Location: southbound between the M23 and the junction with the A272 .
Due to: Emergency resurfacing.
Period : from 21:24 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 12.32 miles from Upper Hartfield.

Location: southbound between the M23 and the junction with the A272 .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 00:00 and 00:15 on 24 January 2026.
Normal traffic conditions are expected between 01:00 and 01:15 on 24 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 12.32 miles from Upper Hartfield.

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 19:00 and 19:15 on 23 January 2026.
Normal traffic conditions are expected between 19:00 and 19:15 on 23 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 14.28 miles from Upper Hartfield.

Location: eastbound between junctions J3 (Sevenoaks) and J4 (West Malling) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 19:15 and 19:30 on 23 January 2026.
Normal traffic conditions are expected between 19:15 and 19:30 on 23 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.95 miles from Upper Hartfield.

Location: anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 16:30 and 16:45 on 23 January 2026.
Normal traffic conditions are expected between 16:30 and 16:45 on 23 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 13.83 miles from Upper Hartfield.

High Street (All Directions) at the junction of Homefield Rise - Temporary Traffic Signals to facilitate works Traffic is moving well.
Nearest town: 19.95 miles from Upper Hartfield.

Sanderstead Hill (Both Directions) at the junction of Sundown Avenue - Possible lane closures because of a collision.
The road has reopened.
Nearest town: 18.75 miles from Upper Hartfield.

Farnborough Common (Both Directions) at the junction of Hilda Vale Road - Temporary signals in operation to facilitate resurfacing works.
Nearest town: 19.09 miles from Upper Hartfield.

Location: southbound exit slip at junction J10 (Crawley) .
Due to: Congestion.
Normal traffic conditions are expected between 19:00 and 19:15 on 23 January 2026.
Nearest town: 10.25 miles from Upper Hartfield.

Location: southbound exit slip at junction J10A (Crawley) .
Due to: Congestion.
Normal traffic conditions are expected between 19:30 and 19:45 on 23 January 2026.
Nearest town: 9.91 miles from Upper Hartfield.

Location: southbound exit slip at junction J11 (Brighton) .
Due to: Congestion.
Normal traffic conditions are expected between 20:45 and 21:00 on 23 January 2026.
Nearest town: 10.65 miles from Upper Hartfield.

Location: southbound between the M23 and the junction with the A272 .
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 23 January 2026.
Delay : There are currently delays of 30 minutes against expected traffic.
Nearest town: 12.65 miles from Upper Hartfield.

Location: southbound between the junctions with the A228 and the A262 .
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 23 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.79 miles from Upper Hartfield.

Location: eastbound entry slip at junction J2A .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 23 January 2026.
Nearest town: 18.59 miles from Upper Hartfield.

Location: northbound between the junctions with the M23 and the A237 .
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 23 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.09 miles from Upper Hartfield.

Location: eastbound at junction J2A .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 23 January 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.13 miles from Upper Hartfield.

Location: southbound exit slip to the A228 .
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 23 January 2026.
Nearest town: 10.53 miles from Upper Hartfield.

Location: The junction of the A27 and the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 16:00 and 16:15 on 23 January 2026.
Nearest town: 19.59 miles from Upper Hartfield.

Location: The junction of the A2270 and the A27 .
Due to: Congestion.
Normal traffic conditions are expected between 16:00 and 16:15 on 23 January 2026.
Nearest town: 19.62 miles from Upper Hartfield.

Location: eastbound between the junctions with the A270 Brighton West and the A293 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 24 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.64 miles from Upper Hartfield.

Location: northbound between the junctions with the A27 and the A273 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 January 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.87 miles from Upper Hartfield.

Location: northbound between the A27 and the junction with the A2300 .
Due to: Roadworks scheme.
Period : from 20:03 on 23 January 2026 to 06:00 on 24 January 2026.
Nearest town: 17.87 miles from Upper Hartfield.

Location: northbound between the A281 and the junction with the A2300 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.93 miles from Upper Hartfield.

Location: eastbound between junctions J2A and J3 .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.31 miles from Upper Hartfield.

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 05:30 on 24 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.83 miles from Upper Hartfield.

Location: eastbound between the junctions with the A22 Polegate West and the A22 Polegate East.
Lane Closures : Lane two is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 24 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.06 miles from Upper Hartfield.

Location: westbound between the junctions with the A22 North and the A2270 .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 24 January 2026.
Nearest town: 19.13 miles from Upper Hartfield.

Location: eastbound between the junctions with the A2270 and the A22 North.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 24 January 2026.
Nearest town: 19.38 miles from Upper Hartfield.

Location: anticlockwise between junctions J7 (Gatwick) and J6 (East Grinstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 05:30 on 24 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.56 miles from Upper Hartfield.

Location: clockwise exit slip at junction J5 (Sevenoaks) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.98 miles from Upper Hartfield.

Location: southbound between the M25 and the junction with the A225 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.57 miles from Upper Hartfield.

Location: clockwise between junctions J6 (East Grinstead) and J7 (Gatwick) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.5 miles from Upper Hartfield.

Location: eastbound between the A23 and the junction with the A26 North.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Nearest town: 16.13 miles from Upper Hartfield.

Location: westbound at the junction with the A26 North.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Nearest town: 15.57 miles from Upper Hartfield.

Location: eastbound between the junctions with the A26 North and the A26 South.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Nearest town: 15.54 miles from Upper Hartfield.

Location: eastbound at the junction with the A277 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.84 miles from Upper Hartfield.

Location: eastbound at the junction with the A26 North.
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.54 miles from Upper Hartfield.

Location: westbound at the junction with the A277 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Nearest town: 15.87 miles from Upper Hartfield.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.88 miles from Upper Hartfield.

Location: westbound between the junctions with the A22 North and the A2270 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 January 2026.
Nearest town: 19.13 miles from Upper Hartfield.

Location: eastbound between the junctions with the A2270 and the A22 North.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 January 2026.
Nearest town: 19.54 miles from Upper Hartfield.

Location: westbound between the junctions with the A26 South and the A26 North.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Nearest town: 15.56 miles from Upper Hartfield.

Location: westbound between the junctions with the A26 North and the A277 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 January 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.58 miles from Upper Hartfield.

Location: anticlockwise between junctions J4 (Bromley) and J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 05:30 on 24 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.75 miles from Upper Hartfield.

Location: anticlockwise entry slip at junction J5 (Sevenoaks) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.16 miles from Upper Hartfield.

Location: clockwise entry slip at junction J5 (Sevenoaks) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.16 miles from Upper Hartfield.

Location: northbound between the A25 before A25 east exit and the junction with the M25 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 22 January 2026 to 05:30 on 23 January 2026.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.77 miles from Upper Hartfield.

Location: northbound entry slip from the A25 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.76 miles from Upper Hartfield.

Location: westbound between junction J3 and the M25 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 16:00 on 23 January 2026.
Nearest town: 19.01 miles from Upper Hartfield.

Location: anticlockwise exit slip at junction J8 (Reigate) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 23 January 2026 to 05:30 on 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.14 miles from Upper Hartfield.

Location: clockwise at junction J7 (Gatwick) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 16:00 on 23 January 2026.
Nearest town: 14.97 miles from Upper Hartfield.

Location: anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.18 miles from Upper Hartfield.

Location: southbound exit slip to the A26 .
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 10.7 miles from Upper Hartfield.

Location: eastbound between the A2038 and the junction with the A23 .
Due to: Roadworks scheme.
Period : from 20:02 on 23 January 2026 to 06:00 on 24 January 2026.
Nearest town: 19.36 miles from Upper Hartfield.

Location: eastbound between the junctions with the A2038 and the A23 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 January 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.08 miles from Upper Hartfield.

Location: eastbound entry slip from the A2038 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 19.36 miles from Upper Hartfield.

Location: southbound between junctions J10A (Crawley) and J11 (Brighton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.46 miles from Upper Hartfield.

Location: southbound between the M23 and the junction with the A272 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.31 miles from Upper Hartfield.

Location: eastbound entry slip from the A23 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.14 miles from Upper Hartfield.

Location: eastbound between the junctions with the A26 North and the A26 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Nearest town: 15.56 miles from Upper Hartfield.

Location: eastbound exit slip to the A23 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.34 miles from Upper Hartfield.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.58 miles from Upper Hartfield.

Location: eastbound between the junctions with the A2038 and the A23 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.11 miles from Upper Hartfield.

Location: westbound at the junction with the A26 North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Nearest town: 15.55 miles from Upper Hartfield.

Location: westbound between the junctions with the A26 South and the A26 North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Nearest town: 15.64 miles from Upper Hartfield.

Location: southbound between the A2300 and the junction with the A281 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.48 miles from Upper Hartfield.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 05:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.54 miles from Upper Hartfield.

Location: southbound between the junctions with the A27 and the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 04:00 on 28 January 2026.
Nearest town: 17.82 miles from Upper Hartfield.

Location: northbound between the junctions with the A259 and the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 04:00 on 28 January 2026.
Nearest town: 17.87 miles from Upper Hartfield.

Location: westbound between junction J2A and the M25 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.3 miles from Upper Hartfield.

Location: anticlockwise between junctions J8 (Reigate) and J7 (Gatwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 28 January 2026 to 05:30 on 29 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.76 miles from Upper Hartfield.

Location: clockwise between junctions J4 (Bromley) and J5 (Sevenoaks) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:30 on 30 January 2026.
Schedule : From 23:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.41 miles from Upper Hartfield.

Location: anticlockwise between junctions J5 (Sevenoaks) and J4 (Bromley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 January 2026 to 05:30 on 30 January 2026.
Schedule : From 23:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.88 miles from Upper Hartfield.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.15 miles from Upper Hartfield.

Location: eastbound entry slip from the A270 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.79 miles from Upper Hartfield.

Location: southbound entry slip from the A272 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.98 miles from Upper Hartfield.

Location: southbound exit slip to the A272 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.93 miles from Upper Hartfield.

Location: southbound exit slip to the A2300 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.45 miles from Upper Hartfield.

Location: southbound between the A2300 and the junction with the A281 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.45 miles from Upper Hartfield.

Location: southbound between the M23 and the junction with the A2300 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.5 miles from Upper Hartfield.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.54 miles from Upper Hartfield.

Location: clockwise at junction J6 (East Grinstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.36 miles from Upper Hartfield.

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.12 miles from Upper Hartfield.

Location: clockwise between junctions J6 (East Grinstead) and J7 (Gatwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.7 miles from Upper Hartfield.

Location: anticlockwise at junction J7 (Gatwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.68 miles from Upper Hartfield.

Location: anticlockwise exit slip at junction J7 (Gatwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.68 miles from Upper Hartfield.

Location: southbound entry slip at junction J8 (Reigate) from the M25 anticlockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.52 miles from Upper Hartfield.

Location: northbound entry slip at junction J8 (Reigate) from the M25 anticlockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.51 miles from Upper Hartfield.

Location: anticlockwise between junctions J8 (Reigate) and J7 (Gatwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 January 2026 to 05:30 on 27 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.59 miles from Upper Hartfield.

Location: northbound between the A28 and the junction with the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 29 January 2026 to 15:30 on 29 January 2026.
Nearest town: 19.74 miles from Upper Hartfield.

Location: southbound between the A2100 north of Battle and the junction with the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 29 January 2026 to 15:30 on 29 January 2026.
Nearest town: 19.53 miles from Upper Hartfield.

Location: clockwise between junctions J8 (Reigate) and J9 (Leatherhead) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 09:30 on 29 January 2026 to 16:00 on 29 January 2026.
Nearest town: 18.22 miles from Upper Hartfield.

Location: anticlockwise between junctions J4 (Bromley) and J3 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 January 2026 to 05:30 on 29 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.81 miles from Upper Hartfield.

Location: northbound between the A2300 and the junction with the M23 .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 January 2026 to 06:00 on 29 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.29 miles from Upper Hartfield.

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 January 2026 to 06:00 on 29 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.61 miles from Upper Hartfield.

Location: southbound between the M23 and the junction with the A2300 .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 January 2026 to 06:00 on 29 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.9 miles from Upper Hartfield.

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2026 to 06:00 on 26 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.68 miles from Upper Hartfield.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 05:00 on 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.42 miles from Upper Hartfield.

Location: westbound between the junctions with the A270 Brighton East and the A23 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 05:00 on 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.39 miles from Upper Hartfield.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 05:00 on 28 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.1 miles from Upper Hartfield.

Location: westbound between the A277 and the junction with the A23 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 05:00 on 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.61 miles from Upper Hartfield.

Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 06:00 on 28 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.73 miles from Upper Hartfield.

Location: northbound between the A281 and the junction with the A2300 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 06:00 on 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.95 miles from Upper Hartfield.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:00 from 26 January 2026 to 30 January 2026.
Nearest town: 14.36 miles from Upper Hartfield.

Location: northbound entry slip from the A2300 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:00 from 26 January 2026 to 30 January 2026.
Nearest town: 14.43 miles from Upper Hartfield.

Location: clockwise between junctions J8 (Reigate) and J9 (Leatherhead) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 January 2026 to 28 January 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.92 miles from Upper Hartfield.

Location: clockwise between junctions J4 (Bromley) and J5 (Sevenoaks) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 January 2026 to 29 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.92 miles from Upper Hartfield.

Location: anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 January 2026 to 28 January 2026.
Schedule : From 22:00 on 29 January 2026 to 05:30 on 30 January 2026.
Schedule : From 23:00 on 30 January 2026 to 06:00 on 31 January 2026.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 2 February 2026 to 6 February 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.18 miles from Upper Hartfield.

Location: anticlockwise entry slip at junction J5 (Sevenoaks) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 January 2026 to 29 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.38 miles from Upper Hartfield.

Location: anticlockwise between junctions J5 (Sevenoaks) and J4 (Bromley) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 January 2026 to 29 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.87 miles from Upper Hartfield.

Location: eastbound between the junctions with the A23 and the A277 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 27 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.31 miles from Upper Hartfield.

Location: eastbound between the A23 and the junction with the A277 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 27 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.09 miles from Upper Hartfield.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 27 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.4 miles from Upper Hartfield.

Location: eastbound between the junctions with the A26 North and the A26 South.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 29 January 2026.
Nearest town: 15.55 miles from Upper Hartfield.

Location: southbound between the junctions with the A273 and the A27 .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 27 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.26 miles from Upper Hartfield.

Location: westbound between the junctions with the A26 South and the A26 North.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 29 January 2026.
Nearest town: 16.13 miles from Upper Hartfield.

Location: southbound exit slip to the A25 west.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2026 to 29 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.67 miles from Upper Hartfield.

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2026 to 05:00 on 26 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.74 miles from Upper Hartfield.

Location: northbound entry slip at junction J10 (Crawley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2026 to 05:00 on 26 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.3 miles from Upper Hartfield.

Location: northbound at junction J10 (Crawley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2026 to 05:00 on 26 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.25 miles from Upper Hartfield.

Location: northbound at junction J9 (Gatwick Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2026 to 05:00 on 26 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.6 miles from Upper Hartfield.

Location: northbound between junctions J10 (Crawley) and J9 (Gatwick Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2026 to 05:00 on 26 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.33 miles from Upper Hartfield.

Location: eastbound between junctions J9A and J9 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2026 to 05:00 on 26 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.89 miles from Upper Hartfield.

Location: northbound entry slip at junction J9 (Gatwick Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2026 to 05:00 on 26 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.74 miles from Upper Hartfield.

Location: southbound at junction J10 (Crawley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 January 2026 to 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.28 miles from Upper Hartfield.

Location: northbound between junctions J11 (Brighton) and J10 (Crawley) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 January 2026 to 31 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.63 miles from Upper Hartfield.

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 February 2026 to 14 February 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 February 2026 to 21 February 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.28 miles from Upper Hartfield.

Location: southbound exit slip at junction J10A (Crawley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 14 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 February 2026 to 21 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.87 miles from Upper Hartfield.

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 January 2026 to 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.19 miles from Upper Hartfield.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 January 2026 to 06:00 on 24 January 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 January 2026 to 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.31 miles from Upper Hartfield.

Location: northbound between the A26 Tonbridge East and the junction with the A25 West.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 7 February 2026.
Nearest town: 10.81 miles from Upper Hartfield.

Location: northbound between the A26 Tonbridge East and the junction with the A25 West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.81 miles from Upper Hartfield.

Location: northbound entry slip from the A26 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.86 miles from Upper Hartfield.

Location: northbound entry slip from the A26 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.07 miles from Upper Hartfield.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.13 miles from Upper Hartfield.