Location: southbound between the A417 and the junction with the A361 .
Due to: Roadworks.
Period : from 20:04 on 4 December 2025 to 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.38 miles from Sunhill.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.7 miles from Sunhill.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.32 miles from Sunhill.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.01 miles from Sunhill.

Location: southbound between junctions J9 (Tewkesbury) and J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 07:00 on 6 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.67 miles from Sunhill.

Location: southbound between junctions J10 (Cheltenham) and J11 (Cheltenham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 07:00 on 6 December 2025.
Nearest town: 19.28 miles from Sunhill.

Location: southbound between junctions J10 (Cheltenham) and J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 December 2025 to 07:00 on 6 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.28 miles from Sunhill.

Location: southbound exit slip at junction J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.99 miles from Sunhill.

Location: eastbound between the junctions with the A417 north of Gloucester and the M5 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.07 miles from Sunhill.

Location: eastbound between the A417 north of Gloucester and the junction with the M5 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Sunhill.

Location: southbound between the A417 and the junction with the A361 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.66 miles from Sunhill.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Due to: Roadworks scheme.
Period : from 20:12 on 4 December 2025 to 06:00 on 5 December 2025.
Nearest town: 11.82 miles from Sunhill.

Location: eastbound at junction J16 (Swindon) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 11.71 miles from Sunhill.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 11.43 miles from Sunhill.

Location: eastbound exit slip at junction J15 (Swindon) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.88 miles from Sunhill.

Location: westbound between the junctions with the A417 north of Gloucester and the A38 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 17:00 on 5 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.94 miles from Sunhill.

Location: southbound exit slip at junction J10 (Cheltenham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.45 miles from Sunhill.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 18:00 on 31 July 2026.
Nearest town: 12.26 miles from Sunhill.

Location: northbound between the A419 and the junction with the A436 .
Due to: Roadworks scheme.
Period : from 17:01 on 2 July 2024 to 06:00 on 17 April 2026.
Nearest town: 12.26 miles from Sunhill.

Location: northbound between the junctions with the A419 and the A436 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Nearest town: 12.27 miles from Sunhill.

Location: southbound between the A436 and the junction with the A419 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Nearest town: 12.37 miles from Sunhill.

Location: northbound between the A436 and the junction with the A46 .
Due to: Roadworks scheme.
Period : from 09:14 on 3 February 2025 to 06:00 on 17 April 2026.
Nearest town: 13.95 miles from Sunhill.

Location: northbound between the junctions with the A436 and the A46 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.61 miles from Sunhill.

Location: northbound between the junctions with the A419 and the A436 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.26 miles from Sunhill.

Location: southbound between the A436 and the junction with the A419 .
Due to: Roadworks scheme.
Period : from 17:01 on 2 July 2024 to 06:00 on 17 April 2026.
Nearest town: 12.37 miles from Sunhill.

Location: northbound between the junctions with the A436 and the A46 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Nearest town: 13.95 miles from Sunhill.

Location: southbound between the junctions with the A46 and the A436 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Nearest town: 14.53 miles from Sunhill.

Location: westbound between the junctions with the A417 north of Gloucester and the A38 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.74 miles from Sunhill.

Location: southbound between junctions J11A (Gloucester) and J12 (Gloucester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Nearest town: 17.01 miles from Sunhill.

Location: southbound between junctions J11 (Cheltenham) and J12 (Gloucester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.11 miles from Sunhill.

Location: southbound entry slip at junction J11A (Gloucester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.01 miles from Sunhill.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2025 to 13 December 2025.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.45 miles from Sunhill.

Location: southbound between junctions J9 (Tewkesbury) and J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 December 2025 to 18 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.67 miles from Sunhill.

Location: southbound between junctions J9 (Tewkesbury) and J11 (Cheltenham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 10 December 2025 to 06:00 on 18 December 2025.
Nearest town: 19.67 miles from Sunhill.

Location: southbound exit slip at junction J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 December 2025 to 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.99 miles from Sunhill.

Location: southbound exit slip at junction J10 (Cheltenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 December 2025 to 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.45 miles from Sunhill.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.38 miles from Sunhill.

Location: southbound between junctions J11A (Gloucester) and J12 (Gloucester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.25 miles from Sunhill.

Location: westbound exit slip at Leigh Delamere Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.42 miles from Sunhill.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 12 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.06 miles from Sunhill.

Location: southbound between junctions J11A (Gloucester) and J12 (Gloucester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.29 miles from Sunhill.

Location: westbound between the M5 and the junction with the A417 north of Gloucester.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Nearest town: 18.32 miles from Sunhill.

Location: westbound between the M5 and the junction with the A417 north of Gloucester.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.81 miles from Sunhill.

Location: westbound between the junctions with the M5 and the A417 north of Gloucester.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.32 miles from Sunhill.

Location: southbound between junctions J10 (Cheltenham) and J11A (Gloucester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Nearest town: 18.28 miles from Sunhill.

Location: southbound between junctions J10 (Cheltenham) and J11A (Gloucester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.28 miles from Sunhill.

Location: southbound entry slip at junction J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.73 miles from Sunhill.

Location: southbound between junctions J10 (Cheltenham) and J11 (Cheltenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 8 December 2025 to 15:30 on 8 December 2025.
Nearest town: 18.86 miles from Sunhill.

Location: southbound exit slip at junction J12 (Gloucester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.77 miles from Sunhill.

Location: southbound between junctions J11A (Gloucester) and J12 (Gloucester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.01 miles from Sunhill.

Location: southbound at junction J11A (Gloucester) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.13 miles from Sunhill.

Location: southbound between junctions J11 (Cheltenham) and J11A (Gloucester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.12 miles from Sunhill.

Location: eastbound exit slip to the M5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.94 miles from Sunhill.

Location: northbound entry slip at junction J12 (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.93 miles from Sunhill.

Location: northbound entry slip at junction J12 (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.96 miles from Sunhill.

Location: eastbound between the junctions with the A417 north of Gloucester and the M5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.97 miles from Sunhill.

Location: northbound between junctions J12 (Gloucester) and J11A (Gloucester) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.98 miles from Sunhill.

Location: northbound entry slip at junction J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.9 miles from Sunhill.

Location: northbound between junctions J12 (Gloucester) and J11A (Gloucester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.23 miles from Sunhill.

Location: southbound at junction J11 (Cheltenham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.99 miles from Sunhill.

Location: southbound between junctions J11 (Cheltenham) and J11A (Gloucester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.73 miles from Sunhill.

Location: southbound between junctions J10 (Cheltenham) and J11 (Cheltenham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.63 miles from Sunhill.

Location: northbound between junctions J11A (Gloucester) and J11 (Cheltenham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.25 miles from Sunhill.

Location: northbound entry slip at junction J11A (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.11 miles from Sunhill.

Location: southbound exit slip at junction J11A (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.12 miles from Sunhill.

Location: southbound between junctions J9 (Tewkesbury) and J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.67 miles from Sunhill.

Location: southbound between junctions J11A (Gloucester) and J12 (Gloucester) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 5 December 2025.
Nearest town: 17.14 miles from Sunhill.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 11 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.45 miles from Sunhill.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 6 December 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 12.78 miles from Sunhill.