Location: anticlockwise at junction J2 (London (SE)) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 13:30 and 13:45 on 14 December 2025.
Normal traffic conditions are expected between 13:30 and 13:45 on 14 December 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.28 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 09:15 and 09:30 on 14 December 2025.
Normal traffic conditions are expected between 09:15 and 09:30 on 14 December 2025.
Lanes Closed : There are lane closures.
Nearest town: 17.14 miles from Hanningfield Reservoir.

Ripple Road (Eastbound) - Lane three (of three) blocked due to a broken down vehicle.
The accident has been cleared and lane three has been reopened to traffic.
Traffic flows are returning to normal for the time of day.
Nearest town: 18.45 miles from Hanningfield Reservoir.

A13 Ripple Road (Eastbound) just after the entry slip from Lodge Avenue - All lanes reopened following a collision.
Traffic flows are normal for the time of day.
Nearest town: 18.72 miles from Hanningfield Reservoir.

Rainham Road North junction with Oxlow Lane (All Directions): The traffic lights are not working at this location.
The signals have now been repaired.
Nearest town: 16.35 miles from Hanningfield Reservoir.

Station Road (All Directions) between Valence Avenue and Broomfield Road - Temporary traffic signals in operation to facilitate resurfacing works.
Nearest town: 17.15 miles from Hanningfield Reservoir.

Location: anticlockwise at junction J1A (Erith) .
Due to: Congestion.
Normal traffic conditions are expected between 12:30 and 12:45 on 14 December 2025.
Nearest town: 17.99 miles from Hanningfield Reservoir.

Location: westbound between the junctions with the A131 North and the A131 South.
Due to: Congestion.
Normal traffic conditions are expected between 12:45 and 13:00 on 14 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.3 miles from Hanningfield Reservoir.

Location: eastbound entry slip from the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 14 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.53 miles from Hanningfield Reservoir.

Location: westbound between the junctions with the A131 North and the A131 South.
Due to: Congestion.
Normal traffic conditions are expected between 10:30 and 10:45 on 14 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.3 miles from Hanningfield Reservoir.

Location: westbound between the junctions with the A131 North and the A131 South.
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 14 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.3 miles from Hanningfield Reservoir.

Location: westbound entry slip from the M25 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 14 December 2025 to 05:30 on 15 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.79 miles from Hanningfield Reservoir.

Location: anticlockwise exit slip at junction J2 (London (SE)) for A2 East.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 14 December 2025 to 05:30 on 15 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.89 miles from Hanningfield Reservoir.

Location: southbound between junctions J7 (Chelmsford) and J6 (Hatfield) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 15:30 on 14 December 2025.
Nearest town: 15.52 miles from Hanningfield Reservoir.

Location: anticlockwise at junction J1A (Erith) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 14 December 2025 to 05:00 on 15 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.29 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 14 December 2025 to 05:00 on 15 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18 miles from Hanningfield Reservoir.

Location: northbound between junctions J7 (Chelmsford) and J7A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 December 2025 to 05:00 on 15 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.56 miles from Hanningfield Reservoir.

Location: southbound between junctions J8 (Bishops Stortford) and J7A .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 December 2025 to 05:00 on 15 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.29 miles from Hanningfield Reservoir.

Location: southbound at junction J8 (Bishops Stortford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 December 2025 to 05:00 on 15 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.6 miles from Hanningfield Reservoir.

Location: southbound between junctions J16 and J15 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.75 miles from Hanningfield Reservoir.

Location: eastbound between the A227 and the junction with the M2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 December 2025.
Nearest town: 18.04 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.08 miles from Hanningfield Reservoir.

Location: anticlockwise entry slip from the A206 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.05 miles from Hanningfield Reservoir.

Location: anticlockwise at junction J1A (Erith) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.25 miles from Hanningfield Reservoir.

Location: anticlockwise entry slip from the A206 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.05 miles from Hanningfield Reservoir.

Location: northbound between junctions J12 and J15 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.66 miles from Hanningfield Reservoir.

Location: northbound between junctions J12 and J15 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.46 miles from Hanningfield Reservoir.

Location: northbound between junctions J12 and J15 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.54 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:30 on 18 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.98 miles from Hanningfield Reservoir.

Location: eastbound between the junctions with the A2260 and the A227 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 16 December 2025 to 16:00 on 16 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.74 miles from Hanningfield Reservoir.

Location: westbound between the A131 South and the junction with the M11 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.74 miles from Hanningfield Reservoir.

Location: westbound between the A131 North and the junction with the A131 South.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.2 miles from Hanningfield Reservoir.

Location: eastbound between the junctions with the A131 South and the A131 North.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.83 miles from Hanningfield Reservoir.

Location: southbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.91 miles from Hanningfield Reservoir.

Location: northbound entry slip at junction J6 (Hatfield) from M25 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from Hanningfield Reservoir.

Location: anticlockwise entry slip at junction J27 (Stansted) From M11 North.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.23 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.51 miles from Hanningfield Reservoir.

Location: anticlockwise at junction J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.7 miles from Hanningfield Reservoir.

Location: anticlockwise exit slip at junction J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.7 miles from Hanningfield Reservoir.

Location: southbound entry slip at junction J6 (Hatfield) from M25 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from Hanningfield Reservoir.

Location: anticlockwise entry slip at junction J27 (Stansted) From M11 South.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.98 miles from Hanningfield Reservoir.

Location: northbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.3 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.04 miles from Hanningfield Reservoir.

Location: clockwise at junction J28 (Chelmsford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 15 December 2025 to 05:30 on 16 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.86 miles from Hanningfield Reservoir.

Location: northbound between junctions J19 and J20B .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.84 miles from Hanningfield Reservoir.

Location: southbound between junctions J20B and J19 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.44 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.35 miles from Hanningfield Reservoir.

Location: southbound between junctions J22 and J21 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.6 miles from Hanningfield Reservoir.

Location: northbound between junctions J20A and J22 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.54 miles from Hanningfield Reservoir.

Location: northbound between junctions J21 and J22 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.96 miles from Hanningfield Reservoir.

Location: northbound between junctions J22 and J24 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.19 miles from Hanningfield Reservoir.

Location: northbound between junctions J18 and J19 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.51 miles from Hanningfield Reservoir.

Location: northbound entry slip at junction J22 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.19 miles from Hanningfield Reservoir.

Location: northbound exit slip at junction J23 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.88 miles from Hanningfield Reservoir.

Location: eastbound between junctions J1 (Rochester) and J3 (Maidstone) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 December 2025 to 06:00 on 20 December 2025.
Nearest town: 18.13 miles from Hanningfield Reservoir.

Location: eastbound between junctions J2 (Strood) and J3 (Maidstone) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2025 to 20 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.3 miles from Hanningfield Reservoir.

Location: eastbound between junctions J1 (Rochester) and J2 (Strood) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2025 to 20 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.17 miles from Hanningfield Reservoir.

Location: eastbound at junction J1 (Rochester) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2025 to 20 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.13 miles from Hanningfield Reservoir.

Location: westbound between junctions J2 (Strood) and J1 (Rochester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 December 2025 to 06:00 on 20 December 2025.
Nearest town: 19.35 miles from Hanningfield Reservoir.

Location: westbound between junctions J2 (Strood) and J1 (Rochester) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2025 to 20 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.71 miles from Hanningfield Reservoir.

Location: eastbound at junction J2 (Strood) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2025 to 20 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.76 miles from Hanningfield Reservoir.

Location: westbound at junction J2 (Strood) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2025 to 20 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.35 miles from Hanningfield Reservoir.

Location: northbound between junctions J4 (North Circular) and J6 (Hatfield) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 15 December 2025 to 16:00 on 15 December 2025.
Nearest town: 19.57 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 15 December 2025 to 05:30 on 16 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.99 miles from Hanningfield Reservoir.

Location: southbound between junctions J12 and J11 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.78 miles from Hanningfield Reservoir.

Location: northbound between junctions J11 and J12 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.75 miles from Hanningfield Reservoir.

Location: northbound between junctions J11 and J12 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.91 miles from Hanningfield Reservoir.

Location: southbound between junctions J12 and J11 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.73 miles from Hanningfield Reservoir.

Location: southbound between junctions J12 and J11 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.55 miles from Hanningfield Reservoir.

Location: southbound between junctions J16 and J15 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.75 miles from Hanningfield Reservoir.

Location: northbound between junctions J11 and J12 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.9 miles from Hanningfield Reservoir.

Location: southbound between junctions J13 and J12 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.81 miles from Hanningfield Reservoir.

Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 17 December 2025 to 16:00 on 17 December 2025.
Nearest town: 17.2 miles from Hanningfield Reservoir.

Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 December 2025 to 05:30 on 17 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.7 miles from Hanningfield Reservoir.

Location: clockwise entry slip at junction J28 (Chelmsford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 December 2025 to 05:30 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.72 miles from Hanningfield Reservoir.

Location: clockwise at junction J28 (Chelmsford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 December 2025 to 05:30 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.86 miles from Hanningfield Reservoir.

Location: northbound between junctions J15 and J16 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.46 miles from Hanningfield Reservoir.

Location: northbound between junctions J25 and J26 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.52 miles from Hanningfield Reservoir.

Location: northbound between junctions J23 and J25 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.1 miles from Hanningfield Reservoir.

Location: northbound between junctions J23 and J25 .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.68 miles from Hanningfield Reservoir.

Location: southbound between junctions J7A and J7 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.52 miles from Hanningfield Reservoir.

Location: clockwise exit slip at junction J27 (Stansted) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.56 miles from Hanningfield Reservoir.

Location: clockwise between junctions J26 (Waltham Abbey) and J27 (Stansted) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.02 miles from Hanningfield Reservoir.

Location: northbound between the junctions with the A126 Tilbury and the A126 Grays.
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.97 miles from Hanningfield Reservoir.

Location: clockwise exit slip at junction J2 (London (SE)) to A2 East.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.42 miles from Hanningfield Reservoir.

Location: clockwise between junctions J31 (Thurrock) and J1B (Dartford) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.04 miles from Hanningfield Reservoir.

Location: clockwise.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.61 miles from Hanningfield Reservoir.

Location: clockwise entry slip at junction J2 (London (SE)) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.67 miles from Hanningfield Reservoir.

Location: clockwise between junctions J1B (Dartford) and J3 (Maidstone) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.1 miles from Hanningfield Reservoir.

Location: southbound between the junctions with the A126 Grays and the A126 Tilbury.
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.74 miles from Hanningfield Reservoir.

Location: southbound between junctions J6 (Hatfield) and J5 (Loughton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.4 miles from Hanningfield Reservoir.

Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.79 miles from Hanningfield Reservoir.

Location: anticlockwise entry slip at junction J29 (Romford) .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 15 December 2025 to 05:30 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.02 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.5 miles from Hanningfield Reservoir.

Location: anticlockwise exit slip at junction J2 (London (SE)) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.89 miles from Hanningfield Reservoir.

Location: southbound exit slip at junction J19 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.93 miles from Hanningfield Reservoir.

Location: southbound between junctions J20B and J19 .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.4 miles from Hanningfield Reservoir.

Location: eastbound between the A227 and the junction with the M2 .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 18 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.2 miles from Hanningfield Reservoir.

Location: eastbound between junctions J1 (Rochester) and J2 (Strood) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 18 December 2025.
Nearest town: 18.14 miles from Hanningfield Reservoir.

Location: eastbound between junctions J1 (Rochester) and J2 (Strood) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 18 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.17 miles from Hanningfield Reservoir.

Location: eastbound at junction J1 (Rochester) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 18 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.14 miles from Hanningfield Reservoir.

Location: southbound at junction J8 (Bishops Stortford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.6 miles from Hanningfield Reservoir.

Location: northbound at junction J8A (Stansted) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.36 miles from Hanningfield Reservoir.

Location: northbound exit slip at junction J8 (Bishops Stortford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.34 miles from Hanningfield Reservoir.

Location: northbound between junctions J15 and J16 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.78 miles from Hanningfield Reservoir.

Location: southbound between junctions J12 and J11 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 2 January 2026 to 05:00 on 3 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 January 2026 to 10 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 January 2026 to 17 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 19 January 2026 to 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.53 miles from Hanningfield Reservoir.

Location: northbound between junctions J11 and J12 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 2 January 2026 to 05:00 on 3 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 January 2026 to 10 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 January 2026 to 17 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 19 January 2026 to 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.55 miles from Hanningfield Reservoir.

Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 15 December 2025 to 19 December 2025.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 22 December 2025 to 24 December 2025.
Nearest town: 10.95 miles from Hanningfield Reservoir.

Location: southbound between junctions J25 and J23 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.61 miles from Hanningfield Reservoir.

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.08 miles from Hanningfield Reservoir.

Location: anticlockwise at junction J1A (Erith) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18 miles from Hanningfield Reservoir.

Location: anticlockwise entry slip from the A206 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.05 miles from Hanningfield Reservoir.

Location: anticlockwise at junction J1A (Erith) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.25 miles from Hanningfield Reservoir.

Location: anticlockwise entry slip from the A206 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.05 miles from Hanningfield Reservoir.