Swakeleys Roundabout - There is a broken down car on the eastbound on slip road to the A40.
All lanes are open.
Nearest town: 13.11 miles from Winkfield.

Cross Deep (All Directions) junction with Grotto Road.
All closures have been removed - Traffic flows have returned to normal in the area
Nearest town: 15.98 miles from Winkfield.

Leatherhead Road (Northbound).
Traffic is moving well.
Traffic is moving well.
Nearest town: 17.96 miles from Winkfield.

Tolworth Rise North (Northbound) - Lane restriction on on-slip to northbound A3 at the junction of Fairmead due to emergency gas works.
Restrictions have been removed.
All lanes open.
Nearest town: 18.89 miles from Winkfield.

Western Avenue (Eastbound) near the junction with Alperton Lane - Collision - Lane one reopened.
Traffic is flowing well for the time of day.
Nearest town: 18.22 miles from Winkfield.

Horn Lane (All Directions) at the junction of Rectory Road - Three-way temporary signals in operation to facilitate works by BT.
Traffic is flowing well in the area.
Nearest town: 19.25 miles from Winkfield.

Lampton Road (Both Directions) at the junction of Alexandra Road - Temporary Traffic Signals to facilitate junction improvements works Traffic is flowing well.
Nearest town: 14.82 miles from Winkfield.

All lanes reopened.
Traffic is moving well.
Nearest town: 16.67 miles from Winkfield.

High Street (Both Directions) at the junction of Cambridge Road - 2-way temporary traffic signals in operation to facilitate new gas connection now removed.
Traffic is moving well.
Nearest town: 19.57 miles from Winkfield.

The Parkway (Northbound) at the junction of North Hyde Road - Road is now fully open.
Traffic is moving well.
Nearest town: 13.36 miles from Winkfield.

Forty Avenue (All Directions) at the junction of Preston Road.
Lane restrictions in place due to a collision.
The road has reopened.
Nearest town: 19.73 miles from Winkfield.

Western Avenue (Eastbound) near the junction of Victoria Road lane one blocked by a broken down van.
Vehicle has been recovered.
Traffis is flowing well.
Nearest town: 19.87 miles from Winkfield.

Heston Road (All Directions) at the junction of Wheatlands - Temporary signals in operation to facilitate resurfacing works.
Expect some delays while the restrictions are in place.
Nearest town: 14.79 miles from Winkfield.

On Tolworth Broadway (Southbound) at the junction with A3 Tolworth Roundabout, there is a broken down vehicle blocking lane two of three).
Approach with caution.
All lanes have reopened.
Traffic is flowing well.
Nearest town: 18.8 miles from Winkfield.

Kymberley Road (One Way System) between Headstone Road and College Road - Road closure to facilitate resurfacing works
Nearest town: 18.56 miles from Winkfield.

Gunnersbury Avenue (North Circular Road) (Southbound) at the junction of Power Road - Collision vehicles have now been cleared.
Traffic flowing well in the area.
Nearest town: 18.63 miles from Winkfield.

Location: eastbound exit slip at junction J4 .
Due to: Congestion.
Normal traffic conditions are expected between 04:00 and 04:15 on 3 September 2025.
Nearest town: 11.53 miles from Winkfield.

Location: westbound exit slip at junction J4B (Heathrow) .
Due to: Roadworks.
Period : from 00:23 on 2 September 2025 to 05:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.14 miles from Winkfield.

Location: westbound entry slip at junction J7 (Slough) .
Due to: Roadworks.
Period : from 22:46 on 2 September 2025 to 05:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.33 miles from Winkfield.

Location: anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .
Due to: Road repairs.
Period : from 22:30 on 2 September 2025 to 06:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.5 miles from Winkfield.

Location: anticlockwise entry slip at junction J15 (Slough) from the M4 westbound.
Due to: Road repairs.
Period : from 22:06 on 2 September 2025 to 05:30 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.93 miles from Winkfield.

Location: anticlockwise entry slip at junction J14 (Heathrow Airport) .
Due to: Roadworks.
Period : from 21:36 on 2 September 2025 to 05:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.72 miles from Winkfield.

Location: anticlockwise between junctions J15 (Slough) and J13 (A30) .
Due to: Road repairs.
Period : from 21:33 on 2 September 2025 to 05:30 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.5 miles from Winkfield.

Location: eastbound at junction J5 (Colnbrook) .
Due to: Roadworks.
Period : from 21:30 on 2 September 2025 to 05:30 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 7.84 miles from Winkfield.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.6 miles from Winkfield.

Location: clockwise between junctions J9 (Leatherhead) and J11 (Chertsey) .
Due to: Roadworks scheme.
Period : from 22:01 on 2 September 2025 to 05:30 on 3 September 2025.
Nearest town: 15.1 miles from Winkfield.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 13.27 miles from Winkfield.

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 15.1 miles from Winkfield.

Location: clockwise at junction J10 (Guildford) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.99 miles from Winkfield.

Location: westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 3 September 2025 to 05:30 on 4 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.37 miles from Winkfield.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Due to: Roadworks scheme.
Period : from 22:02 on 1 September 2025 to 06:00 on 6 September 2025.
Nearest town: 13.46 miles from Winkfield.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 3 September 2025 to 17:00 on 3 September 2025.
Nearest town: 11.32 miles from Winkfield.

Location: southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 3 September 2025 to 17:00 on 3 September 2025.
Nearest town: 11.43 miles from Winkfield.

Location: eastbound exit slip at junction J12 (Reading) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.64 miles from Winkfield.

Location: northbound between the junctions with the A322 and the A3100 .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.27 miles from Winkfield.

Location: northbound at junction J1 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 3 September 2025 to 05:00 on 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.54 miles from Winkfield.

Location: northbound entry slip at junction J5 (High Wycombe) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.63 miles from Winkfield.

Location: northbound exit slip at junction J6 (Thame) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Winkfield.

Location: northbound entry slip at junction J6 (Thame) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.44 miles from Winkfield.

Location: westbound entry slip at Heston Services.
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 3 September 2025 to 05:00 on 4 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.86 miles from Winkfield.

Location: westbound between junctions J2 (N.Circular) and J3 (Heathrow) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 3 September 2025 to 05:00 on 4 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.06 miles from Winkfield.

Location: northbound entry slip from the A320 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.37 miles from Winkfield.

Location: northbound between the junctions with the A322 and the A3100 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.4 miles from Winkfield.

Location: northbound between the junctions with the A322 and the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.25 miles from Winkfield.

Location: southbound at junction J1 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 September 2025 to 5 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.23 miles from Winkfield.

Location: northbound between the junctions with the A283 and the A31 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.74 miles from Winkfield.

Location: southbound between the junctions with the A31 and the A283 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.33 miles from Winkfield.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 3 September 2025 to 06:00 on 4 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.45 miles from Winkfield.

Location: clockwise between junctions J14 (Heathrow Airport) and J15 (Slough) .
Lane Closures : Lanes 5 and 6 are closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 3 September 2025.
Lanes Closed : There are two of six lanes closed.
Nearest town: 9.06 miles from Winkfield.

Location: westbound entry slip at junction J7 (Slough) .
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.69 miles from Winkfield.

Location: westbound between junctions J6 (Slough) and J8 (High Wycombe) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 5.46 miles from Winkfield.

Location: southbound.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.41 miles from Winkfield.

Location: southbound between the A320 and the junction with the A31 .
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.25 miles from Winkfield.

Location: southbound.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.49 miles from Winkfield.

Location: eastbound at junction J4B (Heathrow) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Litter Clearance.
Period : expect disruption until 05:00 on 3 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 9.48 miles from Winkfield.

Location: southbound between the A244 and the junction with the A247 .
Due to: Roadworks scheme.
Period : from 22:01 on 1 September 2025 to 05:30 on 10 September 2025.
Nearest town: 14.56 miles from Winkfield.

Location: southbound at the junction with the M25 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.7 miles from Winkfield.

Location: northbound entry slip from the A244 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.13 miles from Winkfield.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Due to: Roadworks scheme.
Period : from 20:02 on 29 August 2025 to 06:00 on 27 September 2025.
Nearest town: 6.78 miles from Winkfield.

Location: southbound between junctions J4 (High Wycombe) and J2 (Beaconsfield) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 11.26 miles from Winkfield.

Location: southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 11.83 miles from Winkfield.

Location: eastbound between junctions J13 (Newbury) and J11 (Basingstoke) .
Due to: Roadworks scheme.
Period : from 20:01 on 2 September 2025 to 06:00 on 6 September 2025.
Nearest town: 15.86 miles from Winkfield.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 14.26 miles from Winkfield.

Location: anticlockwise at junction J10 (Guildford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 13.46 miles from Winkfield.

Location: southbound between the A245 and the junction with the M25 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 14.09 miles from Winkfield.

Location: northbound between the junctions with the A247 and the M25 .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 1 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.57 miles from Winkfield.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Due to: Roadworks scheme.
Period : from 00:02 on 1 January 2024 to 06:00 on 31 December 2025.
Nearest town: 13.46 miles from Winkfield.

Location: southbound exit slip at junction J5 (High Wycombe) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 9 September 2025 to 06:00 on 10 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.82 miles from Winkfield.

Location: southbound between junctions J6 (Thame) and J5 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 9 September 2025 to 06:00 on 10 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.22 miles from Winkfield.

Location: northbound between the A245 and the junction with the A244 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 September 2025 to 12 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.35 miles from Winkfield.

Location: northbound exit slip to the A244 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 September 2025 to 12 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.91 miles from Winkfield.

Location: westbound between junctions J7 (Slough) and J8 (High Wycombe) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 9 September 2025 to 06:00 on 12 September 2025.
Nearest town: 4.25 miles from Winkfield.

Location: westbound at junction J8 (High Wycombe) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 September 2025 to 06:00 on 12 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.15 miles from Winkfield.

Location: westbound between junctions J7 (Slough) and J8 (High Wycombe) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 September 2025 to 06:00 on 12 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.25 miles from Winkfield.

Location: westbound at junction J8 (High Wycombe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 September 2025 to 06:00 on 10 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.15 miles from Winkfield.

Location: westbound between junctions J7 (Slough) and J8 (High Wycombe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 September 2025 to 06:00 on 10 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 4.25 miles from Winkfield.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 September 2025 to 06:00 on 12 September 2025.
Nearest town: 3.85 miles from Winkfield.

Location: eastbound at junction J8 (High Wycombe) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 September 2025 to 06:00 on 12 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.12 miles from Winkfield.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 September 2025 to 06:00 on 12 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.85 miles from Winkfield.

Location: eastbound at junction J8 (High Wycombe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 September 2025 to 06:00 on 11 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.12 miles from Winkfield.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 September 2025 to 06:00 on 11 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.85 miles from Winkfield.

Location: eastbound between junctions J6 (Slough) and J5 (Colnbrook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 20:00 on 9 September 2025 to 06:00 on 10 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.47 miles from Winkfield.

Location: clockwise between junctions J14 (Heathrow Airport) and J14 (Heathrow Airport) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 06:00 on 20 September 2025.
Nearest town: 8.96 miles from Winkfield.

Location: clockwise entry slip at junction J14 (Heathrow Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.96 miles from Winkfield.

Location: clockwise between junctions J14 (Heathrow Airport) and J15 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of six lanes closed.
Nearest town: 9.06 miles from Winkfield.

Location: clockwise at junction J14 (Heathrow Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.04 miles from Winkfield.

Location: clockwise exit slip at junction J15 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.69 miles from Winkfield.

Location: westbound entry slip at junction J4B (Heathrow) from M25 clockwise.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.74 miles from Winkfield.

Location: eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.33 miles from Winkfield.

Location: westbound entry slip at junction J1 (Sunbury) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.45 miles from Winkfield.

Location: westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.64 miles from Winkfield.

Location: westbound between the A312 and the junction with the M3 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.92 miles from Winkfield.

Location: anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Schedule : From 23:00 on 5 September 2025 to 05:30 on 6 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.53 miles from Winkfield.

Location: clockwise entry slip at junction J16 (M40) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:15 and 06:00 from 8 September 2025 to 11 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.26 miles from Winkfield.

Location: anticlockwise between junctions J13 (A30) and J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 7.38 miles from Winkfield.

Location: eastbound between junctions J4 (Guildford) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.43 miles from Winkfield.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 9 September 2025 to 06:00 on 10 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.66 miles from Winkfield.

Location: clockwise between junctions J11 (Chertsey) and J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.58 miles from Winkfield.

Location: clockwise entry slip at junction J18 (Rickmansworth) .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 September 2025 to 10 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.43 miles from Winkfield.

Location: clockwise.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 September 2025 to 10 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.42 miles from Winkfield.

Location: clockwise at junction J12 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.99 miles from Winkfield.

Location: clockwise between junctions J17 (Maple Cross) and J18 (Rickmansworth) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 September 2025 to 10 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.66 miles from Winkfield.

Location: clockwise exit slip at junction J18 (Rickmansworth) .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 September 2025 to 10 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.35 miles from Winkfield.

Location: westbound between junctions J1 (London) and J2 (N.Circular) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 11 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.74 miles from Winkfield.

Location: anticlockwise between junctions J17 (Maple Cross) and J16 (M40) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 September 2025 to 05:00 on 9 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.47 miles from Winkfield.

Location: clockwise between junctions J16 (M40) and J18 (Rickmansworth) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 September 2025 to 10 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.07 miles from Winkfield.

Location: westbound exit slip at junction J2 (N.Circular) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 11 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.13 miles from Winkfield.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 12 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.71 miles from Winkfield.

Location: clockwise between junctions J15 (Slough) and J16 (M40) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 12 September 2025.
Schedule : From 23:00 on 12 September 2025 to 05:30 on 13 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.85 miles from Winkfield.

Location: clockwise at junction J10 (Guildford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 12 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.99 miles from Winkfield.

Location: clockwise entry slip at junction J10 (Guildford) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 12 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.68 miles from Winkfield.

Location: northbound between the junctions with the A247 and the M25 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 12 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.64 miles from Winkfield.

Location: northbound exit slip to the M25 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 12 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.74 miles from Winkfield.

Location: northbound at the junction with the M25 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 12 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.74 miles from Winkfield.

Location: clockwise exit slip at junction J11 (Chertsey) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 September 2025 to 12 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.81 miles from Winkfield.

Location: westbound at junction J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.82 miles from Winkfield.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.02 miles from Winkfield.

Location: southbound between junctions J4 (High Wycombe) and J2 (Beaconsfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.12 miles from Winkfield.

Location: westbound entry slip at junction J7 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.69 miles from Winkfield.

Location: westbound exit slip at junction J7 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.4 miles from Winkfield.

Location: westbound between junctions J6 (Slough) and J8 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.53 miles from Winkfield.

Location: northbound between junctions J6 (Thame) and J8A (Thame) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.35 miles from Winkfield.

Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.04 miles from Winkfield.

Location: westbound at junction J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.75 miles from Winkfield.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.22 miles from Winkfield.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 10 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.91 miles from Winkfield.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 September 2025 to 06:00 on 9 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.69 miles from Winkfield.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 October 2025 to 06:00 on 5 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.43 miles from Winkfield.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 8 September 2025 to 06:00 on 11 October 2025.
Nearest town: 15.23 miles from Winkfield.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 September 2025 to 20 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 September 2025 to 3 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.23 miles from Winkfield.

Location: westbound entry slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 October 2025 to 06:00 on 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.51 miles from Winkfield.

Location: westbound entry slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 September 2025 to 20 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 September 2025 to 3 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.51 miles from Winkfield.

Location: anticlockwise at junction J10 (Guildford) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.46 miles from Winkfield.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 14.26 miles from Winkfield.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 4 September 2025 to 06:00 on 5 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.17 miles from Winkfield.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 September 2025 to 06:00 on 10 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.21 miles from Winkfield.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 07:00 on 7 September 2025 to 23:59 on 9 September 2025.
Nearest town: 11.82 miles from Winkfield.

Location: clockwise exit slip at junction J19 (Watford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.72 miles from Winkfield.

Location: clockwise exit slip at junction J19 (Watford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.56 miles from Winkfield.

Location: clockwise between junctions J19 (Watford) and J21A (Watword) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.9 miles from Winkfield.

Location: clockwise between junctions J18 (Rickmansworth) and J19 (Watford) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.97 miles from Winkfield.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 07:00 on 7 September 2025 to 23:59 on 17 September 2025.
Nearest town: 17.5 miles from Winkfield.

Location: clockwise exit slip at junction J14 (Heathrow Airport) for Heathrow T5.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 6 September 2025 to 06:00 on 7 September 2025.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.41 miles from Winkfield.

Location: clockwise exit slip at junction J14 (Heathrow Airport) for A3113.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 6 September 2025 to 06:00 on 7 September 2025.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.54 miles from Winkfield.

Location: clockwise between junctions J13 (A30) and J14 (Heathrow Airport) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 6 September 2025 to 06:00 on 7 September 2025.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.62 miles from Winkfield.

Location: clockwise at junction J13 (A30) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 6 September 2025 to 06:00 on 7 September 2025.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.5 miles from Winkfield.

Location: clockwise between junctions J12 (Basingstoke) and J13 (A30) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 6 September 2025 to 06:00 on 7 September 2025.
Schedule : From 22:30 on 7 September 2025 to 05:30 on 8 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.76 miles from Winkfield.

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 6 September 2025 to 06:00 on 7 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.99 miles from Winkfield.

Location: northbound between junctions J2 (Beaconsfield) and J4 (High Wycombe) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.12 miles from Winkfield.

Location: northbound exit slip at junction J3 (Loudwater) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.26 miles from Winkfield.

Location: northbound exit slip at junction J6 (Thame) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Winkfield.

Location: northbound entry slip at junction J6 (Thame) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.44 miles from Winkfield.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.84 miles from Winkfield.

Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.69 miles from Winkfield.

Location: westbound entry slip at junction J4A (Farnborough) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.4 miles from Winkfield.

Location: westbound between junctions J4A (Farnborough) and J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.23 miles from Winkfield.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 6.78 miles from Winkfield.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 September 2025 to 06:00 on 5 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.69 miles from Winkfield.

Location: northbound exit slip at junction J5 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 4 September 2025 to 05:00 on 5 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.37 miles from Winkfield.

Location: southbound entry slip at junction J5 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 4 September 2025 to 05:00 on 5 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.64 miles from Winkfield.

Location: anticlockwise at junction J16 (M40) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Schedule : From 23:00 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.45 miles from Winkfield.

Location: westbound entry slip at junction J2 (Gatwick M23) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 6 September 2025.
Nearest town: 7.8 miles from Winkfield.

Location: westbound entry slip at junction J2 (Gatwick M23) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Schedule : From 23:00 on 5 September 2025 to 05:30 on 6 September 2025.
Nearest town: 7.57 miles from Winkfield.

Location: westbound entry slip at junction J2 (Gatwick M23) from M25 clockwise.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Schedule : From 23:00 on 5 September 2025 to 05:30 on 6 September 2025.
Nearest town: 7.75 miles from Winkfield.

Location: westbound entry slip at junction J2 (Gatwick M23) from M25 anti-clockwise.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Schedule : From 23:00 on 5 September 2025 to 05:30 on 6 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.8 miles from Winkfield.

Location: anticlockwise between junctions J17 (Maple Cross) and J16 (M40) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 4 September 2025 to 05:30 on 5 September 2025.
Schedule : From 23:00 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.41 miles from Winkfield.

Location: westbound entry slip at junction J6 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.8 miles from Winkfield.

Location: westbound between junctions J6 (Slough) and J7 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.66 miles from Winkfield.

Location: westbound at junction J6 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.96 miles from Winkfield.

Location: westbound between junctions J5 (Colnbrook) and J6 (Slough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.49 miles from Winkfield.

Location: westbound exit slip at junction J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.96 miles from Winkfield.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 September 2025 to 05:00 on 5 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.37 miles from Winkfield.

Location: southbound between junctions J6 (Thame) and J5 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 September 2025 to 05:00 on 5 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.2 miles from Winkfield.

Location: southbound entry slip from the A322 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.23 miles from Winkfield.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 11 September 2025.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 September 2025 to 20 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.91 miles from Winkfield.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 11 September 2025.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 September 2025 to 20 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.2 miles from Winkfield.

Location: northbound at junction J4 (High Wycombe) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 September 2025 to 11 September 2025.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 September 2025 to 20 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.2 miles from Winkfield.

Location: northbound between the A247 and the junction with the M25 .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.61 miles from Winkfield.

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 7.12 miles from Winkfield.

Location: eastbound exit slip at junction J2 (Gatwick M23) .
Due to: Barrier repairs.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 7.47 miles from Winkfield.

Location: clockwise entry slip at junction J12 (Basingstoke) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Barrier repairs.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.41 miles from Winkfield.

Location: clockwise entry slip at junction J12 (Basingstoke) .
Due to: Barrier repairs.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 7.6 miles from Winkfield.

Location: anticlockwise.
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Litter Clearance.
Period : expect disruption until 05:00 on 3 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.41 miles from Winkfield.

Location: anticlockwise between junctions J14 (Heathrow Airport) from Heathrow T5 and J13 (A30) .
Due to: Litter Clearance.
Period : expect disruption until 05:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.15 miles from Winkfield.

Location: anticlockwise between junctions J15 (Slough) and J14 (Heathrow Airport) .
Due to: Litter Clearance.
Period : expect disruption until 05:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.99 miles from Winkfield.

Location: anticlockwise entry slip at junction J14 (Heathrow Airport) from A3113.
Due to: Litter Clearance.
Period : expect disruption until 05:00 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.75 miles from Winkfield.

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 3 September 2025 to 5 September 2025.
Schedule : From 23:00 on 5 September 2025 to 06:00 on 6 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.94 miles from Winkfield.

Location: eastbound at junction J5 (Colnbrook) .
Lane Closures : Lane one is closed.
Due to: Litter Clearance.
Period : expect disruption until 05:00 on 3 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 7.91 miles from Winkfield.

Location: eastbound between junctions J5 (Colnbrook) and J4B (Heathrow) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Litter Clearance.
Period : expect disruption until 05:00 on 3 September 2025.
Lanes Closed : There is one of five lanes closed.
Nearest town: 8.34 miles from Winkfield.

Location: southbound between the junctions with the M25 and the A247 .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.77 miles from Winkfield.

Location: southbound between the A244 and the junction with the M25 .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.56 miles from Winkfield.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane Closures : Lanes 2, 3 and 4 are closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 17.35 miles from Winkfield.

Location: anticlockwise entry slip at junction J9 (Leatherhead) .
Due to: Road repairs.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.36 miles from Winkfield.

Location: anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .
Due to: Road repairs.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.31 miles from Winkfield.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.91 miles from Winkfield.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 12.24 miles from Winkfield.

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 15.09 miles from Winkfield.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 15.86 miles from Winkfield.

Location: eastbound at junction J5 (Colnbrook) .
Due to: Road repairs.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : All lanes are closed.
Nearest town: 7.67 miles from Winkfield.

Location: northbound between the A245 and the junction with the A309 .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Horticultural works.
Period : expect disruption until 05:30 on 3 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.35 miles from Winkfield.

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 3 September 2025 to 5 September 2025.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 8 September 2025 to 12 September 2025.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 15 September 2025 to 17 September 2025.
Nearest town: 16.66 miles from Winkfield.

Location: The A308M eastbound between the junctions with the M4 and the A308 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 3 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 4.23 miles from Winkfield.

Location: westbound exit slip at junction J6 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 October 2025 to 23 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.87 miles from Winkfield.
