Location: southbound exit slip to the A696 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 16 June 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.43 miles from Penshaw.

Location: southbound exit slip to the A696 .
Due to: Congestion.
Normal traffic conditions are expected between 03:15 and 03:30 on 16 June 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.43 miles from Penshaw.

Location: southbound exit slip to the A696 .
Due to: Congestion.
Normal traffic conditions are expected between 02:15 and 02:30 on 16 June 2026.
Nearest town: 11.43 miles from Penshaw.

Location: southbound exit slip to the A696 .
Due to: Congestion.
Normal traffic conditions are expected between 01:30 and 01:45 on 16 June 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.43 miles from Penshaw.

Location: southbound entry slip from the A181 .
Due to: Roadworks.
Period : from 20:37 on 15 June 2026 to 06:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 10.8 miles from Penshaw.

Location: southbound exit slip to the A181 .
Due to: Roadworks.
Period : from 20:36 on 15 June 2026 to 06:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 10.66 miles from Penshaw.

Location: northbound between the A1056 and the junction with the A189 .
Due to: Roadworks scheme.
Period : from 20:00 on 1 June 2026 to 06:00 on 22 August 2026.
Nearest town: 13.58 miles from Penshaw.

Location: southbound entry slip from the A1056 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.23 miles from Penshaw.

Location: southbound at the junction with the A1056 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.4 miles from Penshaw.

Location: northbound between the A1058 and the junction with the A1056 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.31 miles from Penshaw.

Location: northbound exit slip to the A1056 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.06 miles from Penshaw.

Location: northbound.
Due to: Roadworks scheme.
Period : from 20:13 on 15 June 2026 to 06:00 on 18 June 2026.
Nearest town: 8.97 miles from Penshaw.

Location: northbound between the A1058 and the junction with the A1056 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.35 miles from Penshaw.

Location: southbound between the junctions with the A696 and the A69 .
Lane Closures : Lane three is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.16 miles from Penshaw.

Location: southbound at the junction with the A69 .
Lane Closures : Lane three is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 10.99 miles from Penshaw.

Location: southbound between the A189 and the junction with the A1058 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.76 miles from Penshaw.

Location: southbound exit slip to the A1058 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.8 miles from Penshaw.

Location: northbound entry slip from the A1058 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.59 miles from Penshaw.

Location: southbound between the A1056 and the junction with the A1058 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.19 miles from Penshaw.

Location: The A1M northbound between junctions J61 and J63 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2026 to 06:00 on 17 August 2026.
Nearest town: 9.67 miles from Penshaw.

Location: westbound exit slip to the A194 .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 5.13 miles from Penshaw.

Location: northbound exit slip to the A191 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.71 miles from Penshaw.

Location: northbound entry slip from the A191 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.96 miles from Penshaw.

Location: southbound exit slip to the A191 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.15 miles from Penshaw.

Location: southbound entry slip from the A186 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.92 miles from Penshaw.

Location: southbound entry slip from the A186 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.92 miles from Penshaw.

Location: northbound exit slip to the A191 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2026 to 06:00 on 17 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.71 miles from Penshaw.

Location: southbound at the junction with the A1056 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.4 miles from Penshaw.

Location: southbound entry slip from the A1056 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.23 miles from Penshaw.

Location: northbound exit slip to the A1056 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.06 miles from Penshaw.

Location: northbound between the A1058 and the junction with the A1056 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.35 miles from Penshaw.

Location: southbound between the A189 and the junction with the A1058 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.76 miles from Penshaw.

Location: southbound exit slip to the A191 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.15 miles from Penshaw.

Location: southbound entry slip from the A186 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.92 miles from Penshaw.

Location: northbound exit slip to the A191 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.71 miles from Penshaw.

Location: northbound entry slip from the A191 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 June 2026 to 06:00 on 23 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.96 miles from Penshaw.

Location: southbound at the junction with the A184 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 02:00 from 22 June 2026 to 24 June 2026.
Schedule : From 20:00 on 29 June 2026 to 02:00 on 30 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.04 miles from Penshaw.

Location: southbound entry slip from the A184 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 02:00 from 22 June 2026 to 24 June 2026.
Schedule : From 20:00 on 29 June 2026 to 02:00 on 30 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.87 miles from Penshaw.

Location: northbound between the junctions with the A182 Easington and the A182 Murton.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.72 miles from Penshaw.

Location: southbound at the junction with the A189 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 13.81 miles from Penshaw.

Location: northbound at the junction with the A189 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 13.75 miles from Penshaw.

Location: northbound between the junctions with the A1056 and the A189 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.58 miles from Penshaw.

Location: southbound between the A181 and the junction with the A179 .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.08 miles from Penshaw.

Location: southbound at the junction with the A189 .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2026 to 02:00 on 27 June 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.81 miles from Penshaw.

Location: northbound at the junction with the A189 .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2026 to 02:00 on 27 June 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.75 miles from Penshaw.

Location: northbound between the A191 and the junction with the A189 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2026 to 02:00 on 20 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.6 miles from Penshaw.

Location: southbound entry slip from the A182 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.86 miles from Penshaw.

Location: northbound between the A1058 and the junction with the A1056 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 June 2026 to 02:00 on 25 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.81 miles from Penshaw.

Location: northbound entry slip from the A182 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 4 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 July 2026 to 11 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.92 miles from Penshaw.

Location: southbound between the A182 Murton and the junction with the A1086 Easington.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.6 miles from Penshaw.

Location: southbound between the junctions with the A182 Murton and the A1086 Easington.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 4 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 July 2026 to 11 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.41 miles from Penshaw.

Location: northbound between the A189 and the junction with the A1068 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 02:00 on 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.79 miles from Penshaw.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 04:00 on 19 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.63 miles from Penshaw.

Location: northbound between the A179 and the junction with the A181 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 4 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 July 2026 to 11 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.82 miles from Penshaw.

Location: southbound exit slip to the A179 .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.61 miles from Penshaw.

Location: northbound exit slip to the A179 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 4 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 July 2026 to 11 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.05 miles from Penshaw.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 June 2026 to 18 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.24 miles from Penshaw.

Location: southbound between the A179 and the junction with the A689 .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.91 miles from Penshaw.

Location: southbound between the junctions with the A1056 and the A696 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 06:00 on 18 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.72 miles from Penshaw.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 June 2026 to 18 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.26 miles from Penshaw.

Location: northbound.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.97 miles from Penshaw.

Location: southbound between the junctions with the A1056 and the A696 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 06:00 on 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.97 miles from Penshaw.

Location: The A1M southbound between junctions J62 and J61 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 13 July 2026 to 06:00 on 22 August 2026.
Nearest town: 5.45 miles from Penshaw.

Location: The A1M southbound between junctions J64 and J61 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 1 August 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 August 2026 to 8 August 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.57 miles from Penshaw.

Location: The A1M northbound entry slip at junction J62 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 06:00 on 19 June 2026.
Schedule : From 20:00 on 16 August 2026 to 06:00 on 17 August 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.4 miles from Penshaw.

Location: The A1M northbound between junctions J61 and J62 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2026 to 18 June 2026.
Schedule : From 20:00 on 19 June 2026 to 06:00 on 20 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 1 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.01 miles from Penshaw.

Location: The A1M northbound entry slip at junction J61 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 1 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 July 2026 to 4 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.67 miles from Penshaw.

Location: The A1M northbound between junctions J60 and J61 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 1 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 July 2026 to 4 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.41 miles from Penshaw.

Location: The A1M southbound between junctions J63 and J62 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 06:00 on 19 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.93 miles from Penshaw.

Location: The A1M northbound between junctions J61 and J62 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 June 2026 to 22 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.01 miles from Penshaw.

Location: The A1M southbound between junctions J62 and J61 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 June 2026 to 22 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.17 miles from Penshaw.

Location: The A1M southbound entry slip at junction J62 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 1 August 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 August 2026 to 8 August 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.45 miles from Penshaw.

Location: southbound between the junctions with the A1058 and the A193 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 June 2026 to 02:00 on 26 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.34 miles from Penshaw.

Location: southbound between the A186 and the junction with the A1058 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 June 2026 to 02:00 on 26 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.81 miles from Penshaw.

Location: southbound entry slip from the A1058 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 June 2026 to 02:00 on 26 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.54 miles from Penshaw.

Location: northbound exit slip to the A1058 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 02:00 on 19 June 2026.
Schedule : From 20:00 on 25 June 2026 to 02:00 on 26 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.28 miles from Penshaw.

Location: northbound between the A1058 and the junction with the A191 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 02:00 on 19 June 2026.
Schedule : From 20:00 on 25 June 2026 to 02:00 on 26 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.28 miles from Penshaw.

Location: northbound between the junctions with the A193 and the A1058 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 02:00 on 19 June 2026.
Schedule : From 20:00 on 25 June 2026 to 02:00 on 26 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.07 miles from Penshaw.

Location: southbound between the A1056 and the junction with the A1058 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 June 2026 to 02:00 on 24 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.57 miles from Penshaw.

Location: northbound entry slip from the A1058 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 06:00 on 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.59 miles from Penshaw.

Location: southbound exit slip to the A1058 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 06:00 on 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.8 miles from Penshaw.

Location: southbound entry slip from the A1058 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 06:00 on 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.54 miles from Penshaw.

Location: northbound exit slip to the A1058 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2026 to 06:00 on 18 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.28 miles from Penshaw.

Location: The A1M southbound entry slip at junction J63 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 1 August 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 August 2026 to 8 August 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.42 miles from Penshaw.

Location: The A1M southbound between junctions J64 and J63 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 1 August 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 August 2026 to 8 August 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.71 miles from Penshaw.

Location: The A1M northbound between junctions J61 and J63 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 06:00 on 19 June 2026.
Schedule : From 20:00 on 16 August 2026 to 06:00 on 17 August 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.94 miles from Penshaw.

Location: The A1M northbound between junctions J62 and J63 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 06:00 on 19 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.64 miles from Penshaw.

Location: The A194M northbound between junctions J2 Washington(North) and J3 .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 16 June 2026.
Lanes Closed : All lanes are closed.
Nearest town: 5.02 miles from Penshaw.

Location: The A1M southbound exit slip at junction J61 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 1 August 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 August 2026 to 8 August 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.5 miles from Penshaw.

Location: The A1M northbound exit slip at junction J62 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2026 to 20 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 1 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 July 2026 to 4 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.64 miles from Penshaw.

Location: The A1M southbound exit slip at junction J62 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 1 August 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 August 2026 to 8 August 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.23 miles from Penshaw.

Location: southbound between the A189 and the junction with the A186 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 02:00 on 19 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.76 miles from Penshaw.

Location: The A1M northbound exit slip at junction J63 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2026 to 06:00 on 19 June 2026.
Schedule : From 20:00 on 16 August 2026 to 06:00 on 17 August 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.41 miles from Penshaw.

Location: southbound at the junction with the A193 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 June 2026 to 02:00 on 26 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.05 miles from Penshaw.

Location: northbound between the A182 Easington and the junction with the A1018 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 June 2026 to 4 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 July 2026 to 11 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 July 2026 to 18 July 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 July 2026 to 25 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.02 miles from Penshaw.