Location: southbound between the A31 and the junction with the A283 .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 22:15 and 22:30 on 3 March 2026.
Normal traffic conditions are expected between 22:15 and 22:30 on 3 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 6.4 miles from North Camp.

Location: southbound between the junctions with the A283 Milford north and the A333 .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 21:45 and 22:00 on 3 March 2026.
Normal traffic conditions are expected between 21:45 and 22:00 on 3 March 2026.
Lanes Closed : All lanes are closed.
Previous
Due to: Following an earlier accident.
Nearest town: 8.27 miles from North Camp.

Location: northbound between the junctions with the A333 and the A283 Milford north.
Due to: Road Management.
Time To Clear : The event is expected to clear between 22:00 and 22:15 on 3 March 2026.
Normal traffic conditions are expected between 22:00 and 22:15 on 3 March 2026.
Lanes Closed : There are lane closures.
Nearest town: 8.45 miles from North Camp.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 17:15 and 17:30 on 3 March 2026.
Normal traffic conditions are expected between 17:15 and 17:30 on 3 March 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 8.67 miles from North Camp.

Location: clockwise at junction J14 (Heathrow Airport) .
Lane Closures : Lane four is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 16:30 and 16:45 on 3 March 2026.
Normal traffic conditions are expected between 17:15 and 17:30 on 3 March 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16.98 miles from North Camp.

Leatherhead Road (Northbound).
Traffic is moving well.
Traffic is moving well.
Nearest town: 19.38 miles from North Camp.

Location: southbound between the junctions with the A283 Milford north and the A333 .
Due to: Congestion.
Normal traffic conditions are expected between 20:15 and 20:30 on 3 March 2026.
Nearest town: 8.63 miles from North Camp.

Location: southbound between the junctions with the A320 and the A31 .
Due to: Congestion.
Normal traffic conditions are expected between 19:45 and 20:00 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.91 miles from North Camp.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 19:45 and 20:00 on 3 March 2026.
Nearest town: 15.94 miles from North Camp.

Location: northbound at the junction with the A333 .
Due to: Congestion.
Normal traffic conditions are expected between 20:30 and 20:45 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.29 miles from North Camp.

Location: eastbound exit slip at junction J4 (Guildford) .
Due to: Congestion.
Normal traffic conditions are expected between 19:30 and 19:45 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 3.2 miles from North Camp.

Location: southbound between the junctions with the A283 Milford north and the A333 .
Due to: Congestion.
Normal traffic conditions are expected between 18:45 and 19:00 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.63 miles from North Camp.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 18:30 and 18:45 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.72 miles from North Camp.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 3 March 2026.
Nearest town: 15.94 miles from North Camp.

Location: westbound exit slip at junction J6 (Basingstoke) .
Due to: Congestion.
Normal traffic conditions are expected between 18:45 and 19:00 on 3 March 2026.
Nearest town: 13.33 miles from North Camp.

Location: eastbound at the junction with the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 3 March 2026.
Nearest town: 15.94 miles from North Camp.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.72 miles from North Camp.

Location: clockwise at junction J14 (Heathrow Airport) .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.42 miles from North Camp.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 3 March 2026.
Nearest town: 15.94 miles from North Camp.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.72 miles from North Camp.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 3 March 2026.
Nearest town: 15.94 miles from North Camp.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 3 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.72 miles from North Camp.

Location: eastbound between junctions J4 (Guildford) and J3 (Woking) .
Due to: Roadworks.
Period : from 21:07 on 3 March 2026 to 06:00 on 4 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 3.32 miles from North Camp.

Location: eastbound at junction J4B (Heathrow) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 3 March 2026 to 05:30 on 4 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.91 miles from North Camp.

Location: eastbound between junctions J5 (Colnbrook) and J4B (Heathrow) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 3 March 2026 to 05:30 on 4 March 2026.
Lanes Closed : There will be three of five lanes closed.
Nearest town: 18.17 miles from North Camp.

Location: clockwise between junctions J9 (Leatherhead) and J11 (Chertsey) .
Due to: Roadworks scheme.
Period : from 22:02 on 2 March 2026 to 06:00 on 7 March 2026.
Nearest town: 14.59 miles from North Camp.

Location: eastbound between junctions J4A (Farnborough) and J4 (Guildford) .
Lane Closures : Lanes 2, 3 and 4 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 4 March 2026.
Lanes Closed : There are three of four lanes closed.
Nearest town: 2.78 miles from North Camp.

Location: eastbound between junctions J5 (Hook) and J4A (Farnborough) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 4 March 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 3.3 miles from North Camp.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 4 March 2026.
Lanes Closed : There are two of four lanes closed.
Nearest town: 6.46 miles from North Camp.

Location: westbound at junction J3 (Woking) .
Lane Closures : Lane three is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 4 March 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 7.08 miles from North Camp.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 4 March 2026.
Lanes Closed : There are two of four lanes closed.
Nearest town: 8.06 miles from North Camp.

Location: westbound between the junctions with the A308 and the M25 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 3 March 2026 to 05:30 on 4 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.77 miles from North Camp.

Location: eastbound between the junctions with the M25 and the A308 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 3 March 2026 to 05:30 on 4 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.54 miles from North Camp.

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 4 March 2026.
Lanes Closed : There are two of four lanes closed.
Nearest town: 12.06 miles from North Camp.

Location: westbound between junctions J7 (Slough) and J8 (High Wycombe) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 4 March 2026.
Lanes Closed : There are two of four lanes closed.
Nearest town: 16.4 miles from North Camp.

Location: northbound entry slip from the A283 .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 4 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 7.59 miles from North Camp.

Location: northbound exit slip to the A283 .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 4 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 7.7 miles from North Camp.

Location: southbound entry slip from the A245 .
Due to: Roadworks scheme.
Period : from 22:03 on 2 March 2026 to 06:00 on 7 March 2026.
Nearest town: 14.78 miles from North Camp.

Location: northbound entry slip from the A245 .
Due to: Roadworks scheme.
Period : from 22:03 on 2 March 2026 to 06:00 on 7 March 2026.
Nearest town: 14.85 miles from North Camp.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Due to: Roadworks scheme.
Period : from 10:00 on 3 March 2026 to 06:00 on 20 May 2026.
Nearest town: 15.31 miles from North Camp.

Location: westbound between junctions J8 (High Wycombe) and J11 (Basingstoke) .
Due to: Roadworks scheme.
Period : from 21:05 on 2 March 2026 to 06:00 on 15 March 2026.
Nearest town: 13.05 miles from North Camp.

Location: southbound.
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 20 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.46 miles from North Camp.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 March 2026.
Nearest town: 11.38 miles from North Camp.

Location: anticlockwise at junction J11 (Chertsey) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.86 miles from North Camp.

Location: eastbound between junctions J5 (Hook) and J4A (Farnborough) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 6 March 2026.
Nearest town: 4.34 miles from North Camp.

Location: westbound between junctions J4A (Farnborough) and J5 (Hook) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 6 March 2026.
Nearest town: 4.2 miles from North Camp.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:30 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.82 miles from North Camp.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 11 March 2026 to 06:00 on 12 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.83 miles from North Camp.

Location: southbound exit slip to the A31 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.53 miles from North Camp.

Location: southbound between the A320 and the junction with the A31 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.99 miles from North Camp.

Location: westbound between junctions J8 (High Wycombe) and J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.66 miles from North Camp.

Location: westbound exit slip at junction J8 (High Wycombe) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from North Camp.

Location: westbound entry slip at junction J8 (High Wycombe) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.85 miles from North Camp.

Location: westbound at junction J8 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.96 miles from North Camp.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.69 miles from North Camp.

Location: The A308M westbound between the junctions with the A308 and the M4 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.3 miles from North Camp.

Location: southbound between the junctions with the A333 and the A325 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.13 miles from North Camp.

Location: northbound between the A272 Petersfield North and the junction with the A333 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.79 miles from North Camp.

Location: eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 March 2026 to 05:30 on 5 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.5 miles from North Camp.

Location: eastbound entry slip at junction J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 March 2026 to 05:30 on 5 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.15 miles from North Camp.

Location: anticlockwise exit slip at junction J12 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 March 2026 to 05:30 on 5 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.16 miles from North Camp.

Location: eastbound at junction J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 March 2026 to 05:30 on 5 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.02 miles from North Camp.

Location: northbound between the M25 and the junction with the A244 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 9 March 2026 to 06:00 on 14 March 2026.
Nearest town: 13.47 miles from North Camp.

Location: northbound between the M25 and the junction with the A244 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.47 miles from North Camp.

Location: northbound between the junctions with the M25 and the A245 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.94 miles from North Camp.

Location: southbound between the junctions with the A244 and the A245 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 12 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.71 miles from North Camp.

Location: southbound between the A244 and the junction with the M25 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 12 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.53 miles from North Camp.

Location: anticlockwise between junctions J14 (Heathrow Airport) and J13 (A30) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 16.35 miles from North Camp.

Location: anticlockwise entry slip at junction J13 (A30) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.46 miles from North Camp.

Location: clockwise exit slip at junction J13 (A30) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.15 miles from North Camp.

Location: anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 9 March 2026 to 05:30 on 10 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.87 miles from North Camp.

Location: clockwise at junction J13 (A30) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.15 miles from North Camp.

Location: anticlockwise at junction J11 (Chertsey) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 9 March 2026 to 05:30 on 10 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.91 miles from North Camp.

Location: eastbound between the M25 and the junction with the A308 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from North Camp.

Location: westbound entry slip from the A308 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.92 miles from North Camp.

Location: westbound between the A315 and the junction with the M25 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from North Camp.

Location: westbound between the junctions with the A315 and the A308 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.15 miles from North Camp.

Location: anticlockwise at junction J13 (A30) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.73 miles from North Camp.

Location: clockwise between junctions J12 (Basingstoke) and J13 (A30) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 14.45 miles from North Camp.

Location: clockwise exit slip at junction J9 (Leatherhead) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 11 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.95 miles from North Camp.

Location: anticlockwise exit slip at junction J13 (A30) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 March 2026 to 13 March 2026.
Schedule : From 23:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from North Camp.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 9 March 2026 to 05:30 on 10 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.33 miles from North Camp.

Location: westbound at junction J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.27 miles from North Camp.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.93 miles from North Camp.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.69 miles from North Camp.

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.33 miles from North Camp.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.85 miles from North Camp.

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.59 miles from North Camp.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.23 miles from North Camp.

Location: clockwise at junction J10 (Guildford) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.82 miles from North Camp.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 9 March 2026 to 10 March 2026.
Nearest town: 12.75 miles from North Camp.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 9 March 2026 to 10 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.19 miles from North Camp.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 6 March 2026 to 16:00 on 6 March 2026.
Nearest town: 18.75 miles from North Camp.

Location: westbound exit slip to the A308 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from North Camp.

Location: westbound between the A315 and the junction with the A308 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.01 miles from North Camp.

Location: westbound between the A315 and the junction with the A308 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.71 miles from North Camp.

Location: westbound entry slip at junction J7 (Basingstoke) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 March 2026 to 06:00 on 9 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.84 miles from North Camp.

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 7 March 2026 to 06:00 on 8 March 2026.
Schedule : From 22:30 on 8 March 2026 to 05:30 on 9 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.57 miles from North Camp.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 7 March 2026 to 06:00 on 8 March 2026.
Schedule : From 22:30 on 8 March 2026 to 05:30 on 9 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.82 miles from North Camp.

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 7 March 2026 to 06:00 on 8 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.66 miles from North Camp.

Location: northbound between the junctions with the A247 and the M25 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 7 March 2026 to 06:00 on 8 March 2026.
Schedule : From 22:30 on 8 March 2026 to 05:30 on 9 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.1 miles from North Camp.

Location: clockwise entry slip at junction J10 (Guildford) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 7 March 2026 to 06:00 on 8 March 2026.
Schedule : From 22:30 on 8 March 2026 to 05:30 on 9 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.57 miles from North Camp.

Location: northbound exit slip to the M25 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 7 March 2026 to 06:00 on 8 March 2026.
Schedule : From 22:30 on 8 March 2026 to 05:30 on 9 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.48 miles from North Camp.

Location: clockwise exit slip at junction J11 (Chertsey) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 7 March 2026 to 06:00 on 8 March 2026.
Schedule : From 22:30 on 8 March 2026 to 05:30 on 9 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.77 miles from North Camp.

Location: westbound between junctions J5 (Colnbrook) and J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.43 miles from North Camp.

Location: westbound at junction J6 (Slough) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.22 miles from North Camp.

Location: westbound between junctions J5 (Colnbrook) and J6 (Slough) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.43 miles from North Camp.

Location: westbound between junctions J5 (Colnbrook) and J7 (Slough) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 12 March 2026 to 06:00 on 28 March 2026.
Nearest town: 17.43 miles from North Camp.

Location: westbound entry slip at junction J6 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.17 miles from North Camp.

Location: westbound between junctions J6 (Slough) and J7 (Slough) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.19 miles from North Camp.

Location: eastbound entry slip at junction J6 (Slough) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 7 March 2026 to 06:00 on 22 March 2026.
Nearest town: 17.23 miles from North Camp.

Location: eastbound at junction J6 (Slough) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.2 miles from North Camp.

Location: eastbound between junctions J7 (Slough) and J6 (Slough) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2026 to 21 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.23 miles from North Camp.

Location: eastbound between junctions J7 (Slough) and J6 (Slough) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 March 2026 to 12 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.25 miles from North Camp.

Location: eastbound entry slip at junction J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.23 miles from North Camp.

Location: eastbound between junctions J8 (High Wycombe) and J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 March 2026 to 06:00 on 8 March 2026.
Schedule : From 21:00 on 21 March 2026 to 06:00 on 22 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.18 miles from North Camp.

Location: eastbound entry slip at junction J7 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 March 2026 to 12 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.53 miles from North Camp.

Location: eastbound entry slip at junction J7 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 March 2026 to 06:00 on 8 March 2026.
Schedule : From 21:00 on 21 March 2026 to 06:00 on 22 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.53 miles from North Camp.

Location: eastbound exit slip at junction J6 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 March 2026 to 06:00 on 10 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.2 miles from North Camp.

Location: eastbound exit slip at junction J6 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 March 2026 to 12 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.2 miles from North Camp.

Location: westbound exit slip at junction J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.22 miles from North Camp.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 9 March 2026.
Nearest town: 10.06 miles from North Camp.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 March 2026 to 9 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.79 miles from North Camp.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 7 March 2026 to 8 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.06 miles from North Camp.

Location: eastbound exit slip at junction J5 (Hook) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 9 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.2 miles from North Camp.

Location: southbound between the A283 Milford north and the junction with the A333 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.62 miles from North Camp.

Location: northbound exit slip to the A4130 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.93 miles from North Camp.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 March 2026 to 06:00 on 7 March 2026.
Schedule : From 21:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.79 miles from North Camp.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 March 2026 to 06:00 on 7 March 2026.
Schedule : From 21:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.82 miles from North Camp.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 March 2026 to 06:00 on 7 March 2026.
Schedule : From 21:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.86 miles from North Camp.

Location: southbound between the A31 and the junction with the A283 Godalming North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 March 2026 to 06:00 on 7 March 2026.
Schedule : From 20:00 on 9 March 2026 to 06:00 on 10 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.29 miles from North Camp.

Location: westbound between junctions J8 (High Wycombe) and J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 March 2026 to 06:00 on 9 March 2026.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.05 miles from North Camp.

Location: westbound entry slip at junction J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.97 miles from North Camp.

Location: westbound entry slip at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.83 miles from North Camp.

Location: westbound exit slip at junction J11 (Basingstoke) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.42 miles from North Camp.

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.13 miles from North Camp.

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 March 2026 to 06:00 on 9 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.01 miles from North Camp.

Location: northbound entry slip from the A31 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.3 miles from North Camp.

Location: eastbound between junctions J8 (High Wycombe) and J7 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 March 2026 to 06:00 on 6 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17 miles from North Camp.

Location: eastbound between junctions J4 (Guildford) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.14 miles from North Camp.

Location: anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 5 March 2026 to 05:30 on 6 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.26 miles from North Camp.

Location: southbound between the A325 and the junction with the A272 Petersfield South.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 March 2026 to 06:00 on 6 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.6 miles from North Camp.

Location: southbound entry slip from the A272 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 March 2026 to 06:00 on 6 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.98 miles from North Camp.

Location: northbound entry slip from the A272 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 March 2026 to 06:00 on 6 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.06 miles from North Camp.

Location: southbound between the A283 Milford north and the junction with the A333 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 March 2026 to 06:00 on 6 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.27 miles from North Camp.

Location: westbound at junction J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 March 2026 to 7 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.22 miles from North Camp.

Location: westbound between junctions J5 (Colnbrook) and J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 March 2026 to 7 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.01 miles from North Camp.

Location: westbound between junctions J6 (Slough) and J7 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 March 2026 to 7 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.19 miles from North Camp.

Location: northbound between the A325 and the junction with the A283 Milford north.
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 March 2026 to 06:00 on 6 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.67 miles from North Camp.

Location: anticlockwise between junctions J10 (Guildford) and J8 (Reigate) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 March 2026 to 05:30 on 5 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.8 miles from North Camp.

Location: southbound between the A325 and the junction with the A272 Petersfield South.
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.6 miles from North Camp.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.97 miles from North Camp.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.88 miles from North Camp.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.91 miles from North Camp.

Location: northbound between the A283 and the junction with the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.37 miles from North Camp.

Location: northbound entry slip from the A31 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.3 miles from North Camp.

Location: westbound between junctions J7 (Slough) and J8 (High Wycombe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 05:00 on 5 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.11 miles from North Camp.

Location: southbound between the junctions with the A3100 and the A320 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9 miles from North Camp.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.46 miles from North Camp.

Location: westbound at junction J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.08 miles from North Camp.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.29 miles from North Camp.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.87 miles from North Camp.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 09:30 on 4 March 2026 to 16:00 on 4 March 2026.
Nearest town: 12.75 miles from North Camp.

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 4 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 13.42 miles from North Camp.

Location: westbound at junction J1 (Sunbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 3 March 2026 to 05:30 on 4 March 2026.
Schedule : From 23:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.01 miles from North Camp.

Location: westbound between the A312 and the junction with the M3 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 3 March 2026 to 05:30 on 4 March 2026.
Schedule : From 23:00 on 4 March 2026 to 06:00 on 5 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.35 miles from North Camp.

Location: eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.13 miles from North Camp.

Location: eastbound between the junctions with the M3 and the A312 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.02 miles from North Camp.

Location: northbound exit slip to the A245 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.53 miles from North Camp.

Location: southbound entry slip from the A245 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.78 miles from North Camp.

Location: southbound exit slip to the A245 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.02 miles from North Camp.

Location: northbound entry slip from the A245 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.85 miles from North Camp.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 4 March 2026 to 16:00 on 4 March 2026.
Nearest town: 14.82 miles from North Camp.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 April 2026 to 18 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 April 2026 to 25 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 29 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.31 miles from North Camp.

Location: eastbound between junctions J5 (Hook) and J4A (Farnborough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 March 2026 to 06:00 on 6 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.85 miles from North Camp.

Location: westbound between junctions J4A (Farnborough) and J5 (Hook) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.87 miles from North Camp.

Location: anticlockwise at junction J11 (Chertsey) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.91 miles from North Camp.

Location: anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.89 miles from North Camp.

Location: anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 2 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.89 miles from North Camp.

Location: anticlockwise exit slip at junction J10 (Guildford) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.42 miles from North Camp.

Location: anticlockwise exit slip at junction J14 (Heathrow Airport) for Heathrow T5.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.96 miles from North Camp.

Location: anticlockwise entry slip at junction J14 (Heathrow Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.65 miles from North Camp.

Location: anticlockwise entry slip at junction J14 (Heathrow Airport) from A3113.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.3 miles from North Camp.

Location: anticlockwise exit slip at junction J14 (Heathrow Airport) for A3113.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.06 miles from North Camp.

Location: anticlockwise between junctions J15 (Slough) from M4 eastbound and J13 (A30) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.1 miles from North Camp.

Location: eastbound between junctions J5 (Colnbrook) and J4B (Heathrow) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 18.17 miles from North Camp.

Location: anticlockwise at junction J15 (Slough) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.45 miles from North Camp.

Location: anticlockwise entry slip at junction J15 (Slough) from the M4 westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.23 miles from North Camp.

Location: anticlockwise exit slip at junction J13 (A30) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 March 2026 to 6 March 2026.
Schedule : From 23:00 on 6 March 2026 to 06:00 on 7 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.73 miles from North Camp.

Location: eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 4 March 2026 to 6 March 2026.
Nearest town: 13.6 miles from North Camp.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 4 March 2026 to 06:00 on 5 March 2026.
Nearest town: 11.87 miles from North Camp.