Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Vehicle tyre change.
Time To Clear : The event is expected to clear between 13:30 and 13:45 on 12 June 2025.
Normal traffic conditions are expected between 13:30 and 13:45 on 12 June 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 9.97 miles from Artington.

Location: westbound between junctions J9 (Gatwick Airport) and J9A .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 13:30 and 13:45 on 12 June 2025.
Normal traffic conditions are expected between 13:15 and 13:30 on 12 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.42 miles from Artington.

Location: westbound exit slip at junction J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 12:45 and 13:00 on 12 June 2025.
Normal traffic conditions are expected between 12:45 and 13:00 on 12 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.67 miles from Artington.

Location: anticlockwise at junction J10 (Guildford) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 12:30 and 12:45 on 12 June 2025.
Normal traffic conditions are expected between 12:30 and 12:45 on 12 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 9.49 miles from Artington.

Location: eastbound between junctions J4 (Guildford) and J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 10:45 and 11:00 on 12 June 2025.
Normal traffic conditions are expected between 10:45 and 11:00 on 12 June 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 10.3 miles from Artington.

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Due to: Road traffic collision.
Status : Cleared.
Nearest town: 19.94 miles from Artington.

Location: clockwise at junction J10 (Guildford) .
Due to: Broken down vehicle.
Status : Cleared.
Nearest town: 9.5 miles from Artington.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Vehicle tyre change.
Time To Clear : The event is expected to clear between 09:00 and 09:15 on 12 June 2025.
Normal traffic conditions are expected between 09:00 and 09:15 on 12 June 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 9.85 miles from Artington.

Location: westbound between junctions J5 (Colnbrook) and J6 (Slough) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 09:45 and 10:00 on 12 June 2025.
Normal traffic conditions are expected between 09:45 and 10:00 on 12 June 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 18.89 miles from Artington.

Cross Deep (All Directions) junction with Grotto Road.
All closures have been removed - Traffic flows have returned to normal in the area
Nearest town: 19.12 miles from Artington.

Leatherhead Road (Northbound).
Traffic is moving well.
Traffic is moving well.
Nearest town: 14.42 miles from Artington.

Burlington Road between High Street and Malden Way (Kingston By Pass) - road is closed due to a fire.
Traffic is flowing well.
Nearest town: 19.51 miles from Artington.

Tolworth Rise North (Northbound) - Lane restriction on on-slip to northbound A3 at the junction of Fairmead due to emergency gas works.
Restrictions have been removed.
All lanes open.
Nearest town: 17.6 miles from Artington.

High Street (Both Directions) at the junction of Cambridge Road - 2-way temporary traffic signals in operation to facilitate new gas connection now removed.
Traffic is moving well.
Nearest town: 19.23 miles from Artington.

On Tolworth Broadway (Southbound) at the junction with A3 Tolworth Roundabout, there is a broken down vehicle blocking lane two of three).
Approach with caution.
All lanes have reopened.
Traffic is flowing well.
Nearest town: 17.38 miles from Artington.

Location: clockwise entry slip at junction J15 (Slough) from the M4 westbound.
Due to: Congestion.
Normal traffic conditions are expected between 13:15 and 13:30 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.81 miles from Artington.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 13:15 and 13:30 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.59 miles from Artington.

Location: clockwise exit slip at junction J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 12:45 and 13:00 on 12 June 2025.
Nearest town: 9.48 miles from Artington.

Location: westbound between junctions J9 (Gatwick Airport) and J9A .
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.34 miles from Artington.

Location: anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.97 miles from Artington.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 12 June 2025.
Nearest town: 15.87 miles from Artington.

Location: southbound exit slip to the A245 .
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 12 June 2025.
Nearest town: 10.86 miles from Artington.

Location: anticlockwise exit slip at junction J8 (Reigate) .
Due to: Congestion.
Normal traffic conditions are expected between 10:30 and 10:45 on 12 June 2025.
Nearest town: 16.86 miles from Artington.

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 12 June 2025.
Cause : Road traffic collision.
Delay : There are currently delays of 30 minutes against expected traffic.
Nearest town: 19.87 miles from Artington.

Location: northbound between the junctions with the M23 and the A237 .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.12 miles from Artington.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 09:45 and 10:00 on 12 June 2025.
Nearest town: 15.86 miles from Artington.

Location: northbound exit slip to the A244 .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.26 miles from Artington.

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 09:45 and 10:00 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Earlier
Due to: Caused by the earlier broken down vehicle.
Nearest town: 9.46 miles from Artington.

Location: clockwise entry slip at junction J10 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.41 miles from Artington.

Location: southbound exit slip at junction J9 (Gatwick Airport) .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.86 miles from Artington.

Location: southbound exit slip at junction J10 (Crawley) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.98 miles from Artington.

Location: northbound between the junctions with the M23 and the A237 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 12 June 2025.
Nearest town: 19.12 miles from Artington.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 12 June 2025.
Nearest town: 15.86 miles from Artington.

Location: southbound exit slip at junction J9 (Gatwick Airport) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.86 miles from Artington.

Location: southbound exit slip at junction J9 (Gatwick Airport) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 12 June 2025.
Nearest town: 19.86 miles from Artington.

Location: northbound between the junctions with the M23 and the A237 .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.12 miles from Artington.

Location: westbound between the junctions with the A3044 and the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 12 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.9 miles from Artington.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.06 miles from Artington.

Location: eastbound at junction J1 (Sunbury) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:30 on 12 June 2025 to 05:00 on 13 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.91 miles from Artington.

Location: eastbound entry slip from the A308 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:30 on 12 June 2025 to 05:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.93 miles from Artington.

Location: anticlockwise entry slip at junction J14 (Heathrow Airport) from A3113.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.81 miles from Artington.

Location: anticlockwise between junctions J14 (Heathrow Airport) and J13 (A30) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 17.38 miles from Artington.

Location: anticlockwise at junction J14 (Heathrow Airport) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.17 miles from Artington.

Location: clockwise entry slip at junction J10 (Guildford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.43 miles from Artington.

Location: northbound exit slip to the M25 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.25 miles from Artington.

Location: anticlockwise at junction J11 (Chertsey) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.61 miles from Artington.

Location: anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.61 miles from Artington.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.16 miles from Artington.

Location: northbound between the junctions with the A272 and the M23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.29 miles from Artington.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 July 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 10.61 miles from Artington.

Location: westbound at junction J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 July 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 10.65 miles from Artington.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 9.53 miles from Artington.

Location: anticlockwise at junction J10 (Guildford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 9.41 miles from Artington.

Location: southbound between the A245 and the junction with the M25 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 10.85 miles from Artington.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 9.32 miles from Artington.

Location: clockwise at junction J10 (Guildford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 9.5 miles from Artington.

Location: westbound between junctions J10 (Reading) and J12 (Reading) .
Due to: Roadworks scheme.
Period : from 20:01 on 11 June 2025 to 06:00 on 24 June 2025.
Nearest town: 18.86 miles from Artington.

Location: northbound between the junctions with the A247 and the M25 .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 1 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 8.3 miles from Artington.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Due to: Roadworks scheme.
Period : from 21:04 on 4 November 2024 to 06:00 on 5 July 2025.
Nearest town: 10.65 miles from Artington.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Due to: Roadworks scheme.
Period : from 23:59 on 31 December 2023 to 06:00 on 31 December 2025.
Nearest town: 9.5 miles from Artington.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Due to: Roadworks scheme.
Period : from 00:02 on 1 January 2024 to 06:00 on 31 December 2025.
Nearest town: 9.41 miles from Artington.

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 19 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 23 June 2025 to 27 June 2025.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 30 June 2025 to 4 July 2025.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 7 July 2025 to 11 July 2025.
Nearest town: 11.23 miles from Artington.

Location: clockwise between junctions J8 (Reigate) and J9 (Leatherhead) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 June 2025 to 05:30 on 19 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.82 miles from Artington.

Location: westbound between junctions J8 (High Wycombe) and J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.02 miles from Artington.

Location: westbound at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.04 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2 miles from Artington.

Location: northbound between the A283 and the junction with the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.94 miles from Artington.

Location: clockwise at junction J11 (Chertsey) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:30 on 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.37 miles from Artington.

Location: anticlockwise at junction J11 (Chertsey) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:30 on 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.79 miles from Artington.

Location: anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:30 on 14 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.52 miles from Artington.

Location: clockwise between junctions J11 (Chertsey) and J12 (Basingstoke) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:30 on 14 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.03 miles from Artington.

Location: anticlockwise at junction J12 (Basingstoke) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:30 on 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.05 miles from Artington.

Location: westbound at junction J4 (Guildford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 June 2025 to 20 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.27 miles from Artington.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 June 2025 to 20 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.17 miles from Artington.

Location: westbound between junctions J3 (Woking) and J4A (Farnborough) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 17 June 2025 to 06:00 on 20 June 2025.
Nearest town: 10.17 miles from Artington.

Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 June 2025 to 20 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.4 miles from Artington.

Location: southbound between the A320 and the junction with the A31 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 17 June 2025 to 19 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.53 miles from Artington.

Location: southbound between the junctions with the A3100 and the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 17 June 2025 to 19 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.11 miles from Artington.

Location: northbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.16 miles from Artington.

Location: northbound between the A247 and the junction with the M25 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 19 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.5 miles from Artington.

Location: northbound between the A247 and the junction with the M25 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 16 June 2025 to 05:30 on 19 June 2025.
Nearest town: 7.5 miles from Artington.

Location: northbound at the junction with the M25 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.25 miles from Artington.

Location: anticlockwise between junctions J11 (Chertsey) and J11 (Chertsey) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 16 June 2025 to 05:30 on 20 June 2025.
Nearest town: 11.61 miles from Artington.

Location: anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.36 miles from Artington.

Location: anticlockwise at junction J11 (Chertsey) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.79 miles from Artington.

Location: anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.61 miles from Artington.

Location: anticlockwise exit slip at junction J10 (Guildford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.41 miles from Artington.

Location: westbound at junction J1 (Sunbury) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 19 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.09 miles from Artington.

Location: westbound between the A312 and the junction with the M3 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 19 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.37 miles from Artington.

Location: anticlockwise at junction J12 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.32 miles from Artington.

Location: southbound entry slip from the A247 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.51 miles from Artington.

Location: southbound between the M25 and the junction with the A322 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.79 miles from Artington.

Location: southbound entry slip from the A264 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.96 miles from Artington.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.65 miles from Artington.

Location: westbound between junctions J9 (Gatwick Airport) and J9A .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 18 June 2025.
Nearest town: 19.76 miles from Artington.

Location: westbound between junctions J9 (Gatwick Airport) and J9A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.7 miles from Artington.

Location: westbound between junctions J9 (Gatwick Airport) and J9A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.76 miles from Artington.

Location: northbound between junctions J10 (Crawley) and J9 (Gatwick Airport) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 18 June 2025.
Nearest town: 19.92 miles from Artington.

Location: northbound exit slip at junction J9 (Gatwick Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.8 miles from Artington.

Location: northbound exit slip at junction J9 (Gatwick Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.83 miles from Artington.

Location: eastbound between junctions J9A and J9 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19 miles from Artington.

Location: northbound between junctions J10 (Crawley) and J9 (Gatwick Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.93 miles from Artington.

Location: northbound entry slip at junction J10 (Crawley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.92 miles from Artington.

Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 20 June 2025.
Nearest town: 19.01 miles from Artington.

Location: The junction of the A23 and the M23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.01 miles from Artington.

Location: northbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.94 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.33 miles from Artington.

Location: The junction of the A23 and the M23 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 20 June 2025.
Nearest town: 18.2 miles from Artington.

Location: The junction of the A23 and the M23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.95 miles from Artington.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.71 miles from Artington.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.2 miles from Artington.

Location: southbound exit slip to the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.53 miles from Artington.

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 15 June 2025 to 05:30 on 16 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.97 miles from Artington.

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.84 miles from Artington.

Location: southbound entry slip from the A322 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.34 miles from Artington.

Location: southbound between the A244 and the junction with the A245 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.57 miles from Artington.

Location: northbound between the junctions with the A245 and the A244 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.74 miles from Artington.

Location: westbound at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.04 miles from Artington.

Location: westbound entry slip at junction J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.86 miles from Artington.

Location: westbound entry slip at junction J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Schedule : From 21:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.03 miles from Artington.

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.02 miles from Artington.

Location: southbound between junctions J7 (Crawley) and J8 (Reigate) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Schedule : From 23:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.16 miles from Artington.

Location: southbound exit slip at junction J8 (Reigate) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Schedule : From 23:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.94 miles from Artington.

Location: northbound between the junctions with the M23 and the A237 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Schedule : From 23:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.22 miles from Artington.

Location: southbound between the A237 and the junction with the A242 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Schedule : From 23:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.67 miles from Artington.

Location: northbound between junctions J4A and J4 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 05:30 on 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.69 miles from Artington.

Location: northbound entry slip at junction J8 (Reigate) from the M25 anticlockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Schedule : From 23:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.76 miles from Artington.

Location: northbound between the A242 and the junction with the A237 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Schedule : From 23:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19 miles from Artington.

Location: southbound between the junctions with the A237 and the M23 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Schedule : From 23:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.5 miles from Artington.

Location: northbound exit slip to the A333 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.34 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.71 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.69 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.39 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.85 miles from Artington.

Location: northbound between the A325 and the junction with the A283 Milford north.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 July 2025 to 06:00 on 22 August 2025.
Nearest town: 15.78 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.24 miles from Artington.

Location: northbound between the A325 and the junction with the A333 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.78 miles from Artington.

Location: northbound entry slip at Liphook Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.55 miles from Artington.

Location: northbound exit slip at Liphook Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.61 miles from Artington.

Location: northbound at the junction with the A325 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.06 miles from Artington.

Location: eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 16:00 on 12 June 2025.
Nearest town: 13.19 miles from Artington.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.35 miles from Artington.

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 12 June 2025.
Nearest town: 11.61 miles from Artington.

Location: northbound exit slip to the A245 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:30 on 13 June 2025.
Schedule : From 23:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 June 2025 to 20 June 2025.
Schedule : From 23:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.49 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.96 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.97 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.69 miles from Artington.

Location: northbound entry slip from the A283 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.84 miles from Artington.

Location: northbound between the A283 and the junction with the A31 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 June 2025 to 06:00 on 2 July 2025.
Nearest town: 3.84 miles from Artington.

Location: northbound between the A333 and the junction with the A31 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.15 miles from Artington.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.64 miles from Artington.

Location: southbound at junction J10 (Crawley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 July 2025 to 7 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 July 2025 to 28 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.95 miles from Artington.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 21 June 2025 to 06:00 on 21 July 2025.
Nearest town: 18.89 miles from Artington.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.89 miles from Artington.

Location: northbound at junction J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.88 miles from Artington.

Location: northbound between the junctions with the A272 and the M23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.87 miles from Artington.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 July 2025 to 06:00 on 4 August 2025.
Nearest town: 18.89 miles from Artington.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 July 2025 to 7 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 July 2025 to 28 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.89 miles from Artington.

Location: southbound at junction J10 (Crawley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.95 miles from Artington.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.89 miles from Artington.

Location: northbound at junction J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.88 miles from Artington.

Location: northbound between the junctions with the A272 and the M23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.87 miles from Artington.

Location: southbound between the junctions with the M23 and the A272 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.95 miles from Artington.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.
Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.89 miles from Artington.

Location: westbound exit slip at junction J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 October 2025 to 23 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.98 miles from Artington.

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 12 December 2025.
Nearest town: 18.89 miles from Artington.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 October 2025 to 06:00 on 16 December 2025.
Nearest town: 18.89 miles from Artington.