Location: eastbound exit slip at junction J8 (Bury) .
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 28 January 2026.
Nearest town: 19.51 miles from Garstang.

Location: southbound at the junction with the A588 South.
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 28 January 2026.
Nearest town: 9.33 miles from Garstang.

Location: eastbound exit slip at junction J8 (Bury) .
Due to: Congestion.
Normal traffic conditions are expected between 09:45 and 10:00 on 28 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.51 miles from Garstang.

Location: eastbound exit slip at junction J5 (Shadsworth) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 28 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.81 miles from Garstang.

Location: eastbound exit slip at junction J8 (Bury) .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 28 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.51 miles from Garstang.

Location: northbound between the A588 North and the junction with the A588 South.
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 28 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.07 miles from Garstang.

Location: northbound exit slip at junction J33 (Lancaster) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 28 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.68 miles from Garstang.

Location: westbound exit slip at junction J2 (Manchester) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 28 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.81 miles from Garstang.

Location: southbound at the junction with the A588 South.
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 28 January 2026.
Nearest town: 9.26 miles from Garstang.

Location: eastbound at junction J2 (Manchester) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 28 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.72 miles from Garstang.

Location: westbound entry slip at junction J4 (Blackburn) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 28 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.19 miles from Garstang.

Location: southbound between junctions J36 (Kirby Lonsdale) and J35 (Carnforth) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 18:00 on 28 January 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.73 miles from Garstang.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 28 January 2026 to 06:00 on 29 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.93 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 00:00 on 7 February 2026.
Nearest town: 6.8 miles from Garstang.

Location: southbound between junctions J32 (Blackpool) and J31 (Preston) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 January 2026 to 06:00 on 6 March 2026.
Nearest town: 7.13 miles from Garstang.

Location: northbound between junctions J31 (Preston) and J32 (Blackpool) .
Due to: Roadworks scheme.
Period : from 20:04 on 23 January 2026 to 06:00 on 6 March 2026.
Nearest town: 10 miles from Garstang.

Location: westbound at junction J5 (Shadsworth) .
Due to: Emergency barrier repairs.
Period : expect disruption until 23:00 on 3 September 2027.
Lanes Closed : All lanes are closed.
Nearest town: 17.79 miles from Garstang.

Location: westbound entry slip at junction J5 (Shadsworth) .
Due to: Emergency barrier repairs.
Period : expect disruption until 23:00 on 3 September 2027.
Lanes Closed : All lanes are closed.
Nearest town: 17.85 miles from Garstang.

Location: eastbound at junction J5 (Shadsworth) .
Due to: Emergency barrier repairs.
Period : expect disruption until 23:00 on 3 September 2027.
Lanes Closed : All lanes are closed.
Nearest town: 17.85 miles from Garstang.

Location: eastbound entry slip at junction J5 (Shadsworth) .
Due to: Emergency barrier repairs.
Period : expect disruption until 23:00 on 3 September 2027.
Lanes Closed : All lanes are closed.
Nearest town: 17.77 miles from Garstang.

Location: westbound exit slip at junction J5 (Shadsworth) .
Due to: Emergency barrier repairs.
Period : expect disruption until 23:00 on 3 September 2027.
Lanes Closed : All lanes are closed.
Nearest town: 17.79 miles from Garstang.

Location: eastbound exit slip at junction J5 (Shadsworth) .
Due to: Emergency barrier repairs.
Period : expect disruption until 23:00 on 3 September 2027.
Lanes Closed : All lanes are closed.
Nearest town: 17.85 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Due to: Roadworks scheme.
Period : from 10:30 on 22 January 2026 to 07:30 on 14 February 2026.
Nearest town: 2.33 miles from Garstang.

Location: southbound between junctions J28 (Leyland) and J27 (Parbold) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 January 2026.
Nearest town: 17.79 miles from Garstang.

Location: eastbound between junctions J6 (Blackburn) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.95 miles from Garstang.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 13.59 miles from Garstang.

Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 13.14 miles from Garstang.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.29 miles from Garstang.

Location: westbound between junctions J6 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.84 miles from Garstang.

Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.47 miles from Garstang.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 15.73 miles from Garstang.

Location: eastbound between junctions J2 (Manchester) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 13.62 miles from Garstang.

Location: westbound between junctions J4 (Blackburn) and J1A (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.69 miles from Garstang.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.82 miles from Garstang.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.75 miles from Garstang.

Location: southbound between the M6 and junction J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 12.41 miles from Garstang.

Location: northbound between junction J9 and the M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 13.98 miles from Garstang.

Location: southbound between the M6 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 12.69 miles from Garstang.

Location: northbound entry slip at junction J33 (Lancaster) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.71 miles from Garstang.

Location: southbound entry slip at junction J33 (Lancaster) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.71 miles from Garstang.

Location: southbound exit slip at junction J33 (Lancaster) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.04 miles from Garstang.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 3 February 2026 to 05:00 on 4 February 2026.
Schedule : From 22:00 on 5 February 2026 to 05:00 on 6 February 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2026 to 12 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 1.71 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 12:00 on 30 January 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 2.33 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 12:00 on 30 January 2026 to 07:30 on 2 February 2026.
Schedule : From 17:00 on 2 February 2026 to 17:00 on 3 February 2026.
Schedule : From 17:00 on 8 February 2026 to 07:30 on 9 February 2026.
Schedule : From 17:00 on 9 February 2026 to 20:00 on 9 February 2026.
Nearest town: 2.33 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 February 2026 to 05:00 on 7 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.82 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 9 February 2026 to 14 February 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.33 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 31 January 2026 to 2 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.93 miles from Garstang.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 3 February 2026 to 05:00 on 4 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.81 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 February 2026 to 05:00 on 3 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.87 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 3 February 2026 to 05:00 on 4 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.67 miles from Garstang.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 February 2026 to 05:00 on 3 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.07 miles from Garstang.

Location: southbound between junctions J30 (Manchester) and J28 (Leyland) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 February 2026 to 06:00 on 10 February 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.58 miles from Garstang.

Location: southbound exit slip at junction J29 (Burnley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 9 February 2026 to 06:00 on 10 February 2026.
Nearest town: 13.13 miles from Garstang.

Location: southbound exit slip at junction J29 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 February 2026 to 06:00 on 10 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.13 miles from Garstang.

Location: westbound entry slip at junction J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.96 miles from Garstang.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 February 2026 to 06:00 on 3 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.82 miles from Garstang.

Location: southbound entry slip at junction J29 (Burnley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 February 2026 to 06:00 on 10 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.49 miles from Garstang.

Location: southbound between junctions J32 (Blackpool) and J31 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.63 miles from Garstang.

Location: westbound between the M6 southbound and junction J1 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.61 miles from Garstang.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.62 miles from Garstang.

Location: westbound exit slip at junction J8 (Bury) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 February 2026 to 4 February 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.83 miles from Garstang.

Location: southbound between the junctions with the M65 and the A679 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 February 2026 to 4 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.7 miles from Garstang.

Location: southbound entry slip from the A679 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 2 February 2026 to 4 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.99 miles from Garstang.

Location: southbound between the A679 and the junction with the A680 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 2 February 2026 to 4 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.9 miles from Garstang.

Location: southbound between the M6 and junction J9 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 9 February 2026 to 17:00 on 9 February 2026.
Nearest town: 13.14 miles from Garstang.

Location: northbound between junction J9 and the M6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 9 February 2026 to 17:00 on 9 February 2026.
Nearest town: 12.57 miles from Garstang.

Location: southbound between junctions J8 and J6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 6 February 2026 to 17:00 on 6 February 2026.
Nearest town: 19.56 miles from Garstang.

Location: southbound between junctions J30 (Manchester) and J29 (Burnley) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 1 February 2026 to 05:00 on 2 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.22 miles from Garstang.

Location: southbound between junctions J31 (Preston) and J29 (Burnley) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 1 February 2026 to 05:00 on 2 February 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.58 miles from Garstang.

Location: northbound between junctions J29 (Burnley) and J30 (Manchester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 1 February 2026 to 05:00 on 2 February 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.82 miles from Garstang.

Location: eastbound entry slip at junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 31 January 2026 to 2 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.12 miles from Garstang.

Location: eastbound between junction J2 and the M6 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 31 January 2026 to 2 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.13 miles from Garstang.

Location: westbound between the M6 southbound and junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 7 February 2026 to 9 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.61 miles from Garstang.

Location: westbound between the M6 northbound and junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 February 2026 to 05:00 on 9 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.16 miles from Garstang.

Location: slip road to the M6 northbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 31 January 2026 to 2 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.99 miles from Garstang.

Location: northbound at junction J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 February 2026 to 05:00 on 9 February 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.16 miles from Garstang.

Location: westbound between the M6 northbound and junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 31 January 2026 to 2 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.16 miles from Garstang.

Location: westbound exit slip at junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2026 to 05:00 on 8 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.13 miles from Garstang.

Location: slip road to the M6 southbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 31 January 2026 to 2 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.99 miles from Garstang.

Location: northbound between junctions J31A (Preston) and J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 31 January 2026 to 2 February 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.97 miles from Garstang.

Location: northbound between junctions J31A (Preston) and J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 February 2026 to 05:00 on 9 February 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.31 miles from Garstang.

Location: southbound between junctions J30 (Manchester) and J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.75 miles from Garstang.

Location: southbound exit slip at junction J29 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.13 miles from Garstang.

Location: southbound between junctions J35 (Carnforth) and J34 (Lancaster) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 4 February 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.45 miles from Garstang.

Location: northbound between junctions J34 (Lancaster) and J35 (Carnforth) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 30 January 2026 to 18:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.99 miles from Garstang.

Location: northbound exit slip at junction J29 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.52 miles from Garstang.

Location: northbound between junctions J28 (Leyland) and J29 (Burnley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.73 miles from Garstang.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.88 miles from Garstang.

Location: southbound between junctions J35 (Carnforth) and J34 (Lancaster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.43 miles from Garstang.

Location: southbound between junctions J35 (Carnforth) and J34 (Lancaster) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Nearest town: 13.43 miles from Garstang.

Location: southbound at junction J34 (Lancaster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.71 miles from Garstang.

Location: northbound between junctions J33 (Lancaster) and J34 (Lancaster) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10 miles from Garstang.

Location: southbound between junctions J32 (Blackpool) and J31 (Preston) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 January 2026 to 6 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.64 miles from Garstang.

Location: southbound at junction J32 (Blackpool) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 January 2026 to 6 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.2 miles from Garstang.

Location: northbound between junctions J31A (Preston) and J32 (Blackpool) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 28 January 2026.
Nearest town: 8.74 miles from Garstang.

Location: northbound between junctions J31 (Preston) and J32 (Blackpool) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 January 2026 to 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 14 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 February 2026 to 21 February 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.47 miles from Garstang.

Location: northbound between junctions J8 and J9 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 08:00 on 2 February 2026 to 17:00 on 4 February 2026.
Nearest town: 16.32 miles from Garstang.

Location: northbound between junctions J8 and J9 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 3 February 2026 to 17:00 on 3 February 2026.
Nearest town: 15.89 miles from Garstang.

Location: northbound between junctions J8 and J9 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 4 February 2026 to 17:00 on 4 February 2026.
Nearest town: 15.19 miles from Garstang.

Location: northbound between junctions J8 and J9 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 2 February 2026 to 17:00 on 2 February 2026.
Nearest town: 16.32 miles from Garstang.

Location: southbound between junctions J9 and J8 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 9 February 2026 to 17:00 on 9 February 2026.
Nearest town: 15.79 miles from Garstang.

Location: southbound between the M6 and junction J9 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 5 February 2026 to 17:00 on 5 February 2026.
Nearest town: 13.2 miles from Garstang.

Location: southbound between the M6 and junction J8 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 08:00 on 5 February 2026 to 17:00 on 9 February 2026.
Nearest town: 13.2 miles from Garstang.

Location: southbound between junctions J9 and J8 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 6 February 2026 to 17:00 on 6 February 2026.
Nearest town: 14.34 miles from Garstang.

Location: westbound between the M6 southbound and junction J1 (Preston) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 9 March 2026 to 06:00 on 14 March 2026.
Nearest town: 6.61 miles from Garstang.

Location: westbound between the M6 southbound and junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.61 miles from Garstang.

Location: eastbound entry slip at junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.12 miles from Garstang.

Location: westbound exit slip at junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.13 miles from Garstang.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 March 2026 to 14 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.23 miles from Garstang.