Location: eastbound between junctions J4 (Guildford) and J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Pedestrians in the road.
Time To Clear : The event is expected to clear between 12:00 and 12:15 on 5 December 2025.
Normal traffic conditions are expected between 12:00 and 12:15 on 5 December 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 13.87 miles from Weston Patrick.

Location: southbound between the junctions with the A272 and the A33 .
Due to: Congestion.
Normal traffic conditions are expected between 13:30 and 13:45 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.26 miles from Weston Patrick.

Location: eastbound at junction J11 (Winchester) .
Due to: Congestion.
Normal traffic conditions are expected between 12:45 and 13:00 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.95 miles from Weston Patrick.

Location: eastbound at junction J11 (Winchester) .
Due to: Congestion.
Normal traffic conditions are expected between 12:45 and 13:00 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.39 miles from Weston Patrick.

Location: eastbound at junction J11 (Winchester) .
Due to: Congestion.
Normal traffic conditions are expected between 12:15 and 12:30 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.95 miles from Weston Patrick.

Location: westbound between junctions J11 (Winchester) and J12 (Eastleigh) .
Due to: Congestion.
Normal traffic conditions are expected between 11:45 and 12:00 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.72 miles from Weston Patrick.

Location: westbound exit slip at junction J9 (Winchester) .
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.26 miles from Weston Patrick.

Location: southbound between the A272 and the junction with the M3 .
Due to: Congestion.
Normal traffic conditions are expected between 13:00 and 13:15 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.22 miles from Weston Patrick.

Location: eastbound exit slip at junction J11 (Basingstoke) .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 5 December 2025.
Nearest town: 14.22 miles from Weston Patrick.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 13 December 2025.
Nearest town: 3.91 miles from Weston Patrick.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.3 miles from Weston Patrick.

Location: westbound between junctions J6 (Basingstoke) and J7 (Basingstoke) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.09 miles from Weston Patrick.

Location: northbound between the A33 and the junction with the A303 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.75 miles from Weston Patrick.

Location: northbound entry slip from the A272 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.04 miles from Weston Patrick.

Location: southbound entry slip from the A303 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.3 miles from Weston Patrick.

Location: southbound between the A343 and the junction with the A272 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.06 miles from Weston Patrick.

Location: northbound between the junctions with the A303 and the A343 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.08 miles from Weston Patrick.

Location: southbound between the junctions with the A343 and the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.45 miles from Weston Patrick.

Location: westbound between junctions J8 (High Wycombe) and J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.84 miles from Weston Patrick.

Location: southbound entry slip from the A322 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.55 miles from Weston Patrick.

Location: southbound between the A320 and the junction with the A31 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.45 miles from Weston Patrick.

Location: southbound between the junctions with the A3100 and the A320 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.99 miles from Weston Patrick.

Location: westbound exit slip at junction J6 (Basingstoke) .
Due to: Roadworks scheme.
Period : from 21:03 on 25 November 2025 to 06:00 on 13 December 2025.
Nearest town: 4.02 miles from Weston Patrick.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 6 December 2025.
Nearest town: 3.91 miles from Weston Patrick.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 12 December 2025.
Nearest town: 3.82 miles from Weston Patrick.

Location: southbound entry slip from the A33 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2027.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.7 miles from Weston Patrick.

Location: northbound between the junctions with the A272 and the A303 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 11 December 2025 to 05:30 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.14 miles from Weston Patrick.

Location: southbound between the junctions with the A303 and the A272 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 11 December 2025 to 05:30 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.97 miles from Weston Patrick.

Location: southbound between the A320 and the junction with the A31 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 January 2026 to 06:00 on 9 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.6 miles from Weston Patrick.

Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.52 miles from Weston Patrick.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.24 miles from Weston Patrick.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.88 miles from Weston Patrick.

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.67 miles from Weston Patrick.

Location: northbound between the A303 and the junction with the A343 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.01 miles from Weston Patrick.

Location: southbound between the A343 and the junction with the A303 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.97 miles from Weston Patrick.

Location: southbound between the A31 and the junction with the A283 Milford south.
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.76 miles from Weston Patrick.

Location: northbound between the A333 and the junction with the A283 Milford north.
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.58 miles from Weston Patrick.

Location: westbound entry slip at junction J9 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.34 miles from Weston Patrick.

Location: westbound exit slip at junction J9 (Winchester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 11 December 2025 to 06:00 on 15 December 2025.
Nearest town: 15.22 miles from Weston Patrick.

Location: westbound exit slip at junction J9 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.22 miles from Weston Patrick.

Location: southbound entry slip from the A33 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 February 2026 to 21:00 on 8 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.7 miles from Weston Patrick.

Location: southbound between the A272 and the junction with the M3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 February 2026 to 21:00 on 8 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.99 miles from Weston Patrick.

Location: southbound between the A272 and the junction with the M3 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.19 miles from Weston Patrick.

Location: southbound entry slip from the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 February 2026 to 21:00 on 8 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.97 miles from Weston Patrick.

Location: northbound exit slip to the A303 westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 January 2026 to 2 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 February 2026 to 2 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.36 miles from Weston Patrick.

Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 10 December 2025 to 06:00 on 2 March 2026.
Nearest town: 14.77 miles from Weston Patrick.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 January 2026 to 2 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 February 2026 to 2 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.77 miles from Weston Patrick.

Location: northbound between the A272 and the junction with the A343 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.14 miles from Weston Patrick.

Location: northbound between the A272 and the junction with the A343 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 February 2026 to 14 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 February 2026 to 21 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 February 2026 to 28 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.39 miles from Weston Patrick.

Location: northbound between the A33 and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 January 2026 to 2 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 February 2026 to 2 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.88 miles from Weston Patrick.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 January 2026 to 2 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 February 2026 to 2 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.9 miles from Weston Patrick.

Location: northbound exit slip to the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 January 2026 to 2 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 February 2026 to 2 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.28 miles from Weston Patrick.

Location: northbound exit slip to the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.28 miles from Weston Patrick.

Location: northbound exit slip to the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 February 2026 to 14 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 February 2026 to 21 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 February 2026 to 28 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.28 miles from Weston Patrick.

Location: northbound entry slip from the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 January 2026 to 2 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 February 2026 to 2 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.04 miles from Weston Patrick.

Location: westbound between the M3 and the junction with the A34 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.15 miles from Weston Patrick.

Location: eastbound entry slip at junction J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.59 miles from Weston Patrick.

Location: eastbound between the A34 and the junction with the M3 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.59 miles from Weston Patrick.

Location: northbound between the A303 and the junction with the A4 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.95 miles from Weston Patrick.

Location: southbound between the A4 and the junction with the A343 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.66 miles from Weston Patrick.

Location: westbound entry slip at junction J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 December 2025 to 06:00 on 15 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 December 2025 to 19 December 2025.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.82 miles from Weston Patrick.

Location: westbound between junctions J4A (Farnborough) and J5 (Hook) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.3 miles from Weston Patrick.

Location: westbound between junctions J4A (Farnborough) and J6 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2025 to 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.4 miles from Weston Patrick.

Location: westbound between junctions J5 (Hook) and J6 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 December 2025 to 06:00 on 15 December 2025.
Schedule : From 20:00 on 19 December 2025 to 06:00 on 21 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5 miles from Weston Patrick.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.19 miles from Weston Patrick.

Location: eastbound exit slip at junction J5 (Hook) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 8 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.64 miles from Weston Patrick.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:59 and 06:00 from 10 December 2025 to 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.85 miles from Weston Patrick.

Location: southbound between the A303 and the junction with the A272 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.44 miles from Weston Patrick.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2025 to 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.71 miles from Weston Patrick.

Location: northbound between the A272 and the junction with the A303 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.03 miles from Weston Patrick.

Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.02 miles from Weston Patrick.

Location: westbound at junction J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.43 miles from Weston Patrick.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.96 miles from Weston Patrick.

Location: northbound between the junctions with the A325 and the A333 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.9 miles from Weston Patrick.

Location: southbound between the junctions with the A333 and the A325 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.25 miles from Weston Patrick.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 13 December 2025.
Nearest town: 14.85 miles from Weston Patrick.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.39 miles from Weston Patrick.

Location: southbound between the A325 and the junction with the A272 Petersfield South.
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.98 miles from Weston Patrick.

Location: northbound between the A272 Petersfield South and the junction with the A325 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.66 miles from Weston Patrick.

Location: southbound between the A325 and the junction with the A272 Petersfield North.
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.98 miles from Weston Patrick.

Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.55 miles from Weston Patrick.

Location: westbound between junctions J5 (Hook) and J6 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 December 2025 to 15 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 December 2025 to 21 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.98 miles from Weston Patrick.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 December 2025 to 8 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.29 miles from Weston Patrick.

Location: westbound at junction J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.85 miles from Weston Patrick.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.66 miles from Weston Patrick.

Location: westbound exit slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.85 miles from Weston Patrick.

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.08 miles from Weston Patrick.

Location: westbound between junctions J11 (Basingstoke) and J13 (Newbury) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 13 December 2025.
Nearest town: 15.11 miles from Weston Patrick.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.85 miles from Weston Patrick.

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.11 miles from Weston Patrick.

Location: westbound entry slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.05 miles from Weston Patrick.

Location: southbound between the A320 and the junction with the A31 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 January 2026 to 06:00 on 9 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.6 miles from Weston Patrick.

Location: westbound between junctions J5 (Hook) and J6 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.91 miles from Weston Patrick.

Location: westbound exit slip at junction J6 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.02 miles from Weston Patrick.

Location: westbound entry slip at junction J6 (Basingstoke) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2025 to 06:00 on 29 November 2025.
Schedule : From 21:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4 miles from Weston Patrick.

Location: westbound exit slip at junction J6 (Basingstoke) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 December 2025 to 06:00 on 10 December 2025.
Schedule : From 21:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.02 miles from Weston Patrick.

Location: eastbound exit slip at junction J6 (Basingstoke) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.05 miles from Weston Patrick.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.91 miles from Weston Patrick.

Location: eastbound entry slip at junction J6 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.09 miles from Weston Patrick.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.05 miles from Weston Patrick.

Location: eastbound exit slip at junction J5 (Hook) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.64 miles from Weston Patrick.

Location: westbound between junctions J4A (Farnborough) and J6 (Basingstoke) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 21 December 2025.
Nearest town: 7.3 miles from Weston Patrick.

Location: eastbound between junctions J6 (Basingstoke) and J5 (Hook) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 20 December 2025.
Nearest town: 4.05 miles from Weston Patrick.

Location: southbound between the A272 and the junction with the M3 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2025 to 21:00 on 8 February 2026.
Nearest town: 14.3 miles from Weston Patrick.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 13 December 2025.
Nearest town: 16.66 miles from Weston Patrick.

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 18 December 2025.
Nearest town: 16.8 miles from Weston Patrick.

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 13 December 2025.
Nearest town: 15.08 miles from Weston Patrick.

Location: westbound at junction J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Schedule : From 20:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.85 miles from Weston Patrick.

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Schedule : From 20:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.08 miles from Weston Patrick.

Location: westbound exit slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 December 2025 to 06:00 on 9 December 2025.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.85 miles from Weston Patrick.