.18 miles from Preston.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 September 2025 to 06:00 on 27 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.15 miles from Preston.

Location: eastbound exit slip at junction J3 (Southport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 October 2025 to 06:00 on 11 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.77 miles from Preston.

Location: westbound exit slip at junction J5 (Skelmersdale) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 October 2025 to 06:00 on 7 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.16 miles from Preston.

Location: westbound exit slip at junction J5 (Skelmersdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 September 2025 to 06:00 on 26 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.16 miles from Preston.

Location: westbound exit slip at junction J5 (Skelmersdale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 September 2025 to 06:00 on 27 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.16 miles from Preston.

Location: eastbound between junctions J1 (Kirkby) and J3 (Southport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 October 2025 to 06:00 on 11 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.03 miles from Preston.

Location: eastbound exit slip at junction J5 (Skelmersdale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 September 2025 to 06:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.13 miles from Preston.

Location: eastbound exit slip at junction J4 (Skelmersdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 September 2025 to 06:00 on 25 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.88 miles from Preston.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.05 miles from Preston.

Location: northbound at junction J26 (Wigan) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.16 miles from Preston.

Location: northbound entry slip at junction J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.88 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.7 miles from Preston.

Location: northbound exit slip at junction J27 (Parbold) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.32 miles from Preston.

Location: northbound between the M66 and the junction with the A681 Haslingden South.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 24 September 2025 to 27 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.77 miles from Preston.

Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 24 September 2025 to 27 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.6 miles from Preston.

Location: northbound entry slip from the A680 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 24 September 2025 to 27 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.2 miles from Preston.

Location: northbound between the A682 and the junction with the A680 Haslingden North .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 24 September 2025 to 27 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.58 miles from Preston.

Location: southbound between junctions J9 and J8 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 September 2025 to 05:00 on 25 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.15 miles from Preston.

Location: westbound between the M6 southbound and junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 October 2025 to 06:00 on 2 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.28 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 October 2025 to 06:00 on 2 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.24 miles from Preston.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 October 2025 to 06:00 on 2 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.44 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 23 September 2025 to 25 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.7 miles from Preston.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 September 2025 to 2 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.16 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 September 2025 to 2 October 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.7 miles from Preston.

Location: eastbound between junction J1 (Preston) and the M6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 October 2025 to 24 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.72 miles from Preston.

Location: eastbound at junction J1 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 October 2025 to 24 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.58 miles from Preston.

Location: southbound entry slip at junction J31A (Preston) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 3.41 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J31A (Preston) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 12 October 2025 to 17:00 on 17 October 2025.
Nearest town: 3.46 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J31A (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 October 2025 to 24 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.46 miles from Preston.

Location: southbound entry slip at junction J31A (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 October 2025 to 8 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.41 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J31A (Preston) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 7 October 2025 to 20:00 on 7 October 2025.
Schedule : From 07:30 on 8 October 2025 to 17:00 on 10 October 2025.
Nearest town: 3.23 miles from Preston.

Location: southbound entry slip at junction J31A (Preston) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 7 October 2025 to 20:00 on 7 October 2025.
Schedule : From 07:30 on 8 October 2025 to 17:00 on 10 October 2025.
Nearest town: 3.41 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J31 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 October 2025 to 8 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.15 miles from Preston.

Location: northbound entry slip at junction J31 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 October 2025 to 05:00 on 31 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.72 miles from Preston.

Location: northbound at junction J31 (Preston) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 26 October 2025 to 17:00 on 31 October 2025.
Nearest town: 2.72 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J29 (Burnley) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 September 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 3.15 miles from Preston.

Location: southbound between junctions J31 (Preston) and J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 3 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.85 miles from Preston.

Location: southbound at junction J31 (Preston) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 26 October 2025 to 17:00 on 31 October 2025.
Nearest town: 2.89 miles from Preston.

Location: southbound entry slip at junction J31 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 October 2025 to 05:00 on 29 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.9 miles from Preston.

Location: northbound exit slip at junction J31 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 October 2025 to 05:00 on 30 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.7 miles from Preston.

Location: northbound exit slip at junction J31A (Preston) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 8 October 2025 to 10 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.18 miles from Preston.

Location: southbound exit slip at junction J31 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 September 2025 to 27 September 2025.
Schedule : From 20:00 on 27 October 2025 to 05:00 on 28 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.9 miles from Preston.

Location: northbound between junctions J31 (Preston) and J32 (Blackpool) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 5 October 2025 to 17:00 on 8 October 2025.
Nearest town: 3.05 miles from Preston.

Location: northbound between junctions J31A (Preston) and J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 13 October 2025 to 17 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.2 miles from Preston.

Location: slip road to the M6 southbound .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 October 2025 to 24 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.86 miles from Preston.

Location: northbound between junctions J31 (Preston) and J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 8 October 2025 to 10 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.97 miles from Preston.

Location: southbound between the junctions with the A680 and the A681 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 September 2025 to 06:00 on 27 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.38 miles from Preston.

Location: southbound between the junctions with the A680 and the A681 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 September 2025 to 06:00 on 26 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.36 miles from Preston.

Location: southbound between the junctions with the A679 and the A680 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 September 2025 to 06:00 on 26 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.29 miles from Preston.

Location: southbound between the junctions with the A679 and the A680 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 September 2025 to 06:00 on 25 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.75 miles from Preston.

Location: northbound between junctions J4 and J6 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 September 2025 to 06:00 on 7 October 2025.
Nearest town: 17.5 miles from Preston.

Location: northbound between junctions J4 and J5 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 3 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.5 miles from Preston.

Location: northbound between junctions J5 and J6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 October 2025 to 06:00 on 7 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.88 miles from Preston.

Location: northbound between junctions J5 and J6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 October 2025 to 06:00 on 4 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.88 miles from Preston.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 October 2025 to 05:00 on 4 October 2025.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 October 2025 to 8 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.63 miles from Preston.

Location: westbound entry slip at junction J10 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 September 2025 to 3 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.95 miles from Preston.

Location: westbound between junctions J10 (Burnley) and J9 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 September 2025 to 3 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.21 miles from Preston.

Location: southbound between junctions J34 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 24 September 2025 to 20:00 on 25 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.15 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J34 (Lancaster) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 24 September 2025 to 20:00 on 25 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.85 miles from Preston.

Location: northbound exit slip to the A681 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 September 2025 to 06:00 on 1 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.54 miles from Preston.

Location: northbound between the M66 and the junction with the A680 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 September 2025 to 06:00 on 1 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.73 miles from Preston.

Location: northbound between junctions J4 and J6 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 September 2025 to 06:00 on 26 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.83 miles from Preston.

Location: northbound entry slip at junction J5 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 September 2025 to 06:00 on 26 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.93 miles from Preston.

Location: northbound exit slip at junction J5 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 September 2025 to 06:00 on 26 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.13 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J27 (Parbold) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 October 2025 to 06:00 on 1 November 2025.
Nearest town: 15.47 miles from Preston.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 October 2025 to 1 November 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.16 miles from Preston.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 October 2025 to 1 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.47 miles from Preston.

Location: northbound entry slip at junction J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 October 2025 to 1 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.88 miles from Preston.

Location: westbound between junctions J8 (Bury) and J6 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 October 2025 to 06:00 on 8 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.33 miles from Preston.

Location: westbound entry slip at junction J7 (Accrington) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 October 2025 to 06:00 on 8 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.67 miles from Preston.

Location: westbound at junction J6 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 October 2025 to 06:00 on 8 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.18 miles from Preston.

Location: westbound between junctions J8 (Bury) and J6 (Blackburn) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 October 2025 to 06:00 on 8 October 2025.
Nearest town: 13.33 miles from Preston.

Location: westbound exit slip at junction J6 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 October 2025 to 06:00 on 8 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.18 miles from Preston.

Location: northbound between junctions J8 and J9 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 October 2025 to 06:00 on 30 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.75 miles from Preston.

Location: southbound between junctions J9 and J8 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 October 2025 to 06:00 on 30 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.55 miles from Preston.

Location: southbound between junctions J9 and J8 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 29 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.6 miles from Preston.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 29 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.96 miles from Preston.

Location: westbound between junctions J10 (Burnley) and J9 (Burnley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 September 2025 to 05:00 on 3 October 2025.
Nearest town: 18.21 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 10.32 miles from Preston.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 11.63 miles from Preston.

Location: eastbound at junction J5 (Shadsworth) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 October 2025 to 06:00 on 7 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.41 miles from Preston.

Location: eastbound entry slip at junction J5 (Shadsworth) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 October 2025 to 06:00 on 7 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.5 miles from Preston.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 October 2025 to 06:00 on 7 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.44 miles from Preston.

Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 October 2025 to 06:00 on 8 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.56 miles from Preston.

Location: eastbound at junction J4 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 October 2025 to 06:00 on 8 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.28 miles from Preston.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 10 October 2025 to 06:00 on 11 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.1 miles from Preston.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 October 2025 to 06:00 on 8 October 2025.
Nearest town: 4.42 miles from Preston.
