Location: westbound entry slip at junction J8 (Warrington) .
Due to: Accident involving a vehicle that has left the carriageway.
Time To Clear : The event is expected to clear between 07:45 and 08:00 on 16 June 2026.
Normal traffic conditions are expected between 07:30 and 07:45 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 3.28 miles from Peasley Cross.

Location: westbound between junctions J8 (Warrington) and J7 (Prescot) .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 09:45 and 10:00 on 16 June 2026.
Normal traffic conditions are expected between 09:45 and 10:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 2.06 miles from Peasley Cross.

Location: southbound between junctions J8 and J5 .
Due to: Roadworks scheme.
Period : from 20:00 on 15 June 2026 to 06:00 on 18 July 2026.
Nearest town: 14.47 miles from Peasley Cross.

Location: eastbound between junctions J1 (Kirkby) and M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 March 2027.
Nearest town: 9.43 miles from Peasley Cross.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 March 2027.
Nearest town: 7.2 miles from Peasley Cross.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Due to: Roadworks scheme.
Period : from 21:00 on 15 June 2026 to 06:00 on 9 July 2026.
Nearest town: 7.39 miles from Peasley Cross.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Due to: Roadworks scheme.
Period : from 05:07 on 1 June 2026 to 21:00 on 22 June 2026.
Nearest town: 7.39 miles from Peasley Cross.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 21:00 on 22 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.39 miles from Peasley Cross.

Location: southbound exit slip at junction J3 (Huyton) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 11:00 on 18 July 2026.
Nearest town: 5.48 miles from Peasley Cross.

Location: northbound exit slip at junction J21A (Manchester) to M62 east.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 6.95 miles from Peasley Cross.

Location: westbound at junction J10 (M6) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 7.62 miles from Peasley Cross.

Location: northbound between junctions J21A (Manchester) from M62 westbound and J26 (Wigan) .
Due to: Roadworks scheme.
Period : from 21:05 on 10 June 2026 to 06:00 on 17 June 2026.
Nearest town: 7.39 miles from Peasley Cross.

Location: northbound at junction J21A (Manchester) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 16 June 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 7.19 miles from Peasley Cross.

Location: northbound exit slip at junction J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.92 miles from Peasley Cross.

Location: northbound at junction J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.92 miles from Peasley Cross.

Location: eastbound between junctions J5 (Skelmersdale) and M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 March 2027.
Nearest town: 7.27 miles from Peasley Cross.

Location: eastbound between junctions J4 (Skelmersdale) and J5 (Skelmersdale) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 08:00 on 16 June 2026 to 17:00 on 16 June 2026.
Nearest town: 7.56 miles from Peasley Cross.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.8 miles from Peasley Cross.

Location: southbound between junctions J25 (Ashton in Makerfield) and J22 (Newton le Willows) .
Due to: Roadworks scheme.
Period : from 20:57 on 11 June 2026 to 06:00 on 26 June 2026.
Nearest town: 6.34 miles from Peasley Cross.

Location: eastbound entry slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.18 miles from Peasley Cross.

Location: northbound exit slip at junction J25 (Ashton in Makerfield) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 5.54 miles from Peasley Cross.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 16 June 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 8.62 miles from Peasley Cross.

Location: westbound at junction J4 (Skelmersdale) .
Due to: Roadworks scheme.
Period : from 20:00 on 4 June 2026 to 06:00 on 4 July 2026.
Nearest town: 8.07 miles from Peasley Cross.

Location: westbound between junctions M6 and J1 (Kirkby) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 March 2027.
Nearest town: 7.26 miles from Peasley Cross.

Location: eastbound at junction J15 (Ellesmere Port) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 16:00 on 8 January 2027.
Nearest town: 13.87 miles from Peasley Cross.

Location: eastbound between junctions J15 (Ellesmere Port) and J14 (Helsby) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 30 June 2026.
Nearest town: 13.51 miles from Peasley Cross.

Location: westbound between junctions J11 (Runcorn) and J14 (Helsby) .
Due to: Roadworks scheme.
Period : from 20:11 on 15 June 2026 to 05:00 on 20 June 2026.
Nearest town: 8.3 miles from Peasley Cross.

Location: westbound between junctions J11 (Runcorn) and J14 (Helsby) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2026 to 05:00 on 17 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.3 miles from Peasley Cross.

Location: eastbound entry slip at junction J15 (Ellesmere Port) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 16:00 on 8 January 2027.
Nearest town: 13.81 miles from Peasley Cross.

Location: westbound between junction J1 (Kirkby) and the M57 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 March 2027.
Nearest town: 9.36 miles from Peasley Cross.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Due to: Roadworks scheme.
Period : from 23:01 on 12 June 2026 to 05:00 on 18 June 2026.
Nearest town: 12.34 miles from Peasley Cross.

Location: westbound entry slip at junction J12 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2026 to 05:00 on 17 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.44 miles from Peasley Cross.

Location: northbound between junctions J11 (Runcorn) and J7 (Overpool) .
Due to: Roadworks scheme.
Period : from 22:01 on 15 June 2026 to 05:00 on 18 June 2026.
Nearest town: 13.96 miles from Peasley Cross.

Location: northbound between junctions J10 (Elton) and J7 (Overpool) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 June 2026 to 05:00 on 17 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.76 miles from Peasley Cross.

Location: southbound exit slip at junction J1 (Huyton) to roundabout.
Due to: Emergency Roadworks.
Period : expect disruption until 05:00 on 31 January 2027.
Lanes Closed : All lanes are closed.
Nearest town: 4.13 miles from Peasley Cross.

Location: southbound exit slip at junction J1 (Huyton) to roundabout.
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 December 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 4.13 miles from Peasley Cross.

Location: eastbound exit slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.02 miles from Peasley Cross.

Location: eastbound between junctions J10 (Northwich) and J9 (Preston) .
Due to: Roadworks.
Period : expect disruption until 05:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 9.19 miles from Peasley Cross.

Location: northbound entry slip at junction J24 (Ashton in Makerfield) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 4.77 miles from Peasley Cross.

Location: southbound between junctions J26 (Wigan) and J23 (Haydock) .
Lane Closures : Lane one is closed.
Due to: Emergency Roadside Equipment Maintenance.
Period : expect disruption until 05:00 on 16 June 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 6.08 miles from Peasley Cross.

Location: eastbound.
Due to: Roadworks scheme.
Period : from 21:00 on 4 June 2026 to 06:00 on 4 July 2026.
Nearest town: 9.73 miles from Peasley Cross.

Location: eastbound between junctions J10 (Northwich) and J9 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2026 to 06:00 on 17 June 2026.
Schedule : From 21:00 on 24 June 2026 to 06:00 on 25 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 June 2026 to 1 July 2026.
Schedule : From 21:00 on 3 July 2026 to 06:00 on 4 July 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.73 miles from Peasley Cross.

Location: eastbound between junctions J11 (Runcorn) and J9 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.45 miles from Peasley Cross.

Location: eastbound between junctions J6 (Liverpool) and J7 (Prescot) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.97 miles from Peasley Cross.

Location: eastbound entry slip at junction J7 (Prescot) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.07 miles from Peasley Cross.

Location: eastbound between junctions J7 (Prescot) and J9 (Warrington) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.49 miles from Peasley Cross.

Location: eastbound exit slip at junction J8 (Warrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.1 miles from Peasley Cross.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 June 2026 to 05:00 on 23 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.62 miles from Peasley Cross.

Location: northbound between junctions J12 (Chester) and J11 (Runcorn) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 June 2026 to 27 June 2026.
Nearest town: 14.6 miles from Peasley Cross.

Location: eastbound entry slip at junction J15 (Ellesmere Port) from the M53 northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 June 2026 to 05:00 on 27 June 2026.
Nearest town: 14.36 miles from Peasley Cross.

Location: eastbound between the A494 Chester and junction J15 (Ellesmere Port) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 June 2026 to 27 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.98 miles from Peasley Cross.

Location: eastbound entry slip at junction J15 (Ellesmere Port) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 June 2026 to 27 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.81 miles from Peasley Cross.

Location: eastbound entry slip at junction J15 (Ellesmere Port) from the M53 northbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.36 miles from Peasley Cross.

Location: eastbound between junctions J15 (Ellesmere Port) and J12 (Runcorn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 June 2026 to 27 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.88 miles from Peasley Cross.

Location: eastbound between junctions J10 (Northwich) and J9 (Preston) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 June 2026 to 05:00 on 23 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.19 miles from Peasley Cross.

Location: westbound between junctions J12 (Runcorn) and J14 (Helsby) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 22 June 2026 to 05:00 on 18 July 2026.
Nearest town: 11.24 miles from Peasley Cross.

Location: westbound between junctions J12 (Runcorn) and J14 (Helsby) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 June 2026 to 27 June 2026.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 June 2026 to 4 July 2026.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 July 2026 to 10 July 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.24 miles from Peasley Cross.

Location: westbound between junctions J12 (Runcorn) and J14 (Helsby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2026 to 05:00 on 11 July 2026.
Schedule : From 20:00 on 13 July 2026 to 05:00 on 14 July 2026.
Schedule : From 23:00 on 14 July 2026 to 06:00 on 15 July 2026.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 15 July 2026 to 18 July 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.24 miles from Peasley Cross.

Location: eastbound between junctions J14 (Helsby) and J12 (Runcorn) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 22 June 2026 to 05:00 on 18 July 2026.
Nearest town: 11.87 miles from Peasley Cross.

Location: eastbound between junctions J14 (Helsby) and J12 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 June 2026 to 1 July 2026.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 2 July 2026 to 4 July 2026.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 July 2026 to 10 July 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.87 miles from Peasley Cross.

Location: eastbound between junctions J14 (Helsby) and J12 (Runcorn) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2026 to 05:00 on 11 July 2026.
Schedule : From 20:00 on 13 July 2026 to 05:00 on 14 July 2026.
Schedule : From 23:00 on 14 July 2026 to 05:00 on 15 July 2026.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 15 July 2026 to 18 July 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.86 miles from Peasley Cross.

Location: eastbound between junctions J14 (Helsby) and J12 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 June 2026 to 05:00 on 23 June 2026.
Schedule : From 23:00 on 1 July 2026 to 06:00 on 2 July 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.87 miles from Peasley Cross.

Location: southbound between junctions J8 (Overpool) and J10 (Elton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 22 June 2026 to 05:00 on 23 June 2026.
Nearest town: 12.16 miles from Peasley Cross.

Location: southbound between junctions J9 (Ellesmere Port) and J10 (Elton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 June 2026 to 05:00 on 23 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.2 miles from Peasley Cross.

Location: southbound between junctions J8 (Overpool) and J9 (Ellesmere Port) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 June 2026 to 05:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.16 miles from Peasley Cross.

Location: southbound entry slip at junction J9 (Ellesmere Port) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 June 2026 to 05:00 on 23 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.2 miles from Peasley Cross.

Location: northbound between junctions J10 (Elton) and J9 (Ellesmere Port) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 June 2026 to 05:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.31 miles from Peasley Cross.

Location: southbound exit slip at junction J10 (Elton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 June 2026 to 05:00 on 23 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.08 miles from Peasley Cross.

Location: westbound between junctions J8 (Warrington) and J7 (Prescot) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:30 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 1.68 miles from Peasley Cross.

Location: southbound between junctions J2 (Prescot) and J1 (Huyton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.1 miles from Peasley Cross.

Location: southbound between junctions J2 (Prescot) and J1 (Huyton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.84 miles from Peasley Cross.

Location: eastbound entry slip at junction J6 (Liverpool) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.1 miles from Peasley Cross.

Location: westbound exit slip at junction J6 (Liverpool) to M57 north.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:30 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.33 miles from Peasley Cross.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 July 2026 to 06:00 on 21 July 2026.
Schedule : From 22:00 on 23 July 2026 to 06:00 on 24 July 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.85 miles from Peasley Cross.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 June 2026 to 06:00 on 22 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.56 miles from Peasley Cross.

Location: southbound entry slip at junction J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 June 2026 to 19 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.16 miles from Peasley Cross.

Location: southbound between junctions J8 and J5 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 June 2026 to 06:00 on 30 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.47 miles from Peasley Cross.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.52 miles from Peasley Cross.

Location: northbound entry slip at junction J21A (Manchester) from M62 eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.54 miles from Peasley Cross.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 26 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2026 to 2 July 2026.
Schedule : From 21:00 on 8 July 2026 to 06:00 on 9 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.39 miles from Peasley Cross.

Location: westbound at junction J10 (M6) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 June 2026 to 26 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2026 to 2 July 2026.
Schedule : From 20:00 on 8 July 2026 to 06:00 on 9 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.62 miles from Peasley Cross.

Location: southbound entry slip at junction J25 (Ashton in Makerfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2026 to 06:00 on 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.34 miles from Peasley Cross.

Location: southbound exit slip at junction J24 (Ashton in Makerfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2026 to 06:00 on 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.9 miles from Peasley Cross.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 June 2026 to 06:00 on 25 June 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.35 miles from Peasley Cross.

Location: northbound entry slip at junction J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2026 to 05:00 on 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.25 miles from Peasley Cross.

Location: eastbound exit slip at junction J7 (Prescot) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.54 miles from Peasley Cross.

Location: southbound exit slip at junction J22 (Newton le Willows) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 June 2026 to 26 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.7 miles from Peasley Cross.

Location: southbound exit slip at junction J23 (Haydock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.67 miles from Peasley Cross.

Location: westbound entry slip at junction J7 (Prescot) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:30 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.23 miles from Peasley Cross.

Location: eastbound between junctions J6 (Liverpool) and J7 (Prescot) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.36 miles from Peasley Cross.

Location: eastbound between junctions J6 (Liverpool) and J7 (Prescot) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.36 miles from Peasley Cross.

Location: westbound entry slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 June 2026 to 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.2 miles from Peasley Cross.

Location: eastbound exit slip at junction J1 (Kirkby) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 June 2026 to 06:00 on 29 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.47 miles from Peasley Cross.

Location: eastbound between junctions J3 (Southport) and J4 (Skelmersdale) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 June 2026 to 06:00 on 30 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.39 miles from Peasley Cross.

Location: eastbound at junction J4 (Skelmersdale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 June 2026 to 06:00 on 30 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.15 miles from Peasley Cross.

Location: eastbound at junction J1 (Kirkby) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 June 2026 to 06:00 on 29 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.43 miles from Peasley Cross.

Location: eastbound at junction J15 (Ellesmere Port) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.88 miles from Peasley Cross.

Location: westbound between junctions J11 (Runcorn) and J14 (Helsby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2026 to 05:00 on 20 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.3 miles from Peasley Cross.

Location: northbound at junction J11 (Runcorn) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 05:00 on 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.96 miles from Peasley Cross.

Location: southbound entry slip at Rivington Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 July 2026 to 06:00 on 21 July 2026.
Schedule : From 22:00 on 23 July 2026 to 06:00 on 24 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.13 miles from Peasley Cross.

Location: southbound exit slip at Rivington Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 July 2026 to 06:00 on 21 July 2026.
Schedule : From 22:00 on 23 July 2026 to 06:00 on 24 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.31 miles from Peasley Cross.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.12 miles from Peasley Cross.

Location: eastbound entry slip at junction J6 (Liverpool) from roundabout.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.08 miles from Peasley Cross.

Location: northbound between junctions J11 (Runcorn) and J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 05:00 on 18 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.75 miles from Peasley Cross.

Location: westbound at junction J15 (Ellesmere Port) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.79 miles from Peasley Cross.

Location: eastbound between junctions J14 (Helsby) and J12 (Runcorn) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2026 to 05:00 on 20 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.78 miles from Peasley Cross.

Location: westbound exit slip at junction J6 (Liverpool) to roundabout.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:30 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.89 miles from Peasley Cross.

Location: northbound between junctions J10 (Elton) and J9 (Ellesmere Port) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 05:00 on 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.38 miles from Peasley Cross.

Location: westbound exit slip at junction J12 (Runcorn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2026 to 05:00 on 19 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.28 miles from Peasley Cross.

Location: westbound exit slip at junction J10 (Northwich) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 June 2026 to 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.3 miles from Peasley Cross.

Location: eastbound exit slip at junction J8 (Warrington) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 17 June 2026 to 05:00 on 20 June 2026.
Nearest town: 3.1 miles from Peasley Cross.

Location: eastbound exit slip at junction J8 (Warrington) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 June 2026 to 05:00 on 18 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.1 miles from Peasley Cross.

Location: eastbound exit slip at junction J8 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2026 to 05:00 on 20 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.1 miles from Peasley Cross.

Location: westbound between junctions J7 (Prescot) and J6 (Liverpool) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:30 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 1.91 miles from Peasley Cross.

Location: northbound exit slip at junction J6 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2026 to 05:00 on 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.27 miles from Peasley Cross.

Location: southbound exit slip at junction J6 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 June 2026 to 06:00 on 30 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.34 miles from Peasley Cross.

Location: southbound entry slip at junction J6 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 June 2026 to 06:00 on 30 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.31 miles from Peasley Cross.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2026 to 18 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.24 miles from Peasley Cross.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 June 2026 to 06:00 on 19 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.7 miles from Peasley Cross.

Location: westbound exit slip at junction J8 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2026 to 05:00 on 20 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.54 miles from Peasley Cross.

Location: westbound between junction J15 (Ellesmere Port) and the A494 Chester.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.02 miles from Peasley Cross.

Location: northbound between junctions J6 and J8 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 July 2026 to 06:00 on 15 August 2026.
Nearest town: 12.9 miles from Peasley Cross.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 1 August 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 August 2026 to 8 August 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 August 2026 to 15 August 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.9 miles from Peasley Cross.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 June 2026 to 06:00 on 22 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.28 miles from Peasley Cross.

Location: southbound between junctions J26 (Wigan) and J23 (Haydock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2026 to 06:00 on 20 June 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.8 miles from Peasley Cross.

Location: southbound entry slip at junction J22 (Newton le Willows) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 June 2026 to 26 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.83 miles from Peasley Cross.

Location: southbound entry slip at junction J23 (Haydock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.64 miles from Peasley Cross.

Location: southbound between junctions J24 (Ashton in Makerfield) and J22 (Newton le Willows) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.82 miles from Peasley Cross.