Location: anticlockwise entry slip at junction J24 (Potters Bar) .
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 08:45 and 09:00 on 30 July 2025.
Normal traffic conditions are expected between 08:45 and 09:00 on 30 July 2025.
Lanes Closed : There are lane closures.
Nearest town: 16.98 miles from Hart Hill.

Location: southbound at the junction with the A4012 .
Due to: Congestion.
Normal traffic conditions are expected between 10:00 and 10:15 on 30 July 2025.
Nearest town: 8.42 miles from Hart Hill.

Location: The junction of the A414 and the A1M .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 30 July 2025.
Nearest town: 10.67 miles from Hart Hill.

Location: southbound exit slip at junction J13 (Milton Keynes) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 30 July 2025.
Nearest town: 13.13 miles from Hart Hill.

Location: anticlockwise entry slip at junction J19 (Watford) .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 30 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.03 miles from Hart Hill.

Location: southbound entry slip at junction J10 (Luton Airport) .
Due to: Congestion.
Normal traffic conditions are expected between 07:00 and 07:15 on 30 July 2025.
Nearest town: 2.49 miles from Hart Hill.

Location: southbound between junctions J5 (Harrow A41) and J1 (North Circular) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.63 miles from Hart Hill.

Location: southbound between junctions J5 (Harrow A41) and J1 (North Circular) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.18 miles from Hart Hill.

Location: southbound between junctions J5 (Harrow A41) and J1 (North Circular) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.97 miles from Hart Hill.

Location: southbound entry slip from the M25 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.77 miles from Hart Hill.

Location: The A1M southbound entry slip at junction J10 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.2 miles from Hart Hill.

Location: southbound at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.94 miles from Hart Hill.

Location: southbound between junctions J11A and J11 (Luton) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Nearest town: 3.74 miles from Hart Hill.

Location: clockwise between junctions J16 (M40) and J17 (Maple Cross) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.75 miles from Hart Hill.

Location: clockwise entry slip at junction J17 (Maple Cross) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.73 miles from Hart Hill.

Location: clockwise between junctions J17 (Maple Cross) and J18 (Rickmansworth) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.78 miles from Hart Hill.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.18 miles from Hart Hill.

Location: southbound exit slip at junction J8 (Hemel Hstead) .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.26 miles from Hart Hill.

Location: eastbound between the junctions with the A4147 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.97 miles from Hart Hill.

Location: southbound between junctions J6A (St Albans) and J5 (Harrow A41) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 July 2025 to 05:30 on 31 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.93 miles from Hart Hill.

Location: northbound between the M1 and the junction with the A6 Bedford south.
Due to: Roadworks scheme.
Period : from 20:10 on 28 July 2025 to 06:00 on 16 August 2025.
Nearest town: 14.06 miles from Hart Hill.

Location: anticlockwise entry slip at junction J21 (M1) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 30 July 2025.
Nearest town: 11.76 miles from Hart Hill.

Location: The A1M southbound between junctions J8 and J7 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 30 July 2025.
Nearest town: 8.02 miles from Hart Hill.

Location: northbound between the A603 and the junction with the A421 .
Due to: Roadworks.
Period : from 06:15 on 19 July 2025 to 05:00 on 18 August 2025.
Nearest town: 19.2 miles from Hart Hill.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.34 miles from Hart Hill.

Location: clockwise between junctions J23 (Hatfield) and J24 (Potters Bar) .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 16:00 on 30 July 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16.06 miles from Hart Hill.

Location: northbound between the A600 and the junction with the A4280 .
Due to: Roadworks scheme.
Period : from 21:00 on 25 July 2025 to 05:00 on 18 August 2025.
Nearest town: 17.88 miles from Hart Hill.

Location: northbound between the M1 and the junction with the A4146 Bletchley South.
Due to: Roadworks scheme.
Period : from 20:05 on 4 July 2025 to 06:00 on 22 August 2025.
Nearest town: 6.33 miles from Hart Hill.

Location: southbound between the A4146 South and the junction with the A5183 .
Due to: Roadworks scheme.
Period : from 20:04 on 4 July 2025 to 06:00 on 22 August 2025.
Nearest town: 14.7 miles from Hart Hill.

Location: southbound exit slip at junction J14 (Milton Keynes) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.54 miles from Hart Hill.

Location: southbound between the A6 Bedford south and the junction with the M1 .
Due to: Roadworks scheme.
Period : from 20:00 on 28 July 2025 to 06:00 on 25 October 2025.
Nearest town: 15.61 miles from Hart Hill.

Location: northbound between junctions J10 (Luton Airport) and J14 (Milton Keynes) .
Due to: Roadworks scheme.
Period : from 22:00 on 18 July 2025 to 05:00 on 14 August 2025.
Nearest town: 2.53 miles from Hart Hill.

Location: The A1M northbound between junctions J8 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 12:00 on 8 December 2025.
Nearest town: 9.38 miles from Hart Hill.

Location: northbound.
Due to: Roadworks scheme.
Period : from 06:00 on 19 July 2025 to 05:00 on 18 August 2025.
Nearest town: 16.48 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.46 miles from Hart Hill.

Location: northbound entry slip at Toddington Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.1 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 5.86 miles from Hart Hill.

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.85 miles from Hart Hill.

Location: clockwise exit slip at junction J23 (Hatfield) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.36 miles from Hart Hill.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.3 miles from Hart Hill.

Location: southbound entry slip at junction J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.96 miles from Hart Hill.

Location: southbound between junctions J5 (Harrow A41) and J1 (North Circular) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 5 August 2025 to 7 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.29 miles from Hart Hill.

Location: clockwise between junctions J22 (St Albans) and J23 (Hatfield) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.6 miles from Hart Hill.

Location: southbound between the A6 Bedford south and the junction with the M1 J13.
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.92 miles from Hart Hill.

Location: southbound entry slip from the A4280 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.
Nearest town: 18.34 miles from Hart Hill.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 4 August 2025 to 05:00 on 5 August 2025.
Nearest town: 8.3 miles from Hart Hill.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 4 August 2025 to 05:00 on 5 August 2025.
Nearest town: 9.99 miles from Hart Hill.

Location: The A1M southbound between junctions J7 and J6 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 09:30 on 4 August 2025 to 15:30 on 4 August 2025.
Nearest town: 9.07 miles from Hart Hill.

Location: The A1M southbound between junctions J7 and J6 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 09:30 on 4 August 2025 to 15:30 on 4 August 2025.
Nearest town: 9.06 miles from Hart Hill.

Location: anticlockwise between junctions J20 (Hemel Hstead) and J18 (Rickmansworth) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.21 miles from Hart Hill.

Location: northbound between the A603 and the junction with the A421 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 05:00 on 4 August 2025.
Schedule : From 21:00 on 15 August 2025 to 05:00 on 18 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.25 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.86 miles from Hart Hill.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 4.3 miles from Hart Hill.

Location: northbound at junction J11 (Luton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 2.85 miles from Hart Hill.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.45 miles from Hart Hill.

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.08 miles from Hart Hill.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.55 miles from Hart Hill.

Location: northbound at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.27 miles from Hart Hill.

Location: northbound between junctions J13 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.29 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.06 miles from Hart Hill.

Location: northbound between junctions J11 (Luton) and J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.04 miles from Hart Hill.

Location: northbound at junction J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 4 August 2025 to 05:00 on 5 August 2025.
Nearest town: 12.89 miles from Hart Hill.

Location: southbound between junctions J6 (Watford A405) and J5 (Harrow A41) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 8 August 2025.
Schedule : From 23:00 on 8 August 2025 to 05:00 on 9 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.72 miles from Hart Hill.

Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.76 miles from Hart Hill.

Location: northbound between junctions J5 (Harrow A41) and J6 (Watford A405) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 8 August 2025.
Schedule : From 23:00 on 8 August 2025 to 05:00 on 9 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.91 miles from Hart Hill.

Location: southbound at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.94 miles from Hart Hill.

Location: southbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.86 miles from Hart Hill.

Location: northbound entry slip at junction J14 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.4 miles from Hart Hill.

Location: southbound between junctions J11A and J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.74 miles from Hart Hill.

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.4 miles from Hart Hill.

Location: clockwise between junctions J17 (Maple Cross) and J18 (Rickmansworth) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 8 August 2025.
Schedule : From 23:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.2 miles from Hart Hill.

Location: anticlockwise exit slip at junction J20 (Hemel Hstead) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.76 miles from Hart Hill.

Location: southbound between junctions J4 (Edgware A41) and J1 (North Circular) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 8 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.92 miles from Hart Hill.

Location: anticlockwise at junction J20 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.76 miles from Hart Hill.

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 1.94 miles from Hart Hill.

Location: The A1M southbound between junctions J7 and J6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 31 July 2025 to 05:00 on 1 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.08 miles from Hart Hill.

Location: The A1M southbound between junctions J8 and J6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.12 miles from Hart Hill.

Location: The A1M northbound between junctions J6 and J7 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 6 August 2025 to 05:00 on 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.57 miles from Hart Hill.

Location: The A1M southbound entry slip at junction J7 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 7 August 2025 to 05:00 on 8 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.43 miles from Hart Hill.

Location: The A1M southbound between junctions J8 and J7 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 13 August 2025 to 05:00 on 14 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.88 miles from Hart Hill.

Location: The A1M southbound between junctions J10 and J9 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.89 miles from Hart Hill.

Location: The A1M southbound entry slip at junction J7 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.43 miles from Hart Hill.

Location: The A1M southbound between junctions J7 and J6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 31 July 2025 to 05:00 on 1 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.06 miles from Hart Hill.

Location: The A1M southbound exit slip at junction J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 31 July 2025 to 05:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.15 miles from Hart Hill.

Location: southbound between the A6 Bedford central and the junction with the A6 Bedford south .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.67 miles from Hart Hill.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.03 miles from Hart Hill.

Location: southbound between the A6 Bedford south and the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.61 miles from Hart Hill.

Location: southbound between the junctions with the A603 and the A6 Bedford central.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.02 miles from Hart Hill.

Location: southbound between the junctions with the A603 and the A6 Bedford central.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.85 miles from Hart Hill.

Location: southbound between the junctions with the M25 and the A5135 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.3 miles from Hart Hill.

Location: southbound entry slip at junction J8 (Hemel Hstead) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 18 August 2025 to 21 August 2025.
Nearest town: 9.38 miles from Hart Hill.

Location: northbound at junction J8 (Hemel Hstead) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 18 August 2025 to 21 August 2025.
Nearest town: 8.97 miles from Hart Hill.

Location: clockwise between junctions J23 (Hatfield) and J24 (Potters Bar) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 18 August 2025 to 21 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.06 miles from Hart Hill.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 August 2025 to 05:00 on 3 August 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 5.86 miles from Hart Hill.

Location: The A1M northbound between junctions J2 and J3 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 August 2025 to 06:00 on 3 August 2025.
Schedule : From 22:30 on 3 August 2025 to 05:30 on 4 August 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.15 miles from Hart Hill.

Location: The A1M northbound between junctions J5 and J6 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 August 2025 to 06:00 on 3 August 2025.
Schedule : From 22:30 on 3 August 2025 to 05:30 on 4 August 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.7 miles from Hart Hill.

Location: The A1M northbound between junctions J3 and J4 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 August 2025 to 06:00 on 3 August 2025.
Schedule : From 22:30 on 3 August 2025 to 05:30 on 4 August 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.11 miles from Hart Hill.

Location: The A1M northbound at junction J4 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 August 2025 to 06:00 on 3 August 2025.
Schedule : From 22:30 on 3 August 2025 to 05:30 on 4 August 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.72 miles from Hart Hill.

Location: The A1M northbound between junctions J4 and J5 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 August 2025 to 06:00 on 3 August 2025.
Schedule : From 22:30 on 3 August 2025 to 05:30 on 4 August 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.61 miles from Hart Hill.

Location: The A1M northbound exit slip at junction J6 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 August 2025 to 06:00 on 3 August 2025.
Schedule : From 22:30 on 3 August 2025 to 05:30 on 4 August 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.19 miles from Hart Hill.

Location: The A1M northbound at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 August 2025 to 06:00 on 3 August 2025.
Schedule : From 22:30 on 3 August 2025 to 05:30 on 4 August 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.42 miles from Hart Hill.

Location: clockwise exit slip at junction J19 (Watford) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 1 August 2025 to 05:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.59 miles from Hart Hill.

Location: clockwise between junctions J18 (Rickmansworth) and J19 (Watford) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 1 August 2025 to 05:00 on 2 August 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.96 miles from Hart Hill.

Location: The A1M northbound between junctions J1 and J3 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.08 miles from Hart Hill.

Location: The A1M northbound at junction J1 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.63 miles from Hart Hill.

Location: The A1M northbound entry slip at junction J1 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.54 miles from Hart Hill.

Location: clockwise exit slip at junction J19 (Watford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 July 2025 to 01:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.54 miles from Hart Hill.

Location: southbound between junctions J6 (Watford A405) and J5 (Harrow A41) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.
Schedule : From 23:00 on 1 August 2025 to 05:30 on 2 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.67 miles from Hart Hill.

Location: southbound exit slip at junction J5 (Harrow A41) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.
Schedule : From 23:00 on 1 August 2025 to 05:30 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.63 miles from Hart Hill.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.
Nearest town: 12.21 miles from Hart Hill.

Location: northbound exit slip at junction J13 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.76 miles from Hart Hill.

Location: anticlockwise between junctions J20 (Hemel Hstead) and J17 (Maple Cross) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.66 miles from Hart Hill.

Location: anticlockwise entry slip at junction J18 (Rickmansworth) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 30 July 2025 to 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.4 miles from Hart Hill.

Location: northbound between the junctions with the A4280 and the A1 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 August 2025 to 05:00 on 18 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.62 miles from Hart Hill.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.08 miles from Hart Hill.

Location: northbound between the junctions with the M1 and the A6 Bedford south.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.06 miles from Hart Hill.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.08 miles from Hart Hill.

Location: northbound between the M1 and the junction with the A6 Bedford south.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.06 miles from Hart Hill.

Location: northbound between junctions J1 (North Circular) and J4 (Edgware A41) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 8 August 2025.
Schedule : From 23:00 on 8 August 2025 to 05:30 on 9 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.9 miles from Hart Hill.

Location: The A1M southbound between junctions J7 and J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 1 August 2025 to 16:00 on 1 August 2025.
Nearest town: 8.51 miles from Hart Hill.

Location: The A1M northbound between junctions J6 and J7 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 31 July 2025 to 16:00 on 31 July 2025.
Nearest town: 8.65 miles from Hart Hill.

Location: northbound between the junctions with the A603 and the A4280 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 August 2025 to 05:00 on 18 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.88 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 1 August 2025 to 05:00 on 2 August 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 5.86 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 1 August 2025 to 05:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.06 miles from Hart Hill.

Location: northbound at junction J11A .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 1 August 2025 to 05:00 on 2 August 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 4.34 miles from Hart Hill.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.24 miles from Hart Hill.

Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.77 miles from Hart Hill.

Location: northbound entry slip at junction J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 August 2025 to 05:00 on 20 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.96 miles from Hart Hill.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 4.59 miles from Hart Hill.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 4.59 miles from Hart Hill.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 18 August 2025 to 21 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 26 August 2025 to 29 August 2025.
Nearest town: 4.59 miles from Hart Hill.

Location: northbound entry slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.57 miles from Hart Hill.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.49 miles from Hart Hill.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.85 miles from Hart Hill.

Location: northbound between junctions J6 (Watford A405) and J9 (Dunstable A5) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 18 August 2025 to 21 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 26 August 2025 to 29 August 2025.
Nearest town: 11.11 miles from Hart Hill.

Location: southbound between junctions J10 (Luton Airport) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 2.22 miles from Hart Hill.

Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 1.95 miles from Hart Hill.

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.08 miles from Hart Hill.

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 18 August 2025 to 21 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 26 August 2025 to 29 August 2025.
Nearest town: 2.08 miles from Hart Hill.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.55 miles from Hart Hill.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 18 August 2025 to 21 August 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 26 August 2025 to 29 August 2025.
Nearest town: 3.55 miles from Hart Hill.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.19 miles from Hart Hill.

Location: northbound exit slip at junction J9 (Dunstable A5) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.76 miles from Hart Hill.

Location: southbound exit slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 6 August 2025 to 05:00 on 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.33 miles from Hart Hill.

Location: southbound entry slip at junction J9 (Dunstable A5) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 6 August 2025 to 05:00 on 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.55 miles from Hart Hill.

Location: northbound exit slip at junction J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.86 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.06 miles from Hart Hill.

Location: northbound at junction J11A .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.44 miles from Hart Hill.

Location: northbound entry slip at junction J11A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.56 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.86 miles from Hart Hill.

Location: northbound exit slip at Toddington Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 11 August 2025 to 14 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.86 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 12 August 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 5.86 miles from Hart Hill.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.45 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 August 2025 to 05:00 on 13 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.37 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.06 miles from Hart Hill.

Location: northbound at junction J11A .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 12 August 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 4.34 miles from Hart Hill.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 August 2025 to 05:00 on 13 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 5.86 miles from Hart Hill.

Location: southbound exit slip at junction J13 (Milton Keynes) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 August 2025 to 05:00 on 13 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.29 miles from Hart Hill.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 August 2025 to 05:00 on 13 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.36 miles from Hart Hill.

Location: southbound entry slip at Toddington Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 11 August 2025 to 14 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.96 miles from Hart Hill.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 August 2025 to 05:00 on 13 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.22 miles from Hart Hill.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 12 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.8 miles from Hart Hill.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 12 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.63 miles from Hart Hill.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.8 miles from Hart Hill.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.36 miles from Hart Hill.

Location: southbound at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 August 2025 to 05:00 on 13 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.78 miles from Hart Hill.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 August 2025 to 05:00 on 13 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.8 miles from Hart Hill.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.22 miles from Hart Hill.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.27 miles from Hart Hill.

Location: southbound between the A4146 South and the junction with the A4012 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.65 miles from Hart Hill.

Location: southbound between the junctions with the A4146 North and the A4146 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.98 miles from Hart Hill.

Location: northbound between the A5183 and the junction with the A4146 Bletchley South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.65 miles from Hart Hill.

Location: southbound between the A4146 South and the junction with the A5183 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.7 miles from Hart Hill.

Location: northbound between the junctions with the M1 and the A5183 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.33 miles from Hart Hill.

Location: southbound exit slip at junction J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.22 miles from Hart Hill.

Location: southbound exit slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.36 miles from Hart Hill.

Location: southbound exit slip at junction J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.3 miles from Hart Hill.

Location: southbound entry slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.99 miles from Hart Hill.

Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.37 miles from Hart Hill.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.85 miles from Hart Hill.

Location: northbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.92 miles from Hart Hill.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 5.98 miles from Hart Hill.

Location: southbound between junctions J11A and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.78 miles from Hart Hill.

Location: southbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.86 miles from Hart Hill.

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.48 miles from Hart Hill.

Location: southbound entry slip at junction J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.4 miles from Hart Hill.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.57 miles from Hart Hill.

Location: northbound exit slip at junction J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.54 miles from Hart Hill.

Location: northbound exit slip at junction J11 (Luton) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.85 miles from Hart Hill.

Location: southbound exit slip at junction J11 (Luton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.94 miles from Hart Hill.

Location: southbound exit slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.33 miles from Hart Hill.

Location: northbound exit slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.27 miles from Hart Hill.

Location: northbound between junctions J10 (Luton Airport) and J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.38 miles from Hart Hill.

Location: northbound between junctions J11 (Luton) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 14 August 2025 to 05:00 on 15 August 2025.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.55 miles from Hart Hill.

Location: southbound entry slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.42 miles from Hart Hill.

Location: southbound exit slip at junction J11A .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.78 miles from Hart Hill.

Location: southbound between junctions J14 (Milton Keynes) and J11A .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.7 miles from Hart Hill.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 August 2025 to 05:00 on 17 August 2025.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.31 miles from Hart Hill.

Location: southbound exit slip at Toddington Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.15 miles from Hart Hill.

Location: southbound entry slip at junction J13 (Milton Keynes) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.96 miles from Hart Hill.

Location: southbound entry slip at Toddington Services.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 11 August 2025 to 05:00 on 14 August 2025.
Nearest town: 14.19 miles from Hart Hill.

Location: southbound exit slip at junction J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 August 2025 to 05:00 on 1 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.54 miles from Hart Hill.