Location: clockwise between junctions J9 (Trafford Park) and J10 (Trafford Park) .
Due to: Congestion.
Normal traffic conditions are expected between 15:30 and 15:45 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.14 miles from Moss Bank.

Location: northbound at junction J22 (Newton le Willows) .
Due to: Congestion.
Normal traffic conditions are expected between 15:15 and 15:30 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.69 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 15:30 and 15:45 on 29 May 2025.
Nearest town: 8.92 miles from Moss Bank.

Location: southbound at junction J21A (Manchester) .
Due to: Congestion.
Normal traffic conditions are expected between 14:00 and 14:15 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.34 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 14:30 and 14:45 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.92 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 14:00 and 14:15 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.92 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 13:00 and 13:15 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.92 miles from Moss Bank.

Location: The junction of the M57 J7 (Liverpool) and the M58 .
Due to: Congestion.
Normal traffic conditions are expected between 12:45 and 13:00 on 29 May 2025.
Nearest town: 8.86 miles from Moss Bank.

Location: The junction of the M57 J7 (Liverpool) and the M58 .
Due to: Congestion.
Normal traffic conditions are expected between 12:30 and 12:45 on 29 May 2025.
Nearest town: 8.86 miles from Moss Bank.

Location: westbound at the junction with the A550 .
Due to: Congestion.
Normal traffic conditions are expected between 12:15 and 12:30 on 29 May 2025.
Nearest town: 14.7 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 12:45 and 13:00 on 29 May 2025.
Nearest town: 8.92 miles from Moss Bank.

Location: northbound between the junctions with the A540 and the A41 .
Due to: Congestion.
Normal traffic conditions are expected between 12:15 and 12:30 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.36 miles from Moss Bank.

Location: eastbound between the M53 and the junction with the A550 .
Due to: Congestion.
Normal traffic conditions are expected between 12:00 and 12:15 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.48 miles from Moss Bank.

Location: westbound between the junctions with the A550 and the M53 .
Due to: Congestion.
Normal traffic conditions are expected between 12:00 and 12:15 on 29 May 2025.
Nearest town: 14.7 miles from Moss Bank.

Location: northbound between the junctions with the A540 and the A41 .
Due to: Congestion.
Normal traffic conditions are expected between 11:45 and 12:00 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.36 miles from Moss Bank.

Location: southbound exit slip at junction J19 (Northwich) to A556 north.
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 29 May 2025.
Nearest town: 17.02 miles from Moss Bank.

Location: westbound at the junction with the A550 .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 29 May 2025.
Nearest town: 14.7 miles from Moss Bank.

Location: northbound exit slip at junction J28 (Leyland) .
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 29 May 2025.
Nearest town: 15.89 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.92 miles from Moss Bank.

Location: northbound exit slip at junction J19 (Northwich) .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.26 miles from Moss Bank.

Location: northbound entry slip from the M6 J19 northbound exit.
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 29 May 2025.
Nearest town: 17.17 miles from Moss Bank.

Location: westbound between the junctions with the A550 and the M53 .
Due to: Congestion.
Normal traffic conditions are expected between 10:30 and 10:45 on 29 May 2025.
Nearest town: 14.66 miles from Moss Bank.

Location: The junction of the A59 and the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 29 May 2025.
Nearest town: 8.89 miles from Moss Bank.

Location: eastbound between the M53 and the junction with the A550 .
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 29 May 2025.
Nearest town: 14.48 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 29 May 2025.
Nearest town: 8.92 miles from Moss Bank.

Location: The junction of the M57 J7 (Liverpool) and the M58 .
Due to: Congestion.
Normal traffic conditions are expected between 09:45 and 10:00 on 29 May 2025.
Nearest town: 8.86 miles from Moss Bank.

Location: eastbound at junction J11 (Warrington) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 May 2025 to 02:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.88 miles from Moss Bank.

Location: eastbound between junctions J10 (M6) and J11 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 May 2025 to 02:00 on 30 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.36 miles from Moss Bank.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 July 2025.
Nearest town: 7.53 miles from Moss Bank.

Location: northbound at junction J11 (Runcorn) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.11 miles from Moss Bank.

Location: southbound at junction J11 (Runcorn) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.87 miles from Moss Bank.

Location: southbound between junctions J10 (Elton) and J11 (Runcorn) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.39 miles from Moss Bank.

Location: southbound at junction J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.29 miles from Moss Bank.

Location: northbound entry slip at junction J21 (Warrington) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 17:00 on 29 May 2025.
Nearest town: 10.52 miles from Moss Bank.

Location: westbound between junctions J12 (M60) and J11 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.96 miles from Moss Bank.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 July 2025.
Nearest town: 4.92 miles from Moss Bank.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 July 2025.
Nearest town: 4.91 miles from Moss Bank.

Location: southbound exit slip at junction J2 (Prescot) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 1 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 June 2025 to 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.4 miles from Moss Bank.

Location: northbound at junction J2 from A580 to A666.
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.38 miles from Moss Bank.

Location: northbound between junction A666 and the A6053 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.2 miles from Moss Bank.

Location: northbound between junctions J2 and A666 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.09 miles from Moss Bank.

Location: westbound at junction J15 (Ellesmere Port) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Nearest town: 15.87 miles from Moss Bank.

Location: southbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.87 miles from Moss Bank.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Nearest town: 15.47 miles from Moss Bank.

Location: northbound exit slip at junction J21A (Manchester) to M62 west.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.54 miles from Moss Bank.

Location: northbound exit slip at junction J21A (Manchester) to M62 east.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.93 miles from Moss Bank.

Location: eastbound between the A550 and the junction with the M56 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.24 miles from Moss Bank.

Location: eastbound between junctions J3 (Altrincham) and J1 (Didsbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.94 miles from Moss Bank.

Location: eastbound between the A494 Chester and junction J15 (Ellesmere Port) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.31 miles from Moss Bank.

Location: southbound entry slip at junction J5 (Bebington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.42 miles from Moss Bank.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.47 miles from Moss Bank.

Location: northbound between junctions J21 (Warrington) and J21A (Manchester) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.77 miles from Moss Bank.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.45 miles from Moss Bank.

Location: northbound entry slip at junction J21 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.52 miles from Moss Bank.

Location: eastbound exit slip at junction J2 (Manchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.82 miles from Moss Bank.

Location: southbound exit slip at junction J29 (Burnley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Nearest town: 17.67 miles from Moss Bank.

Location: southbound exit slip at junction J29 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.56 miles from Moss Bank.

Location: southbound exit slip at junction J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.67 miles from Moss Bank.

Location: eastbound exit slip at junction J1 (M6) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Nearest town: 17.51 miles from Moss Bank.

Location: eastbound entry slip at junction J1 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.47 miles from Moss Bank.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.45 miles from Moss Bank.

Location: eastbound exit slip at junction J1 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.51 miles from Moss Bank.

Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.54 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J2 (Manchester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Nearest town: 18.88 miles from Moss Bank.

Location: westbound between junctions J3 (Blackburn) and J2 (Manchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.73 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.88 miles from Moss Bank.

Location: westbound entry slip at junction J3 (Blackburn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.59 miles from Moss Bank.

Location: northbound between junctions J27 (Parbold) and J29 (Burnley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.61 miles from Moss Bank.

Location: southbound entry slip at junction J28 (Leyland) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.03 miles from Moss Bank.

Location: southbound between junctions J2 (West Kirby) and J3 (Tranmere) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.19 miles from Moss Bank.

Location: southbound at junction J2 (West Kirby) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.13 miles from Moss Bank.

Location: northbound between junctions J3 (Tranmere) and J2 (West Kirby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.24 miles from Moss Bank.

Location: clockwise between junctions J15 (Bolton) and J18 (Leeds) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 31 May 2025.
Nearest town: 19.18 miles from Moss Bank.

Location: southbound exit slip at junction J1 (Huyton) to roundabout.
Due to: Emergency Roadworks.
Period : expect disruption until 05:00 on 19 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.36 miles from Moss Bank.

Location: southbound exit slip at junction J1 to A580.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 31 May 2025.
Nearest town: 15.23 miles from Moss Bank.

Location: eastbound entry slip at junction J6 (Liverpool) from roundabout.
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 5.46 miles from Moss Bank.

Location: southbound exit slip at junction J1 (Huyton) to roundabout.
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 October 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 5.36 miles from Moss Bank.

Location: westbound exit slip at junction J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : From 21:00 on 30 June 2025 to 06:00 on 1 July 2025.
Schedule : From 21:00 on 22 September 2025 to 06:00 on 23 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.65 miles from Moss Bank.

Location: northbound between junctions J8 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 15.68 miles from Moss Bank.

Location: southbound between the A5038 and the junction with the A567 .
Due to: Roadworks scheme.
Period : from 20:02 on 28 May 2025 to 06:00 on 7 June 2025.
Nearest town: 10.5 miles from Moss Bank.

Location: westbound exit slip at junction J7 .
Due to: Roadworks scheme.
Period : from 20:05 on 7 May 2025 to 06:00 on 1 October 2025.
Nearest town: 19.76 miles from Moss Bank.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 22 June 2025.
Nearest town: 10.9 miles from Moss Bank.

Location: southbound between junctions J6 and J5 .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 11.36 miles from Moss Bank.

Location: southbound between junctions J6 (Kirkby) and J4 (Knowsley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 29 June 2025.
Nearest town: 5.75 miles from Moss Bank.

Location: southbound at junction J8 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 14.98 miles from Moss Bank.

Location: northbound between junctions J1 (Huyton) and J2 (Prescot) .
Due to: Roadworks scheme.
Period : from 20:01 on 22 May 2025 to 05:00 on 31 May 2025.
Nearest town: 5.22 miles from Moss Bank.

Location: westbound at junction J9 (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 1 August 2025.
Nearest town: 12.74 miles from Moss Bank.

Location: southbound between junctions J4 (Knowsley) and J1 (Huyton) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.53 miles from Moss Bank.

Location: southbound between junctions J5 (St Helens) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 6.11 miles from Moss Bank.

Location: southbound between junctions J7 (Liverpool) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.86 miles from Moss Bank.

Location: northbound between junctions J4 (Knowsley) and J5 (St Helens) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.57 miles from Moss Bank.

Location: northbound between junctions J1 (Huyton) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.38 miles from Moss Bank.

Location: northbound entry slip at junction J1 (Huyton) from roundabout.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.53 miles from Moss Bank.

Location: northbound between junctions J4 (Knowsley) and J7 (Liverpool) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 6.24 miles from Moss Bank.

Location: southbound between junctions J2 (Prescot) and J1 (Huyton) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.25 miles from Moss Bank.

Location: northbound entry slip at junction J2 from A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 15.72 miles from Moss Bank.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 15.29 miles from Moss Bank.

Location: southbound between the M6 and junction J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 18.85 miles from Moss Bank.

Location: northbound between junctions J2 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 15.1 miles from Moss Bank.

Location: northbound between junction J9 and the M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 17.63 miles from Moss Bank.

Location: southbound between the M6 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 18.66 miles from Moss Bank.

Location: northbound at junction J2 for A666.
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.53 miles from Moss Bank.

Location: northbound between the M60 and junction J2 .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16 miles from Moss Bank.

Location: northbound entry slip at junction J1 from M60 anti-clockwise.
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.38 miles from Moss Bank.

Location: northbound between junctions J2 and A666 .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.09 miles from Moss Bank.

Location: westbound exit slip at junction J6 (Liverpool) to roundabout.
Due to: Emergency barrier repairs.
Period : from 05:00 on 27 January 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.33 miles from Moss Bank.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 00:00 on 29 June 2025.
Nearest town: 15.63 miles from Moss Bank.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 June 2025.
Nearest town: 15.63 miles from Moss Bank.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.47 miles from Moss Bank.

Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.53 miles from Moss Bank.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 18.94 miles from Moss Bank.

Location: eastbound between junctions J2 (Manchester) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.82 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J1A (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 19.47 miles from Moss Bank.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 19.57 miles from Moss Bank.

Location: southbound at junction J2 from M61 to A580.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : From 21:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.29 miles from Moss Bank.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 5 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.29 miles from Moss Bank.

Location: southbound at junction J2 from A666 to A580.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : From 21:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.23 miles from Moss Bank.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.56 miles from Moss Bank.

Location: southbound between junctions A666 and J2 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : From 21:00 on 5 June 2025 to 06:00 on 6 June 2025.
Nearest town: 15.08 miles from Moss Bank.

Location: southbound between junctions J3 and J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 5 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.03 miles from Moss Bank.

Location: southbound between junctions J4 and J2 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.13 miles from Moss Bank.

Location: clockwise between junctions J10 (Trafford Park) and J11 (Irlam) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Nearest town: 15.78 miles from Moss Bank.

Location: clockwise between junctions J10 (Trafford Park) and J11 (Irlam) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.78 miles from Moss Bank.

Location: clockwise entry slip at junction J10 (Trafford Park) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.71 miles from Moss Bank.

Location: westbound at junction J11 (Warrington) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 02:00 on 30 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.33 miles from Moss Bank.

Location: westbound between junctions J12 (M60) and J11 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 02:00 on 30 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.08 miles from Moss Bank.

Location: eastbound entry slip at junction J6 (Liverpool) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 1 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.25 miles from Moss Bank.

Location: southbound entry slip at junction J2 (Prescot) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 June 2025 to 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.26 miles from Moss Bank.

Location: southbound between junctions J5 (St Helens) and J4 (Knowsley) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 7 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.11 miles from Moss Bank.

Location: southbound exit slip at junction J2 (Prescot) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 1 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 June 2025 to 7 June 2025.
Schedule : From 21:00 on 28 June 2025 to 06:00 on 29 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.4 miles from Moss Bank.

Location: southbound exit slip at junction J3 (Huyton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 1 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 June 2025 to 7 June 2025.
Schedule : From 21:00 on 28 June 2025 to 06:00 on 29 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.21 miles from Moss Bank.

Location: southbound entry slip at junction J4 (Knowsley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 31 May 2025 to 15:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.63 miles from Moss Bank.

Location: southbound entry slip at junction J2 (Prescot) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.26 miles from Moss Bank.

Location: southbound entry slip at junction J4 (Knowsley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 1 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 June 2025 to 7 June 2025.
Schedule : From 21:00 on 28 June 2025 to 06:00 on 29 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.63 miles from Moss Bank.

Location: southbound between junctions J6 (Kirkby) and J4 (Knowsley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 7 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.74 miles from Moss Bank.

Location: southbound between junctions J4 (Knowsley) and J2 (Prescot) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 June 2025 to 06:00 on 29 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.7 miles from Moss Bank.

Location: southbound exit slip at junction J1 (Huyton) to roundabout.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 1 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 June 2025 to 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.36 miles from Moss Bank.

Location: southbound between junctions J4 (Knowsley) and J1 (Huyton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 1 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 June 2025 to 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.67 miles from Moss Bank.

Location: southbound between junctions J28 (Leyland) and J27 (Parbold) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.29 miles from Moss Bank.

Location: northbound between junctions J27 (Parbold) and J28 (Leyland) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.36 miles from Moss Bank.

Location: southbound exit slip at junction J27 (Parbold) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.83 miles from Moss Bank.

Location: northbound exit slip at Charnock Richard Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.39 miles from Moss Bank.

Location: northbound entry slip at Charnock Richard Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.54 miles from Moss Bank.

Location: eastbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2025 to 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.45 miles from Moss Bank.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2025 to 19 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.74 miles from Moss Bank.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 June 2025 to 6 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 13 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.74 miles from Moss Bank.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.76 miles from Moss Bank.

Location: eastbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 June 2025 to 6 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.45 miles from Moss Bank.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.49 miles from Moss Bank.

Location: eastbound between junctions J12 (Runcorn) and J11 (Runcorn) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.87 miles from Moss Bank.

Location: eastbound entry slip at junction J12 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.72 miles from Moss Bank.

Location: eastbound exit slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 June 2025 to 22 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.36 miles from Moss Bank.

Location: eastbound exit slip at junction J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.53 miles from Moss Bank.

Location: westbound at junction J5 (Skelmersdale) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 1 June 2025 to 17:00 on 1 June 2025.
Nearest town: 4.48 miles from Moss Bank.

Location: northbound entry slip at junction J1 from M60 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.38 miles from Moss Bank.

Location: anticlockwise exit slip at junction J16 (Salford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.36 miles from Moss Bank.

Location: southbound between junctions J2 and J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.59 miles from Moss Bank.

Location: anticlockwise exit slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.38 miles from Moss Bank.

Location: anticlockwise exit slip at junction J14 (St Helens) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.11 miles from Moss Bank.

Location: southbound between junctions J28 (Leyland) and J27 (Parbold) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.34 miles from Moss Bank.

Location: southbound exit slip at Charnock Richard Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.61 miles from Moss Bank.

Location: southbound entry slip at Charnock Richard Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.46 miles from Moss Bank.

Location: southbound between junctions J4 and J2 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 31 May 2025 to 06:00 on 1 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.13 miles from Moss Bank.

Location: clockwise between junctions J15 (Bolton) and J18 (Leeds) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.99 miles from Moss Bank.

Location: northbound entry slip at junction J9 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 08:00 on 5 June 2025 to 18:00 on 5 June 2025.
Nearest town: 17.95 miles from Moss Bank.

Location: eastbound between junctions J6 (Liverpool) and J7 (Prescot) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 31 May 2025 to 17:00 on 31 May 2025.
Nearest town: 4.83 miles from Moss Bank.

Location: southbound exit slip at junction J23 (Haydock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.29 miles from Moss Bank.

Location: southbound between junctions J24 (Ashton in Makerfield) and J23 (Haydock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.07 miles from Moss Bank.

Location: eastbound between junctions J5 (Manchester) and J2 (Wythenshawe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.69 miles from Moss Bank.

Location: eastbound at junction J5 (Manchester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.63 miles from Moss Bank.

Location: eastbound between junctions J6 (Hale) and J5 (Manchester) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.63 miles from Moss Bank.

Location: eastbound entry slip at junction J5 (Manchester) from Manchester Airport.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.76 miles from Moss Bank.

Location: eastbound between junctions J7 and J6 (Hale) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.52 miles from Moss Bank.

Location: eastbound at junction J6 (Hale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.55 miles from Moss Bank.

Location: eastbound entry slip at junction J4 (Wythenshawe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.88 miles from Moss Bank.

Location: eastbound between junctions J3 (Altrincham) and J3A (Altrincham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.94 miles from Moss Bank.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.85 miles from Moss Bank.

Location: eastbound between junctions J9 (Preston) and J7 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.05 miles from Moss Bank.

Location: northbound at junction J11 (Runcorn) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.94 miles from Moss Bank.

Location: southbound between junctions J10 (Elton) and J11 (Runcorn) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.39 miles from Moss Bank.

Location: southbound at junction J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.11 miles from Moss Bank.

Location: northbound between junctions J11 (Runcorn) and J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 05:00 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.76 miles from Moss Bank.

Location: southbound between the A5038 and the junction with the A567 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.5 miles from Moss Bank.

Location: eastbound between junctions J15 (Ellesmere Port) and J14 (Helsby) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.92 miles from Moss Bank.

Location: eastbound between the A494 Chester and junction J15 (Ellesmere Port) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.94 miles from Moss Bank.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Lane Closures : Lane three will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.31 miles from Moss Bank.

Location: southbound exit slip at junction J21 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.33 miles from Moss Bank.

Location: southbound at junction J21A (Manchester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.82 miles from Moss Bank.

Location: southbound entry slip at junction J21A (Manchester) from M62 Eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.72 miles from Moss Bank.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.58 miles from Moss Bank.

Location: westbound at junction J10 (M6) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.65 miles from Moss Bank.

Location: southbound between junctions J22 (Newton le Willows) and J21A (Manchester) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.37 miles from Moss Bank.

Location: southbound entry slip at junction J21A (Manchester) from M62 Westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.49 miles from Moss Bank.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.45 miles from Moss Bank.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 12 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.45 miles from Moss Bank.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 July 2025 to 5 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.9 miles from Moss Bank.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.89 miles from Moss Bank.

Location: southbound entry slip at junction J21 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 16 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.65 miles from Moss Bank.

Location: northbound exit slip at junction J21 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.77 miles from Moss Bank.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.88 miles from Moss Bank.

Location: southbound between junctions J8 and J6 .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 17:00 on 29 May 2025.
Nearest town: 12.99 miles from Moss Bank.

Location: southbound between the A5090 and the junction with the A567 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.64 miles from Moss Bank.

Location: southbound between the A5090 and the junction with the A567 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 7 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.64 miles from Moss Bank.

Location: clockwise entry slip at junction J10 (Trafford Park) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 4 June 2025 to 17:00 on 4 June 2025.
Nearest town: 15.71 miles from Moss Bank.

Location: anticlockwise at junction J13 (Swinton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.94 miles from Moss Bank.

Location: westbound between junctions J12 (M60) and J11 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 31 May 2025 to 05:00 on 1 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.05 miles from Moss Bank.

Location: westbound between junctions J12 (M60) and J11 (Warrington) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.79 miles from Moss Bank.

Location: westbound exit slip at junction J11 (Warrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.33 miles from Moss Bank.

Location: clockwise exit slip at junction J12 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.99 miles from Moss Bank.

Location: anticlockwise between junctions J13 (Swinton) and J12 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.75 miles from Moss Bank.

Location: westbound at junction J1 (M60/M62) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.17 miles from Moss Bank.

Location: westbound entry slip at junction J12 (M60) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.01 miles from Moss Bank.

Location: anticlockwise exit slip at junction J12 (Warrington) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.93 miles from Moss Bank.

Location: westbound between junctions J2 (Eccles) and J1 (M60/M62) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.33 miles from Moss Bank.

Location: westbound entry slip at junction J12 (M60) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.9 miles from Moss Bank.

Location: anticlockwise exit slip at junction J12 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:45 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.95 miles from Moss Bank.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.49 miles from Moss Bank.

Location: westbound between junctions J11 (Warrington) and J9 (Warrington) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.33 miles from Moss Bank.

Location: westbound entry slip at junction J11 (Warrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.08 miles from Moss Bank.

Location: westbound exit slip at junction J10 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.65 miles from Moss Bank.

Location: westbound between junctions J12 (M60) and J11 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.25 miles from Moss Bank.

Location: southbound entry slip at junction J21A (Manchester) from M62 Westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.49 miles from Moss Bank.

Location: northbound between junctions J27 (Parbold) and J28 (Leyland) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.36 miles from Moss Bank.

Location: northbound entry slip at Charnock Richard Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.54 miles from Moss Bank.

Location: northbound exit slip at Charnock Richard Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.39 miles from Moss Bank.

Location: southbound between junctions J6 (Eastham) and J7 (Overpool) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.29 miles from Moss Bank.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.96 miles from Moss Bank.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.15 miles from Moss Bank.

Location: northbound between junctions J8 and J9 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.7 miles from Moss Bank.

Location: eastbound at junction J2 (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.82 miles from Moss Bank.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.5 miles from Moss Bank.

Location: eastbound exit slip at junction J2 (Manchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.82 miles from Moss Bank.

Location: southbound between the M6 and junction J9 .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.45 miles from Moss Bank.

Location: westbound between junctions J3 (Blackburn) and J2 (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.12 miles from Moss Bank.

Location: northbound at junction J9 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.63 miles from Moss Bank.

Location: westbound exit slip at junction J2 (Manchester) .
Lane Closures : Lane two will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.97 miles from Moss Bank.

Location: northbound exit slip at junction J9 .
Lane Closures : Lane two will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.63 miles from Moss Bank.

Location: southbound exit slip at junction J9 .
Lane Closures : Lane two will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.15 miles from Moss Bank.

Location: northbound.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.82 miles from Moss Bank.

Location: southbound.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 05:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.92 miles from Moss Bank.

Location: southbound between junctions J26 (Wigan) and J23 (Haydock) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 26 July 2025.
Nearest town: 4.77 miles from Moss Bank.

Location: eastbound between junctions J6 (Hale) and J5 (Manchester) .
Lane Closures : Lane four will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.62 miles from Moss Bank.

Location: westbound exit slip at junction J4 (Wythenshawe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.92 miles from Moss Bank.

Location: anticlockwise between junctions J6 (Sale) and J5 (Wythenshawe) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.13 miles from Moss Bank.

Location: westbound entry slip at junction J3A (Altrincham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.97 miles from Moss Bank.

Location: eastbound between junctions J5 (Manchester) and J3 (Altrincham) .
Lane Closures : Lane four will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.73 miles from Moss Bank.

Location: southbound at the junction with the M60 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.9 miles from Moss Bank.

Location: southbound between the junctions with the M60 and the M56 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.87 miles from Moss Bank.

Location: anticlockwise exit slip at junction J5 (Wythenshawe) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.6 miles from Moss Bank.

Location: clockwise between junctions J5 (Wythenshawe) and J6 (Sale) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.29 miles from Moss Bank.

Location: southbound.
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.97 miles from Moss Bank.

Location: clockwise exit slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.88 miles from Moss Bank.

Location: anticlockwise exit slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.38 miles from Moss Bank.

Location: clockwise entry slip at junction J17 (Prestwich) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : From 23:59 on 21 June 2025 to 06:00 on 22 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.18 miles from Moss Bank.

Location: anticlockwise entry slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.12 miles from Moss Bank.