Traffic Lingfield

SLIGHT
SEVERE
FULL SCREEN UPDATED: 19:21
Leaflet | © OpenStreetMap contributors
×
×

Current traffic around Lingfield

The following traffic incidents and congestion for Lingfield have been reported by Highways England, Traffic Scotland, Traffic Wales or Transport for London (TfL) in the last two hours:

VEHICLE RECOVERY
Location: The M25 clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane closures: Lane one is closed.
Reason: Vehicle tyre change.
Status: Currently Active.
Time to clear: The event is expected to clear between 19:45 and 20:00 on 19 May 2025.
Return to normal: Normal traffic conditions are expected between 19:45 and 20:00 on 19 May 2025.
Lanes closed: There is one of four lanes closed.
Nearest town: 7.57 miles from Lingfield.
BROKEN DOWN VEHICLE
Location: The M25 clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 19:45 and 20:00 on 19 May 2025.
Return to normal: Normal traffic conditions are expected between 19:45 and 20:00 on 19 May 2025.
Lanes closed: There is one of four lanes closed.
Nearest town: 8.47 miles from Lingfield.
BROKEN DOWN VEHICLE
Location: The M25 clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 15:45 and 16:00 on 19 May 2025.
Return to normal: Normal traffic conditions are expected between 15:45 and 16:00 on 19 May 2025.
Lanes closed: There is one of four lanes closed.
Nearest town: 8.1 miles from Lingfield. CLEARED @ 15:09
GENERAL OBSTRUCTION
Location: The M23 southbound between junctions J9 (Gatwick Airport) and J10 (Crawley) .
Reason: Debris on the carriageway.
Status: Currently Active.
Time to clear: The event is expected to clear between 15:15 and 15:30 on 19 May 2025.
Return to normal: Normal traffic conditions are expected between 15:15 and 15:30 on 19 May 2025.
Lanes closed: There are lane closures.
Nearest town: 5.5 miles from Lingfield. CLEARED @ 13:30
BROKEN DOWN VEHICLE
Location: The M23 southbound exit slip at junction J10 (Crawley) .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 14:30 and 14:45 on 19 May 2025.
Return to normal: Normal traffic conditions are expected between 14:30 and 14:45 on 19 May 2025.
Lanes closed: There is one of two lanes closed.
Nearest town: 5.8 miles from Lingfield. CLEARED @ 13:30
CONGESTION
Location: The A23 northbound between the junctions with the M23 and the A237 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:30 and 18:45 on 19 May 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.07 miles from Lingfield. CLEARED @ 18:36
CONGESTION
Location: The A23 northbound between the junctions with the M23 and the A237 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:45 and 18:00 on 19 May 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.07 miles from Lingfield. CLEARED @ 17:42
CONGESTION
Location: The A23 northbound between the junctions with the M23 and the A237 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:45 and 17:00 on 19 May 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.07 miles from Lingfield. CLEARED @ 16:57


There are no current incidents in this location.

Roadworks

ROAD WORKS
Location: The M23 southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 19 May 2025 to 05:00 on 20 May 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 5.14 miles from Lingfield.
ROAD WORKS
Location: The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 16:00 on 19 May 2025.
Nearest town: 19 miles from Lingfield. CLEARED @ 16:03
ROAD WORKS
Location: The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 22:00 on 19 May 2025 to 05:30 on 22 May 2025.
Nearest town: 19.92 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound between the junctions with the A262 and the A228 .
Lane closures: Lane one will be closed.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 15.73 miles from Lingfield.
ROAD WORKS
Location: The M25 anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 22:00 on 19 May 2025 to 05:30 on 22 May 2025.
Nearest town: 6.72 miles from Lingfield.
ROAD WORKS
Location: The M20 eastbound between junctions J1 and J3 (Sevenoaks) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: From 22:00 on 19 May 2025 to 05:00 on 20 May 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 17.91 miles from Lingfield.
ROAD WORKS
Location: The M20 eastbound exit slip at junction J2 (Paddock Wood) .
Lane closures: Lane one will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: From 22:00 on 19 May 2025 to 05:00 on 20 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 16.82 miles from Lingfield.
ROAD WORKS
Location: The M25 clockwise entry slip at junction J9 (Leatherhead) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 19 May 2025 to 05:30 on 20 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 16.26 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 5.56 miles from Lingfield.
ROAD WORKS
Location: The A23 southbound entry slip from the A2300 .
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 15.72 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound at junction J10 (Crawley) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 5.75 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound exit slip at junction J10 (Crawley) .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 5.75 miles from Lingfield.
ROAD WORKS
Location: The M25 clockwise exit slip at junction J3 (Maidstone) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 20 May 2025 to 05:30 on 21 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.64 miles from Lingfield.
ROAD WORKS
Location: The M25 clockwise at junction J3 (Maidstone) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 20 May 2025 to 05:30 on 21 May 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.64 miles from Lingfield.
ROAD WORKS
Location: The M25 clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:00 on 20 May 2025 to 05:30 on 21 May 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 19.51 miles from Lingfield.
ROAD WORKS
Location: The A23 northbound.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:00 and 16:00 from 20 May 2025 to 22 May 2025.
Schedule: Expect disruption everyday between 09:00 and 16:00 from 27 May 2025 to 30 May 2025.
Schedule: From 09:00 on 5 Jun 2025 to 16:00 on 5 Jun 2025.
Nearest town: 12.84 miles from Lingfield.
ROAD WORKS
Location: The A23 southbound.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:00 and 16:00 from 20 May 2025 to 22 May 2025.
Schedule: Expect disruption everyday between 09:00 and 16:00 from 27 May 2025 to 30 May 2025.
Schedule: From 09:00 on 5 Jun 2025 to 16:00 on 5 Jun 2025.
Nearest town: 12.77 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound between the A228 and the junction with the A26 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 16 Jun 2025 to 20 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 23 Jul 2025 to 27 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.89 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 16 Jun 2025 to 20 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 23 Jul 2025 to 27 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.84 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound between the A26 and the junction with the A25 West.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 16 Jun 2025 to 20 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 23 Jul 2025 to 27 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.02 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound exit slip to the A225 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 16 Jun 2025 to 20 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 23 Jul 2025 to 27 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 11.01 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 16 Jun 2025 to 20 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 23 Jul 2025 to 27 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.96 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound exit slip to the A26 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 16 Jun 2025 to 20 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 23 Jul 2025 to 27 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound entry slip from the A26 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 16 Jun 2025 to 20 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 23 Jul 2025 to 27 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 12.1 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 16 Jun 2025 to 20 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 23 Jul 2025 to 27 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 12.12 miles from Lingfield.
ROAD WORKS
Location: The A3 northbound between the junctions with the A244 and the A309 .
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 22:00 on 22 May 2025 to 05:30 on 23 May 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 19.07 miles from Lingfield.
ROAD WORKS
Location: The M20 westbound between junctions J3 (Sevenoaks) and J1 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: From 22:00 on 22 May 2025 to 05:00 on 23 May 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 17.23 miles from Lingfield.
ROAD WORKS
Location: The A3 northbound between the A244 and the junction with the A309 .
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 22:00 on 22 May 2025 to 05:30 on 23 May 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 18.89 miles from Lingfield.
ROAD WORKS
Location: The M25 clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 22 May 2025 to 05:00 on 23 May 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 10.19 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 22 May 2025 to 05:30 on 23 May 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 6.84 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound at junction J8 (Reigate) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 22 May 2025 to 05:30 on 23 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 7.93 miles from Lingfield.
ROAD WORKS
Location: The A21 southbound between the junctions with the A25 and the A225 .
Lane closures: Lane two will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 10.59 miles from Lingfield.
ROAD WORKS
Location: The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 19.92 miles from Lingfield.
ROAD WORKS
Location: The M26 eastbound between the M25 and junction J2A .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 21 May 2025 to 23 May 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.03 miles from Lingfield.
ROAD WORKS
Location: The M26 eastbound entry slip at junction J2A .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 21 May 2025 to 23 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.89 miles from Lingfield.
ROAD WORKS
Location: The M26 eastbound between junctions J2A and J3 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 21 May 2025 to 23 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.46 miles from Lingfield.
ROAD WORKS
Location: The M20 westbound entry slip at junction J2 (Paddock Wood) .
Reason: Litter clearance is planned.
Status: Pending.
Schedule: From 22:00 on 21 May 2025 to 05:00 on 22 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.49 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 21 May 2025 to 05:30 on 22 May 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 6.36 miles from Lingfield.
ROAD WORKS
Location: The M20 westbound between junctions J3 (Sevenoaks) and J1 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: From 22:00 on 21 May 2025 to 05:00 on 22 May 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.74 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound at junction J8 (Reigate) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 21 May 2025 to 05:30 on 22 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 7.93 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 6.5 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound between the A225 and the junction with the M25 after A25 east exit.
Lane closures: Lane two will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 10.48 miles from Lingfield.
ROAD WORKS
Location: The A21 southbound between the M25 and the junction with the A225 .
Lane closures: Lane two will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 10.82 miles from Lingfield.
ROAD WORKS
Location: The A23 southbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.67 miles from Lingfield.
ROAD WORKS
Location: The M25 anticlockwise between junctions J9 (Leatherhead) and J7 (Gatwick) .
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 20 May 2025 to 22 May 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 10.96 miles from Lingfield.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J8 (Reigate) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 20 May 2025 to 22 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.1 miles from Lingfield.
ROAD WORKS
Location: The M20 eastbound between junctions J1 and J3 (Sevenoaks) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: From 22:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 16.69 miles from Lingfield.
ROAD WORKS
Location: The M20 eastbound exit slip at junction J2 (Paddock Wood) .
Lane closures: Lane one will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: From 22:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 16.8 miles from Lingfield.
ROAD WORKS
Location: The A23 northbound.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.83 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound between junctions J9 (Gatwick Airport) and J10 (Crawley) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 5.28 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound between junctions J11 (Brighton) and J10 (Crawley) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 20 May 2025 to 06:00 on 7 Jun 2025.
Nearest town: 9.56 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound between junctions J11 (Brighton) and J10 (Crawley) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.56 miles from Lingfield.
ROAD WORKS
Location: The A23 northbound between the A272 and the junction with the A264 .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 20 May 2025 to 06:00 on 7 Jun 2025.
Nearest town: 10.25 miles from Lingfield.
ROAD WORKS
Location: The A23 northbound exit slip to the A264 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 9.86 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound at junction J10 (Crawley) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 5.75 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound at junction J11 (Brighton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.77 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound entry slip at junction J10A (Crawley) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 6.91 miles from Lingfield.
ROAD WORKS
Location: The A23 northbound between the junctions with the A272 and the M23 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.86 miles from Lingfield.
ROAD WORKS
Location: The A23 northbound between the junctions with the A272 and the M23 .
Lane closures: Lane three will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 10.25 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound between junctions J9 (Gatwick Airport) and J11 (Brighton) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 20 May 2025 to 06:00 on 7 Jun 2025.
Nearest town: 5.28 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound between junctions J10 (Crawley) and J11 (Brighton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 5.87 miles from Lingfield.
ROAD WORKS
Location: The A23 southbound between the junctions with the M23 and the A272 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Jun 2025 to 7 Jun 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.81 miles from Lingfield.
ROAD WORKS
Location: The M25 anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 09:30 on 20 May 2025 to 16:00 on 20 May 2025.
Nearest town: 19.11 miles from Lingfield.
ROAD WORKS
Location: The M25 anticlockwise at junction J6 (East Grinstead) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 6.72 miles from Lingfield.
ROAD WORKS
Location: The M25 anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 6.59 miles from Lingfield.
ROAD WORKS
Location: The M25 anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 7.97 miles from Lingfield.
ROAD WORKS
Location: The M25 clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 7.08 miles from Lingfield.
ROAD WORKS
Location: The M20 westbound between junctions J3 (Sevenoaks) and J1 .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.25 miles from Lingfield.
ROAD WORKS
Location: The A20 westbound between the M25 and the junction with the A223 .
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.77 miles from Lingfield.
ROAD WORKS
Location: The M20 westbound at junction J1 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.92 miles from Lingfield.
ROAD WORKS
Location: The A21 southbound exit slip to the A225 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 19 May 2025 to 22 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.97 miles from Lingfield.
ROAD WORKS
Location: The A21 northbound exit slip to the A225 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 19 May 2025 to 22 May 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 11.01 miles from Lingfield.
ROAD WORKS
Location: The A23 northbound.
Reason: Road repairs.
Status: Currently Active.
Period: expect disruption until 16:00 on 19 May 2025.
Nearest town: 12.84 miles from Lingfield. CLEARED @ 14:06
ROAD WORKS
Location: The A23 southbound.
Reason: Road repairs.
Status: Currently Active.
Period: expect disruption until 16:00 on 19 May 2025.
Nearest town: 12.77 miles from Lingfield. CLEARED @ 14:06
ROAD WORKS
Location: The A23 northbound.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:00 and 16:00 from 20 May 2025 to 21 May 2025.
Nearest town: 12.84 miles from Lingfield.
ROAD WORKS
Location: The A23 southbound.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 09:00 and 16:00 from 20 May 2025 to 21 May 2025.
Nearest town: 12.77 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 22 May 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 4.87 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound at junction J10 (Crawley) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Jul 2025 to 7 Jul 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Jul 2025 to 28 Jul 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Aug 2025 to 4 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 5.75 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound between junctions J11 (Brighton) and J10A (Crawley) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 14 Jun 2025 to 06:00 on 21 Jul 2025.
Nearest town: 9.56 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound between junctions J11 (Brighton) and J10A (Crawley) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 14 Jun 2025 to 16 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 21 Jun 2025 to 23 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 12 Jul 2025 to 14 Jul 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 19 Jul 2025 to 21 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.56 miles from Lingfield.
ROAD WORKS
Location: The M23 northbound at junction J11 (Brighton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 14 Jun 2025 to 16 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 21 Jun 2025 to 23 Jun 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 12 Jul 2025 to 14 Jul 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 19 Jul 2025 to 21 Jul 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.77 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound between junctions J10 (Crawley) and J11 (Brighton) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 5 Jul 2025 to 06:00 on 4 Aug 2025.
Nearest town: 5.87 miles from Lingfield.
ROAD WORKS
Location: The M23 southbound between junctions J10 (Crawley) and J11 (Brighton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Jul 2025 to 7 Jul 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Jul 2025 to 28 Jul 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 2 Aug 2025 to 4 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 5.87 miles from Lingfield.

Traffic in Nearby Villages

Lingfield


Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone, tablet or any electronic device without a hands-free kit whilst driving. If you're caught by the police using any device that can send or receive data whilst driving or riding a motorcyle you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web:

National Highways TrafficNational Highways England

Official source of traffic updates.

Transport for LondonTransport for London (TFL)

Transport for London's (TfL) portal for transportation in London.

Traffic WalesTraffic Wales

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .

Lane Closures : Lane one is closed.

Due to: Vehicle tyre change.



Time To Clear : The event is expected to clear between 19:45 and 20:00 on 19 May 2025.

Normal traffic conditions are expected between 19:45 and 20:00 on 19 May 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 7.57 miles from Lingfield.

51.27-0.03

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 19:45 and 20:00 on 19 May 2025.

Normal traffic conditions are expected between 19:45 and 20:00 on 19 May 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 8.47 miles from Lingfield.

51.28-0.07

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 15:45 and 16:00 on 19 May 2025.

Normal traffic conditions are expected between 15:45 and 16:00 on 19 May 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 8.1 miles from Lingfield.

51.27-0.06

Location: southbound between junctions J9 (Gatwick Airport) and J10 (Crawley) .

Due to: Debris on the carriageway.



Time To Clear : The event is expected to clear between 15:15 and 15:30 on 19 May 2025.

Normal traffic conditions are expected between 15:15 and 15:30 on 19 May 2025.

Lanes Closed : There are lane closures.
Nearest town: 5.5 miles from Lingfield.

51.14--0.14

Location: southbound exit slip at junction J10 (Crawley) .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 14:30 and 14:45 on 19 May 2025.

Normal traffic conditions are expected between 14:30 and 14:45 on 19 May 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 5.8 miles from Lingfield.

51.13--0.14

Leatherhead Road (Northbound).

Traffic is moving well.

Traffic is moving well.
Nearest town: 17.86 miles from Lingfield.

51.34--0.32

Tolworth Rise North (Northbound) - Lane restriction on on-slip to northbound A3 at the junction of Fairmead due to emergency gas works.

Restrictions have been removed.

All lanes open.
Nearest town: 18.67 miles from Lingfield.

51.38--0.28

Sydenham Road (Both Directions) at the junction of Larkbere Road - Reports of an accident at this location.

Traffic is flowing well.
Nearest town: 18.03 miles from Lingfield.

51.43--0.04

Dulwich Common (Both Directions) at the junction of Ryecotes Mead - All lanes are now open.

All lanes are now open.

Traffic is flowing well in the area.
Nearest town: 19.3 miles from Lingfield.

51.44--0.08

High Street (All Directions) at the junction of Homefield Rise - Temporary Traffic Signals to facilitate works Traffic is moving well.
Nearest town: 15.27 miles from Lingfield.

51.38-0.1

Bromley Common (Southbound) at the junction of Johnson Road - Road now reopened.

Traffic is moving well.
Nearest town: 15.58 miles from Lingfield.

51.39-0.03

Burlington Road between High Street and Malden Way (Kingston By Pass) - road is closed due to a fire.

Traffic is flowing well.
Nearest town: 18.83 miles from Lingfield.

51.4--0.24

Sanderstead Hill (Both Directions) at the junction of Sundown Avenue - Possible lane closures because of a collision.

The road has reopened.
Nearest town: 12.13 miles from Lingfield.

51.34--0.08

Bromley Common (Southbound) at the junction of Crown Lane - There is a collision at this location.

The southbound carriageway is blocked due a collision.

Police are directing traffic.

Expect delays
Nearest town: 15.57 miles from Lingfield.

51.39-0.04

High Street (Both Directions) at the junction of Cambridge Road - 2-way temporary traffic signals in operation to facilitate new gas connection now removed.

Traffic is moving well.
Nearest town: 19.27 miles from Lingfield.

51.4--0.26

Purley Way (Northbound) between Whitestone Way and Commerce Way - Lane closure for BT works.


Nearest town: 15.02 miles from Lingfield.

51.37--0.12

On Tolworth Broadway (Southbound) at the junction with A3 Tolworth Roundabout, there is a broken down vehicle blocking lane two of three).

Approach with caution.

All lanes have reopened.

Traffic is flowing well.
Nearest town: 18.61 miles from Lingfield.

51.38--0.28

Norwood Road (Southbound) at the junction of Robson Road - Waterworks completed.

Traffic is moving well.
Nearest town: 18.8 miles from Lingfield.

51.43--0.1

Middleton Road (Both Directions) between Bishopsford Road and St Helier Avenue - road closure to facilitate carriageway resurfacing.

Local diversion in place.


Nearest town: 16.94 miles from Lingfield.

51.39--0.18

Trinity Road (Both Directions) at the junction of Eatonville Road - Temporary traffic signals will be in place to facilitate water works.


Nearest town: 19.82 miles from Lingfield.

51.44--0.16

Purley Way (Northbound) between Whitestone Way and Commerce Way - Lane restrictions to facilitate carriageway chamber access works for new connections.

(Night works only)
Nearest town: 14.94 miles from Lingfield.

51.37--0.12

Sidcup By-pass Road (Eastbound) at the junction of Crittlls Corner - The A20 will be closed between Crittalls Corner and the M25 J3 for overnight works.


Nearest town: 17.92 miles from Lingfield.

51.41-0.11

Station Road (All Directions)at the junction of Longlands Road will have various road closures in place for the duration of the works.


Nearest town: 19.07 miles from Lingfield.

51.43-0.1

Balham Station Road (Both Directions) between Bedford Hill and Balham High Road - Road closed to facilitate carriageway resurfacing.

Use other routes.
Nearest town: 19.86 miles from Lingfield.

51.44--0.15

Bromley Road (All Directions) at the junction of Beckenham Hill Road - Temporary Traffic Signals in operation to facilitate works
Nearest town: 18.01 miles from Lingfield.

51.43--0.01

Greyhound Lane (Both Directions) at the junction of Streatham High Road - 2 way temporary traffic signals in operation to facilitate carriageway resurfacing.


Nearest town: 18.29 miles from Lingfield.

51.42--0.13

Farnborough Common (Both Directions) at the junction of Hilda Vale Road - Temporary signals in operation to facilitate resurfacing works.


Nearest town: 13.93 miles from Lingfield.

51.36-0.06

Beckenham Grove (Both Directions) between Scott's Lane and Shortlands Road - road closure to facilitate carriageway resurfacing.

Use other route.
Nearest town: 16.47 miles from Lingfield.

51.4--0.01

High Street (All Directions) at the junction of Grosvenor Road - two way temporary traffic signals will be in operation to facilitate gas works.

There are no restrictions in place at the present time.

Traffic is flowing normally.
Nearest town: 14.49 miles from Lingfield.

51.38--0.02

Location: northbound between the junctions with the M23 and the A237 .

Due to: Congestion.



Normal traffic conditions are expected between 18:30 and 18:45 on 19 May 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.07 miles from Lingfield.

51.28--0.16

Location: northbound between the junctions with the M23 and the A237 .

Due to: Congestion.



Normal traffic conditions are expected between 17:45 and 18:00 on 19 May 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.07 miles from Lingfield.

51.28--0.16

Location: northbound between the junctions with the M23 and the A237 .

Due to: Congestion.



Normal traffic conditions are expected between 16:45 and 17:00 on 19 May 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.07 miles from Lingfield.

51.28--0.16

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 19 May 2025 to 05:00 on 20 May 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.14 miles from Lingfield.

51.19--0.13

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 16:00 on 19 May 2025.
Nearest town: 19 miles from Lingfield.

51.31--0.4

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 19 May 2025 to 05:30 on 22 May 2025.
Nearest town: 19.92 miles from Lingfield.

51.31--0.42

Location: northbound between the junctions with the A262 and the A228 .

Lane Closures : Lane one will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.73 miles from Lingfield.

51.14-0.34

Location: anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 19 May 2025 to 05:30 on 22 May 2025.
Nearest town: 6.72 miles from Lingfield.

51.26--0.07

Location: eastbound between junctions J1 and J3 (Sevenoaks) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 19 May 2025 to 05:00 on 20 May 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.91 miles from Lingfield.

51.35-0.27

Location: eastbound exit slip at junction J2 (Paddock Wood) .

Lane Closures : Lane one will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 19 May 2025 to 05:00 on 20 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.82 miles from Lingfield.

51.32-0.29

Location: clockwise entry slip at junction J9 (Leatherhead) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 19 May 2025 to 05:30 on 20 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.26 miles from Lingfield.

51.3--0.32

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.56 miles from Lingfield.

51.21--0.13

Location: southbound entry slip from the A2300 .

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from Lingfield.

50.97--0.19

Location: southbound at junction J10 (Crawley) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.75 miles from Lingfield.

51.14--0.14

Location: southbound exit slip at junction J10 (Crawley) .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.75 miles from Lingfield.

51.14--0.14

Location: clockwise exit slip at junction J3 (Maidstone) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 May 2025 to 05:30 on 21 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.64 miles from Lingfield.

51.4-0.2

Location: clockwise at junction J3 (Maidstone) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 May 2025 to 05:30 on 21 May 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.64 miles from Lingfield.

51.4-0.2

Location: clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 May 2025 to 05:30 on 21 May 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.51 miles from Lingfield.

51.41-0.21

Location: northbound.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 20 May 2025 to 22 May 2025.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 27 May 2025 to 30 May 2025.

Schedule : From 09:00 on 5 June 2025 to 16:00 on 5 June 2025.
Nearest town: 12.84 miles from Lingfield.

51.02--0.2

Location: southbound.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 20 May 2025 to 22 May 2025.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 27 May 2025 to 30 May 2025.

Schedule : From 09:00 on 5 June 2025 to 16:00 on 5 June 2025.
Nearest town: 12.77 miles from Lingfield.

51.02--0.2

Location: northbound between the A228 and the junction with the A26 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2025 to 20 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 July 2025 to 27 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.89 miles from Lingfield.

51.15-0.3

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2025 to 20 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 July 2025 to 27 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.84 miles from Lingfield.

51.16-0.3

Location: northbound between the A26 and the junction with the A25 West.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2025 to 20 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 July 2025 to 27 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.02 miles from Lingfield.

51.18-0.28

Location: northbound exit slip to the A225 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2025 to 20 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 July 2025 to 27 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.01 miles from Lingfield.

51.24-0.21

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2025 to 20 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 July 2025 to 27 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.96 miles from Lingfield.

51.16-0.31

Location: northbound exit slip to the A26 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2025 to 20 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 July 2025 to 27 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13 miles from Lingfield.

51.18-0.28

Location: northbound entry slip from the A26 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2025 to 20 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 July 2025 to 27 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.1 miles from Lingfield.

51.18-0.26

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 June 2025 to 20 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 July 2025 to 27 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.12 miles from Lingfield.

51.18-0.26

Location: northbound between the junctions with the A244 and the A309 .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 22 May 2025 to 05:30 on 23 May 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.07 miles from Lingfield.

51.37--0.32

Location: westbound between junctions J3 (Sevenoaks) and J1 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 22 May 2025 to 05:00 on 23 May 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.23 miles from Lingfield.

51.31-0.3

Location: northbound between the A244 and the junction with the A309 .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 22 May 2025 to 05:30 on 23 May 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.89 miles from Lingfield.

51.36--0.32

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 22 May 2025 to 05:00 on 23 May 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.19 miles from Lingfield.

51.29-0.12

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 22 May 2025 to 05:30 on 23 May 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 6.84 miles from Lingfield.

51.24--0.12

Location: northbound at junction J8 (Reigate) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 22 May 2025 to 05:30 on 23 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 7.93 miles from Lingfield.

51.26--0.13

Location: southbound between the junctions with the A25 and the A225 .

Lane Closures : Lane two will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.59 miles from Lingfield.

51.27-0.17

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.92 miles from Lingfield.

51.31--0.42

Location: eastbound between the M25 and junction J2A .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 21 May 2025 to 23 May 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.03 miles from Lingfield.

51.3-0.31

Location: eastbound entry slip at junction J2A .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 21 May 2025 to 23 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.89 miles from Lingfield.

51.3-0.34

Location: eastbound between junctions J2A and J3 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 21 May 2025 to 23 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.46 miles from Lingfield.

51.3-0.33

Location: westbound entry slip at junction J2 (Paddock Wood) .

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 21 May 2025 to 05:00 on 22 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.49 miles from Lingfield.

51.31-0.32

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 21 May 2025 to 05:30 on 22 May 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 6.36 miles from Lingfield.

51.23--0.12

Location: westbound between junctions J3 (Sevenoaks) and J1 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 21 May 2025 to 05:00 on 22 May 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.74 miles from Lingfield.

51.31-0.35

Location: northbound at junction J8 (Reigate) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 21 May 2025 to 05:30 on 22 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 7.93 miles from Lingfield.

51.26--0.13

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 6.5 miles from Lingfield.

51.24--0.12

Location: northbound between the A225 and the junction with the M25 after A25 east exit.

Lane Closures : Lane two will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.48 miles from Lingfield.

51.26-0.17

Location: southbound between the M25 and the junction with the A225 .

Lane Closures : Lane two will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.82 miles from Lingfield.

51.29-0.14

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.67 miles from Lingfield.

51--0.2

Location: anticlockwise between junctions J9 (Leatherhead) and J7 (Gatwick) .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 20 May 2025 to 22 May 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.96 miles from Lingfield.

51.26--0.22

Location: anticlockwise entry slip at junction J8 (Reigate) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 20 May 2025 to 22 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.1 miles from Lingfield.

51.26--0.2

Location: eastbound between junctions J1 and J3 (Sevenoaks) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 20 May 2025 to 05:00 on 21 May 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.69 miles from Lingfield.

51.32-0.28

Location: eastbound exit slip at junction J2 (Paddock Wood) .

Lane Closures : Lane one will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 20 May 2025 to 05:00 on 21 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.8 miles from Lingfield.

51.32-0.29

Location: northbound.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.83 miles from Lingfield.

50.92--0.19

Location: southbound between junctions J9 (Gatwick Airport) and J10 (Crawley) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.28 miles from Lingfield.

51.15--0.14

Location: northbound between junctions J11 (Brighton) and J10 (Crawley) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 20 May 2025 to 06:00 on 7 June 2025.
Nearest town: 9.56 miles from Lingfield.

51.09--0.2

Location: northbound between junctions J11 (Brighton) and J10 (Crawley) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.56 miles from Lingfield.

51.09--0.2

Location: northbound between the A272 and the junction with the A264 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 20 May 2025 to 06:00 on 7 June 2025.
Nearest town: 10.25 miles from Lingfield.

51.08--0.2

Location: northbound exit slip to the A264 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.86 miles from Lingfield.

51.08--0.2

Location: southbound at junction J10 (Crawley) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 5.75 miles from Lingfield.

51.14--0.14

Location: northbound at junction J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.77 miles from Lingfield.

51.08--0.2

Location: northbound entry slip at junction J10A (Crawley) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 6.91 miles from Lingfield.

51.11--0.14

Location: northbound between the junctions with the A272 and the M23 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.86 miles from Lingfield.

51.08--0.2

Location: northbound between the junctions with the A272 and the M23 .

Lane Closures : Lane three will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.25 miles from Lingfield.

51.08--0.2

Location: southbound between junctions J9 (Gatwick Airport) and J11 (Brighton) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 20 May 2025 to 06:00 on 7 June 2025.
Nearest town: 5.28 miles from Lingfield.

51.15--0.14

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 5.87 miles from Lingfield.

51.13--0.14

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.81 miles from Lingfield.

51.08--0.2

Location: anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:30 on 20 May 2025 to 16:00 on 20 May 2025.
Nearest town: 19.11 miles from Lingfield.

51.4-0.21

Location: anticlockwise at junction J6 (East Grinstead) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.72 miles from Lingfield.

51.26--0.07

Location: anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.59 miles from Lingfield.

51.26--0.06

Location: anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.97 miles from Lingfield.

51.27-0.06

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.08 miles from Lingfield.

51.27--0.01

Location: westbound between junctions J3 (Sevenoaks) and J1 .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.25 miles from Lingfield.

51.38-0.22

Location: westbound between the M25 and the junction with the A223 .

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.77 miles from Lingfield.

51.39-0.19

Location: westbound at junction J1 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 19 May 2025 to 22 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.92 miles from Lingfield.

51.39-0.21

Location: southbound exit slip to the A225 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 19 May 2025 to 22 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.97 miles from Lingfield.

51.24-0.21

Location: northbound exit slip to the A225 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 19 May 2025 to 22 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.01 miles from Lingfield.

51.24-0.21

Location: northbound.

Due to: Road repairs.



Period : expect disruption until 16:00 on 19 May 2025.
Nearest town: 12.84 miles from Lingfield.

51.02--0.2

Location: southbound.

Due to: Road repairs.



Period : expect disruption until 16:00 on 19 May 2025.
Nearest town: 12.77 miles from Lingfield.

51.02--0.2

Location: northbound.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 20 May 2025 to 21 May 2025.
Nearest town: 12.84 miles from Lingfield.

51.02--0.2

Location: southbound.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 20 May 2025 to 21 May 2025.
Nearest town: 12.77 miles from Lingfield.

51.02--0.2

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 22 May 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.87 miles from Lingfield.

51.18--0.13

Location: southbound at junction J10 (Crawley) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 July 2025 to 7 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 July 2025 to 28 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 5.75 miles from Lingfield.

51.14--0.14

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 14 June 2025 to 06:00 on 21 July 2025.
Nearest town: 9.56 miles from Lingfield.

51.09--0.2

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 June 2025 to 16 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 July 2025 to 14 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.56 miles from Lingfield.

51.09--0.2

Location: northbound at junction J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 June 2025 to 16 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 July 2025 to 14 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.77 miles from Lingfield.

51.08--0.2

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 5 July 2025 to 06:00 on 4 August 2025.
Nearest town: 5.87 miles from Lingfield.

51.13--0.14

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 July 2025 to 7 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 July 2025 to 28 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 5.87 miles from Lingfield.

51.13--0.14

Location: northbound between the junctions with the A272 and the M23 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 June 2025 to 16 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 June 2025 to 23 June 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 July 2025 to 14 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 July 2025 to 21 July 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.86 miles from Lingfield.

51.08--0.2

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 5 July 2025 to 06:00 on 4 August 2025.
Nearest town: 9.81 miles from Lingfield.

51.08--0.2

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 July 2025 to 7 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 July 2025 to 28 July 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.81 miles from Lingfield.

51.08--0.2

Location: southbound exit slip to the A26 .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 10:00 on 22 May 2025 to 13:00 on 22 May 2025.

Schedule : From 10:00 on 30 May 2025 to 13:00 on 30 May 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.85 miles from Lingfield.

51.18-0.28

Location: southbound between the A225 and the junction with the A26 Tonbridge East.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 10:00 on 22 May 2025 to 13:00 on 22 May 2025.

Schedule : From 10:00 on 30 May 2025 to 13:00 on 30 May 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.01 miles from Lingfield.

51.19-0.23

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 20 May 2025 to 22 May 2025.
Nearest town: 18 miles from Lingfield.

51.31--0.36

Location: southbound at junction J10 (Crawley) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.

Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.

Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 5.75 miles from Lingfield.

51.14--0.14

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.56 miles from Lingfield.

51.09--0.2

Location: northbound at junction J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.77 miles from Lingfield.

51.08--0.2

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.

Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.

Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 5.87 miles from Lingfield.

51.13--0.14

Location: northbound between the junctions with the A272 and the M23 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.86 miles from Lingfield.

51.08--0.2

Location: southbound between the junctions with the M23 and the A272 .

Lane Closures : Lane three will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.13 miles from Lingfield.

51.08--0.2

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 6 October 2025.

Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.

Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.81 miles from Lingfield.

51.08--0.2

Location: northbound.

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 16 June 2025 to 06:00 on 27 July 2025.
Nearest town: 13 miles from Lingfield.

51.18-0.28

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 12 December 2025.
Nearest town: 9.56 miles from Lingfield.

51.09--0.2

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 16 December 2025.
Nearest town: 5.87 miles from Lingfield.

51.13--0.14

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 5 October 2025 to 06:00 on 16 December 2025.
Nearest town: 9.81 miles from Lingfield.

51.08--0.2