Route Planner to Avoid Traffic
START
FINISH
Loading Traffic Details

Traffic Runwell

SLIGHT
SEVERE
FULL SCREENUPDATED: 20:35
WE NEED YOUR HELP We've been forced to remove features such as traffic flow, road closures etc due to Google's new extortionate pricing. So that we can bring them back to you, and to gauge interest, would you be willing to pay £2 a month to bring these best features back? YESNO
Don't know
×
×

Current traffic around Runwell

The following traffic incidents and congestion for Runwell have been reported by Highways England, Traffic Scotland, Traffic Wales or Transport for London (TfL) in the last two hours:

BROKEN DOWN VEHICLE
Location: The M25 anticlockwise at junction J2 (London (SE)) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 19:00 and 19:15 on 17 Jun 2019.
Return to normal: Normal traffic conditions are expected between 19:00 and 19:15 on 17 Jun 2019.
Lanes closed: There are two of three lanes closed.
Nearest town: 17.79 miles from Runwell. CLEARED @ 18:27
BROKEN DOWN VEHICLE
Location: The M25 anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 20:15 and 20:30 on 17 Jun 2019.
Return to normal: Normal traffic conditions are expected between 20:15 and 20:30 on 17 Jun 2019.
Lanes closed: There is one of four lanes closed.
Nearest town: 18.79 miles from Runwell. CLEARED @ 19:21
ACCIDENT
Location: The M25 anticlockwise between junctions J2 (London (SE)) and J1A (Erith) .
Reason: Road traffic collision.
Status: Cleared.
Nearest town: 16.92 miles from Runwell. CLEARED @ 18:36
GENERAL OBSTRUCTION
Location: The M25 clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .
Lane closures: The hard shoulder, lanes 1 and 2 are closed.
Reason: Debris on the carriageway.
Status: Currently Active.
Time to clear: The event is expected to clear between 17:15 and 17:30 on 17 Jun 2019.
Return to normal: Normal traffic conditions are expected between 17:15 and 17:30 on 17 Jun 2019.
Lanes closed: There are two of four lanes closed.
Nearest town: 18.17 miles from Runwell. CLEARED @ 15:54
ACCIDENT
Location: The M25 anticlockwise between junctions J2 (London (SE)) and J1A (Erith) .
Lane closures: Lanes 3 and 4 are closed.
Reason: Road traffic collision.
Status: Currently Active.
Time to clear: The event is expected to clear between 17:30 and 17:45 on 17 Jun 2019.
Return to normal: Normal traffic conditions are expected between 17:30 and 17:45 on 17 Jun 2019.
Lanes closed: There are two of four lanes closed.
Nearest town: 16.93 miles from Runwell. CLEARED @ 15:45
CONGESTION
Location: The M11 northbound exit slip at junction J5 (Loughton) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:45 and 19:00 on 17 Jun 2019.
Nearest town: 18.51 miles from Runwell. CLEARED @ 18:54
CONGESTION
Location: The A282 anticlockwise entry slip from the A206 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 19:00 and 19:15 on 17 Jun 2019.
Nearest town: 16.27 miles from Runwell. CLEARED @ 19:03
CONGESTION
Location: The A13 westbound exit slip to the A1012 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:30 and 18:45 on 17 Jun 2019.
Nearest town: 11.63 miles from Runwell. CLEARED @ 18:36
CONGESTION
Location: The A282 anticlockwise entry slip from the A206 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:45 and 19:00 on 17 Jun 2019.
Nearest town: 16.27 miles from Runwell. CLEARED @ 18:54
CONGESTION
Location: The M25 anticlockwise at junction J27 (Stansted) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:15 and 18:30 on 17 Jun 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.47 miles from Runwell. CLEARED @ 18:18
CONGESTION
Location: The A2 eastbound exit slip to the A2018 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:15 and 18:30 on 17 Jun 2019.
Nearest town: 19.06 miles from Runwell. CLEARED @ 18:18
CONGESTION
Location: The A282 anticlockwise entry slip from the A206 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:15 and 18:30 on 17 Jun 2019.
Nearest town: 16.27 miles from Runwell. CLEARED @ 18:18
CONGESTION
Location: The A120 eastbound between the junctions with the A131 South and the A131 North.
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:00 and 18:15 on 17 Jun 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.17 miles from Runwell. CLEARED @ 18:00
CONGESTION
Location: The A13 westbound exit slip to the A1012 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:00 and 18:15 on 17 Jun 2019.
Nearest town: 11.63 miles from Runwell. CLEARED @ 18:09
CONGESTION
Location: The A249 southbound between the junctions with the A250 Queenborough and the A2 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:30 and 17:45 on 17 Jun 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.09 miles from Runwell. CLEARED @ 17:33
CONGESTION
Location: The A282 anticlockwise entry slip from the A206 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:30 and 17:45 on 17 Jun 2019.
Nearest town: 16.27 miles from Runwell. CLEARED @ 17:33
CONGESTION
Location: The A13 eastbound at the junction with the A1089 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:00 and 18:15 on 17 Jun 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.64 miles from Runwell. CLEARED @ 18:00
CONGESTION
Location: The M25 anticlockwise entry slip at junction J1B (Dartford) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:30 and 17:45 on 17 Jun 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.02 miles from Runwell. CLEARED @ 17:42
CONGESTION
Location: The A13 eastbound at the junction with the A1089 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:00 and 17:15 on 17 Jun 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.64 miles from Runwell. CLEARED @ 16:57
CONGESTION
Location: The A12 northbound exit slip to the A130 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:15 and 17:30 on 17 Jun 2019.
Nearest town: 5.78 miles from Runwell. CLEARED @ 17:15
CONGESTION
Location: The M25 anticlockwise between junctions J2 (London (SE)) and J1A (Erith) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 19:00 and 19:15 on 17 Jun 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Earlier Reason: Caused by an earlier accident.
Nearest town: 17.38 miles from Runwell. CLEARED @ 18:36
CONGESTION
Location: The M25 anticlockwise entry slip at junction J1A (Erith) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 19:45 and 20:00 on 17 Jun 2019.
Nearest town: 16.28 miles from Runwell. CLEARED @ 19:03
CONGESTION
Location: The A12 northbound exit slip to the A130 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 15:15 and 15:30 on 17 Jun 2019.
Nearest town: 5.78 miles from Runwell. CLEARED @ 15:18


There are no current incidents in this location.

Roadworks

ROAD WORKS
Location: The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Lane closures: Lanes 3 and 4 are closed.
Reason: Road repairs.
Status: Currently Active.
Period: from 20:30 on 17 Jun 2019 to 05:30 on 18 Jun 2019.
Lanes Closed: There are two of four lanes closed.
Nearest town: 15.16 miles from Runwell.
ROAD WORKS
Location: The A13 westbound between the junctions with the A1089 and the A1012 .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 17 Jun 2019 to 05:00 on 18 Jun 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 10.72 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J27 (Stansted) From M11 South.
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 17 Jun 2019 to 05:00 on 18 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.01 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane closures: Lanes 1, 2, 3 and 4 will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 17 Jun 2019 to 05:00 on 18 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 15.96 miles from Runwell.
ROAD WORKS
Location: The M11 southbound between junctions J8 (Bishops Stortford) and J6 (Hatfield) .
Lane closures: Lane one will be closed.
Reason: Emergency roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 17 Jun 2019 to 05:00 on 18 Jun 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 18.44 miles from Runwell.
ROAD WORKS
Location: The M2 westbound between junctions J4 (Gillingham) and J3 (Maidstone) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 20:00 on 21 Jun 2019.
Nearest town: 19.89 miles from Runwell.
ROAD WORKS
Location: The M2 eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 20:00 on 21 Jun 2019.
Nearest town: 19.56 miles from Runwell.
ROAD WORKS
Location: The A12 southbound between the junctions with the A120 Colchester West and the A130 Chelmsford North.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Jul 2019.
Lanes Closed: There is one of three lanes closed.
Nearest town: 10.64 miles from Runwell.
ROAD WORKS
Location: The M25 clockwise between junctions J26 (Waltham Abbey) and J27 (Stansted) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 17 Jun 2019 to 05:00 on 18 Jun 2019.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 19.67 miles from Runwell.
ROAD WORKS
Location: The M25 clockwise at junction J27 (Stansted) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 17 Jun 2019 to 05:00 on 18 Jun 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 17.57 miles from Runwell.
ROAD WORKS
Location: The A12 southbound.
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 17 Jun 2019 to 05:00 on 20 Jun 2019.
Nearest town: 6.88 miles from Runwell.
ROAD WORKS
Location: The A120 westbound between the junctions with the A131 North and the A131 South.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 19 Jun 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 17.53 miles from Runwell.
ROAD WORKS
Location: The A120 eastbound between the junctions with the A131 South and the A131 North.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 19 Jun 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 17.56 miles from Runwell.
ROAD WORKS
Location: The A120 eastbound between the junctions with the A131 South and the A131 North.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 19 Jun 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 17.1 miles from Runwell.
ROAD WORKS
Location: The A120 eastbound between the junctions with the A131 North and the A12 Colchester West.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 19 Jun 2019.
Lanes Closed: All lanes are closed.
Nearest town: 18.47 miles from Runwell.
ROAD WORKS
Location: The A120 westbound between the junctions with the A131 North and the A131 South.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 19 Jun 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 18.45 miles from Runwell.
ROAD WORKS
Location: The A12 northbound between the junctions with the A130 Chelmsford North and the A120 Colchester West.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 21 Jun 2019.
Lanes Closed: There is one of three lanes closed.
Nearest town: 10.23 miles from Runwell.
ROAD WORKS
Location: The M11 northbound at junction J6 (Hatfield) .
Lane closures: Lane one will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 17 Jun 2019 to 21 Jun 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.23 miles from Runwell.
ROAD WORKS
Location: The M11 northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Lane closures: Lane one will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 17 Jun 2019 to 21 Jun 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 17.4 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound.
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:05 on 11 Jun 2019 to 06:00 on 26 Oct 2019.
Nearest town: 15.5 miles from Runwell.
ROAD WORKS
Location: The M2 eastbound between junctions J4 (Gillingham) and J6 (Faversham) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:06 on 6 Jun 2019 to 06:00 on 27 Jul 2019.
Nearest town: 19.63 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J27 (Stansted) From M11 North.
Lane closures: Lanes 1 and 2 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 17 Jun 2019 to 19 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.21 miles from Runwell.
ROAD WORKS
Location: The A1089 northbound between the junctions with the A126 Grays and the A13 .
Lane closures: Lane one will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 18 Jun 2019 to 05:00 on 19 Jun 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 10.86 miles from Runwell.
ROAD WORKS
Location: The A1089 southbound between the A13 and the junction with the A126 Grays.
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 19 Jun 2019 to 05:00 on 20 Jun 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 11.3 miles from Runwell.
ROAD WORKS
Location: The A1089 southbound exit slip to the A126 .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 19 Jun 2019 to 05:00 on 20 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 11.78 miles from Runwell.
ROAD WORKS
Location: The M11 northbound between junctions J7 (Chelmsford) and J8 (Bishops Stortford) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 17 Jun 2019 to 19 Jun 2019.
Nearest town: 18.33 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:30 on 18 Jun 2019.
Lanes Closed: All lanes are closed.
Nearest town: 15.57 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 23 Jun 2019 to 05:00 on 24 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.38 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J1A (Erith) .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 22 Jun 2019 to 05:00 on 23 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.29 miles from Runwell.
ROAD WORKS
Location: The A282 anticlockwise entry slip from the A206 .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 22 Jun 2019 to 05:00 on 23 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.28 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise at junction J1A (Erith) .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 22 Jun 2019 to 05:00 on 23 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.38 miles from Runwell.
ROAD WORKS
Location: The M11 northbound at junction J6 (Hatfield) .
Lane closures: Lane one will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 25 Jun 2019 to 28 Jun 2019.
Schedule: From 23:00 on 28 Jun 2019 to 06:00 on 29 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 1 Jul 2019 to 5 Jul 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.23 miles from Runwell.
ROAD WORKS
Location: The M11 northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Lane closures: Lane one will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 25 Jun 2019 to 28 Jun 2019.
Schedule: From 23:00 on 28 Jun 2019 to 06:00 on 29 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 1 Jul 2019 to 5 Jul 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 17.41 miles from Runwell.
ROAD WORKS
Location: The M25 clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 23:00 on 21 Jun 2019 to 05:00 on 22 Jun 2019.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 14.68 miles from Runwell.
ROAD WORKS
Location: The A12 southbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 17 Jun 2019 to 19 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 6.88 miles from Runwell.
ROAD WORKS
Location: The A12 southbound between the junctions with the A414 Chelmsford West and the A1023 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 18 Jun 2019 to 20 Jun 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 6.9 miles from Runwell.
ROAD WORKS
Location: The A12 southbound between the junctions with the A414 Chelmsford West and the A1023 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 17 Jun 2019 to 19 Jun 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 6.49 miles from Runwell.
ROAD WORKS
Location: The A12 southbound between the A120 Colchester West and the junction with the A130 Chelmsford North.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 18 Jun 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 14.91 miles from Runwell.
ROAD WORKS
Location: The A12 southbound between the A130 Chelmsford North and the junction with the A414 Chelmsford East.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 18 Jun 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 9.74 miles from Runwell.
ROAD WORKS
Location: The A12 southbound between the junctions with the A120 Colchester West and the A130 Chelmsford North.
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 18 Jun 2019.
Lanes Closed: There is one of three lanes closed.
Nearest town: 11.11 miles from Runwell.
ROAD WORKS
Location: The M11 northbound between junctions J7 (Chelmsford) and J8 (Bishops Stortford) .
Lane closures: Lane one will be closed.
Reason: Emergency roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 19 Jun 2019 to 05:00 on 20 Jun 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 18.45 miles from Runwell.
ROAD WORKS
Location: The M11 northbound between junctions J7 (Chelmsford) and J8 (Bishops Stortford) .
Lane closures: Lane one will be closed.
Reason: Emergency roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 19 Jun 2019 to 05:00 on 20 Jun 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 19.56 miles from Runwell.
ROAD WORKS
Location: The A120 westbound between the junctions with the A12 Colchester West and the A131 North.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 19 Jun 2019 to 06:00 on 24 Jun 2019.
Nearest town: 18.51 miles from Runwell.
ROAD WORKS
Location: The A120 eastbound between the junctions with the A131 North and the A12 Colchester West.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 19 Jun 2019 to 06:00 on 24 Jun 2019.
Nearest town: 18.5 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J27 (Stansted) From M11 North.
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 Jun 2019 to 21 Jun 2019.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 25 Jun 2019 to 28 Jun 2019.
Schedule: From 23:00 on 28 Jun 2019 to 06:00 on 29 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.21 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 19 Jun 2019 to 05:00 on 20 Jun 2019.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 14.22 miles from Runwell.
ROAD WORKS
Location: The M25 clockwise entry slip at junction J1A (Erith) .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 19 Jun 2019 to 05:00 on 20 Jun 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.26 miles from Runwell.
ROAD WORKS
Location: The M25 clockwise exit slip at junction J1B (Dartford) .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 19 Jun 2019 to 05:00 on 20 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.93 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 18 Jun 2019 to 21 Jun 2019.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 24 Jun 2019 to 28 Jun 2019.
Schedule: From 23:00 on 28 Jun 2019 to 06:00 on 29 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 13.56 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 18 Jun 2019 to 21 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 24 Jun 2019 to 28 Jun 2019.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 14.22 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise at junction J30 (Dagenham) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 18 Jun 2019 to 21 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 24 Jun 2019 to 28 Jun 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 14.03 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J30 (Dagenham) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 18 Jun 2019 to 21 Jun 2019.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 24 Jun 2019 to 28 Jun 2019.
Schedule: From 23:00 on 28 Jun 2019 to 06:00 on 29 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 13.35 miles from Runwell.
ROAD WORKS
Location: The A13 eastbound exit slip to the M25 .
Lane closures: Lane one will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 18 Jun 2019 to 21 Jun 2019.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 24 Jun 2019 to 28 Jun 2019.
Schedule: From 23:00 on 28 Jun 2019 to 06:00 on 29 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 13.28 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J2 (London (SE)) from A2 westbound.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 17 Jun 2019 to 21 Jun 2019.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.26 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J2 (London (SE)) from A2 eastbound.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 17 Jun 2019 to 21 Jun 2019.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.66 miles from Runwell.
ROAD WORKS
Location: The M25 anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .
Lane closures: Lanes 1, 2, 3 and 4 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 17 Jun 2019 to 21 Jun 2019.
Schedule: From 23:00 on 21 Jun 2019 to 06:00 on 22 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 18.52 miles from Runwell.
ROAD WORKS
Location: The M2 eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 19 Jun 2019 to 22 Jun 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 24 Jun 2019 to 26 Jun 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 19.63 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound at the junction with the M2 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 15 Jul 2019 to 20 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 22 Jul 2019 to 27 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 29 Jul 2019 to 3 Aug 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Aug 2019 to 10 Aug 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 15.43 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 15 Jul 2019 to 20 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 22 Jul 2019 to 27 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 29 Jul 2019 to 3 Aug 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Aug 2019 to 10 Aug 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 15.51 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 15 Jul 2019 to 20 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 22 Jul 2019 to 27 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 29 Jul 2019 to 3 Aug 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Aug 2019 to 10 Aug 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 15.42 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound between the A2260 and the junction with the M2 .
Lane closures: Lanes 2, 3 and 4 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 18 Jun 2019.
Lanes Closed: There are three of four lanes closed.
Nearest town: 15.4 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound entry slip from the A227 .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 18 Jun 2019.
Lanes Closed: All lanes are closed.
Nearest town: 15.4 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 18 Jun 2019.
Lanes Closed: All lanes are closed.
Nearest town: 15.5 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 18 Jun 2019.
Lanes Closed: All lanes are closed.
Nearest town: 15.43 miles from Runwell.
ROAD WORKS
Location: The A2 eastbound between the A227 and the junction with the M2 .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 15 Jul 2019 to 20 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 22 Jul 2019 to 27 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 29 Jul 2019 to 3 Aug 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Aug 2019 to 10 Aug 2019.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 15.55 miles from Runwell.
ROAD WORKS
Location: The M2 eastbound at junction J1 (Rochester) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 15 Jul 2019 to 20 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 22 Jul 2019 to 27 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 29 Jul 2019 to 3 Aug 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Aug 2019 to 10 Aug 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 15.4 miles from Runwell.
ROAD WORKS
Location: The M2 westbound entry slip at Medway Services.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 18 Jun 2019 to 20:01 on 19 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 19.6 miles from Runwell.
ROAD WORKS
Location: The M2 westbound exit slip at Medway Services.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 18 Jun 2019 to 20:01 on 19 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 19.56 miles from Runwell.
ROAD WORKS
Location: The M25 clockwise entry slip at junction J27 (Stansted) From M11 North.
Lane closures: Lanes 1 and 2 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 17 Jun 2019 to 19 Jun 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.21 miles from Runwell.
ROAD WORKS
Location: The A120 eastbound between the junctions with the M11 and the A131 South.
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 18 Jun 2019 to 22 Jun 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 24 Jun 2019 to 29 Jun 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Jul 2019 to 6 Jul 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Jul 2019 to 13 Jul 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 18.33 miles from Runwell.

Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location: anticlockwise at junction J2 (London (SE)) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 19:00 and 19:15 on 17 June 2019.

Normal traffic conditions are expected between 19:00 and 19:15 on 17 June 2019.

Lanes Closed : There are two of three lanes closed.
Nearest town: 17.79 miles from Runwell.

51.43-0.24

Location: anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 20:15 and 20:30 on 17 June 2019.

Normal traffic conditions are expected between 20:15 and 20:30 on 17 June 2019.

Lanes Closed : There is one of four lanes closed.
Nearest town: 18.79 miles from Runwell.

51.69-0.09

Location: anticlockwise between junctions J2 (London (SE)) and J1A (Erith) .

Due to: Road traffic collision.

Status : Cleared.
Nearest town: 16.92 miles from Runwell.

51.44-0.24

Location: clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .

Lane Closures : The hard shoulder, lanes 1 and 2 are closed.

Due to: Debris on the carriageway.



Time To Clear : The event is expected to clear between 17:15 and 17:30 on 17 June 2019.

Normal traffic conditions are expected between 17:15 and 17:30 on 17 June 2019.

Lanes Closed : There are two of four lanes closed.
Nearest town: 18.17 miles from Runwell.

51.42-0.23

Location: anticlockwise between junctions J2 (London (SE)) and J1A (Erith) .

Lane Closures : Lanes 3 and 4 are closed.

Due to: Road traffic collision.



Time To Clear : The event is expected to clear between 17:30 and 17:45 on 17 June 2019.

Normal traffic conditions are expected between 17:30 and 17:45 on 17 June 2019.

Lanes Closed : There are two of four lanes closed.
Nearest town: 16.93 miles from Runwell.

51.44-0.24

Ripple Road (Eastbound) - Lane three (of three) blocked due to a broken down vehicle.

The accident has been cleared and lane three has been reopened to traffic.

Traffic flows are returning to normal for the time of day.
Nearest town: 17.75 miles from Runwell.

51.53-0.12

A13 Ripple Road (Eastbound) just after the entry slip from Lodge Avenue - All lanes reopened following a collision.

Traffic flows are normal for the time of day.
Nearest town: 18.06 miles from Runwell.

51.53-0.11

Rainham Road North junction with Oxlow Lane (All Directions): The traffic lights are not working at this location.

The signals have now been repaired.
Nearest town: 15.76 miles from Runwell.

51.55-0.16

Station Road (All Directions) between Valence Avenue and Broomfield Road - Temporary traffic signals in operation to facilitate resurfacing works.


Nearest town: 16.8 miles from Runwell.

51.57-0.13

Location: northbound exit slip at junction J5 (Loughton) .

Due to: Congestion.



Normal traffic conditions are expected between 18:45 and 19:00 on 17 June 2019.
Nearest town: 18.51 miles from Runwell.

51.64-0.08

Location: anticlockwise entry slip from the A206 .

Due to: Congestion.



Normal traffic conditions are expected between 19:00 and 19:15 on 17 June 2019.
Nearest town: 16.27 miles from Runwell.

51.45-0.24

Location: westbound exit slip to the A1012 .

Due to: Congestion.



Normal traffic conditions are expected between 18:30 and 18:45 on 17 June 2019.
Nearest town: 11.63 miles from Runwell.

51.5-0.32

Location: anticlockwise entry slip from the A206 .

Due to: Congestion.



Normal traffic conditions are expected between 18:45 and 19:00 on 17 June 2019.
Nearest town: 16.27 miles from Runwell.

51.45-0.24

Location: anticlockwise at junction J27 (Stansted) .

Due to: Congestion.



Normal traffic conditions are expected between 18:15 and 18:30 on 17 June 2019.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.47 miles from Runwell.

51.68-0.12

Location: eastbound exit slip to the A2018 .

Due to: Congestion.



Normal traffic conditions are expected between 18:15 and 18:30 on 17 June 2019.
Nearest town: 19.06 miles from Runwell.

51.44-0.18

Location: anticlockwise entry slip from the A206 .

Due to: Congestion.



Normal traffic conditions are expected between 18:15 and 18:30 on 17 June 2019.
Nearest town: 16.27 miles from Runwell.

51.45-0.24

Location: eastbound between the junctions with the A131 South and the A131 North.

Due to: Congestion.



Normal traffic conditions are expected between 18:00 and 18:15 on 17 June 2019.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.17 miles from Runwell.

51.86-0.56

Location: westbound exit slip to the A1012 .

Due to: Congestion.



Normal traffic conditions are expected between 18:00 and 18:15 on 17 June 2019.
Nearest town: 11.63 miles from Runwell.

51.5-0.32

Location: southbound between the junctions with the A250 Queenborough and the A2 .

Due to: Congestion.



Normal traffic conditions are expected between 17:30 and 17:45 on 17 June 2019.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.09 miles from Runwell.

51.41-0.76

Location: anticlockwise entry slip from the A206 .

Due to: Congestion.



Normal traffic conditions are expected between 17:30 and 17:45 on 17 June 2019.
Nearest town: 16.27 miles from Runwell.

51.45-0.24

Location: eastbound at the junction with the A1089 .

Due to: Congestion.



Normal traffic conditions are expected between 18:00 and 18:15 on 17 June 2019.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.64 miles from Runwell.

51.5-0.35

Location: anticlockwise entry slip at junction J1B (Dartford) .

Due to: Congestion.



Normal traffic conditions are expected between 17:30 and 17:45 on 17 June 2019.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.02 miles from Runwell.

51.44-0.24

Location: eastbound at the junction with the A1089 .

Due to: Congestion.



Normal traffic conditions are expected between 17:00 and 17:15 on 17 June 2019.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.64 miles from Runwell.

51.5-0.35

Location: northbound exit slip to the A130 .

Due to: Congestion.



Normal traffic conditions are expected between 17:15 and 17:30 on 17 June 2019.
Nearest town: 5.78 miles from Runwell.

51.7-0.51

Location: anticlockwise between junctions J2 (London (SE)) and J1A (Erith) .

Due to: Congestion.



Normal traffic conditions are expected between 19:00 and 19:15 on 17 June 2019.

Delay : There are currently delays of 10 minutes against expected traffic.

Earlier Due to: Caused by an earlier accident.
Nearest town: 17.38 miles from Runwell.

51.43-0.24

Location: anticlockwise entry slip at junction J1A (Erith) .

Due to: Congestion.



Normal traffic conditions are expected between 19:45 and 20:00 on 17 June 2019.
Nearest town: 16.28 miles from Runwell.

51.45-0.24

Location: northbound exit slip to the A130 .

Due to: Congestion.



Normal traffic conditions are expected between 15:15 and 15:30 on 17 June 2019.
Nearest town: 5.78 miles from Runwell.

51.7-0.51

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Lane Closures : Lanes 3 and 4 are closed.

Due to: Road repairs.



Period : from 20:30 on 17 June 2019 to 05:30 on 18 June 2019.

Lanes Closed : There are two of four lanes closed.
Nearest town: 15.16 miles from Runwell.

51.47-0.26

Location: westbound between the junctions with the A1089 and the A1012 .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 17 June 2019 to 05:00 on 18 June 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.72 miles from Runwell.

51.5-0.34

Location: anticlockwise entry slip at junction J27 (Stansted) From M11 South.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 17 June 2019 to 05:00 on 18 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.01 miles from Runwell.

51.68-0.13

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Lane Closures : Lanes 1, 2, 3 and 4 will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 17 June 2019 to 05:00 on 18 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from Runwell.

51.67-0.15

Location: southbound between junctions J8 (Bishops Stortford) and J6 (Hatfield) .

Lane Closures : Lane one will be closed.

Due to: Emergency roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 17 June 2019 to 05:00 on 18 June 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.44 miles from Runwell.

51.76-0.15

Location: westbound between junctions J4 (Gillingham) and J3 (Maidstone) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 20:00 on 21 June 2019.
Nearest town: 19.89 miles from Runwell.

51.33-0.57

Location: eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 20:00 on 21 June 2019.
Nearest town: 19.56 miles from Runwell.

51.34-0.61

Location: southbound between the junctions with the A120 Colchester West and the A130 Chelmsford North.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 July 2019.

Lanes Closed : There is one of three lanes closed.
Nearest town: 10.64 miles from Runwell.

51.77-0.56

Location: clockwise between junctions J26 (Waltham Abbey) and J27 (Stansted) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 17 June 2019 to 05:00 on 18 June 2019.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.67 miles from Runwell.

51.69-0.07

Location: clockwise at junction J27 (Stansted) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 17 June 2019 to 05:00 on 18 June 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.57 miles from Runwell.

51.68-0.11

Location: southbound.

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 17 June 2019 to 05:00 on 20 June 2019.
Nearest town: 6.88 miles from Runwell.

51.67-0.37

Location: westbound between the junctions with the A131 North and the A131 South.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 19 June 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 17.53 miles from Runwell.

51.87-0.58

Location: eastbound between the junctions with the A131 South and the A131 North.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 19 June 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 17.56 miles from Runwell.

51.87-0.58

Location: eastbound between the junctions with the A131 South and the A131 North.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 19 June 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 17.1 miles from Runwell.

51.86-0.55

Location: eastbound between the junctions with the A131 North and the A12 Colchester West.

Due to: Roadworks.



Period : expect disruption until 06:00 on 19 June 2019.

Lanes Closed : All lanes are closed.
Nearest town: 18.47 miles from Runwell.

51.88-0.58

Location: westbound between the junctions with the A131 North and the A131 South.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 19 June 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 18.45 miles from Runwell.

51.88-0.59

Location: northbound between the junctions with the A130 Chelmsford North and the A120 Colchester West.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 21 June 2019.

Lanes Closed : There is one of three lanes closed.
Nearest town: 10.23 miles from Runwell.

51.76-0.54

Location: northbound at junction J6 (Hatfield) .

Lane Closures : Lane one will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 17 June 2019 to 21 June 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.23 miles from Runwell.

51.67-0.12

Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .

Lane Closures : Lane one will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 17 June 2019 to 21 June 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.4 miles from Runwell.

51.66-0.11

Location: eastbound.

Due to: Roadworks scheme.



Period : from 20:05 on 11 June 2019 to 06:00 on 26 October 2019.
Nearest town: 15.5 miles from Runwell.

51.41-0.38

Location: eastbound between junctions J4 (Gillingham) and J6 (Faversham) .

Due to: Roadworks scheme.



Period : from 20:06 on 6 June 2019 to 06:00 on 27 July 2019.
Nearest town: 19.63 miles from Runwell.

51.34-0.6

Location: anticlockwise entry slip at junction J27 (Stansted) From M11 North.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 17 June 2019 to 19 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.21 miles from Runwell.

51.68-0.12

Location: northbound between the junctions with the A126 Grays and the A13 .

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 18 June 2019 to 05:00 on 19 June 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.86 miles from Runwell.

51.49-0.36

Location: southbound between the A13 and the junction with the A126 Grays.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 19 June 2019 to 05:00 on 20 June 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.3 miles from Runwell.

51.48-0.36

Location: southbound exit slip to the A126 .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 19 June 2019 to 05:00 on 20 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 11.78 miles from Runwell.

51.48-0.35

Location: northbound between junctions J7 (Chelmsford) and J8 (Bishops Stortford) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 June 2019 to 19 June 2019.
Nearest town: 18.33 miles from Runwell.

51.76-0.15

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Due to: Roadworks.



Period : expect disruption until 05:30 on 18 June 2019.

Lanes Closed : All lanes are closed.
Nearest town: 15.57 miles from Runwell.

51.46-0.25

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 23 June 2019 to 05:00 on 24 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.38 miles from Runwell.

51.45-0.24

Location: anticlockwise entry slip at junction J1A (Erith) .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 22 June 2019 to 05:00 on 23 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.29 miles from Runwell.

51.45-0.24

Location: anticlockwise entry slip from the A206 .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 22 June 2019 to 05:00 on 23 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.28 miles from Runwell.

51.45-0.24

Location: anticlockwise at junction J1A (Erith) .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 22 June 2019 to 05:00 on 23 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.38 miles from Runwell.

51.45-0.24

Location: northbound at junction J6 (Hatfield) .

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 25 June 2019 to 28 June 2019.

Schedule : From 23:00 on 28 June 2019 to 06:00 on 29 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 1 July 2019 to 5 July 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.23 miles from Runwell.

51.67-0.12

Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 25 June 2019 to 28 June 2019.

Schedule : From 23:00 on 28 June 2019 to 06:00 on 29 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 1 July 2019 to 5 July 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.41 miles from Runwell.

51.66-0.11

Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 21 June 2019 to 05:00 on 22 June 2019.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.68 miles from Runwell.

51.66-0.18

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 June 2019 to 19 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 6.88 miles from Runwell.

51.67-0.37

Location: southbound between the junctions with the A414 Chelmsford West and the A1023 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 June 2019 to 20 June 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.9 miles from Runwell.

51.66-0.37

Location: southbound between the junctions with the A414 Chelmsford West and the A1023 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 June 2019 to 19 June 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.49 miles from Runwell.

51.68-0.4

Location: southbound between the A120 Colchester West and the junction with the A130 Chelmsford North.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 18 June 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 14.91 miles from Runwell.

51.81-0.66

Location: southbound between the A130 Chelmsford North and the junction with the A414 Chelmsford East.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 18 June 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 9.74 miles from Runwell.

51.76-0.52

Location: southbound between the junctions with the A120 Colchester West and the A130 Chelmsford North.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 18 June 2019.

Lanes Closed : There is one of three lanes closed.
Nearest town: 11.11 miles from Runwell.

51.77-0.58

Location: northbound between junctions J7 (Chelmsford) and J8 (Bishops Stortford) .

Lane Closures : Lane one will be closed.

Due to: Emergency roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 19 June 2019 to 05:00 on 20 June 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.45 miles from Runwell.

51.76-0.15

Location: northbound between junctions J7 (Chelmsford) and J8 (Bishops Stortford) .

Lane Closures : Lane one will be closed.

Due to: Emergency roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 19 June 2019 to 05:00 on 20 June 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.56 miles from Runwell.

51.81-0.18

Location: westbound between the junctions with the A12 Colchester West and the A131 North.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 19 June 2019 to 06:00 on 24 June 2019.
Nearest town: 18.51 miles from Runwell.

51.88-0.59

Location: eastbound between the junctions with the A131 North and the A12 Colchester West.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 19 June 2019 to 06:00 on 24 June 2019.
Nearest town: 18.5 miles from Runwell.

51.88-0.59

Location: anticlockwise entry slip at junction J27 (Stansted) From M11 North.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 June 2019 to 21 June 2019.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 25 June 2019 to 28 June 2019.

Schedule : From 23:00 on 28 June 2019 to 06:00 on 29 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.21 miles from Runwell.

51.68-0.12

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 19 June 2019 to 05:00 on 20 June 2019.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.22 miles from Runwell.

51.65-0.19

Location: clockwise entry slip at junction J1A (Erith) .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 19 June 2019 to 05:00 on 20 June 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.26 miles from Runwell.

51.45-0.24

Location: clockwise exit slip at junction J1B (Dartford) .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 19 June 2019 to 05:00 on 20 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.93 miles from Runwell.

51.44-0.24

Location: anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 June 2019 to 21 June 2019.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 24 June 2019 to 28 June 2019.

Schedule : From 23:00 on 28 June 2019 to 06:00 on 29 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 13.56 miles from Runwell.

51.49-0.27

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 June 2019 to 21 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 24 June 2019 to 28 June 2019.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.22 miles from Runwell.

51.48-0.27

Location: anticlockwise at junction J30 (Dagenham) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 June 2019 to 21 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 24 June 2019 to 28 June 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.03 miles from Runwell.

51.48-0.27

Location: anticlockwise entry slip at junction J30 (Dagenham) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 June 2019 to 21 June 2019.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 24 June 2019 to 28 June 2019.

Schedule : From 23:00 on 28 June 2019 to 06:00 on 29 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 13.35 miles from Runwell.

51.5-0.27

Location: eastbound exit slip to the M25 .

Lane Closures : Lane one will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 June 2019 to 21 June 2019.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 24 June 2019 to 28 June 2019.

Schedule : From 23:00 on 28 June 2019 to 06:00 on 29 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 13.28 miles from Runwell.

51.5-0.27

Location: anticlockwise entry slip at junction J2 (London (SE)) from A2 westbound.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 17 June 2019 to 21 June 2019.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.26 miles from Runwell.

51.43-0.25

Location: anticlockwise entry slip at junction J2 (London (SE)) from A2 eastbound.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 17 June 2019 to 21 June 2019.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.66 miles from Runwell.

51.43-0.24

Location: anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .

Lane Closures : Lanes 1, 2, 3 and 4 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 17 June 2019 to 21 June 2019.

Schedule : From 23:00 on 21 June 2019 to 06:00 on 22 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 18.52 miles from Runwell.

51.42-0.23

Location: eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 June 2019 to 22 June 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 June 2019 to 26 June 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.63 miles from Runwell.

51.34-0.6

Location: eastbound at the junction with the M2 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 July 2019 to 20 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2019 to 27 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2019 to 3 August 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2019 to 10 August 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 15.43 miles from Runwell.

51.4-0.44

Location: eastbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 July 2019 to 20 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2019 to 27 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2019 to 3 August 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2019 to 10 August 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 15.51 miles from Runwell.

51.4-0.42

Location: eastbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 July 2019 to 20 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2019 to 27 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2019 to 3 August 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2019 to 10 August 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 15.42 miles from Runwell.

51.4-0.42

Location: eastbound between the A2260 and the junction with the M2 .

Lane Closures : Lanes 2, 3 and 4 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 18 June 2019.

Lanes Closed : There are three of four lanes closed.
Nearest town: 15.4 miles from Runwell.

51.42-0.34

Location: eastbound entry slip from the A227 .

Due to: Roadworks.



Period : expect disruption until 06:00 on 18 June 2019.

Lanes Closed : All lanes are closed.
Nearest town: 15.4 miles from Runwell.

51.42-0.36

Location: eastbound.

Due to: Roadworks.



Period : expect disruption until 06:00 on 18 June 2019.

Lanes Closed : All lanes are closed.
Nearest town: 15.5 miles from Runwell.

51.41-0.38

Location: eastbound.

Due to: Roadworks.



Period : expect disruption until 06:00 on 18 June 2019.

Lanes Closed : All lanes are closed.
Nearest town: 15.43 miles from Runwell.

51.41-0.39

Location: eastbound between the A227 and the junction with the M2 .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 July 2019 to 20 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2019 to 27 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2019 to 3 August 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2019 to 10 August 2019.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.55 miles from Runwell.

51.4-0.41

Location: eastbound at junction J1 (Rochester) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 July 2019 to 20 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2019 to 27 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2019 to 3 August 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2019 to 10 August 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.4 miles from Runwell.

51.4-0.44

Location: westbound entry slip at Medway Services.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 June 2019 to 20:01 on 19 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 19.6 miles from Runwell.

51.34-0.61

Location: westbound exit slip at Medway Services.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 June 2019 to 20:01 on 19 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 19.56 miles from Runwell.

51.34-0.61

Location: clockwise entry slip at junction J27 (Stansted) From M11 North.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 17 June 2019 to 19 June 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.21 miles from Runwell.

51.68-0.12

Location: eastbound between the junctions with the M11 and the A131 South.

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 June 2019 to 22 June 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 June 2019 to 29 June 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2019 to 6 July 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2019 to 13 July 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.33 miles from Runwell.

51.87-0.36