Location: northbound between junctions J4 (Lichfield) and J4A .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 00:00 and 00:15 on 19 April 2024.
Normal traffic conditions are expected between 00:30 and 00:45 on 19 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.23 miles from Coven Heath.
Location: northbound at junction J11 (Cannock) .
Lane Closures : Lane one is closed.
Due to: Gantry construction.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.45 miles from Coven Heath.
Location: northbound at junction J11 (Cannock) .
Lane Closures : Lane one is closed.
Due to: Gantry construction.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 3.38 miles from Coven Heath.
Location: northbound between junctions J4 (Lichfield) and J4A .
Due to: Congestion.
Normal traffic conditions are expected between 23:15 and 23:30 on 18 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.3 miles from Coven Heath.
Location: southbound between junctions J11 (Cannock) and J10 (Walsall) .
Due to: Congestion.
Normal traffic conditions are expected between 21:45 and 22:00 on 18 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 4.84 miles from Coven Heath.
Location: southbound between junctions J10 (Walsall) and J8 (Birmingham) .
Due to: Roadworks.
Period : from 20:52 on 18 April 2024 to 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 6.25 miles from Coven Heath.
Location: northbound entry slip at junction from M5 North.
Due to: Roadworks.
Period : from 20:34 on 18 April 2024 to 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.68 miles from Coven Heath.
Location: southbound entry slip at junction J10 (Walsall) .
Due to: Roadworks.
Period : from 20:39 on 18 April 2024 to 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 6.1 miles from Coven Heath.
Location: slip road to the M5 southbound .
Due to: Roadworks.
Period : from 19:57 on 18 April 2024 to 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.62 miles from Coven Heath.
Location: northbound between the A34 and the junction with the A4601 .
Due to: Roadworks.
Period : from 19:55 on 18 April 2024 to 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 5.34 miles from Coven Heath.
Location: northbound between junctions J12 (Telford) and J13 (Stafford) .
Lane Closures : Lane one is closed.
Due to: Emergency Roadside Equipment Maintenance.
Period : expect disruption until 05:00 on 19 April 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 4.79 miles from Coven Heath.
Location: northbound exit slip at junction J10 (Walsall) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 19 April 2024.
Nearest town: 6.24 miles from Coven Heath.
Location: northbound between the A34 and the junction with the A4601 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 5.37 miles from Coven Heath.
Location: southbound between the A4601 and the junction with the A34 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 4.79 miles from Coven Heath.
Location: southbound exit slip at junction J13 (Stafford) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 06:00 on 20 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.19 miles from Coven Heath.
Location: northbound exit slip at junction J5 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 06:00 on 20 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.84 miles from Coven Heath.
Location: northbound between junctions J4 (Lichfield) and J6 (Birmingham) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 06:00 on 20 April 2024.
Nearest town: 17.19 miles from Coven Heath.
Location: northbound entry slip at junction J4 (Bromsgrove) .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.98 miles from Coven Heath.
Location: southbound between the junctions with the A461 and the A5127 .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.36 miles from Coven Heath.
Location: northbound between the junctions with the A38 and the A5127 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Nearest town: 12.7 miles from Coven Heath.
Location: southbound between the junctions with the A5127 and the A38 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Nearest town: 12.69 miles from Coven Heath.
Location: northbound between junctions J14 (Stafford) and J15 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 19.04 miles from Coven Heath.
Location: westbound between junctions J5 (Telford) and J7 (Wellington) .
Due to: Roadworks scheme.
Period : from 20:08 on 15 April 2024 to 06:00 on 27 April 2024.
Nearest town: 14.41 miles from Coven Heath.
Location: eastbound entry slip at junction J7 (Wellington) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.56 miles from Coven Heath.
Location: eastbound between junctions J7 (Wellington) and J6 (Telford W) .
Due to: Roadworks scheme.
Period : from 20:08 on 15 April 2024 to 06:00 on 20 April 2024.
Nearest town: 17.7 miles from Coven Heath.
Location: eastbound between junctions J7 (Wellington) and J6 (Telford W) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.7 miles from Coven Heath.
Location: eastbound exit slip at junction J6 (Telford W) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 15.54 miles from Coven Heath.
Location: southbound between the junctions with the A49 East of Shrewsbury and the M54 .
Due to: Roadworks scheme.
Period : from 20:08 on 15 April 2024 to 06:00 on 27 April 2024.
Nearest town: 18.41 miles from Coven Heath.
Location: southbound between the junctions with the A49 East of Shrewsbury and the M54 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.85 miles from Coven Heath.
Location: westbound entry slip at junction J3 (Wolverhampton W) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 06:00 on 22 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.13 miles from Coven Heath.
Location: westbound between junctions J3 (Wolverhampton W) and J4 (Telford E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 06:00 on 22 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.88 miles from Coven Heath.
Location: westbound exit slip at junction J4 (Telford E) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 06:00 on 22 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.53 miles from Coven Heath.
Location: northbound exit slip at junction J2 (Dudley) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 06:00 on 20 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.04 miles from Coven Heath.
Location: southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 29 April 2024.
Nearest town: 12.2 miles from Coven Heath.
Location: northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 12.55 miles from Coven Heath.
Location: northbound exit slip to the A453 .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.36 miles from Coven Heath.
Location: northbound entry slip from the A453 .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 16.6 miles from Coven Heath.
Location: southbound exit slip to the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 05:30 on 20 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.06 miles from Coven Heath.
Location: southbound entry slip from the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 19 April 2024 to 05:30 on 20 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.15 miles from Coven Heath.
Location: northbound entry slip at junction from M5 North.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.92 miles from Coven Heath.
Location: northbound between the M5 and junction J1 (Bromsgrove) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.48 miles from Coven Heath.
Location: northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 December 2024.
Nearest town: 11.1 miles from Coven Heath.
Location: northbound between the A34 and the junction with the A4601 .
Due to: Roadworks scheme.
Period : from 20:13 on 18 April 2024 to 06:00 on 11 May 2024.
Nearest town: 5.37 miles from Coven Heath.
Location: southbound between the A4601 and the junction with the A34 .
Due to: Roadworks scheme.
Period : from 20:13 on 18 April 2024 to 06:00 on 11 May 2024.
Nearest town: 4.79 miles from Coven Heath.
Location: westbound between junctions J2 (Wolverhampton) and J3 (Wolverhampton W) .
Due to: Roadworks scheme.
Period : from 20:05 on 13 April 2024 to 06:00 on 25 April 2024.
Nearest town: 0.26 miles from Coven Heath.
Location: northbound exit slip at junction J5 (Birmingham) .
Due to: Roadworks scheme.
Period : from 20:04 on 6 April 2024 to 06:00 on 30 April 2024.
Nearest town: 16.84 miles from Coven Heath.
Location: northbound entry slip from the A5127 .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 05:30 on 25 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.01 miles from Coven Heath.
Location: northbound between the M5 and junction J1 (Bromsgrove) .
Due to: Roadworks scheme.
Period : from 20:08 on 8 April 2024 to 06:00 on 20 April 2024.
Nearest town: 19.92 miles from Coven Heath.
Location: westbound between junctions J3 (Wolverhampton W) and J4 (Telford E) .
Due to: Roadworks scheme.
Period : from 21:00 on 10 April 2024 to 06:00 on 22 April 2024.
Nearest town: 6.88 miles from Coven Heath.
Location: southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Due to: Roadworks scheme.
Period : from 20:00 on 2 April 2024 to 20:00 on 29 April 2024.
Nearest town: 19.51 miles from Coven Heath.
Location: southbound between junctions J9 (Wednesbury) and J8 (Birmingham) .
Due to: Roadworks scheme.
Period : from 21:00 on 18 April 2024 to 06:00 on 11 May 2024.
Nearest town: 7.21 miles from Coven Heath.
Location: northbound between junctions J8 (Birmingham) and J10 (Walsall) .
Due to: Roadworks scheme.
Period : from 21:00 on 18 April 2024 to 06:00 on 11 May 2024.
Nearest town: 11.18 miles from Coven Heath.
Location: southbound between junctions J6 (Birmingham) and J5 (Birmingham) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency roadworks.
Period : expect disruption until 23:39 on 31 December 2024.
Nearest town: 15.8 miles from Coven Heath.
Location: southbound between the A38 and the junction with the A453 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.88 miles from Coven Heath.
Location: northbound between the A453 and the junction with the A38 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.08 miles from Coven Heath.
Location: southbound exit slip to the A5127 .
Due to: Road repairs.
Period : expect disruption until 06:00 on 24 June 2024.
Lanes Closed : All lanes are closed.
Nearest town: 15.2 miles from Coven Heath.
Location: northbound between the junctions with the A453 and the A38 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 30 September 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.47 miles from Coven Heath.
Location: southbound between the junctions with the A38 and the A453 .
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 30 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14 miles from Coven Heath.
Location: southbound between the junctions with the A38 and the A453 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.44 miles from Coven Heath.
Location: northbound between the junctions with the A453 and the A38 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.91 miles from Coven Heath.
Location: northbound between the A5148 and the junction with the A513 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.66 miles from Coven Heath.
Location: southbound between the A38 and the junction with the A5 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.65 miles from Coven Heath.
Location: northbound between the A5 and the junction with the A38 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.27 miles from Coven Heath.
Location: southbound between the A513 and the junction with the A5148 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.97 miles from Coven Heath.
Location: northbound between the A5192 and the junction with the A513 .
Due to: Bridge repairs.
Period : expect disruption until 05:30 on 30 June 2024.
Nearest town: 15.02 miles from Coven Heath.
Location: southbound between the junctions with the A5195 and the A461 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 10.56 miles from Coven Heath.
Location: northbound between the junctions with the A4601 and the M6 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 4.3 miles from Coven Heath.
Location: northbound between the junctions with the A461 and the A5195 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 10.68 miles from Coven Heath.
Location: southbound between the junctions with the M6 and the A4601 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 4.29 miles from Coven Heath.
Location: northbound between the junctions with the A461 and the A5195 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 9.95 miles from Coven Heath.
Location: southbound between the junctions with the A5195 and the A461 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 9.9 miles from Coven Heath.
Location: southbound between junctions J2 (Dudley) and J3 (Kidderminster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 13.28 miles from Coven Heath.
Location: southbound between junctions J2 (Dudley) and J3 (Kidderminster) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 13.28 miles from Coven Heath.
Location: southbound exit slip at junction J3 (Kidderminster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 13.45 miles from Coven Heath.
Location: northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.34 miles from Coven Heath.
Location: eastbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.66 miles from Coven Heath.
Location: southbound between junctions J11 (Cannock) and J10 (Walsall) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 5.52 miles from Coven Heath.
Location: southbound between junctions J10 (Walsall) and J8 (Birmingham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 5.89 miles from Coven Heath.
Location: northbound between junctions J9 (Wednesbury) and J10 (Walsall) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 7.2 miles from Coven Heath.
Location: southbound entry slip at junction J9 (Wednesbury) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 7.21 miles from Coven Heath.
Location: northbound between junctions J8 (Birmingham) and J9 (Wednesbury) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Nearest town: 7.69 miles from Coven Heath.
Location: northbound exit slip at junction J9 (Wednesbury) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.39 miles from Coven Heath.
Location: northbound at junction J8 (Birmingham) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 9.2 miles from Coven Heath.
Location: southbound between the A34 and the junction with the A452 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.53 miles from Coven Heath.
Location: northbound between the A452 and the junction with the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.24 miles from Coven Heath.
Location: southbound between junctions J4 (Bromsgrove) and J4A (Birmingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.52 miles from Coven Heath.
Location: northbound entry slip at junction J13 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.04 miles from Coven Heath.
Location: northbound between junctions J13 (Stafford) and J14 (Stafford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 27 April 2024.
Nearest town: 9.04 miles from Coven Heath.
Location: northbound exit slip at junction J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.21 miles from Coven Heath.
Location: southbound between junctions J14 (Stafford) and J13 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.12 miles from Coven Heath.
Location: northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.35 miles from Coven Heath.
Location: southbound between junction J1 (Bromsgrove) and the M5 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 06:00 on 24 April 2024.
Nearest town: 19.59 miles from Coven Heath.
Location: slip road to the M5 northbound .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.51 miles from Coven Heath.
Location: southbound between junction J1 (Bromsgrove) and the M5 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.59 miles from Coven Heath.
Location: northbound between junctions J1 (Bromsgrove) and J2 (Birmingham S) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.87 miles from Coven Heath.
Location: northbound between junctions J2 (Dudley) and J1 (West Bromwich) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.63 miles from Coven Heath.
Location: southbound between junctions J1 (West Bromwich) and J2 (Dudley) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.68 miles from Coven Heath.
Location: northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 April 2024 to 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.55 miles from Coven Heath.
Location: northbound between junctions J6 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 21 April 2024 to 06:00 on 22 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.99 miles from Coven Heath.
Location: southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 21 April 2024 to 06:00 on 22 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.12 miles from Coven Heath.
Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:30 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.58 miles from Coven Heath.
Location: westbound entry slip at junction J4 (Telford E) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 05:30 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.87 miles from Coven Heath.
Location: eastbound between junctions J4 (Telford E) and J3 (Wolverhampton W) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 1 May 2024 to 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.15 miles from Coven Heath.
Location: westbound between junctions J3 (Wolverhampton W) and J4 (Telford E) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 29 April 2024 to 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.74 miles from Coven Heath.
Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2024 to 05:30 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.58 miles from Coven Heath.
Location: eastbound entry slip at junction J4 (Telford E) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2024 to 05:30 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.81 miles from Coven Heath.
Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 05:30 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.58 miles from Coven Heath.
Location: eastbound entry slip at junction J3 (Wolverhampton W) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 05:30 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.13 miles from Coven Heath.
Location: westbound entry slip at junction J3 (Wolverhampton W) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 05:30 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.13 miles from Coven Heath.
Location: westbound exit slip at junction J7 (Wellington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:30 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.29 miles from Coven Heath.
Location: eastbound exit slip at junction J4 (Telford E) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2024 to 05:30 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.07 miles from Coven Heath.
Location: westbound exit slip at junction J7 (Wellington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2024 to 05:30 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.29 miles from Coven Heath.
Location: westbound exit slip at junction J7 (Wellington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 05:30 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.29 miles from Coven Heath.
Location: eastbound exit slip at junction J3 (Wolverhampton W) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 05:30 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.38 miles from Coven Heath.
Location: westbound exit slip at junction J3 (Wolverhampton W) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 05:30 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.88 miles from Coven Heath.
Location: westbound exit slip at junction J4 (Telford E) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 05:30 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.53 miles from Coven Heath.
Location: eastbound entry slip at junction J2 (Wolverhampton) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:30 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 0.52 miles from Coven Heath.
Location: eastbound exit slip at junction J2 (Wolverhampton) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:30 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 0.42 miles from Coven Heath.
Location: southbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 3 May 2024.
Nearest town: 14.04 miles from Coven Heath.
Location: southbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.04 miles from Coven Heath.
Location: northbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 May 2024 to 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.04 miles from Coven Heath.
Location: southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 1 May 2024.
Schedule : From 21:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.12 miles from Coven Heath.
Location: southbound entry slip at junction J8 (Birmingham E) .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 03:00 on 20 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.01 miles from Coven Heath.
Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 03:00 on 20 April 2024 to 05:00 on 22 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.94 miles from Coven Heath.
Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 03:00 on 20 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.94 miles from Coven Heath.
Location: westbound between junctions J6 (Telford W) and J7 (Wellington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.04 miles from Coven Heath.
Location: westbound between junctions J5 (Telford) and J6 (Telford W) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 14.41 miles from Coven Heath.
Location: westbound exit slip at junction J7 (Wellington) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.29 miles from Coven Heath.
Location: westbound entry slip at junction J6 (Telford W) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.36 miles from Coven Heath.
Location: southbound between the junctions with the A49 East of Shrewsbury and the M54 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.41 miles from Coven Heath.
Location: northbound between the junctions with the M54 and the A49 East of Shrewsbury.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.73 miles from Coven Heath.
Location: eastbound entry slip at junction J4 (Telford E) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 6 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.81 miles from Coven Heath.
Location: eastbound between junctions J4 (Telford E) and J3 (Wolverhampton W) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 6 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.07 miles from Coven Heath.
Location: eastbound exit slip at junction J3 (Wolverhampton W) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 6 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.38 miles from Coven Heath.
Location: southbound entry slip from the A51 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 22 April 2024 to 05:30 on 23 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.02 miles from Coven Heath.
Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 05:30 on 24 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.24 miles from Coven Heath.
Location: southbound exit slip to the A51 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 22 April 2024 to 05:30 on 23 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.79 miles from Coven Heath.
Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2024 to 05:30 on 24 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.47 miles from Coven Heath.
Location: westbound between junctions J2 (Wolverhampton) and J3 (Wolverhampton W) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 25 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 0.26 miles from Coven Heath.
Location: westbound exit slip at junction J3 (Wolverhampton W) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 25 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.88 miles from Coven Heath.
Location: westbound between junctions J1 (Cannock) and J2 (Wolverhampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 25 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 1.47 miles from Coven Heath.
Location: southbound between junctions J4A and J4 (Lichfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.45 miles from Coven Heath.
Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 April 2024 to 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.07 miles from Coven Heath.
Location: northbound between junctions J4 (Lichfield) and J6 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 April 2024 to 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.68 miles from Coven Heath.
Location: northbound between junctions J4 (Lichfield) and J6 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18.95 miles from Coven Heath.
Location: northbound exit slip at junction J5 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 April 2024 to 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.84 miles from Coven Heath.
Location: eastbound between junctions J4 (Telford E) and J3 (Wolverhampton W) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 6 May 2024.
Nearest town: 12.07 miles from Coven Heath.
Location: southbound exit slip at junction J4A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 05:00 on 27 April 2024.
Schedule : From 21:00 on 31 May 2024 to 05:00 on 1 June 2024.
Schedule : From 21:00 on 28 June 2024 to 05:00 on 29 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.89 miles from Coven Heath.