Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Vehicle fire.
Time To Clear : The event is expected to clear between 11:15 and 11:30 on 14 March 2026.
Normal traffic conditions are expected between 11:15 and 11:30 on 14 March 2026.
Lanes Closed : There are two of four lanes closed.
Nearest town: 14.68 miles from Bowling Alley.

Location: westbound at junction J12 (Reading) .
Lane Closures : Lane three is closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 09:15 and 09:30 on 14 March 2026.
Normal traffic conditions are expected between 09:15 and 09:30 on 14 March 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 16.35 miles from Bowling Alley.

Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Due to: Congestion.
Normal traffic conditions are expected between 11:45 and 12:00 on 14 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.92 miles from Bowling Alley.

Location: anticlockwise entry slip at junction J12 (Basingstoke) .
Due to: Congestion.
Normal traffic conditions are expected between 12:15 and 12:30 on 14 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.46 miles from Bowling Alley.

Location: eastbound at junction J10 (Reading) .
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 14 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.69 miles from Bowling Alley.

Location: The A308M westbound between the junctions with the A308 and the M4 .
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 14 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.64 miles from Bowling Alley.

Location: southbound exit slip to the M25 .
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 14 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.21 miles from Bowling Alley.

Location: southbound.
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 20 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.91 miles from Bowling Alley.

Location: westbound between junctions J8 (High Wycombe) and J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.62 miles from Bowling Alley.

Location: westbound entry slip at junction J10 (Reading) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 13.59 miles from Bowling Alley.

Location: westbound entry slip at junction J10 (Reading) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 13.51 miles from Bowling Alley.

Location: westbound exit slip at junction J11 (Basingstoke) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 12.91 miles from Bowling Alley.

Location: northbound between the M25 and the junction with the A244 .
Due to: Roadworks scheme.
Period : from 22:03 on 9 March 2026 to 06:00 on 14 March 2026.
Nearest town: 18.95 miles from Bowling Alley.

Location: northbound between the M25 and the junction with the A244 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.95 miles from Bowling Alley.

Location: northbound between the junctions with the M25 and the A245 .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 19.44 miles from Bowling Alley.

Location: eastbound between the A34 and the junction with the M3 .
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.43 miles from Bowling Alley.

Location: westbound between junctions J8 (High Wycombe) and J11 (Basingstoke) .
Due to: Roadworks scheme.
Period : from 20:04 on 6 March 2026 to 06:00 on 15 March 2026.
Nearest town: 15.62 miles from Bowling Alley.

Location: westbound between junctions J6 (Basingstoke) and J7 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.8 miles from Bowling Alley.

Location: The A404M southbound exit slip at junction J9A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.68 miles from Bowling Alley.

Location: The A404M southbound exit slip at junction J9A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.68 miles from Bowling Alley.

Location: The A404M southbound entry slip at junction J9A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.79 miles from Bowling Alley.

Location: westbound exit slip at junction J7 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.27 miles from Bowling Alley.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.37 miles from Bowling Alley.

Location: westbound entry slip at junction J3 (Woking) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.64 miles from Bowling Alley.

Location: westbound at junction J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.07 miles from Bowling Alley.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.38 miles from Bowling Alley.

Location: westbound exit slip at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.92 miles from Bowling Alley.

Location: westbound between junctions J8 (High Wycombe) and J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.52 miles from Bowling Alley.

Location: eastbound exit slip at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.29 miles from Bowling Alley.

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.14 miles from Bowling Alley.

Location: eastbound at junction J7 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Nearest town: 12.29 miles from Bowling Alley.

Location: northbound between the A247 and the junction with the M25 .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.39 miles from Bowling Alley.

Location: northbound between the A272 Petersfield North and the junction with the A325 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.22 miles from Bowling Alley.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 25 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.77 miles from Bowling Alley.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 25 March 2026.
Nearest town: 10.78 miles from Bowling Alley.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 25 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.78 miles from Bowling Alley.

Location: southbound between the A3100 and the junction with the A322 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Nearest town: 13.58 miles from Bowling Alley.

Location: southbound between the A320 and the junction with the A322 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.07 miles from Bowling Alley.

Location: southbound between the junctions with the A3100 and the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.58 miles from Bowling Alley.

Location: northbound between the A325 and the junction with the A333 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 25 March 2026.
Nearest town: 10.71 miles from Bowling Alley.

Location: northbound between the A325 and the junction with the A333 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 25 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.71 miles from Bowling Alley.

Location: southbound between the A333 and the junction with the A325 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 25 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.76 miles from Bowling Alley.

Location: northbound entry slip from the A31 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 March 2026 to 06:00 on 28 March 2026.
Schedule : From 21:00 on 30 March 2026 to 06:00 on 31 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.62 miles from Bowling Alley.

Location: southbound between the A272 Petersfield South and the junction with the A3M .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.86 miles from Bowling Alley.

Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.55 miles from Bowling Alley.

Location: westbound between junctions J8 (High Wycombe) and J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.52 miles from Bowling Alley.

Location: westbound at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.92 miles from Bowling Alley.

Location: westbound at junction J12 (Reading) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 28 March 2026.
Nearest town: 16.19 miles from Bowling Alley.

Location: westbound entry slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 25 March 2026.
Schedule : From 21:00 on 27 March 2026 to 06:00 on 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.47 miles from Bowling Alley.

Location: westbound at junction J12 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Schedule : From 21:00 on 26 March 2026 to 06:00 on 27 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.19 miles from Bowling Alley.

Location: eastbound entry slip at junction J12 (Reading) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 28 March 2026.
Nearest town: 16.43 miles from Bowling Alley.

Location: eastbound entry slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.43 miles from Bowling Alley.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2026 to 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.11 miles from Bowling Alley.

Location: eastbound exit slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.71 miles from Bowling Alley.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.13 miles from Bowling Alley.

Location: eastbound at junction J8 (High Wycombe) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.16 miles from Bowling Alley.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Nearest town: 18.38 miles from Bowling Alley.

Location: eastbound exit slip at junction J8 (High Wycombe) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.16 miles from Bowling Alley.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.38 miles from Bowling Alley.

Location: northbound between the A322 and the junction with the A3100 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 24 March 2026 to 06:00 on 26 March 2026.
Nearest town: 12.63 miles from Bowling Alley.

Location: westbound between junctions J4A (Farnborough) and J5 (Hook) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 19 March 2026 to 16:00 on 19 March 2026.
Nearest town: 3.98 miles from Bowling Alley.

Location: eastbound between junctions J5 (Hook) and J4A (Farnborough) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 19 March 2026 to 16:00 on 19 March 2026.
Nearest town: 3.98 miles from Bowling Alley.

Location: southbound between the junctions with the A3100 and the A320 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.4 miles from Bowling Alley.

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 March 2026 to 20 March 2026.
Schedule : From 23:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 22:00 on 21 March 2026 to 06:00 on 22 March 2026.
Schedule : From 22:30 on 22 March 2026 to 05:30 on 23 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.26 miles from Bowling Alley.

Location: anticlockwise entry slip at junction J12 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 March 2026 to 20 March 2026.
Schedule : From 23:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 22:00 on 21 March 2026 to 06:00 on 22 March 2026.
Schedule : From 22:30 on 22 March 2026 to 05:30 on 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.24 miles from Bowling Alley.

Location: clockwise entry slip at junction J12 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 March 2026 to 20 March 2026.
Schedule : From 23:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 22:00 on 21 March 2026 to 06:00 on 22 March 2026.
Schedule : From 22:30 on 22 March 2026 to 05:30 on 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.96 miles from Bowling Alley.

Location: eastbound at junction J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 March 2026 to 20 March 2026.
Schedule : From 23:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 22:00 on 21 March 2026 to 06:00 on 22 March 2026.
Schedule : From 22:30 on 22 March 2026 to 05:30 on 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.96 miles from Bowling Alley.

Location: clockwise between junctions J12 (Basingstoke) and J13 (A30) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 March 2026 to 20 March 2026.
Schedule : From 23:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 19.61 miles from Bowling Alley.

Location: eastbound entry slip at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.74 miles from Bowling Alley.

Location: The A404M northbound exit slip at junction J9A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.72 miles from Bowling Alley.

Location: The A404M northbound exit slip at junction J9A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.72 miles from Bowling Alley.

Location: The A404M northbound entry slip at junction J9A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.59 miles from Bowling Alley.

Location: eastbound entry slip at junction J12 (Reading) .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.43 miles from Bowling Alley.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.05 miles from Bowling Alley.

Location: westbound between junctions J6 (Basingstoke) and J7 (Basingstoke) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.17 miles from Bowling Alley.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.4 miles from Bowling Alley.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.06 miles from Bowling Alley.

Location: eastbound entry slip at junction J8 (Andover) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.99 miles from Bowling Alley.

Location: eastbound between the junctions with the A34 and the M3 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.49 miles from Bowling Alley.

Location: eastbound between junctions J8 (High Wycombe) and J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2026 to 06:00 on 22 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.83 miles from Bowling Alley.

Location: eastbound entry slip at junction J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.59 miles from Bowling Alley.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 17 March 2026 to 05:30 on 18 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.32 miles from Bowling Alley.

Location: westbound entry slip at junction J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2026 to 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.64 miles from Bowling Alley.

Location: northbound between the A333 and the junction with the A31 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 13:47 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.2 miles from Bowling Alley.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2026 to 19 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.37 miles from Bowling Alley.

Location: southbound between the junctions with the A31 and the A283 Milford north.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 13:47 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.96 miles from Bowling Alley.

Location: northbound between the junctions with the A322 and the A3100 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 March 2026 to 06:00 on 25 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.94 miles from Bowling Alley.

Location: northbound between the junctions with the A322 and the A3100 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.94 miles from Bowling Alley.

Location: northbound between the junctions with the A322 and the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 March 2026 to 06:00 on 25 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.63 miles from Bowling Alley.

Location: northbound between the junctions with the A322 and the A320 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.63 miles from Bowling Alley.

Location: southbound between the junctions with the A3100 and the A320 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 24 March 2026 to 06:00 on 26 March 2026.
Nearest town: 13.54 miles from Bowling Alley.

Location: southbound between the junctions with the A3100 and the A320 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.54 miles from Bowling Alley.

Location: southbound between the junctions with the A3100 and the A320 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 March 2026 to 06:00 on 25 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.54 miles from Bowling Alley.

Location: anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 March 2026 to 20 March 2026.
Schedule : From 23:00 on 20 March 2026 to 05:30 on 21 March 2026.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 23 March 2026 to 27 March 2026.
Schedule : From 23:00 on 27 March 2026 to 05:30 on 28 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.3 miles from Bowling Alley.

Location: westbound between junctions J8 (High Wycombe) and J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.67 miles from Bowling Alley.

Location: westbound at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.92 miles from Bowling Alley.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.19 miles from Bowling Alley.

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.62 miles from Bowling Alley.

Location: westbound entry slip at junction J12 (Reading) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.47 miles from Bowling Alley.

Location: westbound exit slip at junction J12 (Reading) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.19 miles from Bowling Alley.

Location: southbound exit slip to the A333 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.43 miles from Bowling Alley.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.47 miles from Bowling Alley.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.5 miles from Bowling Alley.

Location: southbound between the A283 Milford north and the junction with the A325 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.52 miles from Bowling Alley.

Location: northbound at the junction with the A325 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.24 miles from Bowling Alley.

Location: southbound at the junction with the A31 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.88 miles from Bowling Alley.

Location: eastbound exit slip at junction J7 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.77 miles from Bowling Alley.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 April 2026 to 06:00 on 20 May 2026.
Nearest town: 10.19 miles from Bowling Alley.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 April 2026 to 18 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 April 2026 to 25 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 29 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.19 miles from Bowling Alley.