Location: westbound at junction J9 (Fareham) .
Lane Closures : Lane one will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.5 miles from Romsey.

Location: westbound between junctions J10 (Alton) and J9 (Fareham) .
Lane Closures : Lane one will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.46 miles from Romsey.

Location: northbound between junctions J1 (Lordshill) and M27 .
Due to: Congestion.
Normal traffic conditions are expected between 10:00 and 10:15 on 10 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 3.4 miles from Romsey.

Location: northbound between junctions J1 (Lordshill) and M27 .
Due to: Congestion.
Normal traffic conditions are expected between 09:45 and 10:00 on 10 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 3.4 miles from Romsey.

Location: northbound between the junctions with the A30 East and the A345 .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 10 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.97 miles from Romsey.

Location: eastbound exit slip at junction J3 (Southampton) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 10 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 3.06 miles from Romsey.

Location: southbound between the junctions with the A272 and the A33 .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 10 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.04 miles from Romsey.

Location: northbound between the junctions with the A338 and the A30 East.
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 10 June 2025.
Nearest town: 13.73 miles from Romsey.

Location: eastbound exit slip at junction J3 (Southampton) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 10 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 3.06 miles from Romsey.

Location: westbound entry slip at junction J8 (Southampton) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 10 June 2025.
Nearest town: 10.15 miles from Romsey.

Location: northbound between junctions J1 (Lordshill) and M27 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 10 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 4.18 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.48 miles from Romsey.

Location: eastbound between the A3057 and the junction with the A3093 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.82 miles from Romsey.

Location: eastbound exit slip to the A343 .
Due to: Roadworks.
Period : from 22:26 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.89 miles from Romsey.

Location: eastbound between the A3093 and the junction with the A34 .
Due to: Roadworks.
Period : from 20:11 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.92 miles from Romsey.

Location: westbound between the junctions with the M27 and the A338 North.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.81 miles from Romsey.

Location: eastbound between the junctions with the A338 North and the M27 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.59 miles from Romsey.

Location: westbound between the junctions with the A338 South and the A347 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.17 miles from Romsey.

Location: westbound between the junctions with the A338 South and the A347 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.21 miles from Romsey.

Location: westbound between the junctions with the A338 South and the A347 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.85 miles from Romsey.

Location: eastbound between the junctions with the A347 and the A338 South.
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.2 miles from Romsey.

Location: eastbound between the junctions with the A347 and the A338 South.
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.16 miles from Romsey.

Location: westbound at the junction with the A345 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.81 miles from Romsey.

Location: eastbound between the junctions with the A360 and the A345 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.32 miles from Romsey.

Location: eastbound between the A360 and the junction with the A3028 .
Due to: Roadworks scheme.
Period : from 20:04 on 9 June 2025 to 06:00 on 11 June 2025.
Nearest town: 18.32 miles from Romsey.

Location: eastbound between the junctions with the A345 and the A3028 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.85 miles from Romsey.

Location: westbound between the junctions with the A338 South and the A347 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.15 miles from Romsey.

Location: westbound between the junctions with the A338 South and the A347 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.69 miles from Romsey.

Location: westbound between the junctions with the A338 South and the A347 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.17 miles from Romsey.

Location: eastbound between the junctions with the A347 and the A338 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.69 miles from Romsey.

Location: eastbound between the junctions with the A347 and the A338 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.68 miles from Romsey.

Location: eastbound between the junctions with the A347 and the A338 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.14 miles from Romsey.

Location: westbound between the junctions with the A338 South and the A347 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.21 miles from Romsey.

Location: westbound between the A338 South and the junction with the A347 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.71 miles from Romsey.

Location: westbound between the junctions with the A338 South and the A347 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.84 miles from Romsey.

Location: eastbound between the junctions with the A347 and the A338 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.2 miles from Romsey.

Location: eastbound between the junctions with the A347 and the A338 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.16 miles from Romsey.

Location: eastbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 5 July 2025.
Nearest town: 14.48 miles from Romsey.

Location: westbound between junctions J9 (Fareham) and J8 (Southampton) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 June 2025 to 23 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2025 to 1 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 July 2025 to 7 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11 miles from Romsey.

Location: westbound between the junctions with the M27 and the A338 North.
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.81 miles from Romsey.

Location: eastbound between the junctions with the A338 North and the M27 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.59 miles from Romsey.

Location: westbound exit slip to the A338 .
Due to: Horticultural works.
Period : expect disruption until 05:30 on 10 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.58 miles from Romsey.

Location: westbound between the M27 and the junction with the A338 North.
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.46 miles from Romsey.

Location: westbound between the A3057 and the junction with the A342 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.45 miles from Romsey.

Location: southbound between the A303 and the junction with the A272 .
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.34 miles from Romsey.

Location: southbound.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.73 miles from Romsey.

Location: southbound.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 10 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.46 miles from Romsey.

Location: northbound between junctions A35 and J1 (Lordshill) .
Due to: Roadworks scheme.
Period : from 21:03 on 5 June 2025 to 06:00 on 13 September 2025.
Nearest town: 4.68 miles from Romsey.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Due to: Roadworks scheme.
Period : from 20:08 on 4 June 2025 to 06:00 on 9 August 2025.
Nearest town: 3.02 miles from Romsey.

Location: southbound between junctions J1 (Lordshill) and A35 .
Due to: Roadworks scheme.
Period : from 21:02 on 4 June 2025 to 06:00 on 9 August 2025.
Nearest town: 3.71 miles from Romsey.

Due to: Roadworks scheme.
Period : from 20:07 on 5 June 2025 to 06:00 on 7 July 2025.
Nearest town: 11 miles from Romsey.' data-nearesttown='WEST END'>
Location: westbound entry slip at junction J5 (S'ton Airport) .
Due to: Roadworks scheme.
Period : from 20:07 on 5 June 2025 to 06:00 on 7 July 2025.
Nearest town: 11 miles from Romsey.

Location: eastbound entry slip at junction J11 (Fareham C) .
Due to: Roadworks scheme.
Period : from 20:04 on 2 June 2025 to 06:00 on 12 June 2025.
Nearest town: 17.43 miles from Romsey.

Location: eastbound entry slip at junction J8 (Southampton) .
Due to: Roadworks scheme.
Period : from 20:01 on 4 June 2025 to 06:00 on 1 July 2025.
Nearest town: 7.53 miles from Romsey.

Location: eastbound between junctions J9 (Fareham) and J11 (Fareham C) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 April 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 14.76 miles from Romsey.

Location: eastbound at junction J11 (Fareham C) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 April 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.11 miles from Romsey.

Location: southbound entry slip from the A33 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2027.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.48 miles from Romsey.

Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 11 miles from Romsey.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 11 miles from Romsey.

Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 6.06 miles from Romsey.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 6.06 miles from Romsey.

Location: westbound between junctions J9 (Fareham) and J4 (M3) .
Due to: Roadworks scheme.
Period : from 06:00 on 4 May 2025 to 23:00 on 6 March 2026.
Nearest town: 11 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.56 miles from Romsey.

Location: eastbound between the A3093 and the junction with the M3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.06 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.48 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.56 miles from Romsey.

Location: eastbound between the A3093 and the junction with the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.06 miles from Romsey.

Location: eastbound exit slip to the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.76 miles from Romsey.

Location: eastbound between the A3057 and the junction with the A3093 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.82 miles from Romsey.

Location: eastbound entry slip from the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.82 miles from Romsey.

Location: eastbound exit slip to the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.76 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.38 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.38 miles from Romsey.

Location: westbound between junctions J12 (Cosham) and J11 (Fareham C) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.93 miles from Romsey.

Location: northbound between the junctions with the A272 and the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.53 miles from Romsey.

Location: southbound between the junctions with the A303 and the A272 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.75 miles from Romsey.

Location: eastbound between junctions M27 and J13 (Eastleigh) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.36 miles from Romsey.

Location: northbound at the junction with the A30 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.69 miles from Romsey.

Location: southbound at the junction with the A30 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.7 miles from Romsey.

Location: southbound between the junctions with the A3094 and the A360 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 16 June 2025 to 23:59 on 16 June 2025.
Nearest town: 14.85 miles from Romsey.

Location: northbound between the junctions with the A360 and the A3094 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 16 June 2025 to 23:59 on 16 June 2025.
Nearest town: 14.82 miles from Romsey.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.46 miles from Romsey.

Location: southbound entry slip from the A33 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.48 miles from Romsey.

Location: southbound between the A272 and the junction with the M3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.64 miles from Romsey.

Location: southbound entry slip from the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.63 miles from Romsey.

Location: southbound between the A272 and the junction with the M3 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 21 June 2025 to 06:00 on 23 June 2025.
Nearest town: 10.64 miles from Romsey.

Location: eastbound entry slip at junction J2 (Salisbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 4 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.04 miles from Romsey.

Location: eastbound between junctions J2 (Salisbury) and J3 (Southampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 June 2025 to 06:00 on 19 December 2025.
Nearest town: 3.21 miles from Romsey.

Location: eastbound between junctions J2 (Salisbury) and J3 (Southampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 4 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.21 miles from Romsey.

Location: eastbound exit slip at junction J3 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 4 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.04 miles from Romsey.

Location: westbound between junctions J3 (Southampton) and J2 (Salisbury) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 4 July 2025 to 06:00 on 20 December 2025.
Nearest town: 3.09 miles from Romsey.

Location: westbound between junctions J3 (Southampton) and J2 (Salisbury) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 4 July 2025 to 06:00 on 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 July 2025 to 10 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 11 September 2025.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.09 miles from Romsey.

Location: westbound entry slip at junction J3 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 4 July 2025 to 06:00 on 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 July 2025 to 10 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 11 September 2025.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.14 miles from Romsey.

Location: westbound exit slip at junction J2 (Salisbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 4 July 2025 to 06:00 on 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 July 2025 to 10 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 11 September 2025.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.99 miles from Romsey.

Location: westbound between the A338 and the junction with the A345 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.68 miles from Romsey.

Location: southbound between the A303 and the junction with the A30 West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 10 June 2025 to 13 June 2025.
Nearest town: 18.44 miles from Romsey.

Location: northbound between the A30 West and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 10 June 2025 to 13 June 2025.
Nearest town: 17.16 miles from Romsey.

Location: eastbound between the A338 and the junction with the A342 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.52 miles from Romsey.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.67 miles from Romsey.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from Romsey.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.75 miles from Romsey.

Location: northbound between the junctions with the A272 and the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.53 miles from Romsey.

Location: southbound between the junctions with the A303 and the A272 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.75 miles from Romsey.

Location: eastbound between the A3093 and the junction with the M3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.06 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.48 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.56 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.48 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.56 miles from Romsey.

Location: eastbound between the A3057 and the junction with the A3093 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.82 miles from Romsey.

Location: eastbound exit slip to the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.76 miles from Romsey.

Location: eastbound between the A3057 and the junction with the A3093 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.82 miles from Romsey.

Location: eastbound exit slip to the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.76 miles from Romsey.

Location: eastbound entry slip from the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.82 miles from Romsey.

Location: eastbound between the A3093 and the junction with the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.06 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.38 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Romsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.38 miles from Romsey.

Location: eastbound between the A345 and the junction with the A3028 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.45 miles from Romsey.

Location: southbound at junction J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.71 miles from Romsey.

Location: southbound between junctions J3 and J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.15 miles from Romsey.

Location: westbound exit slip at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.09 miles from Romsey.

Location: northbound between junctions J1 (Lordshill) and M27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 September 2025 to 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.87 miles from Romsey.

Location: northbound at junction J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 September 2025 to 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.18 miles from Romsey.

Location: northbound between junctions A35 and J1 (Lordshill) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 September 2025 to 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.68 miles from Romsey.

Location: westbound at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.09 miles from Romsey.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.02 miles from Romsey.

Location: southbound between junctions J1 (Lordshill) and A35 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.96 miles from Romsey.

Location: eastbound entry slip at junction J8 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 June 2025 to 06:00 on 1 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.37 miles from Romsey.

Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.05 miles from Romsey.' data-nearesttown='WEST END'>
Location: eastbound between junctions J5 (S'ton Airport) and J7 (Hedge End) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.05 miles from Romsey.

Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 June 2025 to 06:00 on 25 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.27 miles from Romsey.' data-nearesttown='WEST END'>
Location: westbound entry slip at junction J5 (S'ton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 June 2025 to 06:00 on 25 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.27 miles from Romsey.

Location: eastbound exit slip at junction J7 (Hedge End) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.38 miles from Romsey.

Location: westbound entry slip at junction J7 (Hedge End) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.36 miles from Romsey.

Location: westbound between junctions J9 (Fareham) and J8 (Southampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.04 miles from Romsey.

Location: westbound at junction J9 (Fareham) .
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.46 miles from Romsey.

Location: eastbound between junctions J8 (Southampton) and J9 (Fareham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.37 miles from Romsey.

Location: eastbound at junction J9 (Fareham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.39 miles from Romsey.

Location: eastbound between junctions J9 (Fareham) and J10 (Alton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.71 miles from Romsey.

Location: westbound between junctions J11 (Winchester) and J12 (Eastleigh) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 25 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.36 miles from Romsey.

Location: eastbound between junctions J8 (Southampton) and J10 (Alton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 18 June 2025.
Nearest town: 10.37 miles from Romsey.

Location: southbound between the A272 and the junction with the M3 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 10 June 2025 to 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.1 miles from Romsey.

Location: eastbound at junction J9 (Fareham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.15 miles from Romsey.

Location: eastbound between junctions J9 (Fareham) and J10 (Alton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.43 miles from Romsey.

Location: eastbound entry slip at junction J11 (Fareham C) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.43 miles from Romsey.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11 miles from Romsey.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11 miles from Romsey.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 6.06 miles from Romsey.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 6.06 miles from Romsey.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.51 miles from Romsey.' data-nearesttown='WEST END'>
Location: westbound at junction J5 (S'ton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.51 miles from Romsey.