Location: The A66M eastbound between the junctions with the A1M and the A66 .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 11:45 and 12:00 on 14 March 2026.
Normal traffic conditions are expected between 11:45 and 12:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 14.01 miles from Patrick Brompton.

Location: The A66M westbound between the junctions with the A66 and the A1M .
Lane Closures : Lane two is closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 11:45 and 12:00 on 14 March 2026.
Normal traffic conditions are expected between 11:45 and 12:00 on 14 March 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 14.1 miles from Patrick Brompton.

Location: The A1M southbound at junction J58 .
Due to: Congestion.
Normal traffic conditions are expected between 04:30 and 04:45 on 14 March 2026.
Nearest town: 17.55 miles from Patrick Brompton.

Location: The A1M southbound at junction J58 .
Due to: Congestion.
Normal traffic conditions are expected between 04:00 and 04:15 on 14 March 2026.
Nearest town: 17.55 miles from Patrick Brompton.

Location: The A1M southbound at junction J58 .
Due to: Congestion.
Normal traffic conditions are expected between 03:45 and 04:00 on 14 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.55 miles from Patrick Brompton.

Location: The A1M southbound between junctions J51 and J50 .
Due to: Roadworks.
Period : from 20:28 on 13 March 2026 to 05:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 3.79 miles from Patrick Brompton.

Location: The A1M southbound between junctions J59 and J58 .
Due to: Roadworks.
Period : from 20:06 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 19.43 miles from Patrick Brompton.

Location: The A1M southbound between junctions J60 and J58 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.97 miles from Patrick Brompton.

Location: The A1M southbound entry slip at junction J59 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.64 miles from Patrick Brompton.

Location: The A1M southbound exit slip at junction J58 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.74 miles from Patrick Brompton.

Location: The A1M northbound exit slip at junction J56 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 16:30 on 3 April 2026.
Nearest town: 10.94 miles from Patrick Brompton.

Location: eastbound between the junctions with the A67 and the A1M .
Due to: Roadworks.
Period : expect disruption until 20:00 on 16 March 2026.
Nearest town: 19.52 miles from Patrick Brompton.

Location: The A1M southbound between junctions J51 and J50 .
Due to: Roadworks scheme.
Period : from 20:14 on 2 March 2026 to 06:00 on 18 April 2026.
Nearest town: 3.77 miles from Patrick Brompton.

Location: westbound between the junctions with the A1M and the A67 .
Due to: Roadworks scheme.
Period : from 20:09 on 9 February 2026 to 20:00 on 17 March 2026.
Nearest town: 18.37 miles from Patrick Brompton.

Location: eastbound between the junctions with the A67 and the A1M .
Due to: Roadworks scheme.
Period : from 20:09 on 9 February 2026 to 20:00 on 17 March 2026.
Nearest town: 19.52 miles from Patrick Brompton.

Location: westbound.
Due to: Roadworks scheme.
Period : from 20:00 on 12 March 2026 to 06:00 on 2 April 2026.
Nearest town: 17.67 miles from Patrick Brompton.

Location: eastbound.
Due to: Roadworks scheme.
Period : from 20:00 on 12 March 2026 to 06:00 on 2 April 2026.
Nearest town: 17.5 miles from Patrick Brompton.

Location: westbound between the junctions with the A67 and the A167 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Nearest town: 15.82 miles from Patrick Brompton.

Location: eastbound between the junctions with the A167 and the A67 Darlington.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Nearest town: 15.71 miles from Patrick Brompton.

Location: The A1M northbound between junctions J48 and J49 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.13 miles from Patrick Brompton.

Location: The A1M northbound between junctions J48 and J49 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.13 miles from Patrick Brompton.

Location: westbound between the junctions with the A1M and the A67 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 20 March 2026 to 16:30 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.15 miles from Patrick Brompton.

Location: eastbound between the junctions with the A67 and the A1M .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 20 March 2026 to 16:30 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.5 miles from Patrick Brompton.

Location: The A1M northbound between junctions J50 and J51 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.05 miles from Patrick Brompton.

Location: The A1M southbound between junctions J52 and J50 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 16 March 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 3.74 miles from Patrick Brompton.

Location: The A1M southbound exit slip at junction J50 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Schedule : From 06:00 on 17 March 2026 to 20:00 on 17 March 2026.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Schedule : From 06:00 on 18 March 2026 to 20:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.64 miles from Patrick Brompton.

Location: The A1M southbound between junctions J52 and J50 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2026 to 2 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 April 2026 to 11 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.74 miles from Patrick Brompton.

Location: The A1M southbound entry slip at junction J51 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2026 to 2 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 April 2026 to 11 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.77 miles from Patrick Brompton.

Location: The A1M southbound between junctions J52 and J51 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2026 to 2 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 April 2026 to 11 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.66 miles from Patrick Brompton.

Location: eastbound between the junctions with the A1150 and the A1027 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 March 2026 to 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.93 miles from Patrick Brompton.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 March 2026 to 18 March 2026.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2026 to 2 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.99 miles from Patrick Brompton.

Location: eastbound between the A1150 and the junction with the A1027 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 March 2026 to 18 March 2026.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2026 to 2 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.93 miles from Patrick Brompton.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 March 2026 to 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.02 miles from Patrick Brompton.

Location: eastbound between the junctions with the A67 and the A1M .
Lane Closures : Lane two will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.59 miles from Patrick Brompton.

Location: The A1M northbound exit slip at junction J53 .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.26 miles from Patrick Brompton.

Location: The A1M northbound exit slip at junction J53 .
Lane Closures : Lane two will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.26 miles from Patrick Brompton.

Location: The A1M southbound exit slip at junction J53 .
Lane Closures : Lane two will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.66 miles from Patrick Brompton.

Location: The A1M northbound between junctions J57 and J58 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.23 miles from Patrick Brompton.

Location: The A1M southbound between junctions J58 and J57 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.28 miles from Patrick Brompton.

Location: westbound between the junctions with the A67 and the A66M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 16 March 2026 to 15:00 on 15 April 2026.
Nearest town: 14.44 miles from Patrick Brompton.

Location: eastbound between the junctions with the A66M and the A167 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 16 March 2026 to 15:00 on 15 April 2026.
Nearest town: 14.33 miles from Patrick Brompton.

Location: The A1M northbound exit slip at junction J56 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 17 March 2026 to 14:30 on 17 March 2026.
Nearest town: 10.94 miles from Patrick Brompton.

Location: The A1M northbound between junctions J56 and J58 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 17 March 2026 to 14:30 on 17 March 2026.
Nearest town: 11.3 miles from Patrick Brompton.

Location: The A66M westbound between the junctions with the A66 and the A1M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 18 March 2026 to 14:30 on 18 March 2026.
Nearest town: 14.45 miles from Patrick Brompton.

Location: The A1M northbound between junctions J52 and J53 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 16 March 2026 to 14:30 on 16 March 2026.
Nearest town: 5.54 miles from Patrick Brompton.

Location: The A1M northbound entry slip at junction J52 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 16 March 2026 to 14:30 on 16 March 2026.
Nearest town: 5.15 miles from Patrick Brompton.

Location: The A1M northbound entry slip at junction J53 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 17 March 2026 to 14:30 on 17 March 2026.
Nearest town: 9.74 miles from Patrick Brompton.

Location: The A1M northbound between junctions J57 and J58 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 19 March 2026 to 14:00 on 19 March 2026.
Nearest town: 15.19 miles from Patrick Brompton.

Location: The A66M eastbound between the junctions with the A1M and the A66 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 18 March 2026 to 14:30 on 18 March 2026.
Nearest town: 13.23 miles from Patrick Brompton.

Location: The A1M northbound between junctions J58 and J59 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 19 March 2026 to 14:00 on 19 March 2026.
Nearest town: 17.62 miles from Patrick Brompton.

Location: The A1M northbound exit slip at junction J53 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 16 March 2026 to 14:30 on 16 March 2026.
Nearest town: 9.26 miles from Patrick Brompton.

Location: The A1M northbound between junctions J59 and J60 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 20 March 2026 to 14:30 on 20 March 2026.
Nearest town: 19.73 miles from Patrick Brompton.

Location: The A1M northbound at junction J53 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 16 March 2026 to 14:30 on 16 March 2026.
Nearest town: 9.5 miles from Patrick Brompton.

Location: The A1M northbound between junctions J53 and J56 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 17 March 2026 to 14:30 on 17 March 2026.
Nearest town: 9.89 miles from Patrick Brompton.

Location: westbound between the junctions with the A1M and the A67 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 16 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.37 miles from Patrick Brompton.

Location: westbound between the junctions with the A1M and the A67 .
Due to: Roadworks.
Period : expect disruption until 20:00 on 16 March 2026.
Nearest town: 19.49 miles from Patrick Brompton.

Location: eastbound between the junctions with the A67 and the A1M .
Due to: Roadworks.
Period : expect disruption until 20:00 on 16 March 2026.
Nearest town: 19.52 miles from Patrick Brompton.

Location: westbound between the junctions with the A67 and the A66M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 16 March 2026 to 18 March 2026.
Nearest town: 14.43 miles from Patrick Brompton.

Location: eastbound between the junctions with the A66M and the A167 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 16 March 2026 to 18 March 2026.
Nearest town: 14.33 miles from Patrick Brompton.

Location: eastbound between the junctions with the A167 and the A67 Darlington.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Nearest town: 14.81 miles from Patrick Brompton.

Location: westbound between the junctions with the A67 and the A167 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Nearest town: 16.25 miles from Patrick Brompton.