Location: southbound between junctions J9 (Wednesbury) and J8 (Birmingham) .
Due to: Broken down vehicle.
Status : Cleared.
Nearest town: 10.13 miles from Gunstone.

Location: southbound between junctions J13 (Stafford) and J12 (Telford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.96 miles from Gunstone.

Location: southbound between junctions J3 (Kidderminster) and J4 (Bromsgrove) .
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Nearest town: 16.83 miles from Gunstone.

Location: southbound entry slip at junction J7 (Birmingham) .
Due to: Congestion.
Normal traffic conditions are expected between 12:30 and 12:45 on 28 April 2026.
Nearest town: 12.37 miles from Gunstone.

Location: southbound at junction J8 (Birmingham) .
Due to: Congestion.
Normal traffic conditions are expected between 12:30 and 12:45 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.9 miles from Gunstone.

Location: slip road to the M6 northbound .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.16 miles from Gunstone.

Location: northbound at junction J9 (Wednesbury) .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.23 miles from Gunstone.

Location: southbound entry slip at junction J10 (Walsall) .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 28 April 2026.
Nearest town: 8.28 miles from Gunstone.

Location: southbound between the A5195 and the junction with the A461 .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.47 miles from Gunstone.

Location: northbound exit slip at junction J1 (West Bromwich) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.47 miles from Gunstone.

Location: eastbound exit slip at junction J1 (Cannock) .
Due to: Congestion.
Normal traffic conditions are expected between 09:45 and 10:00 on 28 April 2026.
Nearest town: 4.31 miles from Gunstone.

Location: northbound at junction J8 (Birmingham) .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.2 miles from Gunstone.

Location: southbound between the junctions with the A461 and the A5127 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.94 miles from Gunstone.

Location: southbound exit slip at junction J2 (Dudley) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 28 April 2026.
Nearest town: 12.15 miles from Gunstone.

Location: northbound between junctions J5 (Birmingham) and J6 (Birmingham) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.75 miles from Gunstone.

Location: southbound entry slip at junction J9 (Wednesbury) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 28 April 2026.
Nearest town: 9.33 miles from Gunstone.

Location: slip road to the M6 northbound .
Due to: Congestion.
Normal traffic conditions are expected between 10:30 and 10:45 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.16 miles from Gunstone.

Location: southbound between junctions J11 (Cannock) and J10 (Walsall) .
Due to: Congestion.
Normal traffic conditions are expected between 10:00 and 10:15 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Earlier
Due to: Caused by the earlier broken down vehicle.
Nearest town: 8.11 miles from Gunstone.

Location: southbound entry slip at junction J8 (Birmingham) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.42 miles from Gunstone.

Location: northbound exit slip to the A453 .
Due to: Congestion.
Normal traffic conditions are expected between 07:30 and 07:45 on 28 April 2026.
Nearest town: 19.71 miles from Gunstone.

Location: southbound entry slip at junction J8 (Birmingham) .
Due to: Congestion.
Normal traffic conditions are expected between 07:30 and 07:45 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.42 miles from Gunstone.

Location: southbound at junction J8 (Birmingham) .
Due to: Congestion.
Normal traffic conditions are expected between 07:30 and 07:45 on 28 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.44 miles from Gunstone.

Location: westbound between junctions J2 (Wolverhampton) and J3 (Wolverhampton W) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.67 miles from Gunstone.

Location: eastbound between junction J1 (Cannock) and the M6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.73 miles from Gunstone.

Location: southbound between junctions J11 (Cannock) and J10 (Walsall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.94 miles from Gunstone.

Location: southbound between junctions J11 (Cannock) and J10 (Walsall) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Nearest town: 5.94 miles from Gunstone.

Location: southbound at junction J10 (Walsall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.11 miles from Gunstone.

Location: northbound exit slip at Hilton Park Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.82 miles from Gunstone.

Location: northbound entry slip at Hilton Park Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.72 miles from Gunstone.

Location: southbound between the A5195 and the junction with the A5127 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 6 May 2026.
Nearest town: 13.06 miles from Gunstone.

Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Nearest town: 7.01 miles from Gunstone.

Location: northbound between junctions J10A (Wolverhampton) and J11 (Cannock) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.1 miles from Gunstone.

Location: northbound exit slip at junction J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.68 miles from Gunstone.

Location: southbound between junctions J14 (Stafford) and J13 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.4 miles from Gunstone.

Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.01 miles from Gunstone.

Location: southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 2 May 2026.
Nearest town: 14.03 miles from Gunstone.

Location: eastbound between junctions J4 (Telford E) and J3 (Wolverhampton W) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.57 miles from Gunstone.

Location: southbound exit slip to the A5127 .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 22 December 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.59 miles from Gunstone.

Location: northbound between junctions J5 (Birmingham) and J7 (Birmingham) .
Due to: Roadworks scheme.
Period : from 00:30 on 24 April 2026 to 06:00 on 13 June 2026.
Nearest town: 17.54 miles from Gunstone.

Location: southbound between junctions J8 (Birmingham) and J6 (Birmingham) .
Due to: Roadworks scheme.
Period : from 21:00 on 24 April 2026 to 06:00 on 13 June 2026.
Nearest town: 11.4 miles from Gunstone.

Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 11 July 2026.
Nearest town: 19.85 miles from Gunstone.

Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:30 from 5 May 2026 to 8 May 2026.
Schedule : Expect disruption everyday between 09:00 and 17:30 from 11 May 2026 to 15 May 2026.
Schedule : Expect disruption everyday between 09:00 and 17:30 from 18 May 2026 to 22 May 2026.
Schedule : Expect disruption everyday between 09:00 and 17:30 from 25 May 2026 to 29 May 2026.
Nearest town: 18.96 miles from Gunstone.

Location: northbound between junctions J14 (Stafford) and J15 (Stoke on Trent) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:30 from 5 May 2026 to 8 May 2026.
Schedule : Expect disruption everyday between 09:00 and 17:30 from 11 May 2026 to 15 May 2026.
Schedule : Expect disruption everyday between 09:00 and 17:30 from 18 May 2026 to 22 May 2026.
Schedule : Expect disruption everyday between 09:00 and 17:30 from 25 May 2026 to 29 May 2026.
Nearest town: 18.69 miles from Gunstone.

Location: northbound at junction T8 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2026 to 1 May 2026.
Schedule : From 21:00 on 19 May 2026 to 06:00 on 20 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.14 miles from Gunstone.

Location: northbound at junction J11A (Lichfield) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2026 to 1 May 2026.
Schedule : From 21:00 on 19 May 2026 to 06:00 on 20 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.6 miles from Gunstone.

Location: northbound exit slip at junction J11 (Cannock) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2026 to 1 May 2026.
Schedule : From 21:00 on 19 May 2026 to 06:00 on 20 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.68 miles from Gunstone.

Location: northbound between junctions J10A (Wolverhampton) and J11 (Cannock) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2026 to 1 May 2026.
Schedule : From 21:00 on 19 May 2026 to 06:00 on 20 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.79 miles from Gunstone.

Location: northbound between junctions T7 and T8 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2026 to 1 May 2026.
Schedule : From 21:00 on 19 May 2026 to 06:00 on 20 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.79 miles from Gunstone.

Location: northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.85 miles from Gunstone.

Location: northbound entry slip at junction J4 (Bromsgrove) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.64 miles from Gunstone.

Location: northbound exit slip at Frankley Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.06 miles from Gunstone.

Location: northbound entry slip at Frankley Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.84 miles from Gunstone.

Location: northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.85 miles from Gunstone.

Location: northbound exit slip at junction J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.91 miles from Gunstone.

Location: westbound exit slip at junction J1 (Cannock) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2026 to 06:00 on 2 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.87 miles from Gunstone.

Location: westbound between the M6 and junction J1 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2026 to 06:00 on 2 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.1 miles from Gunstone.

Location: northbound between junctions J6 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 30 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 7 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2026 to 13 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.08 miles from Gunstone.

Location: southbound between junctions J8 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 7 May 2026.
Schedule : From 23:59 on 7 May 2026 to 06:00 on 8 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2026 to 13 June 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.4 miles from Gunstone.

Location: southbound entry slip at junction J8 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2026 to 13 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.54 miles from Gunstone.

Location: northbound between junctions J5 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2026 to 16 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 May 2026 to 22 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 May 2026 to 30 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.54 miles from Gunstone.

Location: southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2026 to 06:00 on 8 May 2026.
Schedule : From 21:00 on 21 May 2026 to 06:00 on 22 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 May 2026 to 30 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 June 2026 to 5 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.27 miles from Gunstone.

Location: northbound between junctions T7 and T8 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 20 May 2026.
Nearest town: 7.79 miles from Gunstone.

Location: northbound between junctions J10A (Wolverhampton) and J11A (Lichfield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 20 May 2026.
Nearest town: 5.79 miles from Gunstone.

Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.24 miles from Gunstone.

Location: eastbound between junctions J2 (Wolverhampton) and J1 (Cannock) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.62 miles from Gunstone.

Location: eastbound between junction J2 (Wolverhampton) and the M6 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.17 miles from Gunstone.

Location: eastbound entry slip at junction J2 (Wolverhampton) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.89 miles from Gunstone.

Location: eastbound between junctions J2 (Wolverhampton) and J1 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.23 miles from Gunstone.

Location: eastbound entry slip at junction J1 (Cannock) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.54 miles from Gunstone.

Location: eastbound exit slip at junction J1 (Cannock) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.2 miles from Gunstone.

Location: southbound between the junctions with the A49 East of Shrewsbury and the M54 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.81 miles from Gunstone.

Location: eastbound between junctions J3 (Wolverhampton W) and J2 (Wolverhampton) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.65 miles from Gunstone.

Location: southbound between the A461 and the junction with the A5127 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : From 21:00 on 5 May 2026 to 06:00 on 6 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.19 miles from Gunstone.

Location: southbound between the junctions with the A5195 and the A461 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : From 21:00 on 5 May 2026 to 06:00 on 6 May 2026.
Nearest town: 13.06 miles from Gunstone.

Location: northbound between the junctions with the A461 and the A5195 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : From 21:00 on 5 May 2026 to 06:00 on 6 May 2026.
Nearest town: 13.14 miles from Gunstone.

Location: northbound between junctions J4 (Bromsgrove) and J1 (West Bromwich) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 30 April 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.39 miles from Gunstone.

Location: southbound exit slip at junction J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.58 miles from Gunstone.

Location: southbound at junction J2 (Dudley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.12 miles from Gunstone.

Location: southbound between junctions J2 (Dudley) and J3 (Kidderminster) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2026 to 05:00 on 28 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.22 miles from Gunstone.

Location: southbound between junctions J1 (West Bromwich) and J2 (Dudley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 30 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.01 miles from Gunstone.

Location: northbound between junctions J6 (Birmingham) and J7 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 May 2026 to 06:00 on 27 May 2026.
Nearest town: 14.29 miles from Gunstone.

Location: southbound between junctions J6 (Birmingham) and J4A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2026 to 16 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.62 miles from Gunstone.

Location: southbound between the junctions with the A513 and the A5192 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 29 May 2027.
Lanes Closed : All lanes will be closed.
Nearest town: 18.23 miles from Gunstone.

Location: northbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.17 miles from Gunstone.

Location: northbound between the A5148 and the junction with the A513 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.91 miles from Gunstone.

Location: northbound entry slip from the A5127 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.41 miles from Gunstone.

Location: southbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 29 May 2027.
Lanes Closed : All lanes will be closed.
Nearest town: 18.22 miles from Gunstone.

Location: northbound exit slip to the A453 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 April 2026 to 06:00 on 21 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2026 to 13 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.84 miles from Gunstone.

Location: southbound between the junctions with the A449 and the M6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 May 2026 to 9 May 2026.
Nearest town: 5.1 miles from Gunstone.

Location: northbound between the junctions with the M6 and the A449 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 May 2026 to 9 May 2026.
Nearest town: 5.17 miles from Gunstone.

Location: northbound exit slip at junction J6 (Birmingham) for A38(M) south.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 May 2026 to 05:00 on 8 May 2026.
Schedule : From 22:00 on 4 June 2026 to 05:00 on 5 June 2026.
Schedule : From 22:00 on 2 July 2026 to 05:00 on 3 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.29 miles from Gunstone.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 May 2026 to 05:00 on 8 May 2026.
Schedule : From 22:00 on 4 June 2026 to 05:00 on 5 June 2026.
Schedule : From 22:00 on 2 July 2026 to 05:00 on 3 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.14 miles from Gunstone.