Location: southbound between junctions J16 (Thornbury) and J17 (Bristol West) .
Lane Closures : The hard shoulder is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 16:30 and 16:45 on 5 December 2025.
Normal traffic conditions are expected between 16:30 and 16:45 on 5 December 2025.
Nearest town: 7.72 miles from Warmley Tower.

Location: southbound between the M4 and the junction with the A420 .
Due to: Congestion.
Normal traffic conditions are expected between 16:15 and 16:30 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.18 miles from Warmley Tower.

Location: westbound between the M4 and junction J1 (Avonmouth) .
Due to: Congestion.
Normal traffic conditions are expected between 15:45 and 16:00 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.55 miles from Warmley Tower.

Location: northbound between the junctions with the A420 and the M4 .
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.28 miles from Warmley Tower.

Location: southbound between the junctions with the A4 and the A366 .
Due to: Congestion.
Normal traffic conditions are expected between 15:00 and 15:15 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.59 miles from Warmley Tower.

Location: northbound between the junctions with the A4 and the A420 .
Due to: Congestion.
Normal traffic conditions are expected between 15:00 and 15:15 on 5 December 2025.
Nearest town: 5.27 miles from Warmley Tower.

Location: northbound between the A4 and the junction with the A420 .
Due to: Congestion.
Normal traffic conditions are expected between 14:30 and 14:45 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.27 miles from Warmley Tower.

Location: northbound between the A4 and the junction with the A420 .
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 5 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.38 miles from Warmley Tower.

Location: southbound exit slip at junction J21 (Weston super Mare) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 05:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.08 miles from Warmley Tower.

Location: northbound exit slip at junction J21 (Weston super Mare) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 05:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.49 miles from Warmley Tower.

Location: northbound between the junctions with the A350 north and the A3098 .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 04:00 on 6 December 2025.
Nearest town: 19.76 miles from Warmley Tower.

Location: southbound between the junctions with the A3098 and the A350 north.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 04:00 on 6 December 2025.
Nearest town: 19.51 miles from Warmley Tower.

Location: northbound between the M5 and the junction with the M4 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.99 miles from Warmley Tower.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.65 miles from Warmley Tower.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.24 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Nearest town: 8.33 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.33 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.77 miles from Warmley Tower.

Location: westbound exit slip at junction J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.51 miles from Warmley Tower.

Location: southbound exit slip at junction J15 (Almondsbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.76 miles from Warmley Tower.

Location: eastbound entry slip at junction J20 (Bristol) from M5 south.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.7 miles from Warmley Tower.

Location: eastbound entry slip at junction J20 (Bristol) from M5 north.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Nearest town: 7.68 miles from Warmley Tower.

Location: eastbound entry slip at junction J20 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Nearest town: 7.56 miles from Warmley Tower.

Location: eastbound entry slip at junction J20 (Bristol) from M5 south.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Nearest town: 7.57 miles from Warmley Tower.

Location: eastbound entry slip at junction J20 (Bristol) from M5 south.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.7 miles from Warmley Tower.

Location: southbound between junctions J14 (Dursley) and J15 (Almondsbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.37 miles from Warmley Tower.

Location: westbound entry slip at junction J20 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.7 miles from Warmley Tower.

Location: northbound between the A361 North and the junction with the A366 .
Due to: Horticultural works.
Period : expect disruption until 16:00 on 5 December 2025.
Nearest town: 13.94 miles from Warmley Tower.

Location: southbound between the A366 and the junction with the A361 North.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 5 December 2025.
Nearest town: 13.73 miles from Warmley Tower.

Location: northbound between junctions J20 (Nailsea) and J19 (Portishead) .
Due to: Roadworks scheme.
Period : from 20:10 on 4 December 2025 to 06:00 on 6 December 2025.
Nearest town: 14.32 miles from Warmley Tower.

Location: northbound between junctions J20 (Nailsea) and J19 (Portishead) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.52 miles from Warmley Tower.

Location: northbound between junctions J20 (Nailsea) and J19 (Portishead) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.32 miles from Warmley Tower.

Location: southbound between the A420 and the junction with the A4 .
Due to: Roadworks scheme.
Period : from 02:00 on 2 December 2025 to 05:00 on 20 December 2025.
Nearest town: 6.43 miles from Warmley Tower.

Location: southbound between the junctions with the A420 and the A4 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 20 December 2025.
Nearest town: 6.54 miles from Warmley Tower.

Location: southbound between the junctions with the A420 and the A4 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 20 December 2025.
Nearest town: 6.43 miles from Warmley Tower.

Location: northbound between the A4 and the junction with the A420 .
Due to: Roadworks scheme.
Period : from 02:00 on 2 December 2025 to 05:00 on 20 December 2025.
Nearest town: 6.6 miles from Warmley Tower.

Location: northbound between the junctions with the A4 and the A420 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 20 December 2025.
Nearest town: 6.6 miles from Warmley Tower.

Location: northbound between the junctions with the A4 and the A420 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 20 December 2025.
Nearest town: 6.58 miles from Warmley Tower.

Location: northbound between junctions J3 and J1 (Filton) .
Due to: Roadworks scheme.
Period : from 20:08 on 28 November 2025 to 06:00 on 13 December 2025.
Nearest town: 3.92 miles from Warmley Tower.

Location: northbound between the M5 and the junction with the M4 .
Due to: Roadworks scheme.
Period : from 20:01 on 3 December 2025 to 06:00 on 6 December 2025.
Nearest town: 8.99 miles from Warmley Tower.

Location: southbound between the junctions with the A4 and the A366 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 10:00 on 9 December 2025 to 14:00 on 9 December 2025.
Nearest town: 7.72 miles from Warmley Tower.

Location: northbound between the junctions with the A366 and the A4 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 10:00 on 9 December 2025 to 14:00 on 9 December 2025.
Nearest town: 7.82 miles from Warmley Tower.

Location: northbound between junctions J20 (Nailsea) and J19 (Portishead) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 08:00 on 9 December 2025 to 17:00 on 9 December 2025.
Nearest town: 13.52 miles from Warmley Tower.

Location: northbound between junctions J20 (Nailsea) and J19 (Portishead) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 08:00 on 9 December 2025 to 17:00 on 9 December 2025.
Nearest town: 14.08 miles from Warmley Tower.

Location: northbound between the junctions with the A366 and the A4 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 10 December 2025 to 12:00 on 10 December 2025.
Nearest town: 10.01 miles from Warmley Tower.

Location: southbound between the junctions with the A4 and the A366 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 10 December 2025 to 12:00 on 10 December 2025.
Nearest town: 9.92 miles from Warmley Tower.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.33 miles from Warmley Tower.

Location: westbound between the A363 and the junction with the A46 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Nearest town: 8.33 miles from Warmley Tower.

Location: westbound between the junctions with the A363 and the A46 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.33 miles from Warmley Tower.

Location: westbound exit slip to the A46 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.67 miles from Warmley Tower.

Location: southbound between the M4 and the junction with the M5 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.95 miles from Warmley Tower.

Location: northbound between the M5 and the junction with the M4 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.99 miles from Warmley Tower.

Location: eastbound at junction J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.74 miles from Warmley Tower.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 5.96 miles from Warmley Tower.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.66 miles from Warmley Tower.

Location: northbound between junctions J22 (Burnham on Sea) and J21 (Weston super Mare) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 08:00 on 11 December 2025 to 16:00 on 11 December 2025.
Nearest town: 19.1 miles from Warmley Tower.

Location: westbound entry slip at junction J22 (Avonmouth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.18 miles from Warmley Tower.

Location: westbound between junctions J21 (Chepstow) and J22 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.49 miles from Warmley Tower.

Location: northbound between the junctions with the M5 and the M4 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.89 miles from Warmley Tower.

Location: eastbound between junctions J20 (Bristol) and J19 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.11 miles from Warmley Tower.

Location: eastbound exit slip at junction J19 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.91 miles from Warmley Tower.

Location: westbound exit slip at junction J22 (Avonmouth) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.04 miles from Warmley Tower.

Location: southbound exit slip at junction J1 (Filton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.46 miles from Warmley Tower.

Location: eastbound entry slip at junction J20 (Bristol) from M5 south.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.7 miles from Warmley Tower.

Location: southbound between junctions J14 (Dursley) and J15 (Almondsbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.21 miles from Warmley Tower.

Location: southbound entry slip at junction J15 (Almondsbury) from M4 eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.9 miles from Warmley Tower.

Location: southbound between junctions J15 (Almondsbury) and J17 (Bristol West) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.76 miles from Warmley Tower.

Location: southbound entry slip at junction J18 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.67 miles from Warmley Tower.

Location: southbound entry slip at junction J16 (Thornbury) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.72 miles from Warmley Tower.

Location: southbound at junction J16 (Thornbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.76 miles from Warmley Tower.

Location: northbound entry slip at junction J21 (Weston super Mare) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.39 miles from Warmley Tower.

Location: northbound between junctions J21 (Weston super Mare) and J20 (Nailsea) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.42 miles from Warmley Tower.

Location: northbound between junctions J20 (Nailsea) and J19 (Portishead) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 9 December 2025 to 10 December 2025.
Nearest town: 12.39 miles from Warmley Tower.

Location: westbound at junction J22 (Avonmouth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 01:00 on 8 December 2025.
Schedule : From 20:00 on 14 December 2025 to 01:00 on 15 December 2025.
Schedule : From 19:00 on 19 December 2025 to 00:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.21 miles from Warmley Tower.

Location: eastbound at junction J22 (Avonmouth) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 01:00 on 8 December 2025.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Schedule : From 20:00 on 14 December 2025 to 01:00 on 15 December 2025.
Schedule : From 20:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.35 miles from Warmley Tower.

Location: northbound between the junctions with the A366 and the A4 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 11 December 2025 to 15:30 on 11 December 2025.
Nearest town: 9.9 miles from Warmley Tower.

Location: southbound between the junctions with the A4 and the A366 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 11 December 2025 to 15:30 on 11 December 2025.
Nearest town: 9.8 miles from Warmley Tower.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 11 December 2025 to 17:00 on 11 December 2025.
Nearest town: 4.9 miles from Warmley Tower.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 08:00 on 11 December 2025 to 17:00 on 11 December 2025.
Nearest town: 4.86 miles from Warmley Tower.

Location: eastbound at junction J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 11 December 2025 to 17:00 on 11 December 2025.
Nearest town: 6.74 miles from Warmley Tower.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 11 December 2025 to 17:00 on 11 December 2025.
Nearest town: 5.96 miles from Warmley Tower.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 11 December 2025 to 17:00 on 11 December 2025.
Nearest town: 4.86 miles from Warmley Tower.

Location: northbound between junctions J18A (South Wales) and J17 (Bristol West) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.88 miles from Warmley Tower.

Location: northbound entry slip at junction J16 (Thornbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.78 miles from Warmley Tower.

Location: eastbound exit slip at junction J22 (Avonmouth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.35 miles from Warmley Tower.

Location: eastbound between junctions J23 (Chepstow) and J22 (Avonmouth) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 10 December 2025 to 06:00 on 11 December 2025.
Nearest town: 14.38 miles from Warmley Tower.

Location: eastbound between junctions J23 (Chepstow) and J22 (Avonmouth) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.38 miles from Warmley Tower.

Location: eastbound between junctions J2 (Chepstow) and J1 (Avonmouth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.24 miles from Warmley Tower.

Location: southbound between the junctions with the M4 and the M5 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.74 miles from Warmley Tower.

Location: westbound exit slip at Leigh Delamere Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.29 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 12 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.71 miles from Warmley Tower.

Location: northbound between junctions J19 (Portishead) and J18 (Bristol) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 5 December 2025 to 08:00 on 6 December 2025.
Schedule : From 19:00 on 6 December 2025 to 09:00 on 7 December 2025.
Schedule : From 19:00 on 7 December 2025 to 06:00 on 8 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 December 2025 to 12 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.51 miles from Warmley Tower.

Location: northbound at junction J19 (Portishead) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 5 December 2025 to 08:00 on 6 December 2025.
Schedule : From 19:00 on 6 December 2025 to 09:00 on 7 December 2025.
Schedule : From 19:00 on 7 December 2025 to 06:00 on 8 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.84 miles from Warmley Tower.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 10 December 2025 to 17:00 on 10 December 2025.
Nearest town: 4.14 miles from Warmley Tower.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 10 December 2025 to 17:00 on 10 December 2025.
Nearest town: 7.39 miles from Warmley Tower.

Location: northbound between the junctions with the A361 South and the A361 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.65 miles from Warmley Tower.

Location: southbound between the junctions with the A361 North and the A361 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.04 miles from Warmley Tower.

Location: westbound between the M4 and junction J1 (Avonmouth) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Nearest town: 10.06 miles from Warmley Tower.

Location: westbound at junction J1 (Avonmouth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.87 miles from Warmley Tower.

Location: westbound between the M4 and junction J1 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.06 miles from Warmley Tower.

Location: northbound between junctions J21 (Weston super Mare) and J20 (Nailsea) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.45 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 9 December 2025 to 17:00 on 9 December 2025.
Nearest town: 11.7 miles from Warmley Tower.

Location: southbound between junctions J18 (Bristol) and J19 (Portishead) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 December 2025 to 15 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.86 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 10 December 2025.
Nearest town: 12.99 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.99 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.99 miles from Warmley Tower.

Location: eastbound between junctions J2 (Chepstow) and J1 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.24 miles from Warmley Tower.

Location: westbound between the M4 and junction J1 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.47 miles from Warmley Tower.

Location: northbound between junctions J18A (South Wales) and J17 (Bristol West) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 8 December 2025 to 12 December 2025.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 15 December 2025 to 19 December 2025.
Nearest town: 8.17 miles from Warmley Tower.

Location: northbound between the junctions with the A366 and the A4 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 8 December 2025 to 15:30 on 8 December 2025.
Nearest town: 10.09 miles from Warmley Tower.

Location: southbound between the junctions with the A4 and the A366 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 8 December 2025 to 15:30 on 8 December 2025.
Nearest town: 10.08 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 December 2025 to 19 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.74 miles from Warmley Tower.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 8 December 2025 to 17:00 on 8 December 2025.
Nearest town: 14.37 miles from Warmley Tower.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 8 December 2025 to 17:00 on 8 December 2025.
Nearest town: 6.87 miles from Warmley Tower.

Location: southbound between junctions J19 (Portishead) and J20 (Nailsea) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 8 December 2025 to 16:00 on 8 December 2025.
Nearest town: 12.64 miles from Warmley Tower.

Location: southbound between junctions J20 (Nailsea) and J22 (Burnham on Sea) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 10 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2025 to 13 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.34 miles from Warmley Tower.

Location: southbound between junctions J13 (Stroud) and J14 (Dursley) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 6 December 2025 to 23 December 2025.
Nearest town: 18.61 miles from Warmley Tower.

Location: southbound between junctions J14 (Dursley) and J15 (Almondsbury) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 6 December 2025 to 23 December 2025.
Nearest town: 9.33 miles from Warmley Tower.

Location: southbound between junctions J17 (Bristol West) and J18 (Bristol) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 6 December 2025 to 23 December 2025.
Nearest town: 7.94 miles from Warmley Tower.

Location: northbound between junctions J22 (Burnham on Sea) and J20 (Nailsea) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.98 miles from Warmley Tower.

Location: northbound exit slip at junction J1 (Filton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 December 2025 to 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.2 miles from Warmley Tower.

Location: northbound between junctions J2 (Stapleton) and J1 (Filton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.61 miles from Warmley Tower.

Location: northbound between junctions J3 and J2 (Stapleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.81 miles from Warmley Tower.

Location: northbound at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.92 miles from Warmley Tower.

Location: northbound at junction J20 (Nailsea) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 04:00 from 5 December 2025 to 28 March 2026.
Schedule : From 20:00 on 28 March 2026 to 04:00 on 29 March 2026.
Schedule : Expect disruption everyday between 20:00 and 04:00 from 29 March 2026 to 1 April 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.02 miles from Warmley Tower.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 December 2025 to 27 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.79 miles from Warmley Tower.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 December 2025 to 27 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.48 miles from Warmley Tower.