Location: southbound between the junctions with the A47 and the A605 .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 22 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.41 miles from Stoke Dry.

Location: westbound entry slip at junction J1 Welford.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2025 to 06:00 on 3 August 2025.
Nearest town: 16.28 miles from Stoke Dry.

Location: westbound exit slip at junction J1 Welford.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2025 to 06:00 on 3 August 2025.
Nearest town: 16.3 miles from Stoke Dry.

Location: eastbound entry slip at junction J10 Burton Latimer.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.68 miles from Stoke Dry.

Location: eastbound between junctions J15 and J16 Catworth.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.11 miles from Stoke Dry.

Location: northbound between the junctions with the A605 and the A6118 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.93 miles from Stoke Dry.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.84 miles from Stoke Dry.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.81 miles from Stoke Dry.

Location: westbound entry slip from the A509 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.69 miles from Stoke Dry.

Location: The junction of the A45 and the A509 North.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.83 miles from Stoke Dry.

Location: The junction of the A45 and the A509 North.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.83 miles from Stoke Dry.

Location: westbound exit slip to the A509 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 August 2025 to 06:00 on 14 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.66 miles from Stoke Dry.

Location: eastbound exit slip to the A509 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.67 miles from Stoke Dry.

Location: westbound entry slip from the A5001 West.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 August 2025 to 06:00 on 14 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.59 miles from Stoke Dry.

Location: eastbound exit slip to the A5001 West.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.58 miles from Stoke Dry.

Location: The junction of the A45 and the A5001 East.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 August 2025 to 16 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.39 miles from Stoke Dry.

Location: westbound between the A5001 East and the junction with the A509 North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 August 2025 to 16 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.4 miles from Stoke Dry.

Location: eastbound entry slip from the A509 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.62 miles from Stoke Dry.

Location: eastbound between the A509 North and the junction with the A5001 East.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.81 miles from Stoke Dry.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.86 miles from Stoke Dry.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.94 miles from Stoke Dry.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.69 miles from Stoke Dry.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 20 miles from Stoke Dry.

Location: westbound at the junction with the A509 North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.84 miles from Stoke Dry.

Location: The A1M northbound between junctions J16 and J17 .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.94 miles from Stoke Dry.

Location: The A1M northbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.43 miles from Stoke Dry.

Location: The A1M northbound.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.25 miles from Stoke Dry.

Location: eastbound between junctions J4 and J7 Kettering North.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 9 August 2025.
Nearest town: 9.78 miles from Stoke Dry.

Location: eastbound between junctions J3 Rothwell and J7 Kettering North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.86 miles from Stoke Dry.

Location: westbound between junctions J8 Kettering Central and J7 Kettering North.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.94 miles from Stoke Dry.

Location: eastbound between junctions J2 Kelmarsh and J3 Rothwell.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 8 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.38 miles from Stoke Dry.

Location: eastbound entry slip at junction J3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.97 miles from Stoke Dry.

Location: eastbound exit slip at Rothwell Lodge Services (J5).
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.88 miles from Stoke Dry.

Location: eastbound entry slip at Rothwell Lodge Services (J5).
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.9 miles from Stoke Dry.

Location: westbound between junctions J8 Kettering Central and J3 Rothwell.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 7 August 2025.
Nearest town: 10.94 miles from Stoke Dry.

Location: westbound between junctions J7 Kettering North and J3 Rothwell.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.91 miles from Stoke Dry.

Location: westbound between junctions J6 and J3 Rothwell.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.9 miles from Stoke Dry.

Location: eastbound exit slip at junction J3 Rothwell.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 8 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.13 miles from Stoke Dry.

Location: eastbound entry slip at junction J4 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.78 miles from Stoke Dry.

Location: eastbound exit slip at junction J7 Kettering North.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.01 miles from Stoke Dry.

Location: westbound at junction J7 Kettering North.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.5 miles from Stoke Dry.

Location: southbound between the A6 and the junction with the A5630 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.42 miles from Stoke Dry.

Location: The A1M southbound between junctions J17 and J16 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 06:00 on 30 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.46 miles from Stoke Dry.

Location: The A1M southbound exit slip at junction J16 .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 06:00 on 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Stoke Dry.

Location: The A1M southbound exit slip at junction J16 .
Lane Closures : Lane one will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 5 August 2025.
Schedule : From 20:00 on 1 September 2025 to 06:00 on 2 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Stoke Dry.

Location: westbound between the A1260 and the junction with the A1 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 30 August 2025.
Nearest town: 15.69 miles from Stoke Dry.

Location: The junction of the A47 and the A1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.21 miles from Stoke Dry.

Location: westbound between the A1260 and the junction with the A1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.69 miles from Stoke Dry.

Location: southbound exit slip to the A47 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.14 miles from Stoke Dry.

Location: The junction of the A47 and the A1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.07 miles from Stoke Dry.

Location: eastbound between the A1 and the junction with the A1260 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 30 August 2025.
Nearest town: 14.24 miles from Stoke Dry.

Location: eastbound between the A1 and the junction with the A1260 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.24 miles from Stoke Dry.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 23:30 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.71 miles from Stoke Dry.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 05:00 on 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.75 miles from Stoke Dry.

Location: westbound entry slip from the A1260 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 05:00 on 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.01 miles from Stoke Dry.

Location: westbound exit slip to the A1260 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 05:00 on 30 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.2 miles from Stoke Dry.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 05:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.81 miles from Stoke Dry.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 05:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Stoke Dry.

Location: westbound between junctions J2 Kelmarsh and M1 Catthorpe Interchange.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.29 miles from Stoke Dry.

Location: westbound between the junctions with the A15 Peterborough West and the A1260 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.68 miles from Stoke Dry.