Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 15:30 and 15:45 on 8 July 2025.
Normal traffic conditions are expected between 15:30 and 15:45 on 8 July 2025.
Delay : There are currently delays of 50 minutes against expected traffic.
Lanes Closed : There are two of three lanes closed.
Nearest town: 10.14 miles from Tea Green.

Location: northbound between the junctions with the A5183 and the A4012 .
Due to: Congestion.
Normal traffic conditions are expected between 13:45 and 14:00 on 8 July 2025.
Delay : There are currently delays of 20 minutes against expected traffic.
Nearest town: 9.01 miles from Tea Green.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Due to: Congestion.
Normal traffic conditions are expected between 13:45 and 14:00 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.88 miles from Tea Green.

Location: northbound entry slip at junction J12 (Flitwick) .
Due to: Congestion.
Normal traffic conditions are expected between 13:30 and 13:45 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.15 miles from Tea Green.

Location: northbound between the junctions with the A5183 and the A4012 .
Due to: Congestion.
Normal traffic conditions are expected between 13:30 and 13:45 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.83 miles from Tea Green.

Location: northbound between junctions J11A and J13 (Milton Keynes) .
Due to: Congestion.
Normal traffic conditions are expected between 13:45 and 14:00 on 8 July 2025.
Cause : Road traffic collision.
Delay : There are currently delays of 50 minutes against expected traffic.
Nearest town: 6.29 miles from Tea Green.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Due to: Congestion.
Normal traffic conditions are expected between 13:15 and 13:30 on 8 July 2025.
Cause : Road traffic collision.
Delay : There are currently delays of 30 minutes against expected traffic.
Nearest town: 10.83 miles from Tea Green.

Location: The junction of the A414 and the A1M .
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 8 July 2025.
Nearest town: 9.87 miles from Tea Green.

Location: southbound exit slip at junction J14 (Milton Keynes) .
Due to: Congestion.
Normal traffic conditions are expected between 10:00 and 10:15 on 8 July 2025.
Nearest town: 18.61 miles from Tea Green.

Location: anticlockwise exit slip at junction J21A (Watword) .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.46 miles from Tea Green.

Location: southbound between the junctions with the A6001 Biggleswade South and the A507 .
Due to: Congestion.
Normal traffic conditions are expected between 10:00 and 10:15 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.74 miles from Tea Green.

Location: clockwise exit slip at junction J22 (St Albans) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 8 July 2025.
Nearest town: 12.75 miles from Tea Green.

Location: southbound entry slip at junction J10 (Luton Airport) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 3.98 miles from Tea Green.

Location: southbound entry slip at junction J11 (Luton) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 8 July 2025.
Nearest town: 4.69 miles from Tea Green.

Location: The junction of the A414 and the A1M .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.87 miles from Tea Green.

Location: anticlockwise exit slip at junction J22 (St Albans) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.86 miles from Tea Green.

Location: northbound between the junctions with the A5183 and the A4012 .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.83 miles from Tea Green.

Location: anticlockwise at junction J17 (Maple Cross) .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.85 miles from Tea Green.

Location: anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.69 miles from Tea Green.

Location: southbound at junction J11A .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 3.9 miles from Tea Green.

Location: southbound between the junctions with the A4146 South and the A4012 .
Due to: Emergency roadworks.
Period : expect disruption until 23:00 on 10 July 2025.
Nearest town: 12.61 miles from Tea Green.

Location: northbound between the junctions with the A4012 and the A4146 Bletchley South.
Due to: Emergency roadworks.
Period : expect disruption until 23:00 on 10 July 2025.
Nearest town: 12.5 miles from Tea Green.

Location: clockwise exit slip at junction J23 (Hatfield) .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.12 miles from Tea Green.

Location: southbound entry slip at junction J8 (Hemel Hstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.18 miles from Tea Green.

Location: The A1M northbound between junctions J6 and J7 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 8 July 2025.
Nearest town: 6.78 miles from Tea Green.

Location: The A1M southbound between junctions J7 and J6 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 July 2025 to 05:00 on 9 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.34 miles from Tea Green.

Location: The A1M northbound between junctions J4 and J6 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 July 2025 to 05:00 on 9 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.92 miles from Tea Green.

Location: clockwise at junction J21A (Watword) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.45 miles from Tea Green.

Location: anticlockwise at junction J21 (M1) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.49 miles from Tea Green.

Location: anticlockwise at junction J21 (M1) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.36 miles from Tea Green.

Location: anticlockwise between junctions J22 (St Albans) and J21A (Watword) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.77 miles from Tea Green.

Location: southbound exit slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.73 miles from Tea Green.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.
Nearest town: 10.23 miles from Tea Green.

Location: clockwise entry slip at junction J22 (St Albans) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.68 miles from Tea Green.

Location: clockwise between junctions J21A (Watword) and J22 (St Albans) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.89 miles from Tea Green.

Location: northbound between the junctions with the A507 and the A6001 Biggleswade South .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 8 July 2025 to 10 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.8 miles from Tea Green.

Location: northbound between the junctions with the A6001 Biggleswade South and the A6001 Biggleswade North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 8 July 2025 to 10 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.22 miles from Tea Green.

Location: northbound between junctions J6 (Watford A405) and J8 (Hemel Hstead) .
Lane Closures : The hard shoulder is closed.
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 15:30 on 8 July 2025.
Nearest town: 11.1 miles from Tea Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : The hard shoulder is closed.
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 15:30 on 8 July 2025.
Nearest town: 8.25 miles from Tea Green.

Location: northbound entry slip at junction J8 (Hemel Hstead) .
Lane Closures : The hard shoulder is closed.
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 15:30 on 8 July 2025.
Nearest town: 9.86 miles from Tea Green.

Location: southbound between junctions J6 (Watford A405) and J1 (North Circular) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.21 miles from Tea Green.

Location: southbound entry slip at junction J5 (Harrow A41) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.39 miles from Tea Green.

Location: northbound between the A603 and the junction with the A1 .
Due to: Roadworks scheme.
Period : from 21:01 on 4 July 2025 to 05:00 on 28 July 2025.
Nearest town: 17.38 miles from Tea Green.

Location: northbound between the M1 and the junction with the A4146 Bletchley South.
Due to: Roadworks scheme.
Period : from 20:05 on 4 July 2025 to 06:00 on 22 August 2025.
Nearest town: 7.99 miles from Tea Green.

Location: southbound between the A4146 South and the junction with the A5183 .
Due to: Roadworks scheme.
Period : from 20:04 on 4 July 2025 to 06:00 on 22 August 2025.
Nearest town: 16.08 miles from Tea Green.

Location: The A1M northbound between junctions J4 and J9 .
Due to: Roadworks scheme.
Period : from 21:01 on 3 July 2025 to 05:00 on 10 July 2025.
Nearest town: 7.94 miles from Tea Green.

Location: The A1M southbound between junctions J9 and J6 .
Due to: Roadworks scheme.
Period : from 21:01 on 3 July 2025 to 05:00 on 10 July 2025.
Nearest town: 7.57 miles from Tea Green.

Location: southbound exit slip at junction J14 (Milton Keynes) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.58 miles from Tea Green.

Location: The A1M northbound between junctions J8 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 12:00 on 8 December 2025.
Nearest town: 7.48 miles from Tea Green.

Location: northbound.
Due to: Roadworks scheme.
Period : from 21:00 on 4 July 2025 to 05:00 on 28 July 2025.
Nearest town: 15.43 miles from Tea Green.

Location: northbound between junctions J6 (Watford A405) and J6A (St Albans) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.
Schedule : From 23:00 on 18 July 2025 to 06:00 on 19 July 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 21 July 2025 to 25 July 2025.
Schedule : From 23:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.97 miles from Tea Green.

Location: northbound between junctions J5 (Harrow A41) and J6 (Watford A405) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.
Schedule : From 23:00 on 18 July 2025 to 06:00 on 19 July 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 21 July 2025 to 25 July 2025.
Schedule : From 23:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.12 miles from Tea Green.

Location: northbound at the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.
Schedule : From 23:00 on 18 July 2025 to 06:00 on 19 July 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 21 July 2025 to 25 July 2025.
Schedule : From 23:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.1 miles from Tea Green.

Location: northbound between junctions J1 (North Circular) and J4 (Edgware A41) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 9 July 2025 to 05:00 on 10 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.33 miles from Tea Green.

Location: anticlockwise between junctions J25 (Enfield) and J24 (Potters Bar) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 11 July 2025 to 05:00 on 12 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.45 miles from Tea Green.

Location: southbound entry slip from the A4146 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 23:59 on 14 July 2025 to 06:00 on 18 July 2025.
Nearest town: 16.89 miles from Tea Green.

Location: anticlockwise between junctions J20 (Hemel Hstead) and J18 (Rickmansworth) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:30 from 14 July 2025 to 17 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.18 miles from Tea Green.

Location: anticlockwise between junctions J18 (Rickmansworth) and J17 (Maple Cross) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:30 from 14 July 2025 to 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.49 miles from Tea Green.

Location: anticlockwise at junction J18 (Rickmansworth) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:30 from 14 July 2025 to 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.14 miles from Tea Green.

Location: anticlockwise exit slip at junction J17 (Maple Cross) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:30 from 14 July 2025 to 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.67 miles from Tea Green.

Location: anticlockwise entry slip at junction J25 (Enfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 14 July 2025 to 05:00 on 15 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.65 miles from Tea Green.

Location: The A1M northbound at junction J1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 18 July 2025.
Schedule : From 23:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.55 miles from Tea Green.

Location: clockwise entry slip at junction J21 (M1) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 14 July 2025 to 05:30 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.14 miles from Tea Green.

Location: clockwise at junction J21A (Watword) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 14 July 2025 to 05:30 on 15 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.45 miles from Tea Green.

Location: clockwise between junctions J20 (Hemel Hstead) and J21 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 14 July 2025 to 05:30 on 15 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.62 miles from Tea Green.

Location: clockwise exit slip at junction J21A (Watword) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 14 July 2025 to 05:30 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.31 miles from Tea Green.

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 21 July 2025 to 23 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.47 miles from Tea Green.

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 16 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.41 miles from Tea Green.

Location: southbound between the M25 and the junction with the A5135 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 18 July 2025.
Schedule : From 23:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.6 miles from Tea Green.

Location: The A1M southbound at junction J1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 18 July 2025.
Schedule : From 23:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.37 miles from Tea Green.

Location: anticlockwise between junctions J25 (Enfield) and J24 (Potters Bar) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 14 July 2025 to 05:00 on 15 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.71 miles from Tea Green.

Location: southbound between the junctions with the A603 and the A6001 Biggleswade North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.13 miles from Tea Green.

Location: northbound between the A6001 Biggleswade South and the junction with the A6001 Biggleswade North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.35 miles from Tea Green.

Location: southbound between the A603 and the junction with the A6001 Biggleswade South.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.
Nearest town: 15.13 miles from Tea Green.

Location: southbound between the junctions with the A6001 Biggleswade North and the A6001 Biggleswade South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.14 miles from Tea Green.

Location: southbound between the A603 and the junction with the A6001 Biggleswade North.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 July 2025 to 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.32 miles from Tea Green.

Location: The A1M northbound between junctions J9 and J10 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.8 miles from Tea Green.

Location: northbound between the A5183 and the junction with the A4146 Bletchley South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 16 July 2025.
Nearest town: 9.65 miles from Tea Green.

Location: southbound between the A4146 South and the junction with the A5183 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 16 July 2025.
Nearest town: 10.27 miles from Tea Green.

Location: southbound entry slip from the A4146 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 14 July 2025 to 06:00 on 15 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.89 miles from Tea Green.

Location: northbound between the A4146 and the junction with the A509 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 06:00 on 19 July 2025.
Nearest town: 16.96 miles from Tea Green.

Location: northbound entry slip from the A4146 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 23:59 on 14 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.96 miles from Tea Green.

Location: northbound exit slip to the A421 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.91 miles from Tea Green.

Location: northbound between junctions J6 (Watford A405) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.86 miles from Tea Green.

Location: southbound exit slip at junction J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 23 July 2025 to 05:00 on 24 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.84 miles from Tea Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.08 miles from Tea Green.

Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.98 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 14 July 2025 to 18 July 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 21 July 2025 to 25 July 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 28 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Nearest town: 5.7 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 5.7 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 5.7 miles from Tea Green.

Location: southbound entry slip at junction J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 23 July 2025 to 05:00 on 24 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.89 miles from Tea Green.

Location: clockwise between junctions J20 (Hemel Hstead) and J21 (M1) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.64 miles from Tea Green.

Location: northbound between junctions J6 (Watford A405) and J6A (St Albans) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.03 miles from Tea Green.

Location: clockwise exit slip at junction J21 (M1) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.45 miles from Tea Green.

Location: northbound between junctions J6 (Watford A405) and J9 (Dunstable A5) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 14 July 2025 to 18 July 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 21 July 2025 to 25 July 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 28 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Nearest town: 11.74 miles from Tea Green.

Location: southbound between junctions J10 (Luton Airport) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.84 miles from Tea Green.

Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.81 miles from Tea Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.74 miles from Tea Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.41 miles from Tea Green.

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 14 July 2025 to 18 July 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 21 July 2025 to 25 July 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 28 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Nearest town: 3.84 miles from Tea Green.

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.84 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 14 July 2025 to 18 July 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 21 July 2025 to 25 July 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 28 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Nearest town: 4.81 miles from Tea Green.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.13 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.81 miles from Tea Green.

Location: southbound at junction J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.22 miles from Tea Green.

Location: northbound entry slip at junction J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 22 July 2025 to 05:00 on 23 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.94 miles from Tea Green.

Location: northbound exit slip at junction J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 22 July 2025 to 05:00 on 23 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.02 miles from Tea Green.

Location: northbound exit slip at junction J9 (Dunstable A5) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.84 miles from Tea Green.

Location: northbound between the A421 and the junction with the A509 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 9 July 2025 to 05:00 on 10 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.04 miles from Tea Green.

Location: southbound between the A6 Bedford central and the junction with the A6 Bedford south .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.71 miles from Tea Green.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Tea Green.

Location: southbound between the A6 Bedford south and the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.7 miles from Tea Green.

Location: southbound between the junctions with the A603 and the A6 Bedford central.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.64 miles from Tea Green.

Location: southbound between the junctions with the A603 and the A6 Bedford central.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.74 miles from Tea Green.

Location: northbound between the M1 and the junction with the A6 Bedford south.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.48 miles from Tea Green.

Location: northbound between the A5183 and the junction with the A4146 Bletchley South.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Nearest town: 8.38 miles from Tea Green.

Location: southbound between the junctions with the A4146 North and the A4146 South.
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.68 miles from Tea Green.

Location: southbound between the A4146 South and the junction with the A5183 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Nearest town: 12.95 miles from Tea Green.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 11 July 2025 to 05:00 on 12 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.29 miles from Tea Green.

Location: northbound at junction J13 (Milton Keynes) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 11 July 2025 to 05:00 on 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.66 miles from Tea Green.

Location: The A1M southbound between junctions J8 and J7 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 11 July 2025 to 05:00 on 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.03 miles from Tea Green.

Location: The A1M southbound between junctions J8 and J7 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 11 July 2025 to 05:00 on 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.22 miles from Tea Green.

Location: The A1M southbound entry slip at junction J10 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 11 July 2025 to 05:00 on 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.52 miles from Tea Green.

Location: The A1M southbound between junctions J10 and J9 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 11 July 2025 to 05:00 on 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.49 miles from Tea Green.

Location: southbound between the junctions with the A4146 South and the A4012 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 July 2025 to 12 July 2025.
Nearest town: 11.35 miles from Tea Green.

Location: The A1M southbound between junctions J7 and J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 10 July 2025 to 16:00 on 10 July 2025.
Nearest town: 6.57 miles from Tea Green.

Location: northbound between the junctions with the A4012 and the A4146 Bletchley South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 July 2025 to 12 July 2025.
Nearest town: 10.73 miles from Tea Green.

Location: The A1M southbound between junctions J10 and J9 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 11 July 2025 to 16:00 on 11 July 2025.
Nearest town: 9.94 miles from Tea Green.

Location: The A1M northbound exit slip at junction J7 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 18 July 2025 to 16:00 on 18 July 2025.
Nearest town: 6.58 miles from Tea Green.

Location: The A1M northbound between junctions J8 and J9 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 14 July 2025 to 15 July 2025.
Nearest town: 6.62 miles from Tea Green.

Location: The A1M northbound between junctions J9 and J10 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 16 July 2025 to 16:00 on 16 July 2025.
Nearest town: 9.11 miles from Tea Green.

Location: The A1M northbound between junctions J9 and J10 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 17 July 2025 to 16:00 on 17 July 2025.
Nearest town: 10.2 miles from Tea Green.

Location: The A1M northbound between junctions J7 and J8 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 18 July 2025 to 16:00 on 18 July 2025.
Nearest town: 6.5 miles from Tea Green.

Location: The A1M northbound between junctions J7 and J8 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 14 July 2025 to 15 July 2025.
Nearest town: 5.76 miles from Tea Green.

Location: The A1M northbound between junctions J9 and J10 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 8 July 2025.
Nearest town: 10.2 miles from Tea Green.

Location: southbound at the junction with the A4146 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 06:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.08 miles from Tea Green.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.65 miles from Tea Green.

Location: southbound between the A4146 South and the junction with the A4012 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.03 miles from Tea Green.

Location: southbound between the junctions with the A4146 North and the A4146 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.35 miles from Tea Green.

Location: northbound between the A5183 and the junction with the A4146 Bletchley South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.38 miles from Tea Green.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.73 miles from Tea Green.

Location: northbound at the junction with the A4146 Bletchley South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 06:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.02 miles from Tea Green.

Location: southbound between the A4146 South and the junction with the A5183 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.12 miles from Tea Green.

Location: northbound between the junctions with the M1 and the A5183 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.99 miles from Tea Green.

Location: northbound between junctions J11 (Luton) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 July 2025 to 10 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.34 miles from Tea Green.

Location: northbound at junction J11A .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 July 2025 to 10 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.75 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 09:30 on 11 July 2025 to 15:30 on 11 July 2025.
Nearest town: 4.72 miles from Tea Green.

Location: The A1M northbound exit slip at junction J7 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 July 2025 to 05:00 on 11 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.58 miles from Tea Green.

Location: anticlockwise between junctions J20 (Hemel Hstead) and J18 (Rickmansworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 July 2025 to 05:00 on 11 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.7 miles from Tea Green.

Location: anticlockwise exit slip at junction J18 (Rickmansworth) .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 July 2025 to 05:00 on 11 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.14 miles from Tea Green.

Location: anticlockwise entry slip at junction J18 (Rickmansworth) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 10 July 2025 to 05:00 on 11 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.49 miles from Tea Green.

Location: The A1M northbound between junctions J4 and J6 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 July 2025 to 05:00 on 11 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.18 miles from Tea Green.

Location: The A1M northbound entry slip at junction J6 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 July 2025 to 05:00 on 11 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.65 miles from Tea Green.

Location: The A1M northbound between junctions J6 and J8 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 July 2025 to 05:00 on 11 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.94 miles from Tea Green.

Location: northbound entry slip from the A4146 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 10 July 2025 to 05:00 on 11 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.96 miles from Tea Green.

Location: The A1M northbound between junctions J8 and J9 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 July 2025 to 05:00 on 10 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.73 miles from Tea Green.

Location: The A1M southbound between junctions J9 and J8 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 July 2025 to 05:00 on 10 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.57 miles from Tea Green.

Location: clockwise between junctions J23 (Hatfield) and J24 (Potters Bar) .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 16:00 on 8 July 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.74 miles from Tea Green.

Location: southbound exit slip at junction J13 (Milton Keynes) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.22 miles from Tea Green.

Location: southbound between junctions J14 (Milton Keynes) and J13 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.17 miles from Tea Green.

Location: southbound at junction J13 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.23 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 09:30 on 10 July 2025 to 15:30 on 10 July 2025.
Nearest town: 5.55 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 09:30 on 10 July 2025 to 15:30 on 10 July 2025.
Nearest town: 4.81 miles from Tea Green.

Location: anticlockwise exit slip at junction J21 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 July 2025 to 11 July 2025.
Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.36 miles from Tea Green.

Location: northbound entry slip at junction J6A (St Albans) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 July 2025 to 11 July 2025.
Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.18 miles from Tea Green.

Location: anticlockwise between junctions J22 (St Albans) and J21A (Watword) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 July 2025 to 11 July 2025.
Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.74 miles from Tea Green.

Location: anticlockwise at junction J21 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 July 2025 to 11 July 2025.
Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.36 miles from Tea Green.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 09:30 on 9 July 2025 to 15:30 on 9 July 2025.
Nearest town: 6.88 miles from Tea Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 09:30 on 9 July 2025 to 15:30 on 9 July 2025.
Nearest town: 6.71 miles from Tea Green.

Location: northbound between the junctions with the A6001 Biggleswade South and the A6001 Biggleswade North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 July 2025 to 05:00 on 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.34 miles from Tea Green.

Location: southbound at the junction with the A6001 Biggleswade South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 8 July 2025 to 10 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.25 miles from Tea Green.

Location: northbound between the junctions with the A603 and the A4280 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 July 2025 to 05:00 on 28 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.38 miles from Tea Green.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 19 July 2025 to 06:00 on 21 July 2025.
Schedule : From 21:00 on 25 July 2025 to 05:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.29 miles from Tea Green.

Location: northbound between the junctions with the A603 and the A421 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 19 July 2025 to 06:00 on 21 July 2025.
Schedule : From 21:00 on 25 July 2025 to 05:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.24 miles from Tea Green.

Location: northbound between the junctions with the A603 and the A421 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 19 July 2025 to 06:00 on 21 July 2025.
Schedule : From 21:00 on 25 July 2025 to 05:00 on 28 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.81 miles from Tea Green.

Location: clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.
Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.69 miles from Tea Green.

Location: clockwise between junctions J24 (Potters Bar) and J25 (Enfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.
Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.35 miles from Tea Green.

Location: clockwise at junction J25 (Enfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.
Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.48 miles from Tea Green.

Location: anticlockwise at junction J25 (Enfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.9 miles from Tea Green.

Location: The A1M northbound between junctions J3 and J4 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 16 July 2025.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 21 July 2025 to 23 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.58 miles from Tea Green.

Location: anticlockwise between junctions J25 (Enfield) and J24 (Potters Bar) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.5 miles from Tea Green.

Location: The A1M northbound entry slip at junction J3 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 16 July 2025.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 21 July 2025 to 23 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.9 miles from Tea Green.

Location: northbound between the A6001 Biggleswade South and the junction with the A6001 Biggleswade North.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 July 2025 to 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.29 miles from Tea Green.

Location: southbound at the junction with the A6001 Biggleswade North.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 July 2025 to 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.18 miles from Tea Green.

Location: southbound between the A603 and the junction with the A6001 Biggleswade North.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 July 2025 to 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.24 miles from Tea Green.

Location: northbound between junctions J11A and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 7 miles from Tea Green.

Location: northbound between junctions J13 (Milton Keynes) and J14 (Milton Keynes) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 14.22 miles from Tea Green.

Location: northbound at junction J11 (Luton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 4.7 miles from Tea Green.

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 3.84 miles from Tea Green.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 8.49 miles from Tea Green.

Location: northbound at junction J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 4.01 miles from Tea Green.

Location: northbound between junctions J11A and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 6.38 miles from Tea Green.

Location: northbound at junction J11A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 5.75 miles from Tea Green.

Location: northbound between junctions J11 (Luton) and J11A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 4.79 miles from Tea Green.

Location: southbound exit slip at junction J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.84 miles from Tea Green.

Location: southbound exit slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.41 miles from Tea Green.

Location: southbound exit slip at junction J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.23 miles from Tea Green.

Location: southbound entry slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.05 miles from Tea Green.

Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.89 miles from Tea Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.92 miles from Tea Green.

Location: northbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.74 miles from Tea Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 6.94 miles from Tea Green.

Location: southbound between junctions J11A and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.16 miles from Tea Green.

Location: southbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.69 miles from Tea Green.

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.52 miles from Tea Green.

Location: southbound entry slip at junction J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.43 miles from Tea Green.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.7 miles from Tea Green.

Location: northbound exit slip at junction J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.02 miles from Tea Green.

Location: northbound exit slip at junction J11 (Luton) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.7 miles from Tea Green.

Location: southbound exit slip at junction J11 (Luton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.73 miles from Tea Green.

Location: southbound exit slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.47 miles from Tea Green.

Location: northbound exit slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.75 miles from Tea Green.

Location: northbound between junctions J10 (Luton Airport) and J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.94 miles from Tea Green.

Location: northbound between junctions J11 (Luton) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 July 2025 to 05:00 on 18 July 2025.
Schedule : From 22:00 on 14 August 2025 to 05:00 on 15 August 2025.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.2 miles from Tea Green.

Location: southbound entry slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.85 miles from Tea Green.

Location: southbound exit slip at junction J11A .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.16 miles from Tea Green.

Location: southbound between junctions J14 (Milton Keynes) and J11A .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.74 miles from Tea Green.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.56 miles from Tea Green.

Location: southbound exit slip at Toddington Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.25 miles from Tea Green.

Location: southbound entry slip at junction J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 July 2025 to 05:00 on 19 July 2025.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.86 miles from Tea Green.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 16 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.76 miles from Tea Green.

Location: southbound between junctions J14 (Milton Keynes) and J13 (Milton Keynes) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 16 July 2025 to 05:00 on 17 July 2025.
Nearest town: 15.17 miles from Tea Green.

Location: southbound exit slip at junction J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 August 2025 to 05:00 on 1 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.58 miles from Tea Green.

Location: southbound between the A6 Bedford south and the junction with the M1 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 21 July 2025 to 06:00 on 25 October 2025.
Nearest town: 15.7 miles from Tea Green.

Location: northbound between junctions J10 (Luton Airport) and J14 (Milton Keynes) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 24 July 2025 to 05:00 on 30 July 2025.
Nearest town: 4.01 miles from Tea Green.