Location: eastbound between junctions J9 (Fareham) and J10 (Alton) .
Due to: Roadworks.
Period : from 21:02 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.11 miles from South Wonston.

Location: southbound at junction J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.35 miles from South Wonston.

Location: westbound at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 6 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 9 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.69 miles from South Wonston.

Location: eastbound entry slip at junction J9 (Winchester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 July 2025 to 06:00 on 30 July 2025.
Nearest town: 3.56 miles from South Wonston.

Location: westbound exit slip at junction J9 (Winchester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 2 August 2025.
Nearest town: 3.41 miles from South Wonston.

Location: southbound between the A272 and the junction with the M3 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 2 August 2025.
Nearest town: 0.62 miles from South Wonston.

Location: northbound between the M3 and the junction with the A303 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 July 2025 to 06:00 on 30 July 2025.
Nearest town: 3.57 miles from South Wonston.

Location: westbound between the A34 and the junction with the A3093 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.58 miles from South Wonston.

Location: westbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.77 miles from South Wonston.

Location: westbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.74 miles from South Wonston.

Location: westbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.75 miles from South Wonston.

Location: eastbound entry slip at junction J11 (Fareham C) .
Due to: Roadworks scheme.
Period : from 21:00 on 26 July 2025 to 06:00 on 7 August 2025.
Nearest town: 19.22 miles from South Wonston.

Location: eastbound entry slip from the A342 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.08 miles from South Wonston.

Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.35 miles from South Wonston.' data-nearesttown='WEST END'>
Location: westbound entry slip at junction J5 (S'ton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.35 miles from South Wonston.

Location: eastbound between junctions J2 (Salisbury) and J4 (M3) .
Due to: Roadworks scheme.
Period : from 23:00 on 19 July 2025 to 06:00 on 19 December 2025.
Nearest town: 14.2 miles from South Wonston.

Location: westbound between junctions J4 (M3) and J2 (Salisbury) .
Due to: Roadworks scheme.
Period : from 20:03 on 18 July 2025 to 06:00 on 20 December 2025.
Nearest town: 12.09 miles from South Wonston.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Due to: Roadworks scheme.
Period : from 20:00 on 22 July 2025 to 06:00 on 9 August 2025.
Nearest town: 12.2 miles from South Wonston.

Location: southbound between junctions J1 (Lordshill) and A35 .
Due to: Roadworks scheme.
Period : from 21:00 on 22 July 2025 to 06:00 on 9 August 2025.
Nearest town: 13.35 miles from South Wonston.

Location: eastbound between junctions J9 (Fareham) and J11 (Fareham C) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 April 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 17.73 miles from South Wonston.

Location: eastbound at junction J11 (Fareham C) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 April 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.01 miles from South Wonston.

Location: southbound entry slip from the A33 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2027.
Lanes Closed : There is one of two lanes closed.
Nearest town: 2.64 miles from South Wonston.

Location: westbound between junctions J7 (Basingstoke) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 10.36 miles from South Wonston.

Location: eastbound between junctions J9 (Winchester) and J7 (Basingstoke) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 10.01 miles from South Wonston.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 9.94 miles from South Wonston.

Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.46 miles from South Wonston.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.46 miles from South Wonston.

Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 11.33 miles from South Wonston.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 11.33 miles from South Wonston.

Location: westbound between junctions J9 (Fareham) and J4 (M3) .
Due to: Roadworks scheme.
Period : from 06:00 on 4 May 2025 to 23:00 on 6 March 2026.
Nearest town: 15.46 miles from South Wonston.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.93 miles from South Wonston.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.98 miles from South Wonston.

Location: eastbound between the A3093 and the junction with the A34 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.52 miles from South Wonston.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.94 miles from South Wonston.

Location: westbound.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.49 miles from South Wonston.

Location: westbound between the M3 and the junction with the A34 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.58 miles from South Wonston.

Location: eastbound between junctions J13 (Eastleigh) and J12 (Eastleigh) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.89 miles from South Wonston.

Location: eastbound between the A3093 and the junction with the M3 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.53 miles from South Wonston.

Location: eastbound entry slip from the A34 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.38 miles from South Wonston.

Location: eastbound entry slip from the A34 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.4 miles from South Wonston.

Location: eastbound exit slip to the A34 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.37 miles from South Wonston.

Location: eastbound between junctions J12 (Eastleigh) and J8 (Andover) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 13 August 2025.
Nearest town: 6.5 miles from South Wonston.

Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2025 to 8 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.46 miles from South Wonston.

Location: eastbound between junctions J12 (Eastleigh) and J11 (Winchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 13 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.5 miles from South Wonston.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 13 August 2025.
Nearest town: 9.77 miles from South Wonston.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 13 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.77 miles from South Wonston.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2025 to 8 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.04 miles from South Wonston.

Location: eastbound entry slip at junction J12 (Eastleigh) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:30 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.11 miles from South Wonston.

Location: eastbound exit slip at junction J12 (Eastleigh) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:30 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.34 miles from South Wonston.

Location: westbound exit slip at junction J9 (Fareham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 8 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.63 miles from South Wonston.

Location: westbound exit slip at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 6 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.69 miles from South Wonston.

Location: southbound between junctions J3 and J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.88 miles from South Wonston.

Location: northbound at junction J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.81 miles from South Wonston.

Location: northbound between junctions J1 (Lordshill) and M27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 September 2025 to 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.56 miles from South Wonston.

Location: northbound at junction J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 September 2025 to 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.81 miles from South Wonston.

Location: northbound between junctions A35 and J1 (Lordshill) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 September 2025 to 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.2 miles from South Wonston.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 6 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 9 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.2 miles from South Wonston.

Location: southbound between junctions J1 (Lordshill) and A35 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.58 miles from South Wonston.

Location: northbound exit slip to the A33 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.84 miles from South Wonston.

Location: eastbound entry slip at junction J9 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.56 miles from South Wonston.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.17 miles from South Wonston.

Location: westbound entry slip at junction J9 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.69 miles from South Wonston.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 July 2025 to 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.17 miles from South Wonston.

Location: eastbound at the junction with the A345 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.49 miles from South Wonston.

Location: westbound between the A338 and the junction with the A345 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.14 miles from South Wonston.

Location: westbound exit slip at junction J9 (Winchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.41 miles from South Wonston.

Location: westbound exit slip at junction J9 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.41 miles from South Wonston.

Location: eastbound exit slip at junction J9 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.81 miles from South Wonston.

Location: southbound between the A272 and the junction with the M3 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.85 miles from South Wonston.

Location: southbound entry slip from the A33 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.64 miles from South Wonston.

Location: southbound between the A272 and the junction with the M3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.62 miles from South Wonston.

Location: northbound between the M3 and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.57 miles from South Wonston.

Location: westbound between the A345 and the junction with the A360 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.48 miles from South Wonston.

Location: northbound exit slip to the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.92 miles from South Wonston.

Location: southbound entry slip from the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.69 miles from South Wonston.

Location: westbound exit slip to the A342 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 8 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.84 miles from South Wonston.

Location: eastbound at junction J9 (Fareham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.78 miles from South Wonston.

Location: eastbound between junctions J9 (Fareham) and J10 (Alton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.92 miles from South Wonston.

Location: eastbound entry slip at junction J11 (Fareham C) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 31 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.22 miles from South Wonston.

Location: eastbound exit slip at junction J3 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.04 miles from South Wonston.

Location: eastbound entry slip at junction J2 (Salisbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.99 miles from South Wonston.

Location: eastbound between junctions J2 (Salisbury) and J3 (Southampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.2 miles from South Wonston.

Location: westbound entry slip at junction J3 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 11 September 2025.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.92 miles from South Wonston.

Location: westbound exit slip at junction J2 (Salisbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 11 September 2025.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.89 miles from South Wonston.

Location: westbound between junctions J6 (Basingstoke) and J7 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.59 miles from South Wonston.

Location: westbound at junction J9 (Fareham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.97 miles from South Wonston.

Location: westbound between junctions J9 (Fareham) and J8 (Southampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.
Nearest town: 16.97 miles from South Wonston.

Location: westbound between junctions J9 (Fareham) and J8 (Southampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.74 miles from South Wonston.

Location: northbound between junctions A35 and J1 (Lordshill) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 20 September 2025.
Nearest town: 14.2 miles from South Wonston.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.47 miles from South Wonston.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.47 miles from South Wonston.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.33 miles from South Wonston.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.33 miles from South Wonston.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.42 miles from South Wonston.' data-nearesttown='WEST END'>
Location: westbound at junction J5 (S'ton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.42 miles from South Wonston.