Location: westbound between junctions J3 (Sevenoaks) and J2 (Paddock Wood) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Emergency Roadworks.
Period : expect disruption until 05:30 on 12 July 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 19.64 miles from The Valley.

Location: southbound between the A2500 and the junction with the M2 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 12 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.31 miles from The Valley.

Location: southbound between the junctions with the A262 and the A268 .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 12 July 2025.
Nearest town: 19.73 miles from The Valley.

Location: northbound between the junctions with the A268 and the A262 .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 12 July 2025.
Nearest town: 19.77 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.02 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.72 miles from The Valley.

Location: westbound between junctions J10A and J10 (Ashford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Nearest town: 9.4 miles from The Valley.

Location: westbound between junctions J10A and J10 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.37 miles from The Valley.

Location: westbound entry slip at junction J10A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.4 miles from The Valley.

Location: eastbound between junctions J6 (Maidstone) and J7 (Maidstone) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 12 July 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 11.94 miles from The Valley.

Location: eastbound between junctions J6 (Maidstone) and J7 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:09 on 11 July 2025 to 06:00 on 12 July 2025.
Nearest town: 11.94 miles from The Valley.

Location: eastbound at junction J7 (Maidstone) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 12 July 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.19 miles from The Valley.

Location: eastbound.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 12 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.19 miles from The Valley.

Location: eastbound between the A2050 Canterbury West and the junction with the A2050 Canterbury South.
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 12 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.17 miles from The Valley.

Location: eastbound entry slip from the A28 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 12 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 11.83 miles from The Valley.

Location: eastbound between junctions J10A and J11 (Canterbury) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 12 July 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 9.37 miles from The Valley.

Location: eastbound between the M2 and the junction with the A28 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 12 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.08 miles from The Valley.

Location: westbound between the A28 and the junction with the M2 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 12 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.88 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 12 July 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 5.83 miles from The Valley.

Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 06:00 on 12 July 2025.
Nearest town: 18.06 miles from The Valley.

Location: westbound between the junctions with the A2070 and the A268 .
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 06:00 on 12 July 2025.
Nearest town: 17.9 miles from The Valley.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Due to: Roadworks scheme.
Period : from 20:07 on 16 June 2025 to 06:00 on 21 July 2025.
Nearest town: 3.69 miles from The Valley.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:07 on 16 June 2025 to 06:00 on 5 August 2025.
Nearest town: 5.61 miles from The Valley.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 05:00 on 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.69 miles from The Valley.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 05:00 on 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.57 miles from The Valley.

Location: eastbound between the junctions with the A260 and the A256 Whitfield West .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.9 miles from The Valley.

Location: westbound entry slip from the A289 and A2.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 05:00 on 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.08 miles from The Valley.

Location: westbound between the A256 Whitfield West and the junction with the A260 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.12 miles from The Valley.

Location: eastbound between junctions J11A (Channel Tunnel) and J12 (Cheriton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 18 July 2025 to 15:30 on 18 July 2025.
Nearest town: 16.78 miles from The Valley.

Location: westbound between junctions J3 (Maidstone) and J2 (Strood) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 17 July 2025 to 06:00 on 18 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.28 miles from The Valley.

Location: eastbound between junctions J2 (Strood) and J3 (Maidstone) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 17 July 2025 to 06:00 on 18 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.25 miles from The Valley.

Location: eastbound entry slip at junction J6 (Faversham) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 July 2025 to 06:00 on 18 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.8 miles from The Valley.

Location: eastbound exit slip at junction J6 (Faversham) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 July 2025 to 06:00 on 18 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.68 miles from The Valley.

Location: northbound between the junctions with the A268 and the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 16 July 2025 to 15:00 on 16 July 2025.
Nearest town: 19.79 miles from The Valley.

Location: westbound at junction J12 (Cheriton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 17 July 2025 to 15:30 on 17 July 2025.
Nearest town: 18.05 miles from The Valley.

Location: westbound at junction J11 (Canterbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 17 July 2025 to 15:30 on 17 July 2025.
Nearest town: 15.16 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 17 July 2025 to 06:00 on 7 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 6.65 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 July 2025 to 06:00 on 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.8 miles from The Valley.

Location: eastbound between junctions J6 (Maidstone) and J9 (Ashford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 July 2025 to 06:00 on 7 August 2025.
Nearest town: 12.03 miles from The Valley.

Location: eastbound between junctions J6 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 July 2025 to 06:00 on 17 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.03 miles from The Valley.

Location: eastbound between junctions J7 (Maidstone) and J9 (Ashford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 17 July 2025 to 06:00 on 7 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.58 miles from The Valley.

Location: eastbound between junctions J7 (Maidstone) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 July 2025 to 06:00 on 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.84 miles from The Valley.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 July 2025 to 06:00 on 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.81 miles from The Valley.

Location: eastbound entry slip at junction J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 17 July 2025 to 06:00 on 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.81 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 July 2025 to 06:00 on 7 August 2025.
Nearest town: 6.8 miles from The Valley.

Location: eastbound at junction J7 (Maidstone) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 July 2025 to 06:00 on 17 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.19 miles from The Valley.

Location: westbound entry slip from the A289 and A2.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 July 2025 to 06:00 on 17 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.08 miles from The Valley.

Location: westbound between junctions J12 (Cheriton) and J11 (Canterbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 16 July 2025 to 15:30 on 16 July 2025.
Nearest town: 16.48 miles from The Valley.

Location: eastbound between junctions J11 (Canterbury) and J12 (Cheriton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 16 July 2025 to 15:30 on 16 July 2025.
Nearest town: 15.25 miles from The Valley.

Location: westbound between the A256 Whitfield West and the junction with the A260 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 05:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.12 miles from The Valley.

Location: eastbound between the A260 and the junction with the A256 Whitfield West .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 05:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.16 miles from The Valley.

Location: eastbound entry slip at Medway Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:15 on 15 July 2025 to 05:00 on 16 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.47 miles from The Valley.

Location: eastbound between junctions J3 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:15 on 15 July 2025 to 05:00 on 16 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.02 miles from The Valley.

Location: eastbound entry slip at junction J4 (Gillingham) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:15 on 15 July 2025 to 05:00 on 16 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.08 miles from The Valley.

Location: eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:15 on 15 July 2025 to 05:00 on 16 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.19 miles from The Valley.

Location: eastbound exit slip at junction J4 (Gillingham) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:15 on 15 July 2025 to 05:00 on 16 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.19 miles from The Valley.

Location: eastbound exit slip at Medway Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:15 on 15 July 2025 to 05:00 on 16 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.54 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 July 2025 to 05:00 on 16 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.8 miles from The Valley.

Location: westbound entry slip at junction J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 July 2025 to 05:00 on 16 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.55 miles from The Valley.

Location: northbound between the junctions with the A268 and the A262 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 July 2025 to 06:00 on 16 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.89 miles from The Valley.

Location: southbound entry slip from the M2 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 12 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.15 miles from The Valley.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 07:00 and 17:00 from 14 July 2025 to 15 July 2025.
Nearest town: 5.12 miles from The Valley.

Location: eastbound at junction J7 (Canterbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 July 2025 to 00:00 on 14 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.79 miles from The Valley.

Location: eastbound between junctions J5 (Aylesford) and J6 (Maidstone) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 15 July 2025 to 15:30 on 15 July 2025.
Nearest town: 13.1 miles from The Valley.

Location: eastbound between junctions J5 (Aylesford) and J6 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.76 miles from The Valley.

Location: eastbound between junctions J4 (West Malling) and J5 (Aylesford) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.34 miles from The Valley.

Location: northbound between the A259 and the junction with the A2042 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 18 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.53 miles from The Valley.

Location: southbound between the A2042 and the junction with the A259 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 18 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.03 miles from The Valley.

Location: westbound between the junctions with the A2050 Canterbury South and the A28 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 06:00 on 15 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.61 miles from The Valley.

Location: eastbound between junctions J6 (Maidstone) and J7 (Maidstone) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 14 July 2025 to 15:30 on 14 July 2025.
Nearest town: 12.03 miles from The Valley.

Location: westbound between junctions J4 (Gillingham) and J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 July 2025 to 05:00 on 14 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.92 miles from The Valley.

Location: westbound exit slip at junction J3 (Maidstone) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 July 2025 to 05:00 on 14 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.56 miles from The Valley.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 13 July 2025 to 06:00 on 14 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.12 miles from The Valley.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 13 July 2025 to 06:00 on 14 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.84 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 July 2025 to 06:00 on 14 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.66 miles from The Valley.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 July 2025 to 06:00 on 14 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.37 miles from The Valley.

Location: eastbound between the M20 and the junction with the A256 Dover West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 14 July 2025 to 15:30 on 14 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.99 miles from The Valley.

Location: northbound between the A2042 and the junction with the M20 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 06:00 on 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.87 miles from The Valley.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 July 2025 to 06:00 on 21 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.69 miles from The Valley.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 5 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.88 miles from The Valley.

Location: northbound between the A2042 and the junction with the M20 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 July 2025 to 06:00 on 19 July 2025.
Nearest town: 9.16 miles from The Valley.