Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Load spillage.
Time To Clear : The event is expected to clear between 02:00 and 02:15 on 25 January 2026.
Normal traffic conditions are expected between 02:00 and 02:15 on 25 January 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 10.67 miles from Chiltern Green.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Load spillage.
Time To Clear : The event is expected to clear between 02:00 and 02:15 on 25 January 2026.
Normal traffic conditions are expected between 02:00 and 02:15 on 25 January 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 16.11 miles from Chiltern Green.

Location: southbound entry slip at junction J11A .
Lane Closures : Lane two is closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 01:30 and 01:45 on 25 January 2026.
Normal traffic conditions are expected between 01:30 and 01:45 on 25 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.66 miles from Chiltern Green.

Bowes Road (North Circular Road) (All Directions) - The traffic signals are not operating under central computer control at this junction.
Traffic signals at this location are now on and working.
Nearest town: 19.38 miles from Chiltern Green.

Green Street (All Directions) at the junction of Jute Lane - The level crossing barriers are now working.
Fault now repaired.
Nearest town: 19.04 miles from Chiltern Green.

Edgware Road West Hendon Broadway junction with Cool Oak Lane (All Directions).
There is a reported collision at this location.
All lanes are open.
Nearest town: 19.51 miles from Chiltern Green.

Watling Avenue (All Directions) at the junction of Orange Hill Road .
Traffic signals have been restored.
Traffic signals have been restored.
Nearest town: 17.48 miles from Chiltern Green.

Aldermans Hill at the junction with Green Lanes - There will be temporary signals in operation due to a crane in the area.
No restrictions in place.
Nearest town: 19.08 miles from Chiltern Green.

Southgate Circus junction with Chase Side(All Directions) There is a collision at this location.
Traffic is flowing well.
Nearest town: 17.77 miles from Chiltern Green.

Kymberley Road (One Way System) between Headstone Road and College Road - Road closure to facilitate resurfacing works
Nearest town: 18.66 miles from Chiltern Green.

Location: northbound exit slip at junction J11A .
Due to: Congestion.
Normal traffic conditions are expected between 23:45 and 00:00 on 25 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.66 miles from Chiltern Green.

Location: southbound between junctions J12 (Flitwick) and J11A .
Due to: Congestion.
Normal traffic conditions are expected between 22:45 and 23:00 on 24 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.39 miles from Chiltern Green.

Location: northbound entry slip at junction J9 (Dunstable A5) .
Due to: Congestion.
Normal traffic conditions are expected between 22:30 and 22:45 on 24 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.59 miles from Chiltern Green.

Location: northbound at junction J8 (Hemel Hstead) .
Due to: Congestion.
Normal traffic conditions are expected between 19:00 and 19:15 on 24 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 4.95 miles from Chiltern Green.

Location: northbound between the A6 Bedford central and the junction with the A4280 .
Due to: Roadworks.
Period : from 21:37 on 24 January 2026 to 06:00 on 25 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.61 miles from Chiltern Green.

Location: northbound exit slip to the A603 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.6 miles from Chiltern Green.

Location: northbound exit slip to the A600 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 19 miles from Chiltern Green.

Location: northbound between the A603 and the junction with the A4280 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.81 miles from Chiltern Green.

Location: northbound exit slip to the A4280 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.62 miles from Chiltern Green.

Location: northbound between the A6 Bedford central and the junction with the A603 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 19.22 miles from Chiltern Green.

Location: anticlockwise between junctions J23 (Hatfield) and J22 (St Albans) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 05:30 on 25 January 2026.
Lanes Closed : There are two of four lanes closed.
Nearest town: 11.29 miles from Chiltern Green.

Location: southbound between junctions J11A and J9 (Dunstable A5) .
Due to: Roadworks.
Period : from 21:00 on 24 January 2026 to 05:30 on 25 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 7.46 miles from Chiltern Green.

Location: northbound entry slip from the A4280 .
Due to: Roadworks scheme.
Period : from 20:00 on 23 January 2026 to 06:00 on 28 February 2026.
Nearest town: 18.13 miles from Chiltern Green.

Location: The A1M southbound between junctions J8 and J7 .
Lane Closures : The hard shoulder is closed.
Due to: Bridge repairs.
Period : expect disruption until 21:00 on 8 October 2026.
Nearest town: 7.6 miles from Chiltern Green.

Location: The A1M northbound between junctions J7 and J8 .
Lane Closures : The hard shoulder is closed.
Due to: Bridge repairs.
Period : expect disruption until 21:00 on 8 October 2026.
Nearest town: 7.34 miles from Chiltern Green.

Location: anticlockwise entry slip at junction J19 (Watford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 January 2026 to 06:00 on 1 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.02 miles from Chiltern Green.

Location: clockwise exit slip at junction J19 (Watford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.65 miles from Chiltern Green.

Location: clockwise exit slip at junction J19 (Watford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.8 miles from Chiltern Green.

Location: southbound between junctions J6A (St Albans) and J5 (Harrow A41) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.55 miles from Chiltern Green.

Location: clockwise exit slip at junction J21 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.5 miles from Chiltern Green.

Location: clockwise between junctions J20 (Hemel Hstead) and J21A (Watword) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.04 miles from Chiltern Green.

Location: clockwise exit slip at junction J21A (Watword) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.31 miles from Chiltern Green.

Location: clockwise between junctions J18 (Rickmansworth) and J19 (Watford) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.32 miles from Chiltern Green.

Location: clockwise exit slip at junction J20 (Hemel Hstead) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.45 miles from Chiltern Green.

Location: clockwise between junctions J19 (Watford) and J20 (Hemel Hstead) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.49 miles from Chiltern Green.

Location: northbound entry slip at junction J6 (Watford A405) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.09 miles from Chiltern Green.

Location: northbound exit slip at junction J6 (Watford A405) .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.03 miles from Chiltern Green.

Location: The A1M northbound between junctions J1 and J3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 26 January 2026 to 16:00 on 26 January 2026.
Nearest town: 11.1 miles from Chiltern Green.

Location: clockwise between junctions J24 (Potters Bar) and J25 (Enfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:30 on 30 January 2026.
Schedule : From 23:00 on 30 January 2026 to 05:30 on 31 January 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.75 miles from Chiltern Green.

Location: northbound between the M1 and the junction with the A6 Bedford central.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.22 miles from Chiltern Green.

Location: southbound between the junctions with the A6 Bedford central and the A6 Bedford south.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.59 miles from Chiltern Green.

Location: northbound exit slip to the A600 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 28 January 2026.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 14 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.6 miles from Chiltern Green.

Location: northbound exit slip to the A6 Bedford central.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 28 January 2026.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 14 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.6 miles from Chiltern Green.

Location: northbound between the A6 Bedford south and the junction with the A6 Bedford central.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 28 January 2026.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 14 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19 miles from Chiltern Green.

Location: northbound exit slip to the A603 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 28 January 2026.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 14 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.62 miles from Chiltern Green.

Location: northbound between the A6 Bedford central and the junction with the A4280 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 28 January 2026.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 14 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.81 miles from Chiltern Green.

Location: northbound between the A6 Bedford south and the junction with the A603 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 January 2026 to 30 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.67 miles from Chiltern Green.

Location: southbound between the A4280 and the junction with the A6 Bedford central.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.41 miles from Chiltern Green.

Location: southbound exit slip to the A603 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 February 2026 to 14 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 February 2026 to 21 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.33 miles from Chiltern Green.

Location: The A1M northbound between junctions J6 and J7 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 January 2026 to 05:00 on 29 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.58 miles from Chiltern Green.

Location: The A1M southbound between junctions J3 and J1 .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 09:30 on 26 January 2026 to 16:00 on 26 January 2026.
Nearest town: 11.32 miles from Chiltern Green.

Location: northbound exit slip at junction J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 27 January 2026 to 05:00 on 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.47 miles from Chiltern Green.

Location: northbound between junctions J6 (Watford A405) and J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 27 January 2026 to 05:00 on 28 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.77 miles from Chiltern Green.

Location: northbound between junctions J11 (Luton) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2026 to 29 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.95 miles from Chiltern Green.

Location: northbound at junction J11A .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2026 to 29 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.54 miles from Chiltern Green.

Location: The A1M northbound between junctions J1 and J3 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 January 2026 to 30 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.32 miles from Chiltern Green.

Location: anticlockwise between junctions J23 (Hatfield) and J22 (St Albans) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 27 January 2026 to 05:30 on 28 January 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.68 miles from Chiltern Green.

Location: northbound between the A4012 and the junction with the A4146 Bletchley South.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 27 January 2026 to 05:00 on 28 January 2026.
Nearest town: 15.93 miles from Chiltern Green.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 January 2026 to 05:00 on 28 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.01 miles from Chiltern Green.

Location: northbound between the A4012 and the junction with the A4146 Bletchley South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 January 2026 to 05:00 on 28 January 2026.
Nearest town: 15.93 miles from Chiltern Green.

Location: The A1M northbound between junctions J6 and J7 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 27 January 2026 to 05:00 on 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.59 miles from Chiltern Green.

Location: anticlockwise between junctions J17 (Maple Cross) and J16 (M40) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.15 miles from Chiltern Green.

Location: clockwise between junctions J22 (St Albans) and J23 (Hatfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:00 on 27 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.24 miles from Chiltern Green.

Location: northbound between the junctions with the A507 and the A6001 Biggleswade South .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 05:00 on 27 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.87 miles from Chiltern Green.

Location: clockwise between junctions J16 (M40) and J17 (Maple Cross) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 26 January 2026 to 27 January 2026.
Nearest town: 19 miles from Chiltern Green.

Location: southbound exit slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 February 2026 to 05:00 on 21 February 2026.
Schedule : From 22:00 on 20 March 2026 to 05:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.71 miles from Chiltern Green.

Location: southbound exit slip at junction J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 February 2026 to 05:00 on 21 February 2026.
Schedule : From 22:00 on 20 March 2026 to 05:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.65 miles from Chiltern Green.

Location: southbound entry slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 February 2026 to 05:00 on 21 February 2026.
Schedule : From 22:00 on 20 March 2026 to 05:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.35 miles from Chiltern Green.

Location: northbound between junctions J6 (Watford A405) and J9 (Dunstable A5) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 28 January 2026 to 05:00 on 29 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.89 miles from Chiltern Green.

Location: anticlockwise between junctions J22 (St Albans) and J21A (Watword) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.7 miles from Chiltern Green.

Location: clockwise between junctions J20 (Hemel Hstead) and J21 (M1) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.72 miles from Chiltern Green.

Location: southbound between junctions J9 (Dunstable A5) and J6 (Watford A405) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.55 miles from Chiltern Green.

Location: clockwise at junction J21 (M1) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.5 miles from Chiltern Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 February 2026 to 05:00 on 19 February 2026.
Schedule : From 22:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 4.44 miles from Chiltern Green.

Location: southbound between junctions J10 (Luton Airport) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 28 January 2026 to 05:00 on 29 January 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.16 miles from Chiltern Green.

Location: northbound entry slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 February 2026 to 05:00 on 19 February 2026.
Schedule : From 22:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.59 miles from Chiltern Green.

Location: northbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 February 2026 to 05:00 on 19 February 2026.
Schedule : From 22:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.96 miles from Chiltern Green.

Location: anticlockwise at junction J21 (M1) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.35 miles from Chiltern Green.

Location: southbound between junctions J6A (St Albans) and J6 (Watford A405) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.89 miles from Chiltern Green.

Location: northbound between junctions J5 (Harrow A41) and J6 (Watford A405) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.74 miles from Chiltern Green.

Location: northbound exit slip at junction J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 February 2026 to 05:00 on 19 February 2026.
Schedule : From 22:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.1 miles from Chiltern Green.

Location: northbound between junctions J8 (Hemel Hstead) and J10 (Luton Airport) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 February 2026 to 05:00 on 19 February 2026.
Schedule : From 22:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.72 miles from Chiltern Green.

Location: northbound exit slip at junction J11 (Luton) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 February 2026 to 05:00 on 19 February 2026.
Schedule : From 22:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.83 miles from Chiltern Green.

Location: northbound between junctions J10 (Luton Airport) and J11A .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 February 2026 to 05:00 on 19 February 2026.
Schedule : From 22:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.2 miles from Chiltern Green.

Location: northbound exit slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 February 2026 to 05:00 on 19 February 2026.
Schedule : From 22:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.54 miles from Chiltern Green.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : The hard shoulder, lanes 2, 3 and 4 are closed.
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 05:00 on 25 January 2026.
Lanes Closed : There are three of four lanes closed.
Nearest town: 8.65 miles from Chiltern Green.

Location: northbound between junctions J11 (Luton) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 February 2026 to 05:00 on 20 February 2026.
Schedule : From 22:00 on 19 March 2026 to 05:00 on 20 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.75 miles from Chiltern Green.

Location: southbound exit slip at junction J11A .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 February 2026 to 05:00 on 21 February 2026.
Schedule : From 22:00 on 20 March 2026 to 05:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.09 miles from Chiltern Green.

Location: southbound entry slip at Toddington Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 February 2026 to 05:00 on 21 February 2026.
Schedule : From 22:00 on 20 March 2026 to 05:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.31 miles from Chiltern Green.

Location: southbound exit slip at Toddington Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 February 2026 to 05:00 on 21 February 2026.
Schedule : From 22:00 on 20 March 2026 to 05:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.5 miles from Chiltern Green.

Location: southbound entry slip at junction J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 February 2026 to 05:00 on 21 February 2026.
Schedule : From 22:00 on 20 March 2026 to 05:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.31 miles from Chiltern Green.

Location: northbound between junctions J6 (Watford A405) and J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 March 2026 to 7 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.99 miles from Chiltern Green.

Location: northbound between junctions J6 (Watford A405) and J8 (Hemel Hstead) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 March 2026 to 7 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.9 miles from Chiltern Green.

Location: anticlockwise exit slip at junction J21 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 March 2026 to 7 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.35 miles from Chiltern Green.

Location: northbound entry slip at junction J6A (St Albans) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 March 2026 to 7 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.21 miles from Chiltern Green.

Location: northbound at junction J6 (Watford A405) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 March 2026 to 7 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.03 miles from Chiltern Green.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.51 miles from Chiltern Green.

Location: southbound between junctions J8 (Hemel Hstead) and J6 (Watford A405) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.11 miles from Chiltern Green.

Location: southbound between junctions J10 (Luton Airport) and J9 (Dunstable A5) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 February 2026 to 21 February 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 February 2026 to 28 February 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.26 miles from Chiltern Green.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 February 2026 to 21 February 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 February 2026 to 28 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.41 miles from Chiltern Green.

Location: southbound entry slip at junction J9 (Dunstable A5) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 16 February 2026 to 21 February 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 23 February 2026 to 28 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.49 miles from Chiltern Green.