Traffic Great Burstead

SLIGHT
SEVERE
FULL SCREEN UPDATED: 07:01
Leaflet | © OpenStreetMap contributors
×
×

Current traffic around Great Burstead

The following traffic incidents and congestion for Great Burstead have been reported by Highways England, Traffic Scotland, Traffic Wales or Transport for London (TfL) in the last two hours:

BROKEN DOWN VEHICLE
Location: The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 06:00 and 06:15 on 8 Jul 2025.
Return to normal: Normal traffic conditions are expected between 06:00 and 06:15 on 8 Jul 2025.
Lanes closed: There are lane closures.
Nearest town: 11.9 miles from Great Burstead. CLEARED @ 05:23
CONGESTION
Location: The A282 anticlockwise entry slip from the A206 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 07:00 and 07:15 on 8 Jul 2025.
Nearest town: 12.93 miles from Great Burstead.
CONGESTION
Location: The M25 anticlockwise exit slip at junction J30 (Dagenham) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 06:15 and 06:30 on 8 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.18 miles from Great Burstead. CLEARED @ 06:17
CONGESTION
Location: The M25 anticlockwise entry slip at junction J1A (Erith) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 06:15 and 06:30 on 8 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.95 miles from Great Burstead. CLEARED @ 06:17
CONGESTION
Location: The M25 anticlockwise entry slip at junction J2 (London (SE)) from A2 westbound.
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 06:00 and 06:15 on 8 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.42 miles from Great Burstead. CLEARED @ 05:59
CONGESTION
Location: The M25 anticlockwise at junction J2 (London (SE)) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 06:00 and 06:15 on 8 Jul 2025.
Nearest town: 14.16 miles from Great Burstead. CLEARED @ 05:59


There are no current incidents in this location.

Roadworks

ROAD WORKS
Location: The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Reason: Roadworks.
Status: Currently Active.
Period: from 22:13 on 7 Jul 2025 to 05:00 on 8 Jul 2025.
Lanes Closed: There are lane closures.
Nearest town: 11.97 miles from Great Burstead. CLEARED @ 04:02
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J1A (Erith) .
Reason: Roadworks.
Status: Currently Active.
Period: from 22:14 on 7 Jul 2025 to 05:00 on 8 Jul 2025.
Lanes Closed: All lanes are closed.
Nearest town: 12.98 miles from Great Burstead. CLEARED @ 04:02
ROAD WORKS
Location: The M25 anticlockwise exit slip at junction J26 (Waltham Abbey) .
Reason: Roadworks.
Status: Currently Active.
Period: from 21:45 on 7 Jul 2025 to 05:30 on 8 Jul 2025.
Lanes Closed: All lanes are closed.
Nearest town: 17.45 miles from Great Burstead. CLEARED @ 03:53
ROAD WORKS
Location: The M2 eastbound at junction J4 (Gillingham) .
Reason: Roadworks.
Status: Currently Active.
Period: from 20:23 on 7 Jul 2025 to 06:00 on 8 Jul 2025.
Lanes Closed: All lanes are closed.
Nearest town: 19.59 miles from Great Burstead. CLEARED @ 05:59
ROAD WORKS
Location: The M11 southbound between junctions J7A and J7 (Chelmsford) .
Lane closures: Lane one will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 21:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 16.5 miles from Great Burstead.
ROAD WORKS
Location: The A12 northbound between junctions J22 and J24 .
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 21:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 18.5 miles from Great Burstead.
ROAD WORKS
Location: The A1089 northbound between the A126 Tilbury and the junction with the A126 Grays.
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 9.74 miles from Great Burstead.
ROAD WORKS
Location: The M20 westbound between junctions J3 (Sevenoaks) and J1 .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:30 on 9 Jul 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 17.31 miles from Great Burstead.
ROAD WORKS
Location: The M20 westbound at junction J1 .
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:30 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.66 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:30 on 9 Jul 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 17.04 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise exit slip at junction J26 (Waltham Abbey) .
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:30 on 9 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.36 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise at junction J28 (Chelmsford) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 8 Jul 2025 to 11 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 14 Jul 2025 to 18 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 21 Jul 2025 to 25 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 28 Jul 2025 to 1 Aug 2025.
Nearest town: 6.84 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 7.86 miles from Great Burstead.
ROAD WORKS
Location: The A13 eastbound.
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 10.93 miles from Great Burstead.
ROAD WORKS
Location: The A13 eastbound at the junction with the M25 .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 10.08 miles from Great Burstead.
ROAD WORKS
Location: The A13 eastbound entry slip from the A1306 Aveley.
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 10.92 miles from Great Burstead.
ROAD WORKS
Location: The A13 eastbound exit slip to the M25 .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 10.08 miles from Great Burstead.
ROAD WORKS
Location: The A12 northbound at junction J11 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 6.97 miles from Great Burstead.
ROAD WORKS
Location: The A2 westbound exit slip to the A2260 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 8 Jul 2025 to 06:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 12.74 miles from Great Burstead.
ROAD WORKS
Location: The A2 westbound between the A227 and the junction with the A2260 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 8 Jul 2025 to 06:00 on 9 Jul 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 12.94 miles from Great Burstead.
ROAD WORKS
Location: The M20 eastbound between junctions J1 and J3 (Sevenoaks) .
Lane closures: The hard shoulder, lanes 1 and 2 are closed.
Reason: Horticultural works.
Status: Currently Active.
Period: expect disruption until 05:30 on 8 Jul 2025.
Lanes Closed: There are two of three lanes closed.
Nearest town: 17.75 miles from Great Burstead. CLEARED @ 04:29
ROAD WORKS
Location: The A1089 northbound between the junctions with the A126 Tilbury and the A126 Grays.
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 10.05 miles from Great Burstead.
ROAD WORKS
Location: The A1089 southbound between the junctions with the A126 Grays and the A126 Tilbury.
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 9.79 miles from Great Burstead.
ROAD WORKS
Location: The junction of the A1089 and the A126 .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 9.74 miles from Great Burstead.
ROAD WORKS
Location: The junction of the A1089 and the A126 .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 8 Jul 2025 to 05:00 on 9 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 9.8 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J26 (Waltham Abbey) and J24 (Potters Bar) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 22:00 on 7 Jul 2025 to 05:30 on 11 Jul 2025.
Nearest town: 19.12 miles from Great Burstead.
ROAD WORKS
Location: The M2 eastbound at junction J4 (Gillingham) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:06 on 2 Jul 2025 to 06:00 on 8 Jul 2025.
Nearest town: 19.6 miles from Great Burstead.
ROAD WORKS
Location: The M2 eastbound at junction J4 (Gillingham) .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 8 Jul 2025.
Lanes Closed: All lanes are closed.
Nearest town: 19.6 miles from Great Burstead.
ROAD WORKS
Location: The M2 westbound between junctions J5 (Maidstone) and J4 (Gillingham) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 19:55 on 4 Jul 2025 to 06:00 on 10 Jul 2025.
Nearest town: 19.63 miles from Great Burstead.
ROAD WORKS
Location: The M2 westbound at junction J4 (Gillingham) .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 8 Jul 2025.
Lanes Closed: All lanes are closed.
Nearest town: 19.61 miles from Great Burstead.
ROAD WORKS
Location: The A12 northbound between junctions J20B and J22 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:45 on 30 Jun 2025 to 05:00 on 12 Jul 2025.
Nearest town: 14.27 miles from Great Burstead.
ROAD WORKS
Location: The A2 eastbound between the A227 and the junction with the M2 .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 23 Dec 2025.
Nearest town: 13.5 miles from Great Burstead.
ROAD WORKS
Location: The A12 southbound exit slip at junction J11 .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:00 on 26 Jul 2025.
Lanes Closed: There is one of two lanes closed.
Nearest town: 6.81 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:00 on 2 Aug 2025.
Nearest town: 7.33 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J28 (Chelmsford) and J28 (Chelmsford) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 05:03 on 18 Jan 2025 to 05:00 on 2 Aug 2025.
Nearest town: 7.03 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise at junction J28 (Chelmsford) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:00 on 2 Aug 2025.
Nearest town: 6.97 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J28 (Chelmsford) .
Lane closures: Lane two is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:00 on 2 Aug 2025.
Lanes Closed: There is one of two lanes closed.
Nearest town: 7.03 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise at junction J2 (London (SE)) .
Reason: Litter clearance is planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 14 Jul 2025 to 18 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 14.73 miles from Great Burstead.
ROAD WORKS
Location: The A13 westbound between the A1089 and the junction with the A1012 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 14 Jul 2025 to 18 Jul 2025.
Schedule: From 23:00 on 18 Jul 2025 to 06:00 on 19 Jul 2025.
Schedule: From 22:00 on 21 Jul 2025 to 05:30 on 22 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 7.4 miles from Great Burstead.
ROAD WORKS
Location: The A13 eastbound at the junction with the A1089 .
Lane closures: Lane three will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 14 Jul 2025 to 18 Jul 2025.
Schedule: From 23:00 on 18 Jul 2025 to 06:00 on 19 Jul 2025.
Schedule: From 22:00 on 19 Jul 2025 to 05:30 on 20 Jul 2025.
Schedule: From 22:30 on 20 Jul 2025 to 05:30 on 21 Jul 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 7.54 miles from Great Burstead.
ROAD WORKS
Location: The A13 westbound at the junction with the M25 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 14 Jul 2025 to 05:00 on 15 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 9.68 miles from Great Burstead.
ROAD WORKS
Location: The A13 westbound between the junctions with the A1012 and the M25 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 14 Jul 2025 to 05:00 on 15 Jul 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 9.54 miles from Great Burstead.
ROAD WORKS
Location: The A13 westbound between the junctions with the A1012 and the A126 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 14 Jul 2025 to 05:00 on 15 Jul 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 9.3 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise at junction J29 (Romford) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 14 Jul 2025 to 18 Jul 2025.
Schedule: From 23:00 on 18 Jul 2025 to 05:30 on 19 Jul 2025.
Schedule: From 22:00 on 19 Jul 2025 to 05:30 on 20 Jul 2025.
Schedule: From 22:30 on 20 Jul 2025 to 05:30 on 21 Jul 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 6.31 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise at junction J29 (Romford) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 14 Jul 2025 to 18 Jul 2025.
Schedule: From 23:00 on 18 Jul 2025 to 05:30 on 19 Jul 2025.
Schedule: From 22:00 on 19 Jul 2025 to 05:30 on 20 Jul 2025.
Schedule: From 22:30 on 20 Jul 2025 to 05:30 on 21 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 6.31 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise exit slip at junction J28 (Chelmsford) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 14 Jul 2025 to 18 Jul 2025.
Schedule: From 23:00 on 18 Jul 2025 to 05:30 on 19 Jul 2025.
Schedule: From 22:00 on 19 Jul 2025 to 05:30 on 20 Jul 2025.
Schedule: From 22:30 on 20 Jul 2025 to 05:30 on 21 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 6.84 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 14 Jul 2025 to 18 Jul 2025.
Schedule: From 23:00 on 18 Jul 2025 to 05:30 on 19 Jul 2025.
Schedule: From 22:00 on 19 Jul 2025 to 05:30 on 20 Jul 2025.
Schedule: From 22:30 on 20 Jul 2025 to 05:30 on 21 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 6.35 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J1B (Dartford) .
Reason: Litter clearance is planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 14 Jul 2025 to 18 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.85 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J26 (Waltham Abbey) and J25 (Enfield) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 14 Jul 2025 to 16 Jul 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 19.12 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J2 (London (SE)) from A2 eastbound and J1A (Erith) .
Reason: Litter clearance is planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 14 Jul 2025 to 18 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 14.47 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Lane closures: Lane four will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 22:00 on 14 Jul 2025 to 22:30 on 27 Jul 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 6.69 miles from Great Burstead.
ROAD WORKS
Location: The A12 northbound exit slip at junction J17 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 14 Jul 2025 to 19 Jul 2025.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 21 Jul 2025 to 26 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 7.78 miles from Great Burstead.
ROAD WORKS
Location: The M11 northbound entry slip at junction J7A .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 14 Jul 2025 to 05:00 on 17 Jul 2025.
Nearest town: 16.91 miles from Great Burstead.
ROAD WORKS
Location: The M11 northbound exit slip at junction J7A .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 14 Jul 2025 to 17 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 16.72 miles from Great Burstead.
ROAD WORKS
Location: The M11 northbound entry slip at junction J7A .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 14 Jul 2025 to 17 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 16.91 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise between junctions J26 (Waltham Abbey) and J27 (Stansted) .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 14 Jul 2025 to 05:00 on 15 Jul 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 14.71 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 14 Jul 2025 to 05:00 on 15 Jul 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 12.1 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise exit slip at junction J27 (Stansted) .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 14 Jul 2025 to 05:00 on 15 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 14.36 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise exit slip at junction J27 (Stansted) .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 14 Jul 2025 to 05:00 on 15 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 13.47 miles from Great Burstead.
ROAD WORKS
Location: The M11 northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 14 Jul 2025 to 05:00 on 15 Jul 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 14.03 miles from Great Burstead.
ROAD WORKS
Location: The A2 eastbound exit slip to the A2260 .
Lane closures: Lane two will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 14 Jul 2025 to 06:00 on 15 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 12.77 miles from Great Burstead.
ROAD WORKS
Location: The A2 eastbound between the M25 and the junction with the A227 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 14 Jul 2025 to 06:00 on 15 Jul 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 12.97 miles from Great Burstead.
ROAD WORKS
Location: The A2 eastbound between the A2018 and the junction with the M25 .
Lane closures: Lane three will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 11 Jul 2025 to 06:00 on 12 Jul 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 14.95 miles from Great Burstead.
ROAD WORKS
Location: The A2 westbound at the junction with the M25 .
Lane closures: Lane three will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 11 Jul 2025 to 06:00 on 12 Jul 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 14.14 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise between junctions J29 (Romford) and J30 (Dagenham) .
Reason: Horticultural works are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 14 Jul 2025 to 15 Jul 2025.
Nearest town: 8.1 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Emergency roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 10 Jul 2025 to 05:30 on 11 Jul 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 9.33 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise entry slip at junction J27 (Stansted) From M11 North.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 14 Jul 2025 to 16 Jul 2025.
Nearest town: 13.97 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise at junction J1A (Erith) .
Lane closures: Lanes 3 and 4 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 13 Jul 2025 to 05:00 on 14 Jul 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 13.15 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 13 Jul 2025 to 05:00 on 14 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 12.86 miles from Great Burstead.
ROAD WORKS
Location: The M2 westbound between junctions J4 (Gillingham) and J3 (Maidstone) .
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 20:00 on 13 Jul 2025 to 05:00 on 14 Jul 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 19.5 miles from Great Burstead.
ROAD WORKS
Location: The M2 westbound exit slip at junction J3 (Maidstone) .
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 20:00 on 13 Jul 2025 to 05:00 on 14 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 19.05 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise exit slip at junction J1A (Erith) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 22:00 on 12 Jul 2025 to 06:00 on 13 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 12.85 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise entry slip at junction J31 (Thurrock) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 12 Jul 2025 to 05:00 on 13 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.41 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise between junctions J31 (Thurrock) and J1A (Erith) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 22:00 on 12 Jul 2025 to 06:00 on 13 Jul 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 12.66 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise between junctions J31 (Thurrock) and J1A (Erith) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 12 Jul 2025 to 05:00 on 13 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.85 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise at junction J1A (Erith) .
Lane closures: Lanes 3 and 4 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:30 on 12 Jul 2025 to 05:00 on 13 Jul 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 13.15 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:30 on 12 Jul 2025 to 05:00 on 13 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 12.86 miles from Great Burstead.
ROAD WORKS
Location: The M20 westbound between junctions J3 (Sevenoaks) and J1 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 23:00 on 11 Jul 2025 to 06:00 on 12 Jul 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 19.02 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J3 (Maidstone) from M20.
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 23:00 on 11 Jul 2025 to 05:30 on 12 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.73 miles from Great Burstead.
ROAD WORKS
Location: The M20 westbound exit slip at junction J1 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 23:00 on 11 Jul 2025 to 05:30 on 12 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.66 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J3 (Maidstone) from A20.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 23:00 on 11 Jul 2025 to 05:30 on 12 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.71 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 23:00 on 11 Jul 2025 to 05:30 on 12 Jul 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 16.88 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 8 Jul 2025 to 11 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 14 Jul 2025 to 18 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 21 Jul 2025 to 25 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 28 Jul 2025 to 1 Aug 2025.
Nearest town: 7.33 miles from Great Burstead.
ROAD WORKS
Location: The M25 anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 8 Jul 2025 to 11 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 14 Jul 2025 to 18 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 21 Jul 2025 to 25 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 28 Jul 2025 to 1 Aug 2025.
Nearest town: 6.69 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 8 Jul 2025 to 11 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 14 Jul 2025 to 18 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 21 Jul 2025 to 25 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 28 Jul 2025 to 1 Aug 2025.
Nearest town: 6.71 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 8 Jul 2025 to 11 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 14 Jul 2025 to 18 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 21 Jul 2025 to 25 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 28 Jul 2025 to 1 Aug 2025.
Nearest town: 8.08 miles from Great Burstead.
ROAD WORKS
Location: The M25 clockwise at junction J28 (Chelmsford) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 8 Jul 2025 to 11 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 14 Jul 2025 to 18 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 21 Jul 2025 to 25 Jul 2025.
Schedule: Expect disruption everyday between 09:30 and 16:00 from 28 Jul 2025 to 1 Aug 2025.
Nearest town: 7.17 miles from Great Burstead.
ROAD WORKS
Location: The M11 southbound between junctions J6 (Hatfield) and J4 (North Circular) .
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 09:30 on 11 Jul 2025 to 16:00 on 11 Jul 2025.
Nearest town: 16.15 miles from Great Burstead.
ROAD WORKS
Location: The A12 southbound between junctions J12 and J11 .
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 9 Jul 2025 to 05:00 on 10 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 4.48 miles from Great Burstead.
ROAD WORKS
Location: The A12 southbound between junctions J13 and J12 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 21:00 on 9 Jul 2025 to 05:00 on 10 Jul 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 4.78 miles from Great Burstead.
ROAD WORKS
Location: The A12 northbound between junctions J20A and J21 .
Lane closures: Lane two will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 10 Jul 2025 to 05:00 on 11 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 14.62 miles from Great Burstead.
ROAD WORKS
Location: The M2 eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .
Lane closures: Lane one will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 10 Jul 2025 to 06:00 on 11 Jul 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 19.62 miles from Great Burstead.

Traffic in Nearby Villages

Great Burstead


Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone, tablet or any electronic device without a hands-free kit whilst driving. If you're caught by the police using any device that can send or receive data whilst driving or riding a motorcyle you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web:

National Highways TrafficNational Highways England

Official source of traffic updates.

Transport for LondonTransport for London (TFL)

Transport for London's (TfL) portal for transportation in London.

Traffic WalesTraffic Wales

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 06:00 and 06:15 on 8 July 2025.

Normal traffic conditions are expected between 06:00 and 06:15 on 8 July 2025.

Lanes Closed : There are lane closures.
Nearest town: 11.9 miles from Great Burstead.

51.46-0.26

Albert Road junction with Saville Road (All Directions): There is a reported building fire at this location.

All restrictions have now been lifted.

There are no reports of congestion in the area.
Nearest town: 17.73 miles from Great Burstead.

51.5-0.04

Southend Road (North Circular Road) at the junction of Wadham Road - All lanes are now open.

All lanes are now open.

Traffic is flowing well.
Nearest town: 18.28 miles from Great Burstead.

51.6-0

Blackwall Tunnel (Southbound Bore) (Southbound): the broken down motorcycle in the tunnel has been removed.

All congestion resulting from this broken down vehicle has cleared (although tailback remain at the present time - see separate entry).
Nearest town: 19.55 miles from Great Burstead.

51.51-0

Ripple Road (Eastbound) - Lane three (of three) blocked due to a broken down vehicle.

The accident has been cleared and lane three has been reopened to traffic.

Traffic flows are returning to normal for the time of day.
Nearest town: 13.84 miles from Great Burstead.

51.53-0.12

Walthamstow Avenue (North Circular Road) (Eastbound) On approach to the Crooked Billet Roundabout.

Partial restriction of the off slip towards the roundabout due to an accident.

The collision has been cleared.

All lanes are open.
Nearest town: 19.32 miles from Great Burstead.

51.61--0.03

Blackwall Tunnel Northern Approach (Southbound) at the junction of East India Dock Road - Congestion due cleared.

A12 Southbound traffic flows have returned to normal for the time of day.
Nearest town: 19.59 miles from Great Burstead.

51.51--0.01

Newham Way (Eastbound) at the junction of Noel Road - All lanes now open.

All lanes now open.
Nearest town: 17.17 miles from Great Burstead.

51.52-0.05

Crooked Billet Underpass (Westbound) - Lane closure overnight to facilitate works The restrictions have been removed.
Nearest town: 18.92 miles from Great Burstead.

51.6--0.02

SFM Asset: 06/000001Shooters Hill Road (All Directions) at the junction of Prince Of Wales Road - The traffic lights are not working The traffic lights are not working at this junction, approach with care
Nearest town: 19.67 miles from Great Burstead.

51.47-0.02

Shooters Hill Road (All Directions) The traffic lights at the junction are now working.

Traffic is moving well.
Nearest town: 19.71 miles from Great Burstead.

51.47-0.02

A13 Ripple Road (Eastbound) just after the entry slip from Lodge Avenue - All lanes reopened following a collision.

Traffic flows are normal for the time of day.
Nearest town: 14.15 miles from Great Burstead.

51.53-0.11

Sidcup By-pass Road (Eastbound) at the junction of Crittlls Corner - The A20 will be closed between Crittalls Corner and the M25 J3 for overnight works.


Nearest town: 18.7 miles from Great Burstead.

51.41-0.11

Station Road (All Directions)at the junction of Longlands Road will have various road closures in place for the duration of the works.


Nearest town: 18.18 miles from Great Burstead.

51.43-0.1

Hardman Road (All Directions) at the junction of Dupree Road - Lane restrictions to facilitate roadworks All restrictions have been removed - Traffic flows have returned to normal
Nearest town: 18.98 miles from Great Burstead.

51.49-0.02

Romford Road (Both Directions) between Upton Lane and Green Street - Romford Road has reopened in both directions Romford Road has reopened in both directions, and vehicles that remain parked at the scene are not causing an obstruction.

Traffic is flowing normally.
Nearest town: 17.37 miles from Great Burstead.

51.55-0.03

Crownfield Road (All Directions) at the junction of A112 Leyton High Road - Temporary signals in operation due to bus shelter upgrade works.

(Sundays Only)
Nearest town: 18.56 miles from Great Burstead.

51.55-0

Beresford Street (Both Directions) at the junction of Macbean Street - One lane closed to facilitate the creation of a new road junction for a hotel complex.

Lane one (of two) closure in place.

Traffic is moving well on approach.
Nearest town: 17.17 miles from Great Burstead.

51.49-0.07

Angel Road (North Circular Road) (All Directions) at the junction of the Cooks Ferry Flyover - The A406 has been fully reopened eastbound with one lane reopened in the westbound carriageway.

All lanes open with traffic flowing well.
Nearest town: 19.8 miles from Great Burstead.

51.61--0.04

Station Road (All Directions) between Valence Avenue and Broomfield Road - Temporary traffic signals in operation to facilitate resurfacing works.


Nearest town: 12.9 miles from Great Burstead.

51.57-0.13

Rainham Road North junction with Oxlow Lane (All Directions): The traffic lights are not working at this location.

The signals have now been repaired.
Nearest town: 11.84 miles from Great Burstead.

51.55-0.16

Bugsby's Way (Both Directions) at the junction of Peninsular Park Road - lane closure to enable Network Rail to carry out bridge repainting programme.


Nearest town: 18.93 miles from Great Burstead.

51.49-0.02

Location: anticlockwise entry slip from the A206 .

Due to: Congestion.



Normal traffic conditions are expected between 07:00 and 07:15 on 8 July 2025.
Nearest town: 12.93 miles from Great Burstead.

51.45-0.24

Location: anticlockwise exit slip at junction J30 (Dagenham) .

Due to: Congestion.



Normal traffic conditions are expected between 06:15 and 06:30 on 8 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.18 miles from Great Burstead.

51.49-0.27

Location: anticlockwise entry slip at junction J1A (Erith) .

Due to: Congestion.



Normal traffic conditions are expected between 06:15 and 06:30 on 8 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.95 miles from Great Burstead.

51.45-0.24

Location: anticlockwise entry slip at junction J2 (London (SE)) from A2 westbound.

Due to: Congestion.



Normal traffic conditions are expected between 06:00 and 06:15 on 8 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.42 miles from Great Burstead.

51.43-0.24

Location: anticlockwise at junction J2 (London (SE)) .

Due to: Congestion.



Normal traffic conditions are expected between 06:00 and 06:15 on 8 July 2025.
Nearest town: 14.16 miles from Great Burstead.

51.43-0.24

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Due to: Roadworks.



Period : from 22:13 on 7 July 2025 to 05:00 on 8 July 2025.

Lanes Closed : There are lane closures.
Nearest town: 11.97 miles from Great Burstead.

51.46-0.26

Location: anticlockwise entry slip at junction J1A (Erith) .

Due to: Roadworks.



Period : from 22:14 on 7 July 2025 to 05:00 on 8 July 2025.

Lanes Closed : All lanes are closed.
Nearest town: 12.98 miles from Great Burstead.

51.45-0.24

Location: anticlockwise exit slip at junction J26 (Waltham Abbey) .

Due to: Roadworks.



Period : from 21:45 on 7 July 2025 to 05:30 on 8 July 2025.

Lanes Closed : All lanes are closed.
Nearest town: 17.45 miles from Great Burstead.

51.68-0.04

Location: eastbound at junction J4 (Gillingham) .

Due to: Roadworks.



Period : from 20:23 on 7 July 2025 to 06:00 on 8 July 2025.

Lanes Closed : All lanes are closed.
Nearest town: 19.59 miles from Great Burstead.

51.34-0.58

Location: southbound between junctions J7A and J7 (Chelmsford) .

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.5 miles from Great Burstead.

51.78-0.17

Location: northbound between junctions J22 and J24 .

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.5 miles from Great Burstead.

51.82-0.67

Location: northbound between the A126 Tilbury and the junction with the A126 Grays.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.74 miles from Great Burstead.

51.47-0.35

Location: westbound between junctions J3 (Sevenoaks) and J1 .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.31 miles from Great Burstead.

51.38-0.23

Location: westbound at junction J1 .

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.66 miles from Great Burstead.

51.39-0.21

Location: anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.04 miles from Great Burstead.

51.68-0.05

Location: anticlockwise exit slip at junction J26 (Waltham Abbey) .

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:30 on 9 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.36 miles from Great Burstead.

51.68-0.04

Location: anticlockwise at junction J28 (Chelmsford) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 8 July 2025 to 11 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 18 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 21 July 2025 to 25 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 28 July 2025 to 1 August 2025.
Nearest town: 6.84 miles from Great Burstead.

51.61-0.27

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.86 miles from Great Burstead.

51.62-0.24

Location: eastbound.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.93 miles from Great Burstead.

51.5-0.23

Location: eastbound at the junction with the M25 .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.08 miles from Great Burstead.

51.5-0.26

Location: eastbound entry slip from the A1306 Aveley.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.92 miles from Great Burstead.

51.5-0.23

Location: eastbound exit slip to the M25 .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.08 miles from Great Burstead.

51.5-0.26

Location: northbound at junction J11 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.97 miles from Great Burstead.

51.61-0.26

Location: westbound exit slip to the A2260 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 8 July 2025 to 06:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.74 miles from Great Burstead.

51.43-0.32

Location: westbound between the A227 and the junction with the A2260 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 8 July 2025 to 06:00 on 9 July 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.94 miles from Great Burstead.

51.42-0.34

Location: eastbound between junctions J1 and J3 (Sevenoaks) .

Lane Closures : The hard shoulder, lanes 1 and 2 are closed.

Due to: Horticultural works.



Period : expect disruption until 05:30 on 8 July 2025.

Lanes Closed : There are two of three lanes closed.
Nearest town: 17.75 miles from Great Burstead.

51.37-0.26

Location: northbound between the junctions with the A126 Tilbury and the A126 Grays.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.05 miles from Great Burstead.

51.46-0.35

Location: southbound between the junctions with the A126 Grays and the A126 Tilbury.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.79 miles from Great Burstead.

51.47-0.35

Location: The junction of the A1089 and the A126 .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.74 miles from Great Burstead.

51.47-0.35

Location: The junction of the A1089 and the A126 .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 8 July 2025 to 05:00 on 9 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.8 miles from Great Burstead.

51.47-0.35

Location: anticlockwise between junctions J26 (Waltham Abbey) and J24 (Potters Bar) .

Due to: Roadworks scheme.



Period : from 22:00 on 7 July 2025 to 05:30 on 11 July 2025.
Nearest town: 19.12 miles from Great Burstead.

51.68-0

Location: eastbound at junction J4 (Gillingham) .

Due to: Roadworks scheme.



Period : from 20:06 on 2 July 2025 to 06:00 on 8 July 2025.
Nearest town: 19.6 miles from Great Burstead.

51.33-0.58

Location: eastbound at junction J4 (Gillingham) .

Due to: Roadworks.



Period : expect disruption until 06:00 on 8 July 2025.

Lanes Closed : All lanes are closed.
Nearest town: 19.6 miles from Great Burstead.

51.33-0.58

Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .

Due to: Roadworks scheme.



Period : from 19:55 on 4 July 2025 to 06:00 on 10 July 2025.
Nearest town: 19.63 miles from Great Burstead.

51.34-0.6

Location: westbound at junction J4 (Gillingham) .

Due to: Roadworks.



Period : expect disruption until 06:00 on 8 July 2025.

Lanes Closed : All lanes are closed.
Nearest town: 19.61 miles from Great Burstead.

51.34-0.59

Location: northbound between junctions J20B and J22 .

Due to: Roadworks scheme.



Period : from 20:45 on 30 June 2025 to 05:00 on 12 July 2025.
Nearest town: 14.27 miles from Great Burstead.

51.78-0.6

Location: eastbound between the A227 and the junction with the M2 .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 23 December 2025.
Nearest town: 13.5 miles from Great Burstead.

51.41-0.39

Location: southbound exit slip at junction J11 .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 05:00 on 26 July 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 6.81 miles from Great Burstead.

51.61-0.27

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 05:00 on 2 August 2025.
Nearest town: 7.33 miles from Great Burstead.

51.62-0.25

Location: anticlockwise between junctions J28 (Chelmsford) and J28 (Chelmsford) .

Due to: Roadworks scheme.



Period : from 05:03 on 18 January 2025 to 05:00 on 2 August 2025.
Nearest town: 7.03 miles from Great Burstead.

51.61-0.26

Location: anticlockwise at junction J28 (Chelmsford) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 05:00 on 2 August 2025.
Nearest town: 6.97 miles from Great Burstead.

51.61-0.26

Location: anticlockwise entry slip at junction J28 (Chelmsford) .

Lane Closures : Lane two is closed.

Due to: Roadworks.



Period : expect disruption until 05:00 on 2 August 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 7.03 miles from Great Burstead.

51.61-0.26

Location: anticlockwise at junction J2 (London (SE)) .

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 18 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.73 miles from Great Burstead.

51.42-0.24

Location: westbound between the A1089 and the junction with the A1012 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.

Schedule : From 23:00 on 18 July 2025 to 06:00 on 19 July 2025.

Schedule : From 22:00 on 21 July 2025 to 05:30 on 22 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 7.4 miles from Great Burstead.

51.5-0.36

Location: eastbound at the junction with the A1089 .

Lane Closures : Lane three will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.

Schedule : From 23:00 on 18 July 2025 to 06:00 on 19 July 2025.

Schedule : From 22:00 on 19 July 2025 to 05:30 on 20 July 2025.

Schedule : From 22:30 on 20 July 2025 to 05:30 on 21 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.54 miles from Great Burstead.

51.5-0.35

Location: westbound at the junction with the M25 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.68 miles from Great Burstead.

51.5-0.27

Location: westbound between the junctions with the A1012 and the M25 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.54 miles from Great Burstead.

51.5-0.28

Location: westbound between the junctions with the A1012 and the A126 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.3 miles from Great Burstead.

51.49-0.29

Location: anticlockwise at junction J29 (Romford) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.

Schedule : From 23:00 on 18 July 2025 to 05:30 on 19 July 2025.

Schedule : From 22:00 on 19 July 2025 to 05:30 on 20 July 2025.

Schedule : From 22:30 on 20 July 2025 to 05:30 on 21 July 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.31 miles from Great Burstead.

51.57-0.29

Location: anticlockwise at junction J29 (Romford) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.

Schedule : From 23:00 on 18 July 2025 to 05:30 on 19 July 2025.

Schedule : From 22:00 on 19 July 2025 to 05:30 on 20 July 2025.

Schedule : From 22:30 on 20 July 2025 to 05:30 on 21 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 6.31 miles from Great Burstead.

51.57-0.29

Location: anticlockwise exit slip at junction J28 (Chelmsford) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.

Schedule : From 23:00 on 18 July 2025 to 05:30 on 19 July 2025.

Schedule : From 22:00 on 19 July 2025 to 05:30 on 20 July 2025.

Schedule : From 22:30 on 20 July 2025 to 05:30 on 21 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 6.84 miles from Great Burstead.

51.61-0.27

Location: anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 18 July 2025.

Schedule : From 23:00 on 18 July 2025 to 05:30 on 19 July 2025.

Schedule : From 22:00 on 19 July 2025 to 05:30 on 20 July 2025.

Schedule : From 22:30 on 20 July 2025 to 05:30 on 21 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 6.35 miles from Great Burstead.

51.57-0.28

Location: anticlockwise entry slip at junction J1B (Dartford) .

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 18 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.85 miles from Great Burstead.

51.44-0.24

Location: anticlockwise between junctions J26 (Waltham Abbey) and J25 (Enfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 14 July 2025 to 16 July 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.12 miles from Great Burstead.

51.68-0

Location: anticlockwise between junctions J2 (London (SE)) from A2 eastbound and J1A (Erith) .

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 July 2025 to 18 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Great Burstead.

51.43-0.24

Location: anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .

Lane Closures : Lane four will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 14 July 2025 to 22:30 on 27 July 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 6.69 miles from Great Burstead.

51.6-0.27

Location: northbound exit slip at junction J17 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 July 2025 to 19 July 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 July 2025 to 26 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.78 miles from Great Burstead.

51.7-0.51

Location: northbound entry slip at junction J7A .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 14 July 2025 to 05:00 on 17 July 2025.
Nearest town: 16.91 miles from Great Burstead.

51.79-0.17

Location: northbound exit slip at junction J7A .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 July 2025 to 17 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.72 miles from Great Burstead.

51.78-0.17

Location: northbound entry slip at junction J7A .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 July 2025 to 17 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.91 miles from Great Burstead.

51.79-0.17

Location: clockwise between junctions J26 (Waltham Abbey) and J27 (Stansted) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.71 miles from Great Burstead.

51.68-0.11

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.1 miles from Great Burstead.

51.67-0.16

Location: clockwise exit slip at junction J27 (Stansted) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.36 miles from Great Burstead.

51.68-0.11

Location: anticlockwise exit slip at junction J27 (Stansted) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.47 miles from Great Burstead.

51.68-0.13

Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.03 miles from Great Burstead.

51.66-0.11

Location: eastbound exit slip to the A2260 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 14 July 2025 to 06:00 on 15 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.77 miles from Great Burstead.

51.43-0.31

Location: eastbound between the M25 and the junction with the A227 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 14 July 2025 to 06:00 on 15 July 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.97 miles from Great Burstead.

51.43-0.3

Location: eastbound between the A2018 and the junction with the M25 .

Lane Closures : Lane three will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.95 miles from Great Burstead.

51.43-0.22

Location: westbound at the junction with the M25 .

Lane Closures : Lane three will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.14 miles from Great Burstead.

51.43-0.25

Location: clockwise between junctions J29 (Romford) and J30 (Dagenham) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 15 July 2025.
Nearest town: 8.1 miles from Great Burstead.

51.53-0.28

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Emergency roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 10 July 2025 to 05:30 on 11 July 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.33 miles from Great Burstead.

51.64-0.21

Location: clockwise entry slip at junction J27 (Stansted) From M11 North.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 16 July 2025.
Nearest town: 13.97 miles from Great Burstead.

51.68-0.12

Location: anticlockwise at junction J1A (Erith) .

Lane Closures : Lanes 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 13 July 2025 to 05:00 on 14 July 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.15 miles from Great Burstead.

51.45-0.24

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 13 July 2025 to 05:00 on 14 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.86 miles from Great Burstead.

51.45-0.24

Location: westbound between junctions J4 (Gillingham) and J3 (Maidstone) .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 13 July 2025 to 05:00 on 14 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.5 miles from Great Burstead.

51.33-0.53

Location: westbound exit slip at junction J3 (Maidstone) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 13 July 2025 to 05:00 on 14 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 19.05 miles from Great Burstead.

51.33-0.51

Location: clockwise exit slip at junction J1A (Erith) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 12 July 2025 to 06:00 on 13 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.85 miles from Great Burstead.

51.45-0.24

Location: clockwise entry slip at junction J31 (Thurrock) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 12 July 2025 to 05:00 on 13 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.41 miles from Great Burstead.

51.49-0.27

Location: clockwise between junctions J31 (Thurrock) and J1A (Erith) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 12 July 2025 to 06:00 on 13 July 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.66 miles from Great Burstead.

51.46-0.25

Location: clockwise between junctions J31 (Thurrock) and J1A (Erith) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 12 July 2025 to 05:00 on 13 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.85 miles from Great Burstead.

51.48-0.27

Location: anticlockwise at junction J1A (Erith) .

Lane Closures : Lanes 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:30 on 12 July 2025 to 05:00 on 13 July 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.15 miles from Great Burstead.

51.45-0.24

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:30 on 12 July 2025 to 05:00 on 13 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.86 miles from Great Burstead.

51.45-0.24

Location: westbound between junctions J3 (Sevenoaks) and J1 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.02 miles from Great Burstead.

51.34-0.28

Location: anticlockwise entry slip at junction J3 (Maidstone) from M20.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 11 July 2025 to 05:30 on 12 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.73 miles from Great Burstead.

51.39-0.2

Location: westbound exit slip at junction J1 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 11 July 2025 to 05:30 on 12 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.66 miles from Great Burstead.

51.39-0.21

Location: anticlockwise entry slip at junction J3 (Maidstone) from A20.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 11 July 2025 to 05:30 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.71 miles from Great Burstead.

51.39-0.19

Location: anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 11 July 2025 to 05:30 on 12 July 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.88 miles from Great Burstead.

51.4-0.2

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 8 July 2025 to 11 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 18 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 21 July 2025 to 25 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 28 July 2025 to 1 August 2025.
Nearest town: 7.33 miles from Great Burstead.

51.62-0.25

Location: anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 8 July 2025 to 11 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 18 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 21 July 2025 to 25 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 28 July 2025 to 1 August 2025.
Nearest town: 6.69 miles from Great Burstead.

51.59-0.27

Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 8 July 2025 to 11 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 18 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 21 July 2025 to 25 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 28 July 2025 to 1 August 2025.
Nearest town: 6.71 miles from Great Burstead.

51.6-0.27

Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 8 July 2025 to 11 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 18 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 21 July 2025 to 25 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 28 July 2025 to 1 August 2025.
Nearest town: 8.08 miles from Great Burstead.

51.62-0.24

Location: clockwise at junction J28 (Chelmsford) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 8 July 2025 to 11 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 18 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 21 July 2025 to 25 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 28 July 2025 to 1 August 2025.
Nearest town: 7.17 miles from Great Burstead.

51.61-0.26

Location: southbound between junctions J6 (Hatfield) and J4 (North Circular) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 11 July 2025 to 16:00 on 11 July 2025.
Nearest town: 16.15 miles from Great Burstead.

51.61-0.05

Location: southbound between junctions J12 and J11 .

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 9 July 2025 to 05:00 on 10 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 4.48 miles from Great Burstead.

51.65-0.35

Location: southbound between junctions J13 and J12 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 21:00 on 9 July 2025 to 05:00 on 10 July 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.78 miles from Great Burstead.

51.66-0.37

Location: northbound between junctions J20A and J21 .

Lane Closures : Lane two will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 July 2025 to 05:00 on 11 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.62 miles from Great Burstead.

51.78-0.61

Location: eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .

Lane Closures : Lane one will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.62 miles from Great Burstead.

51.34-0.6

Location: eastbound exit slip at junction J2 (Strood) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.8 miles from Great Burstead.

51.39-0.46

Location: northbound between junctions J7A and J8 (Bishops Stortford) .

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 9 July 2025 to 05:00 on 10 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.66 miles from Great Burstead.

51.85-0.19

Location: eastbound between junctions J1 and J3 (Sevenoaks) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 10 July 2025 to 16:00 on 10 July 2025.
Nearest town: 19.8 miles from Great Burstead.

51.33-0.27

Location: southbound between junctions J7 (Chelmsford) and J6 (Hatfield) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 10 July 2025 to 15:30 on 10 July 2025.
Nearest town: 14.9 miles from Great Burstead.

51.73-0.14

Location: westbound exit slip at junction J1 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 July 2025 to 11 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.73 miles from Great Burstead.

51.39-0.2

Location: westbound exit slip to the A1089 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 9 July 2025 to 05:30 on 10 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 7.4 miles from Great Burstead.

51.5-0.36

Location: eastbound between the junctions with the A1012 and the A1089 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 9 July 2025 to 05:30 on 10 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.87 miles from Great Burstead.

51.5-0.33

Location: northbound between junctions J4 (North Circular) and J6 (Hatfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 9 July 2025 to 05:00 on 10 July 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.75 miles from Great Burstead.

51.61-0.06

Location: clockwise exit slip at junction J3 (Maidstone) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 July 2025 to 11 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.56 miles from Great Burstead.

51.39-0.2

Location: southbound between junctions J15 and J14 .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 9 July 2025 to 12 July 2025.

Schedule : From 21:00 on 14 July 2025 to 05:00 on 15 July 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.34 miles from Great Burstead.

51.69-0.42

Location: westbound between the A227 and the junction with the A2260 .

Lane Closures : Lane one will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 9 July 2025 to 06:00 on 10 July 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.95 miles from Great Burstead.

51.42-0.34

Location: westbound.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 9 July 2025 to 06:00 on 10 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.82 miles from Great Burstead.

51.42-0.33

Location: eastbound between the junctions with the M25 and the A296 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 21 July 2025 to 26 July 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.01 miles from Great Burstead.

51.43-0.26

Location: eastbound between the A2018 and the junction with the M25 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 21 July 2025 to 26 July 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.95 miles from Great Burstead.

51.43-0.22

Location: clockwise exit slip at junction J27 (Stansted) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.36 miles from Great Burstead.

51.68-0.11

Location: clockwise exit slip at junction J2 (London (SE)) to A2 East.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 21 July 2025 to 26 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.3 miles from Great Burstead.

51.43-0.24

Location: southbound entry slip at junction J6 (Hatfield) From M25 CW.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.14 miles from Great Burstead.

51.68-0.12

Location: clockwise between junctions J26 (Waltham Abbey) and J27 (Stansted) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.79 miles from Great Burstead.

51.68-0.03

Location: clockwise exit slip at junction J26 (Waltham Abbey) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.94 miles from Great Burstead.

51.68-0.02

Location: northbound entry slip at junction J6 (Hatfield) from M25 clockwise.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.14 miles from Great Burstead.

51.68-0.12

Location: eastbound.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.93 miles from Great Burstead.

51.5-0.23

Location: eastbound entry slip from the A1306 Aveley.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.92 miles from Great Burstead.

51.5-0.23

Location: anticlockwise between junctions J26 (Waltham Abbey) and J25 (Enfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.12 miles from Great Burstead.

51.68-0

Location: southbound between junctions J12 and J11 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 8 July 2025 to 10 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.85 miles from Great Burstead.

51.63-0.3

Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 9 July 2025 to 11 July 2025.
Nearest town: 14.88 miles from Great Burstead.

51.64-0.08

Location: southbound between junctions J6 (Hatfield) and J5 (Loughton) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 9 July 2025 to 11 July 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 14 July 2025 to 18 July 2025.
Nearest town: 13.95 miles from Great Burstead.

51.67-0.12

Location: westbound entry slip at junction J4 (Gillingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 10 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 19.63 miles from Great Burstead.

51.34-0.58

Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 10 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.63 miles from Great Burstead.

51.34-0.6

Location: anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.95 miles from Great Burstead.

51.45-0.24

Location: anticlockwise at junction J1A (Erith) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 July 2025 to 11 July 2025.

Schedule : From 23:00 on 11 July 2025 to 06:00 on 12 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.86 miles from Great Burstead.

51.45-0.24

Location: northbound between junctions J20A and J20B .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 11 July 2025 to 05:00 on 12 July 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.99 miles from Great Burstead.

51.78-0.59

Location: clockwise exit slip at junction J28 (Chelmsford) southbound.

Lane Closures : Lane one will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 August 2025 to 15 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.05 miles from Great Burstead.

51.61-0.26