Location: anticlockwise at junction J5 (Wythenshawe) .
Due to: Road traffic collision.
Status : Cleared.
Nearest town: 18.77 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J5 (Wythenshawe) .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 09:15 and 09:30 on 20 May 2025.
Normal traffic conditions are expected between 09:15 and 09:30 on 20 May 2025.
Lanes Closed : There are lane closures.
Nearest town: 18.72 miles from Whittlestone Head.

Location: anticlockwise exit slip at junction J9 (Trafford Park) .
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 08:45 and 09:00 on 20 May 2025.
Normal traffic conditions are expected between 08:15 and 08:30 on 20 May 2025.
Lanes Closed : There are lane closures.
Nearest town: 14.76 miles from Whittlestone Head.

Location: The A627M northbound between junctions J3 and A664 Rochdale.
Due to: Congestion.
Normal traffic conditions are expected between 12:15 and 12:30 on 20 May 2025.
Nearest town: 11.57 miles from Whittlestone Head.

Location: clockwise entry slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 11:45 and 12:00 on 20 May 2025.
Nearest town: 14.56 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 12:00 and 12:15 on 20 May 2025.
Nearest town: 14.53 miles from Whittlestone Head.

Location: southbound between the A669 and the junction with the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 12:00 and 12:15 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.54 miles from Whittlestone Head.

Location: clockwise exit slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 12:00 and 12:15 on 20 May 2025.
Nearest town: 14.46 miles from Whittlestone Head.

Location: westbound between junctions J2 (Denton) and J1 (M60) .
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 20 May 2025.
Nearest town: 18.8 miles from Whittlestone Head.

Location: northbound between the M60 and the junction with the A669 .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 20 May 2025.
Nearest town: 14.54 miles from Whittlestone Head.

Location: southbound between the A669 and the junction with the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.54 miles from Whittlestone Head.

Location: slip road to the M60 southbound .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.25 miles from Whittlestone Head.

Location: clockwise entry slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 20 May 2025.
Nearest town: 14.56 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 20 May 2025.
Nearest town: 14.53 miles from Whittlestone Head.

Location: slip road to the M60 southbound .
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.25 miles from Whittlestone Head.

Location: southbound at the junction with the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 10:30 and 10:45 on 20 May 2025.
Nearest town: 14.55 miles from Whittlestone Head.

Location: southbound exit slip at junction J4 (Manchester) for M60.
Due to: Congestion.
Normal traffic conditions are expected between 10:00 and 10:15 on 20 May 2025.
Nearest town: 10.45 miles from Whittlestone Head.

Location: southbound at the junction with the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 20 May 2025.
Nearest town: 14.55 miles from Whittlestone Head.

Location: southbound exit slip to the M56 .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.48 miles from Whittlestone Head.

Location: northbound between junction A666 and the A6053 .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.71 miles from Whittlestone Head.

Location: eastbound exit slip at junction J8 (Bury) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 20 May 2025.
Nearest town: 8.78 miles from Whittlestone Head.

Location: clockwise entry slip at junction J12 (Warrington) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.66 miles from Whittlestone Head.

Location: northbound exit slip at junction J29 (Burnley) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 20 May 2025.
Nearest town: 10.3 miles from Whittlestone Head.

Location: anticlockwise exit slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 20 May 2025.
Nearest town: 14.69 miles from Whittlestone Head.

Location: southbound exit slip to the M56 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.48 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J6 (Sale) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 20 May 2025.
Nearest town: 17.54 miles from Whittlestone Head.

Location: westbound exit slip at junction J5 (Shadsworth) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 20 May 2025.
Nearest town: 4.19 miles from Whittlestone Head.

Location: The A627M southbound at junction J1 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.88 miles from Whittlestone Head.

Location: northbound at the junction with the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.63 miles from Whittlestone Head.

Location: westbound at junction .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 20 May 2025.
Nearest town: 14.95 miles from Whittlestone Head.

Location: southbound exit slip at junction J4 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 20 May 2025.
Nearest town: 8.44 miles from Whittlestone Head.

Location: clockwise entry slip at junction J12 (Warrington) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.66 miles from Whittlestone Head.

Location: northbound exit slip at junction J23 (Haydock) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.06 miles from Whittlestone Head.

Location: anticlockwise between junctions J8 (Carrington) and J6 (Sale) through lane.
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Earlier
Due to: Caused by an earlier accident.
Nearest town: 18.67 miles from Whittlestone Head.

Location: westbound at junction J19 (Middleton) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.49 miles from Whittlestone Head.

Location: westbound between junctions J2 (Denton) and J1 (M60) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.85 miles from Whittlestone Head.

Location: The A627M northbound between junctions J3 and A664 Rochdale.
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 20 May 2025.
Nearest town: 11.57 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 20 May 2025.
Nearest town: 14.53 miles from Whittlestone Head.

Location: westbound between junctions J19 (Middleton) and J18 (M60) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.49 miles from Whittlestone Head.

Location: southbound exit slip at junction J4 (Manchester) for M60.
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.45 miles from Whittlestone Head.

Location: The A627M northbound between junctions J3 and A664 Rochdale.
Due to: Congestion.
Normal traffic conditions are expected between 07:30 and 07:45 on 20 May 2025.
Nearest town: 11.57 miles from Whittlestone Head.

Location: anticlockwise at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.66 miles from Whittlestone Head.

Location: southbound between junctions A666 and J2 from A666 to M60.
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.84 miles from Whittlestone Head.

Location: southbound exit slip at junction J4 (Manchester) for M60.
Due to: Congestion.
Normal traffic conditions are expected between 07:30 and 07:45 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.45 miles from Whittlestone Head.

Location: clockwise entry slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 07:15 and 07:30 on 20 May 2025.
Nearest town: 14.56 miles from Whittlestone Head.

Location: anticlockwise between junctions J23 (Aston under Lyne) and J19 (Middleton) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 20 May 2025.
Cause : Emergency roadworks.
Delay : There are currently delays of 30 minutes against expected traffic.
Nearest town: 15.16 miles from Whittlestone Head.

Location: clockwise exit slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 07:00 and 07:15 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.46 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J20 (Blackley) .
Due to: Congestion.
Normal traffic conditions are expected between 06:45 and 07:00 on 20 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.5 miles from Whittlestone Head.

Location: clockwise between junctions J13 (Swinton) and J15 (Bolton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.27 miles from Whittlestone Head.

Location: southbound between junctions A666 and J2 from A666 to M60.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.85 miles from Whittlestone Head.

Location: northbound between the M60 and junction J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.04 miles from Whittlestone Head.

Location: northbound entry slip at junction J1 from M60 clockwise.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.33 miles from Whittlestone Head.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.56 miles from Whittlestone Head.

Location: southbound at junction .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.49 miles from Whittlestone Head.

Location: southbound between junctions J3 and J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.07 miles from Whittlestone Head.

Location: southbound between junctions J29 (Burnley) and J28 (Leyland) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.1 miles from Whittlestone Head.

Location: northbound entry slip at junction J28 (Leyland) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.55 miles from Whittlestone Head.

Location: northbound between junctions J27 (Parbold) and J29 (Burnley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.14 miles from Whittlestone Head.

Location: westbound between junctions J22 (Ripponden) and J21 (Milnrow) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.88 miles from Whittlestone Head.

Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.35 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Due to: Emergency roadworks.
Status : Cleared.
Nearest town: 14.26 miles from Whittlestone Head.

Location: northbound entry slip at junction J28 (Leyland) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.55 miles from Whittlestone Head.

Location: southbound between junctions J29 (Burnley) and J28 (Leyland) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.1 miles from Whittlestone Head.

Location: northbound between junctions J27 (Parbold) and J29 (Burnley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.14 miles from Whittlestone Head.

Location: anticlockwise exit slip at junction J3 (Cheadle) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.94 miles from Whittlestone Head.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.73 miles from Whittlestone Head.

Location: southbound exit slip at junction J6 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.01 miles from Whittlestone Head.

Location: northbound between junctions J6 and J8 .
Due to: Roadworks scheme.
Period : from 08:00 on 19 May 2025 to 17:00 on 22 May 2025.
Nearest town: 7.67 miles from Whittlestone Head.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 20 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.63 miles from Whittlestone Head.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 20 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.26 miles from Whittlestone Head.

Location: northbound entry slip at junction J21A (Manchester) from M62 eastbound.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 20 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.61 miles from Whittlestone Head.

Location: northbound between junctions J21A (Manchester) from M62 westbound and J24 (Ashton in Makerfield) .
Due to: Roadworks scheme.
Period : from 21:04 on 19 May 2025 to 06:00 on 22 May 2025.
Nearest town: 17.26 miles from Whittlestone Head.

Location: westbound between junctions J10 (M6) and J9 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.86 miles from Whittlestone Head.

Location: westbound entry slip at junction J9 (Warrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.34 miles from Whittlestone Head.

Location: westbound at junction J9 (Warrington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.19 miles from Whittlestone Head.

Location: westbound exit slip at junction J8 (Warrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 05:00 on 21 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.48 miles from Whittlestone Head.

Location: southbound between junctions J3 and J1 to A580.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Nearest town: 8.71 miles from Whittlestone Head.

Location: southbound between junctions A666 and J2 from A666 to M60.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.85 miles from Whittlestone Head.

Location: southbound at junction J2 from M61 to A580.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.39 miles from Whittlestone Head.

Location: southbound at junction J2 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.39 miles from Whittlestone Head.

Location: northbound between the M60 and junction J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.33 miles from Whittlestone Head.

Location: The M61 northbound entry slip at junction J1 (Stockport) from M60 clockwise.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.27 miles from Whittlestone Head.

Location: southbound between junctions J2 and J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.62 miles from Whittlestone Head.

Location: northbound between the M60 and junction J2 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Nearest town: 10.33 miles from Whittlestone Head.

Location: The M60 clockwise between junctions J13 and J15 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.04 miles from Whittlestone Head.

Location: southbound at junction .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.49 miles from Whittlestone Head.

Location: southbound between junctions J4 and J2 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.71 miles from Whittlestone Head.

Location: northbound between the M60 and the junction with the A669 .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 15:30 on 20 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 14.54 miles from Whittlestone Head.

Location: northbound between junctions J31 (Preston) and J32 (Blackpool) .
Lane Closures : The hard shoulder is closed.
Due to: Planned Roadworks.
Period : expect disruption until 17:00 on 22 May 2025.
Nearest town: 11.62 miles from Whittlestone Head.

Location: clockwise between junctions J15 (Bolton) and J18 (Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.27 miles from Whittlestone Head.

Location: eastbound at junction J18 (M60) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.48 miles from Whittlestone Head.

Location: clockwise between junctions J17 (Prestwich) and J18 (Leeds) .
Due to: Roadworks scheme.
Period : from 21:03 on 14 May 2025 to 06:00 on 23 May 2025.
Nearest town: 10.41 miles from Whittlestone Head.

Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Due to: Roadworks scheme.
Period : from 20:07 on 16 May 2025 to 05:00 on 23 May 2025.
Nearest town: 16.23 miles from Whittlestone Head.

Location: anticlockwise between junctions J20 (Blackley) and J19 (Middleton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 16 July 2025.
Nearest town: 12.83 miles from Whittlestone Head.

Location: northbound between junctions J8 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 8.31 miles from Whittlestone Head.

Location: southbound between junctions J6 and J5 .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 8.04 miles from Whittlestone Head.

Location: southbound at junction J8 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 8.27 miles from Whittlestone Head.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 9.79 miles from Whittlestone Head.

Location: clockwise between junctions J23 (Aston under Lyne) and J24 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 19:00 on 31 March 2027.
Nearest town: 18.05 miles from Whittlestone Head.

Location: anticlockwise between junctions J24 and J23 (Aston under Lyne) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 19:00 on 31 March 2027.
Nearest town: 18.03 miles from Whittlestone Head.

Location: westbound between junctions J21 (Milnrow) and J20 (Rochdale) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 00:00 on 30 March 2026.
Nearest town: 13.7 miles from Whittlestone Head.

Location: anticlockwise between junctions J5 (Wythenshawe) and J4 (Chester) .
Due to: Roadworks scheme.
Period : from 20:02 on 13 May 2025 to 05:00 on 23 May 2025.
Nearest town: 18.69 miles from Whittlestone Head.

Location: eastbound entry slip at junction J2 (Denton) .
Due to: Roadworks.
Period : expect disruption until 05:00 on 7 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.67 miles from Whittlestone Head.

Location: northbound entry slip at junction J2 from A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 10.99 miles from Whittlestone Head.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 9.39 miles from Whittlestone Head.

Location: southbound between the M6 and junction J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 10.23 miles from Whittlestone Head.

Location: northbound between junctions J2 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 9.32 miles from Whittlestone Head.

Location: northbound between junction J9 and the M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 9.02 miles from Whittlestone Head.

Location: southbound between the M6 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 9.97 miles from Whittlestone Head.

Location: northbound at junction J2 for A666.
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.6 miles from Whittlestone Head.

Location: northbound between the M60 and junction J2 .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 10.04 miles from Whittlestone Head.

Location: northbound entry slip at junction J1 from M60 anti-clockwise.
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.25 miles from Whittlestone Head.

Location: northbound between junctions J2 and A666 .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 9.28 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 00:00 on 29 June 2025.
Nearest town: 12.54 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 June 2025.
Nearest town: 12.54 miles from Whittlestone Head.

Location: anticlockwise between junctions J5 (Wythenshawe) and J4 (Chester) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 23:59 on 30 June 2025.
Nearest town: 18.87 miles from Whittlestone Head.

Location: clockwise between junctions J4 (Chester) and J5 (Wythenshawe) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 23:59 on 30 June 2025.
Nearest town: 19.41 miles from Whittlestone Head.

Location: westbound between junctions J10 (Burnley) and J9 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 10.7 miles from Whittlestone Head.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.47 miles from Whittlestone Head.

Location: eastbound between junctions J6 (Blackburn) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 6.6 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.92 miles from Whittlestone Head.

Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 10.74 miles from Whittlestone Head.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 4.07 miles from Whittlestone Head.

Location: westbound between junctions J6 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 6.54 miles from Whittlestone Head.

Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 3.92 miles from Whittlestone Head.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.82 miles from Whittlestone Head.

Location: eastbound between junctions J2 (Manchester) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.39 miles from Whittlestone Head.

Location: westbound between junctions J4 (Blackburn) and J1A (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 4.64 miles from Whittlestone Head.

Location: westbound between junctions J10 (Burnley) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.42 miles from Whittlestone Head.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 4.03 miles from Whittlestone Head.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 4.57 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60) and J3 (Hyde) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 1 April 2026.
Nearest town: 18.95 miles from Whittlestone Head.

Location: The A627M northbound between junctions J3 and A664 Rochdale.
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 12.2 miles from Whittlestone Head.

Location: The A627M southbound between junctions J3 and J1 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 12.34 miles from Whittlestone Head.

Location: The A627M northbound between junctions J1 and J2 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 14 miles from Whittlestone Head.

Location: The A627M northbound between junctions J2 and J3 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 12.46 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60) and J2 (Denton) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.8 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60) and J4 .
Due to: Roadworks scheme.
Period : from 08:11 on 21 August 2023 to 06:00 on 27 December 2025.
Nearest town: 18.77 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60) and J3 (Hyde) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.95 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60) and J2 (Denton) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.77 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60) and J2 (Denton) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 December 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 18.77 miles from Whittlestone Head.

Location: westbound between junctions J2 (Denton) and J1 (M60) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.02 miles from Whittlestone Head.

Location: eastbound entry slip at junction J2 (Denton) .
Due to: Roadworks.
Period : from 07:08 on 30 April 2023 to 05:00 on 31 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.71 miles from Whittlestone Head.

Location: anticlockwise exit slip at junction J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule : From 23:59 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : From 21:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.87 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J20 (Blackley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule : From 23:59 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : From 21:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.83 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J19 (Middleton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 23:59 on 24 June 2025 to 06:00 on 25 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 21:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.65 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J19 (Middleton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 23:59 on 24 June 2025 to 06:00 on 25 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 21:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.65 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 9 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.65 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 July 2025 to 06:00 on 4 July 2025.
Schedule : From 23:59 on 4 July 2025 to 06:00 on 5 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.93 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 24 June 2025 to 06:00 on 25 June 2025.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.83 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule : From 23:59 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.92 miles from Whittlestone Head.

Location: anticlockwise exit slip at junction J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule : From 23:59 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : From 21:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.87 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J19 (Middleton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 23:59 on 24 June 2025 to 06:00 on 25 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 21:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.65 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J19 (Middleton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 23:59 on 24 June 2025 to 06:00 on 25 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 21:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.65 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 July 2025 to 06:00 on 4 July 2025.
Schedule : From 23:59 on 4 July 2025 to 06:00 on 5 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.93 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:59 and 06:00 from 16 June 2025 to 18 June 2025.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.84 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 July 2025 to 06:00 on 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 16 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.27 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule : From 23:59 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.92 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:59 and 06:00 from 16 June 2025 to 18 June 2025.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.84 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 July 2025 to 06:00 on 12 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 16 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.27 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 5 June 2025.
Schedule : From 23:59 on 5 June 2025 to 06:00 on 6 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.93 miles from Whittlestone Head.

Location: southbound between the junctions with the A669 and the M60 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 27 May 2025 to 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.52 miles from Whittlestone Head.

Location: westbound between junctions J12 (M60) and J11 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2025 to 05:00 on 22 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.15 miles from Whittlestone Head.

Location: southbound between junctions J27 (Parbold) and J26 (Wigan) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 27 May 2025 to 30 May 2025.
Nearest town: 13.89 miles from Whittlestone Head.

Location: clockwise between junctions J23 (Aston under Lyne) and J24 .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 26 May 2025 to 05:00 on 27 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.05 miles from Whittlestone Head.

Location: anticlockwise between junctions J24 and J23 (Aston under Lyne) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 26 May 2025 to 05:00 on 27 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.01 miles from Whittlestone Head.

Location: southbound exit slip at junction J1 to A580.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 31 May 2025.
Nearest town: 9.4 miles from Whittlestone Head.

Location: southbound at junction J2 from A666 to A580.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.4 miles from Whittlestone Head.

Location: southbound at junction J2 from M61 to A580.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.39 miles from Whittlestone Head.

Location: southbound between junctions A666 and J2 from A666 to M60.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 31 May 2025.
Nearest town: 9.17 miles from Whittlestone Head.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.56 miles from Whittlestone Head.

Location: southbound between junctions J4 and J2 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.71 miles from Whittlestone Head.

Location: westbound between junctions J21 (Milnrow) and J20 (Rochdale) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 25 May 2025 to 27 May 2025.
Nearest town: 12.58 miles from Whittlestone Head.

Location: westbound exit slip at junction J20 (Rochdale) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 25 May 2025 to 27 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.46 miles from Whittlestone Head.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 07:00 on 25 May 2025 to 17:00 on 25 May 2025.
Nearest town: 19.15 miles from Whittlestone Head.

Location: anticlockwise exit slip at junction J22 (Oldham) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:59 on 24 May 2025 to 05:00 on 25 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.66 miles from Whittlestone Head.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 07:00 on 24 May 2025 to 17:00 on 24 May 2025.
Nearest town: 19.62 miles from Whittlestone Head.

Location: anticlockwise between junctions J16 (Salford) and J15 (Bolton) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 23 May 2025 to 05:00 on 24 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.37 miles from Whittlestone Head.

Location: eastbound at junction J10 (M6) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 May 2025 to 25 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.74 miles from Whittlestone Head.

Location: westbound between junctions J11 (Warrington) and J10 (M6) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 May 2025 to 25 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.62 miles from Whittlestone Head.

Location: northbound entry slip at junction J4 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2025 to 05:00 on 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.51 miles from Whittlestone Head.

Location: northbound between junctions J2 and J5 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2025 to 05:00 on 23 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.66 miles from Whittlestone Head.

Location: eastbound between junctions J11 (Warrington) and J12 (M60) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2025 to 05:00 on 23 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.99 miles from Whittlestone Head.

Location: eastbound at junction J2 (Eccles) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13 miles from Whittlestone Head.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.47 miles from Whittlestone Head.

Location: The A627M northbound between junctions J3 and A664 Rochdale.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 22 May 2025 to 15:00 on 22 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.56 miles from Whittlestone Head.

Location: The A627M northbound between junctions J3 and A664 Rochdale.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 22 May 2025 to 15:00 on 22 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.2 miles from Whittlestone Head.

Location: The A627M northbound entry slip at junction J1 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 22 May 2025 to 24 May 2025.
Nearest town: 13.9 miles from Whittlestone Head.

Location: westbound between junctions J6 (Blackburn) and J5 (Shadsworth) .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2025 to 17:00 on 27 May 2025.
Nearest town: 5.49 miles from Whittlestone Head.

Location: southbound between junctions J2 and J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.62 miles from Whittlestone Head.

Location: southbound at junction J2 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.39 miles from Whittlestone Head.

Location: southbound exit slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9 miles from Whittlestone Head.

Location: northbound exit slip at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.86 miles from Whittlestone Head.

Location: southbound exit slip at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.87 miles from Whittlestone Head.

Location: southbound between junctions J4 and J2 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.87 miles from Whittlestone Head.

Location: northbound exit slip at junction J29 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Schedule : From 21:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.38 miles from Whittlestone Head.

Location: southbound exit slip at junction J29 (Burnley) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Schedule : From 21:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.12 miles from Whittlestone Head.

Location: northbound entry slip at junction J28 (Leyland) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Schedule : From 21:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.55 miles from Whittlestone Head.

Location: eastbound exit slip at junction J1 (M6) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Schedule : From 21:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.54 miles from Whittlestone Head.

Location: northbound between junctions J27 (Parbold) and J29 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Schedule : From 21:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.14 miles from Whittlestone Head.

Location: southbound entry slip at junction J29 (Burnley) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Schedule : From 21:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.22 miles from Whittlestone Head.

Location: westbound exit slip at junction J1 (M6) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 21 May 2025 to 23 May 2025.
Schedule : From 21:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.12 miles from Whittlestone Head.

Location: clockwise between junctions J10 (Trafford Park) and J11 (Irlam) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Nearest town: 14.29 miles from Whittlestone Head.

Location: clockwise between junctions J10 (Trafford Park) and J11 (Irlam) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.29 miles from Whittlestone Head.

Location: clockwise entry slip at junction J10 (Trafford Park) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.28 miles from Whittlestone Head.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.4 miles from Whittlestone Head.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.16 miles from Whittlestone Head.

Location: clockwise exit slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 21 May 2025 to 06:00 on 22 May 2025.
Schedule : From 21:00 on 22 May 2025 to 06:00 on 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.39 miles from Whittlestone Head.

Location: clockwise entry slip at junction J17 (Prestwich) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 21 May 2025 to 06:00 on 22 May 2025.
Schedule : From 21:00 on 22 May 2025 to 06:00 on 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.41 miles from Whittlestone Head.

Location: clockwise between junctions J15 (Bolton) and J18 (Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.35 miles from Whittlestone Head.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 21 May 2025 to 18:00 on 23 May 2025.
Nearest town: 15.59 miles from Whittlestone Head.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2025 to 05:00 on 22 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.53 miles from Whittlestone Head.

Location: northbound exit slip at junction J26 (Wigan) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2025 to 05:00 on 22 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.63 miles from Whittlestone Head.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2025 to 05:00 on 22 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.79 miles from Whittlestone Head.

Location: westbound exit slip at junction J5 (Skelmersdale) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2025 to 05:00 on 22 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.05 miles from Whittlestone Head.

Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 May 2025 to 22 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.23 miles from Whittlestone Head.

Location: northbound entry slip from the M56 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 May 2025 to 22 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.53 miles from Whittlestone Head.

Location: northbound between the junctions with the M56 and the M60 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 May 2025 to 22 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.42 miles from Whittlestone Head.

Location: northbound between junctions J6 and J8 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 17:00 on 20 May 2025.
Nearest town: 7.67 miles from Whittlestone Head.

Location: westbound between junctions J19 (Middleton) and J18 (M60) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.51 miles from Whittlestone Head.

Location: northbound between junctions J23 (Haydock) and J24 (Ashton in Makerfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.02 miles from Whittlestone Head.

Location: northbound between the junctions with the A6104 and the M60 .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 15:30 on 20 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.54 miles from Whittlestone Head.

Location: anticlockwise between junctions J5 (Wythenshawe) and J4 (Chester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 May 2025 to 23 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.21 miles from Whittlestone Head.

Location: southbound between junctions J30 (Manchester) and J29 (Burnley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 23 May 2025 to 17:00 on 26 May 2025.
Nearest town: 10.38 miles from Whittlestone Head.

Location: southbound between junctions J32 (Blackpool) and J29 (Burnley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 23 May 2025 to 17:00 on 26 May 2025.
Nearest town: 14 miles from Whittlestone Head.

Location: anticlockwise exit slip at junction J23 (Aston under Lyne) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.04 miles from Whittlestone Head.

Location: anticlockwise at junction J23 (Aston under Lyne) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.04 miles from Whittlestone Head.

Location: anticlockwise between junctions J24 and J23 (Aston under Lyne) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.01 miles from Whittlestone Head.

Location: anticlockwise exit slip at junction J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 May 2025 to 08:00 on 20 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule : From 23:59 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : From 21:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.87 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J20 (Blackley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 May 2025 to 23 May 2025.
Schedule : From 23:59 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : From 21:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.83 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J19 (Middleton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 23:59 on 24 June 2025 to 06:00 on 25 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 21:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.65 miles from Whittlestone Head.

Location: anticlockwise entry slip at junction J19 (Middleton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 23:59 on 24 June 2025 to 06:00 on 25 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 21:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.65 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.65 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 July 2025 to 06:00 on 4 July 2025.
Schedule : From 23:59 on 4 July 2025 to 06:00 on 5 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.93 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 21 May 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.92 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 7 June 2025.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.93 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:59 and 06:00 from 16 June 2025 to 18 June 2025.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.84 miles from Whittlestone Head.

Location: anticlockwise between junctions J21 (Oldham) and J19 (Middleton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 24 June 2025 to 06:00 on 25 June 2025.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.83 miles from Whittlestone Head.

Location: eastbound exit slip at junction J22 (Ripponden) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 May 2025 to 05:00 on 17 May 2025.
Schedule : From 20:00 on 22 May 2025 to 05:00 on 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.58 miles from Whittlestone Head.

Location: eastbound at junction J22 (Ripponden) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2025 to 05:00 on 23 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.58 miles from Whittlestone Head.

Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2025 to 05:00 on 23 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.23 miles from Whittlestone Head.

Location: eastbound between junctions J10 (M6) and J11 (Warrington) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.97 miles from Whittlestone Head.

Location: anticlockwise between junctions J24 and J23 (Aston under Lyne) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 23:59 on 27 May 2025 to 06:00 on 28 May 2025.
Nearest town: 18.01 miles from Whittlestone Head.

Location: northbound exit slip at junction J27 (Parbold) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 05:00 on 2 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.33 miles from Whittlestone Head.

Location: westbound between junctions J21 (Milnrow) and J20 (Rochdale) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:00 on 29 March 2026 to 00:00 on 30 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.25 miles from Whittlestone Head.

Location: eastbound between junctions J20 (Rochdale) and J21 (Milnrow) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:00 on 29 June 2025 to 00:00 on 30 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.83 miles from Whittlestone Head.
