Traffic Holmbury St Mary

SLIGHT
SEVERE
FULL SCREEN UPDATED: 20:19
Leaflet | © OpenStreetMap contributors
×
×

Current traffic around Holmbury St Mary

The following traffic incidents and congestion for Holmbury St Mary have been reported by Highways England, Traffic Scotland, Traffic Wales or Transport for London (TfL) in the last two hours:

ACCIDENT
Location: The M3 eastbound exit slip at junction J2 (Gatwick M23) .
Reason: Road traffic collision.
Status: Currently Active.
Time to clear: The event is expected to clear between 18:00 and 18:15 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 18:00 and 18:15 on 31 Jul 2025.
Lanes closed: All lanes are closed.
Nearest town: 15.93 miles from Holmbury St Mary. CLEARED @ 14:51
ACCIDENT
Location: The M25 clockwise entry slip at junction J12 (Basingstoke) .
Reason: Road traffic collision.
Status: Currently Active.
Time to clear: The event is expected to clear between 18:00 and 18:15 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 18:00 and 18:15 on 31 Jul 2025.
Lanes closed: All lanes are closed.
Nearest town: 15.92 miles from Holmbury St Mary. CLEARED @ 14:51
BROKEN DOWN VEHICLE
Location: The M25 clockwise between junctions J6 (East Grinstead) and J7 (Gatwick) .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 20:45 and 21:00 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 20:45 and 21:00 on 31 Jul 2025.
Lanes closed: There is one of four lanes closed.
Nearest town: 15.28 miles from Holmbury St Mary.
FLOODING
Location: The M3 westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Flooding.
Status: Currently Active.
Time to clear: The event is expected to clear between 20:45 and 21:00 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 20:45 and 21:00 on 31 Jul 2025.
Lanes closed: There are two of four lanes closed.
Nearest town: 17.74 miles from Holmbury St Mary. CLEARED @ 19:30
BROKEN DOWN VEHICLE
Location: The M3 westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 18:45 and 19:00 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 18:45 and 19:00 on 31 Jul 2025.
Lanes closed: There is one of four lanes closed.
Nearest town: 17.81 miles from Holmbury St Mary. CLEARED @ 18:18
BROKEN DOWN VEHICLE
Location: The M25 anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 17:45 and 18:00 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 18:15 and 18:30 on 31 Jul 2025.
Lanes closed: There are lane closures.
Nearest town: 15.72 miles from Holmbury St Mary. CLEARED @ 17:24
BROKEN DOWN VEHICLE
Location: The A3 northbound between the junctions with the M25 and the A245 .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 18:00 and 18:15 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 18:00 and 18:15 on 31 Jul 2025.
Lanes closed: There is one of three lanes closed.
Nearest town: 9.99 miles from Holmbury St Mary. CLEARED @ 17:33
ACCIDENT
Location: The M25 clockwise exit slip at junction J6 (East Grinstead) .
Lane closures: Lane one is closed.
Reason: Road traffic collision.
Status: Currently Active.
Time to clear: The event is expected to clear between 18:30 and 18:45 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 18:30 and 18:45 on 31 Jul 2025.
Lanes closed: There is one of two lanes closed.
Nearest town: 16.07 miles from Holmbury St Mary. CLEARED @ 16:57
ACCIDENT
Location: The M25 anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane closures: Lane four is closed.
Reason: Road traffic collision.
Status: Currently Active.
Time to clear: The event is expected to clear between 17:15 and 17:30 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 18:00 and 18:15 on 31 Jul 2025.
Lanes closed: There is one of four lanes closed.
Nearest town: 8.42 miles from Holmbury St Mary. CLEARED @ 16:30
ACCIDENT
Location: The M23 northbound between junctions J10A (Crawley) and J10 (Crawley) .
Reason: Road traffic collision.
Status: Cleared.
Nearest town: 12.62 miles from Holmbury St Mary. CLEARED @ 18:00
BROKEN DOWN VEHICLE
Location: The M23 southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 17:15 and 17:30 on 31 Jul 2025.
Return to normal: Normal traffic conditions are expected between 17:15 and 17:30 on 31 Jul 2025.
Lanes closed: There is one of four lanes closed.
Nearest town: 12.38 miles from Holmbury St Mary. CLEARED @ 16:30
BROKEN DOWN VEHICLE
Location: The M3 eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Reason: Broken down vehicle.
Status: Cleared.
Nearest town: 15.83 miles from Holmbury St Mary. CLEARED @ 15:09
CONGESTION
Location: The A30 eastbound between the junctions with the M25 and the A308 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 19:00 and 19:15 on 31 Jul 2025.
Nearest town: 17.87 miles from Holmbury St Mary. CLEARED @ 19:03
CONGESTION
Location: The A23 northbound between the junctions with the M23 and the A237 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 19:00 and 19:15 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.06 miles from Holmbury St Mary. CLEARED @ 19:03
CONGESTION
Location: The A30 eastbound exit slip to the A308 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 19:00 and 19:15 on 31 Jul 2025.
Nearest town: 17.87 miles from Holmbury St Mary. CLEARED @ 19:12
CONGESTION
Location: The A30 eastbound between the M25 and the junction with the A308 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:30 and 18:45 on 31 Jul 2025.
Nearest town: 17.87 miles from Holmbury St Mary. CLEARED @ 18:18
CONGESTION
Location: The M25 clockwise exit slip at junction J10 (Guildford) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:45 and 18:00 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.54 miles from Holmbury St Mary. CLEARED @ 17:51
CONGESTION
Location: The A30 eastbound exit slip to the A308 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:30 and 17:45 on 31 Jul 2025.
Nearest town: 17.87 miles from Holmbury St Mary. CLEARED @ 17:33
CONGESTION
Location: The A30 eastbound between the M25 and the junction with the A308 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:30 and 17:45 on 31 Jul 2025.
Nearest town: 17.87 miles from Holmbury St Mary. CLEARED @ 17:33
CONGESTION
Location: The M25 anticlockwise at junction J14 (Heathrow Airport) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:00 and 18:15 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.6 miles from Holmbury St Mary. CLEARED @ 18:09
CONGESTION
Location: The M25 anticlockwise between junctions J13 (A30) and J12 (Basingstoke) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:15 and 17:30 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.8 miles from Holmbury St Mary. CLEARED @ 17:15
CONGESTION
Location: The A3 southbound entry slip from the A245 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:30 and 17:45 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.31 miles from Holmbury St Mary. CLEARED @ 17:42
CONGESTION
Location: The M25 anticlockwise entry slip at junction J12 (Basingstoke) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 17:00 and 17:15 on 31 Jul 2025.
Nearest town: 15.59 miles from Holmbury St Mary. CLEARED @ 17:06
CONGESTION
Location: The M25 clockwise exit slip at junction J14 (Heathrow Airport) for A3113.
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:30 and 16:45 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.93 miles from Holmbury St Mary. CLEARED @ 16:57
CONGESTION
Location: The A30 eastbound between the M25 and the junction with the A315 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:45 and 17:00 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.87 miles from Holmbury St Mary. CLEARED @ 16:48
CONGESTION
Location: The M25 anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:30 and 16:45 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.96 miles from Holmbury St Mary. CLEARED @ 16:57
CONGESTION
Location: The A3 southbound between the A320 and the junction with the A322 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:30 and 16:45 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.07 miles from Holmbury St Mary. CLEARED @ 16:57
CONGESTION
Location: The M25 anticlockwise entry slip at junction J12 (Basingstoke) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:30 and 16:45 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.92 miles from Holmbury St Mary. CLEARED @ 16:57
CONGESTION
Location: The A3 southbound entry slip from the A322 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:30 and 16:45 on 31 Jul 2025.
Nearest town: 8.83 miles from Holmbury St Mary. CLEARED @ 16:57
CONGESTION
Location: The A30 eastbound between the junctions with the M25 and the A308 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:15 and 16:30 on 31 Jul 2025.
Nearest town: 17.87 miles from Holmbury St Mary. CLEARED @ 16:12
CONGESTION
Location: The M23 northbound between junctions J11 (Brighton) and J10A (Crawley) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 18:45 and 19:00 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Earlier Reason: Caused by an earlier accident.
Nearest town: 12.78 miles from Holmbury St Mary. CLEARED @ 18:00
CONGESTION
Location: The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:30 and 16:45 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.44 miles from Holmbury St Mary. CLEARED @ 16:57
CONGESTION
Location: The M25 clockwise exit slip at junction J14 (Heathrow Airport) for A3113.
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 15:45 and 16:00 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.93 miles from Holmbury St Mary. CLEARED @ 15:45
CONGESTION
Location: The M3 eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 15:45 and 16:00 on 31 Jul 2025.
Delay: There are currently delays of 15 minutes against expected traffic.
Nearest town: 14.67 miles from Holmbury St Mary. CLEARED @ 15:54
CONGESTION
Location: The A3 southbound entry slip from the A245 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 15:15 and 15:30 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.31 miles from Holmbury St Mary. CLEARED @ 15:18
CONGESTION
Location: The A3 southbound exit slip to the A283 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 14:45 and 15:00 on 31 Jul 2025.
Nearest town: 10.29 miles from Holmbury St Mary. CLEARED @ 14:51
CONGESTION
Location: The A30 eastbound between the junctions with the M25 and the A308 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 14:15 and 14:30 on 31 Jul 2025.
Nearest town: 17.87 miles from Holmbury St Mary. CLEARED @ 14:24
CONGESTION
Location: The M25 clockwise at junction J8 (Reigate) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 14:45 and 15:00 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.33 miles from Holmbury St Mary. CLEARED @ 14:24
CONGESTION
Location: The A3 northbound between the A247 and the junction with the M25 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 16:00 and 16:15 on 31 Jul 2025.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.25 miles from Holmbury St Mary. CLEARED @ 16:12
CONGESTION
Location: The M3 eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 15:00 and 15:15 on 31 Jul 2025.
Delay: There are currently delays of 50 minutes against expected traffic.
Earlier Reason: Caused by the earlier broken down vehicle.
Nearest town: 16.32 miles from Holmbury St Mary. CLEARED @ 15:09


There are no current incidents in this location.

Roadworks

ROAD WORKS
Location: The A3 northbound between the A247 and the junction with the M25 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 8.49 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J6 (East Grinstead) and J7 (Gatwick) .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:00 on 1 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 14.89 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:00 on 1 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 13.43 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J13 (A30) and J14 (Heathrow Airport) .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:00 on 1 Aug 2025.
Nearest town: 19.5 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise exit slip at junction J14 (Heathrow Airport) for A3113.
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:00 on 1 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 19.73 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:01 on 31 Jul 2025 to 06:00 on 8 Aug 2025.
Nearest town: 15.52 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise between junctions J11 (Chertsey) and J11 (Chertsey) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 22:01 on 29 Jul 2025 to 05:30 on 7 Aug 2025.
Nearest town: 13.77 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J10 (Guildford) and J10 (Guildford) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 22:00 on 29 Jul 2025 to 05:30 on 7 Aug 2025.
Nearest town: 9.65 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 22:01 on 29 Jul 2025 to 05:30 on 7 Aug 2025.
Nearest town: 8.93 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:03 on 31 Jul 2025 to 06:00 on 9 Aug 2025.
Nearest town: 15.9 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise exit slip at junction J14 (Heathrow Airport) for A3113.
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:00 on 1 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 19.79 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise between junctions J14 (Heathrow Airport) and J13 (A30) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Lanes Closed: There will be one of five lanes closed.
Nearest town: 18.85 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3113 westbound between the A3044 and the junction with the M25 .
Lane closures: Lane two will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:00 on 1 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 19.58 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise exit slip at junction J13 (A30) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 18.8 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 eastbound at junction J1 (Sunbury) .
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 16.24 miles from Holmbury St Mary.
ROAD WORKS
Location: The A316 eastbound entry slip from the A308 .
Lane closures: Lane two will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.25 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 1 Aug 2025.
Lanes Closed: There are two of four lanes closed.
Nearest town: 13.27 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:07 on 31 Jul 2025 to 06:00 on 1 Aug 2025.
Nearest town: 13.27 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound at junction J8 (Reigate) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 1 Aug 2025.
Lanes Closed: All lanes are closed.
Nearest town: 13.44 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 1 Aug 2025.
Lanes Closed: There are two of four lanes closed.
Nearest town: 12.49 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Dec 2025.
Nearest town: 9.29 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise at junction J10 (Guildford) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Dec 2025.
Nearest town: 9.79 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 southbound between the A245 and the junction with the M25 .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Dec 2025.
Nearest town: 10.45 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Dec 2025.
Nearest town: 9.88 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise at junction J10 (Guildford) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Dec 2025.
Nearest town: 9.47 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound between the junctions with the A247 and the M25 .
Lane closures: Lane three is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:30 on 1 Dec 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 9.04 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 23:59 on 31 Dec 2023 to 06:00 on 31 Dec 2025.
Nearest town: 9.47 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 00:02 on 1 Jan 2024 to 06:00 on 31 Dec 2025.
Nearest town: 9.79 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound exit slip to the A333 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 15.49 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound entry slip from the A333 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 15.27 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound exit slip to the A333 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 31 Jul 2025 to 2 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Aug 2025 to 9 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Aug 2025 to 22 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 15.49 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 12.87 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 12.61 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.91 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.9 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 31 Jul 2025 to 2 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Aug 2025 to 9 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Aug 2025 to 22 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.91 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 31 Jul 2025 to 2 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Aug 2025 to 9 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Aug 2025 to 22 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.9 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 19.78 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 31 Jul 2025 to 2 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Aug 2025 to 9 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Aug 2025 to 22 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 19.78 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 15.96 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 19.61 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 31 Jul 2025 to 2 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Aug 2025 to 9 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Aug 2025 to 22 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 15.96 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 31 Jul 2025 to 2 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Aug 2025 to 9 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Aug 2025 to 22 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 19.61 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound exit slip to the A283 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.51 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound entry slip at Liphook Services.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.88 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound exit slip at Liphook Services.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Aug 2025 to 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.96 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound entry slip at Liphook Services.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 31 Jul 2025 to 2 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Aug 2025 to 9 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Aug 2025 to 22 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.88 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound exit slip at Liphook Services.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 31 Jul 2025 to 2 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Aug 2025 to 9 Aug 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Aug 2025 to 22 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.96 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 4 Aug 2025 to 6 Aug 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 15.52 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane closures: Lanes 2, 3 and 4 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 1 Aug 2025.
Lanes Closed: There are three of four lanes closed.
Nearest town: 15.53 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane closures: Lanes 1, 2 and 3 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 1 Aug 2025.
Lanes Closed: There are three of four lanes closed.
Nearest town: 15.9 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J8 (Reigate) and J10 (Guildford) .
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 8.88 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 westbound at junction J3 (Woking) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 20:00 on 6 Aug 2025 to 06:00 on 7 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 16.43 miles from Holmbury St Mary.
ROAD WORKS
Location: The A23 southbound.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 20:00 on 6 Aug 2025 to 05:00 on 7 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.71 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 southbound between the A244 and the junction with the M25 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 5 Aug 2025 to 8 Aug 2025.
Schedule: From 22:00 on 11 Aug 2025 to 05:30 on 12 Aug 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 10.78 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 8.68 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 30 Jul 2025 to 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.47 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise at junction J11 (Chertsey) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 14.02 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 14.94 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise entry slip at junction J10 (Guildford) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.65 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound between the junctions with the A247 and the M25 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 9.02 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.77 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound exit slip to the M25 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 9.48 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 northbound.
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 8.93 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise exit slip at junction J10 (Guildford) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.79 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise exit slip at junction J11 (Chertsey) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 31 Jul 2025 to 05:30 on 1 Aug 2025.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Schedule: From 22:00 on 6 Aug 2025 to 05:30 on 7 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.52 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 westbound between junctions J3 (Woking) and J4 (Guildford) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 5 Aug 2025 to 06:00 on 6 Aug 2025.
Nearest town: 16.75 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 westbound at junction J4 (Guildford) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 5 Aug 2025 to 06:00 on 6 Aug 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 17.39 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 5 Aug 2025 to 06:00 on 6 Aug 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 16.75 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 5 Aug 2025 to 06:00 on 6 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 12.55 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 anticlockwise between junctions J8 (Reigate) and J7 (Gatwick) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 5 Aug 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 12.46 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise at junction J6 (East Grinstead) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 4 Aug 2025 to 8 Aug 2025.
Schedule: From 23:00 on 8 Aug 2025 to 06:00 on 9 Aug 2025.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 13 Aug 2025 to 15 Aug 2025.
Schedule: From 23:00 on 15 Aug 2025 to 06:00 on 16 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 16.19 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 4 Aug 2025 to 8 Aug 2025.
Schedule: From 23:00 on 8 Aug 2025 to 06:00 on 9 Aug 2025.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 13 Aug 2025 to 15 Aug 2025.
Schedule: From 23:00 on 15 Aug 2025 to 06:00 on 16 Aug 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 17.43 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 4 Aug 2025 to 7 Aug 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 18.55 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J5 (Sevenoaks) and J7 (Gatwick) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 22:00 on 4 Aug 2025 to 05:30 on 22 Aug 2025.
Nearest town: 17.43 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J6 (East Grinstead) and J7 (Gatwick) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 4 Aug 2025 to 8 Aug 2025.
Schedule: From 23:00 on 8 Aug 2025 to 06:00 on 9 Aug 2025.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 13 Aug 2025 to 15 Aug 2025.
Schedule: From 23:00 on 15 Aug 2025 to 06:00 on 16 Aug 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 15.42 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J13 (A30) and J14 (Heathrow Airport) .
Lane closures: Lanes 1, 2, 3 and 4 will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 4 Aug 2025 to 8 Aug 2025.
Schedule: From 23:00 on 8 Aug 2025 to 05:00 on 9 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.65 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise at junction J13 (A30) .
Lane closures: Lane four will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 4 Aug 2025 to 8 Aug 2025.
Schedule: From 23:00 on 8 Aug 2025 to 05:00 on 9 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 18.36 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise entry slip at junction J13 (A30) .
Reason: Litter clearance is planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 4 Aug 2025 to 8 Aug 2025.
Schedule: From 23:00 on 8 Aug 2025 to 05:00 on 9 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.7 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 southbound entry slip from the A244 .
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 22:00 on 12 Aug 2025 to 05:30 on 13 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 11.52 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 southbound between the A244 and the junction with the A245 .
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 22:00 on 12 Aug 2025 to 05:30 on 13 Aug 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 11.61 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J12 (Basingstoke) and J13 (A30) .
Lane closures: Lanes 4 and 5 will be closed.
Reason: Litter clearance is planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 4 Aug 2025 to 8 Aug 2025.
Schedule: From 23:00 on 8 Aug 2025 to 05:00 on 9 Aug 2025.
Lanes Closed: There will be two of five lanes closed.
Nearest town: 16.4 miles from Holmbury St Mary.
ROAD WORKS
Location: The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 22:00 on 7 Aug 2025 to 05:30 on 8 Aug 2025.
Schedule: From 23:00 on 8 Aug 2025 to 06:00 on 9 Aug 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 12.26 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lanes 3 and 4 will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 20:00 on 4 Aug 2025 to 05:00 on 5 Aug 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 12.53 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Lane closures: Lane four will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 20:00 on 4 Aug 2025 to 05:00 on 5 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 12.61 miles from Holmbury St Mary.
ROAD WORKS
Location: The M3 westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 4 Aug 2025 to 6 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 15.52 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 3 Aug 2025 to 06:00 on 4 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 12.55 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 2 Aug 2025 to 06:00 on 3 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 12.37 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 2 Aug 2025 to 06:00 on 3 Aug 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 12.49 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound between junctions J8 (Reigate) and J7 (Crawley) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 23:00 on 1 Aug 2025 to 06:00 on 2 Aug 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 12.96 miles from Holmbury St Mary.
ROAD WORKS
Location: The M23 northbound between junctions J8 (Reigate) and J7 (Crawley) .
Lane closures: Lane two will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: From 23:00 on 1 Aug 2025 to 06:00 on 2 Aug 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 12.9 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 southbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 1 Aug 2025 to 06:00 on 4 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 8.98 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 southbound at the junction with the M25 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 1 Aug 2025 to 06:00 on 4 Aug 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.81 miles from Holmbury St Mary.
ROAD WORKS
Location: The A3 southbound between the A244 and the junction with the M25 .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 1 Aug 2025 to 06:00 on 4 Aug 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 10.78 miles from Holmbury St Mary.

Traffic in Nearby Villages

Holmbury St Mary


Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone, tablet or any electronic device without a hands-free kit whilst driving. If you're caught by the police using any device that can send or receive data whilst driving or riding a motorcyle you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web:

National Highways TrafficNational Highways England

Official source of traffic updates.

Transport for LondonTransport for London (TFL)

Transport for London's (TfL) portal for transportation in London.

Traffic WalesTraffic Wales

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location: eastbound exit slip at junction J2 (Gatwick M23) .

Due to: Road traffic collision.



Time To Clear : The event is expected to clear between 18:00 and 18:15 on 31 July 2025.

Normal traffic conditions are expected between 18:00 and 18:15 on 31 July 2025.

Lanes Closed : All lanes are closed.
Nearest town: 15.93 miles from Holmbury St Mary.

51.4--0.54

Location: clockwise entry slip at junction J12 (Basingstoke) .

Due to: Road traffic collision.



Time To Clear : The event is expected to clear between 18:00 and 18:15 on 31 July 2025.

Normal traffic conditions are expected between 18:00 and 18:15 on 31 July 2025.

Lanes Closed : All lanes are closed.
Nearest town: 15.92 miles from Holmbury St Mary.

51.4--0.55

Location: clockwise between junctions J6 (East Grinstead) and J7 (Gatwick) .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 20:45 and 21:00 on 31 July 2025.

Normal traffic conditions are expected between 20:45 and 21:00 on 31 July 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 15.28 miles from Holmbury St Mary.

51.26--0.08

Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Flooding.



Time To Clear : The event is expected to clear between 20:45 and 21:00 on 31 July 2025.

Normal traffic conditions are expected between 20:45 and 21:00 on 31 July 2025.

Lanes Closed : There are two of four lanes closed.
Nearest town: 17.74 miles from Holmbury St Mary.

51.31--0.77

Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 18:45 and 19:00 on 31 July 2025.

Normal traffic conditions are expected between 18:45 and 19:00 on 31 July 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 17.81 miles from Holmbury St Mary.

51.31--0.77

Location: anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 17:45 and 18:00 on 31 July 2025.

Normal traffic conditions are expected between 18:15 and 18:30 on 31 July 2025.

Lanes Closed : There are lane closures.
Nearest town: 15.72 miles from Holmbury St Mary.

51.4--0.54

Location: northbound between the junctions with the M25 and the A245 .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 18:00 and 18:15 on 31 July 2025.

Normal traffic conditions are expected between 18:00 and 18:15 on 31 July 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 9.99 miles from Holmbury St Mary.

51.33--0.44

Location: clockwise exit slip at junction J6 (East Grinstead) .

Lane Closures : Lane one is closed.

Due to: Road traffic collision.



Time To Clear : The event is expected to clear between 18:30 and 18:45 on 31 July 2025.

Normal traffic conditions are expected between 18:30 and 18:45 on 31 July 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 16.07 miles from Holmbury St Mary.

51.26--0.06

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .

Lane Closures : Lane four is closed.

Due to: Road traffic collision.



Time To Clear : The event is expected to clear between 17:15 and 17:30 on 31 July 2025.

Normal traffic conditions are expected between 18:00 and 18:15 on 31 July 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 8.42 miles from Holmbury St Mary.

51.31--0.41

Location: northbound between junctions J10A (Crawley) and J10 (Crawley) .

Due to: Road traffic collision.

Status : Cleared.
Nearest town: 12.62 miles from Holmbury St Mary.

51.12--0.14

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 17:15 and 17:30 on 31 July 2025.

Normal traffic conditions are expected between 17:15 and 17:30 on 31 July 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 12.38 miles from Holmbury St Mary.

51.17--0.13

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .

Due to: Broken down vehicle.

Status : Cleared.
Nearest town: 15.83 miles from Holmbury St Mary.

51.37--0.64

Cross Deep (All Directions) junction with Grotto Road.

All closures have been removed - Traffic flows have returned to normal in the area
Nearest town: 18.15 miles from Holmbury St Mary.

51.44--0.34

Leatherhead Road (Northbound).

Traffic is moving well.

Traffic is moving well.
Nearest town: 11.58 miles from Holmbury St Mary.

51.34--0.32

Burlington Road between High Street and Malden Way (Kingston By Pass) - road is closed due to a fire.

Traffic is flowing well.
Nearest town: 16.55 miles from Holmbury St Mary.

51.4--0.24

Tolworth Rise North (Northbound) - Lane restriction on on-slip to northbound A3 at the junction of Fairmead due to emergency gas works.

Restrictions have been removed.

All lanes open.
Nearest town: 14.84 miles from Holmbury St Mary.

51.38--0.28

Sanderstead Hill (Both Directions) at the junction of Sundown Avenue - Possible lane closures because of a collision.

The road has reopened.
Nearest town: 17.77 miles from Holmbury St Mary.

51.34--0.08

High Street (Both Directions) at the junction of Cambridge Road - 2-way temporary traffic signals in operation to facilitate new gas connection now removed.

Traffic is moving well.
Nearest town: 16.49 miles from Holmbury St Mary.

51.4--0.26

On Tolworth Broadway (Southbound) at the junction with A3 Tolworth Roundabout, there is a broken down vehicle blocking lane two of three).

Approach with caution.

All lanes have reopened.

Traffic is flowing well.
Nearest town: 14.62 miles from Holmbury St Mary.

51.38--0.28

Middleton Road (Both Directions) between Bishopsford Road and St Helier Avenue - road closure to facilitate carriageway resurfacing.

Local diversion in place.


Nearest town: 17.4 miles from Holmbury St Mary.

51.39--0.18

Purley Way (Northbound) between Whitestone Way and Commerce Way - Lane restrictions to facilitate carriageway chamber access works for new connections.

(Night works only)
Nearest town: 18.18 miles from Holmbury St Mary.

51.37--0.12

Purley Way (Northbound) between Whitestone Way and Commerce Way - Lane closure for BT works.


Nearest town: 18.3 miles from Holmbury St Mary.

51.37--0.12

Location: eastbound between the junctions with the M25 and the A308 .

Due to: Congestion.



Normal traffic conditions are expected between 19:00 and 19:15 on 31 July 2025.
Nearest town: 17.87 miles from Holmbury St Mary.

51.44--0.5

Location: northbound between the junctions with the M23 and the A237 .

Due to: Congestion.



Normal traffic conditions are expected between 19:00 and 19:15 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.06 miles from Holmbury St Mary.

51.28--0.16

Location: eastbound exit slip to the A308 .

Due to: Congestion.



Normal traffic conditions are expected between 19:00 and 19:15 on 31 July 2025.
Nearest town: 17.87 miles from Holmbury St Mary.

51.44--0.5

Location: eastbound between the M25 and the junction with the A308 .

Due to: Congestion.



Normal traffic conditions are expected between 18:30 and 18:45 on 31 July 2025.
Nearest town: 17.87 miles from Holmbury St Mary.

51.44--0.5

Location: clockwise exit slip at junction J10 (Guildford) .

Due to: Congestion.



Normal traffic conditions are expected between 17:45 and 18:00 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.54 miles from Holmbury St Mary.

51.32--0.45

Location: eastbound exit slip to the A308 .

Due to: Congestion.



Normal traffic conditions are expected between 17:30 and 17:45 on 31 July 2025.
Nearest town: 17.87 miles from Holmbury St Mary.

51.44--0.5

Location: eastbound between the M25 and the junction with the A308 .

Due to: Congestion.



Normal traffic conditions are expected between 17:30 and 17:45 on 31 July 2025.
Nearest town: 17.87 miles from Holmbury St Mary.

51.44--0.5

Location: anticlockwise at junction J14 (Heathrow Airport) .

Due to: Congestion.



Normal traffic conditions are expected between 18:00 and 18:15 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.6 miles from Holmbury St Mary.

51.44--0.53

Location: anticlockwise between junctions J13 (A30) and J12 (Basingstoke) .

Due to: Congestion.



Normal traffic conditions are expected between 17:15 and 17:30 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.8 miles from Holmbury St Mary.

51.45--0.53

Location: southbound entry slip from the A245 .

Due to: Congestion.



Normal traffic conditions are expected between 17:30 and 17:45 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.31 miles from Holmbury St Mary.

51.33--0.43

Location: anticlockwise entry slip at junction J12 (Basingstoke) .

Due to: Congestion.



Normal traffic conditions are expected between 17:00 and 17:15 on 31 July 2025.
Nearest town: 15.59 miles from Holmbury St Mary.

51.4--0.53

Location: clockwise exit slip at junction J14 (Heathrow Airport) for A3113.

Due to: Congestion.



Normal traffic conditions are expected between 16:30 and 16:45 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.93 miles from Holmbury St Mary.

51.47--0.51

Location: eastbound between the M25 and the junction with the A315 .

Due to: Congestion.



Normal traffic conditions are expected between 16:45 and 17:00 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.87 miles from Holmbury St Mary.

51.44--0.5

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .

Due to: Congestion.



Normal traffic conditions are expected between 16:30 and 16:45 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.96 miles from Holmbury St Mary.

51.31--0.43

Location: southbound between the A320 and the junction with the A322 .

Due to: Congestion.



Normal traffic conditions are expected between 16:30 and 16:45 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.07 miles from Holmbury St Mary.

51.25--0.57

Location: anticlockwise entry slip at junction J12 (Basingstoke) .

Due to: Congestion.



Normal traffic conditions are expected between 16:30 and 16:45 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.92 miles from Holmbury St Mary.

51.4--0.54

Location: southbound entry slip from the A322 .

Due to: Congestion.



Normal traffic conditions are expected between 16:30 and 16:45 on 31 July 2025.
Nearest town: 8.83 miles from Holmbury St Mary.

51.25--0.59

Location: eastbound between the junctions with the M25 and the A308 .

Due to: Congestion.



Normal traffic conditions are expected between 16:15 and 16:30 on 31 July 2025.
Nearest town: 17.87 miles from Holmbury St Mary.

51.44--0.5

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Congestion.



Normal traffic conditions are expected between 18:45 and 19:00 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.

Earlier Due to: Caused by an earlier accident.
Nearest town: 12.78 miles from Holmbury St Mary.

51.12--0.14

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Due to: Congestion.



Normal traffic conditions are expected between 16:30 and 16:45 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.44 miles from Holmbury St Mary.

51.34--0.49

Location: clockwise exit slip at junction J14 (Heathrow Airport) for A3113.

Due to: Congestion.



Normal traffic conditions are expected between 15:45 and 16:00 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.93 miles from Holmbury St Mary.

51.47--0.51

Location: eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .

Due to: Congestion.



Normal traffic conditions are expected between 15:45 and 16:00 on 31 July 2025.

Delay : There are currently delays of 15 minutes against expected traffic.
Nearest town: 14.67 miles from Holmbury St Mary.

51.39--0.47

Location: southbound entry slip from the A245 .

Due to: Congestion.



Normal traffic conditions are expected between 15:15 and 15:30 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.31 miles from Holmbury St Mary.

51.33--0.43

Location: southbound exit slip to the A283 .

Due to: Congestion.



Normal traffic conditions are expected between 14:45 and 15:00 on 31 July 2025.
Nearest town: 10.29 miles from Holmbury St Mary.

51.18--0.65

Location: eastbound between the junctions with the M25 and the A308 .

Due to: Congestion.



Normal traffic conditions are expected between 14:15 and 14:30 on 31 July 2025.
Nearest town: 17.87 miles from Holmbury St Mary.

51.44--0.5

Location: clockwise at junction J8 (Reigate) .

Due to: Congestion.



Normal traffic conditions are expected between 14:45 and 15:00 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.33 miles from Holmbury St Mary.

51.26--0.18

Location: northbound between the A247 and the junction with the M25 .

Due to: Congestion.



Normal traffic conditions are expected between 16:00 and 16:15 on 31 July 2025.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.25 miles from Holmbury St Mary.

51.29--0.49

Location: eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .

Due to: Congestion.



Normal traffic conditions are expected between 15:00 and 15:15 on 31 July 2025.

Delay : There are currently delays of 50 minutes against expected traffic.

Earlier Due to: Caused by the earlier broken down vehicle.
Nearest town: 16.32 miles from Holmbury St Mary.

51.36--0.67

Location: northbound between the A247 and the junction with the M25 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.49 miles from Holmbury St Mary.

51.3--0.48

Location: clockwise between junctions J6 (East Grinstead) and J7 (Gatwick) .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.89 miles from Holmbury St Mary.

51.26--0.09

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.43 miles from Holmbury St Mary.

51.25--0.12

Location: clockwise between junctions J13 (A30) and J14 (Heathrow Airport) .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.
Nearest town: 19.5 miles from Holmbury St Mary.

51.46--0.52

Location: clockwise exit slip at junction J14 (Heathrow Airport) for A3113.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.73 miles from Holmbury St Mary.

51.46--0.51

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Due to: Roadworks scheme.



Period : from 20:01 on 31 July 2025 to 06:00 on 8 August 2025.
Nearest town: 15.52 miles from Holmbury St Mary.

51.38--0.6

Location: anticlockwise between junctions J11 (Chertsey) and J11 (Chertsey) .

Due to: Roadworks scheme.



Period : from 22:01 on 29 July 2025 to 05:30 on 7 August 2025.
Nearest town: 13.77 miles from Holmbury St Mary.

51.37--0.51

Location: clockwise between junctions J10 (Guildford) and J10 (Guildford) .

Due to: Roadworks scheme.



Period : from 22:00 on 29 July 2025 to 05:30 on 7 August 2025.
Nearest town: 9.65 miles from Holmbury St Mary.

51.32--0.45

Location: northbound.

Due to: Roadworks scheme.



Period : from 22:01 on 29 July 2025 to 05:30 on 7 August 2025.
Nearest town: 8.93 miles from Holmbury St Mary.

51.31--0.48

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .

Due to: Roadworks scheme.



Period : from 20:03 on 31 July 2025 to 06:00 on 9 August 2025.
Nearest town: 15.9 miles from Holmbury St Mary.

51.36--0.65

Location: clockwise exit slip at junction J14 (Heathrow Airport) for A3113.

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.79 miles from Holmbury St Mary.

51.46--0.51

Location: anticlockwise between junctions J14 (Heathrow Airport) and J13 (A30) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Lanes Closed : There will be one of five lanes closed.
Nearest town: 18.85 miles from Holmbury St Mary.

51.45--0.52

Location: westbound between the A3044 and the junction with the M25 .

Lane Closures : Lane two will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.58 miles from Holmbury St Mary.

51.46--0.49

Location: anticlockwise exit slip at junction J13 (A30) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.8 miles from Holmbury St Mary.

51.45--0.53

Location: eastbound at junction J1 (Sunbury) .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.24 miles from Holmbury St Mary.

51.42--0.42

Location: eastbound entry slip from the A308 .

Lane Closures : Lane two will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.25 miles from Holmbury St Mary.

51.42--0.42

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 1 August 2025.

Lanes Closed : There are two of four lanes closed.
Nearest town: 13.27 miles from Holmbury St Mary.

51.23--0.12

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Due to: Roadworks scheme.



Period : from 20:07 on 31 July 2025 to 06:00 on 1 August 2025.
Nearest town: 13.27 miles from Holmbury St Mary.

51.23--0.12

Location: northbound at junction J8 (Reigate) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 1 August 2025.

Lanes Closed : All lanes are closed.
Nearest town: 13.44 miles from Holmbury St Mary.

51.26--0.13

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 1 August 2025.

Lanes Closed : There are two of four lanes closed.
Nearest town: 12.49 miles from Holmbury St Mary.

51.21--0.13

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 9.29 miles from Holmbury St Mary.

51.32--0.44

Location: anticlockwise at junction J10 (Guildford) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 9.79 miles from Holmbury St Mary.

51.32--0.46

Location: southbound between the A245 and the junction with the M25 .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 10.45 miles from Holmbury St Mary.

51.34--0.43

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 9.88 miles from Holmbury St Mary.

51.32--0.46

Location: clockwise at junction J10 (Guildford) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 9.47 miles from Holmbury St Mary.

51.32--0.44

Location: northbound between the junctions with the A247 and the M25 .

Lane Closures : Lane three is closed.

Due to: Roadworks.



Period : expect disruption until 05:30 on 1 December 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 9.04 miles from Holmbury St Mary.

51.31--0.47

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Due to: Roadworks scheme.



Period : from 23:59 on 31 December 2023 to 06:00 on 31 December 2025.
Nearest town: 9.47 miles from Holmbury St Mary.

51.32--0.44

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .

Due to: Roadworks scheme.



Period : from 00:02 on 1 January 2024 to 06:00 on 31 December 2025.
Nearest town: 9.79 miles from Holmbury St Mary.

51.32--0.46

Location: northbound exit slip to the A333 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 15.49 miles from Holmbury St Mary.

51.1--0.75

Location: northbound entry slip from the A333 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 15.27 miles from Holmbury St Mary.

51.11--0.74

Location: northbound exit slip to the A333 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 15.49 miles from Holmbury St Mary.

51.1--0.75

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.87 miles from Holmbury St Mary.

51.15--0.7

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.61 miles from Holmbury St Mary.

51.15--0.7

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.91 miles from Holmbury St Mary.

51.09--0.8

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.9 miles from Holmbury St Mary.

51.09--0.8

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.91 miles from Holmbury St Mary.

51.09--0.8

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.9 miles from Holmbury St Mary.

51.09--0.8

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 19.78 miles from Holmbury St Mary.

51.08--0.84

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 19.78 miles from Holmbury St Mary.

51.08--0.84

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from Holmbury St Mary.

51.1--0.76

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 19.61 miles from Holmbury St Mary.

51.08--0.83

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 15.96 miles from Holmbury St Mary.

51.1--0.76

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 19.61 miles from Holmbury St Mary.

51.08--0.83

Location: northbound exit slip to the A283 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.51 miles from Holmbury St Mary.

51.18--0.66

Location: northbound entry slip at Liphook Services.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.88 miles from Holmbury St Mary.

51.08--0.82

Location: northbound exit slip at Liphook Services.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.96 miles from Holmbury St Mary.

51.08--0.82

Location: northbound entry slip at Liphook Services.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.88 miles from Holmbury St Mary.

51.08--0.82

Location: northbound exit slip at Liphook Services.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2025 to 2 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.96 miles from Holmbury St Mary.

51.08--0.82

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 6 August 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.52 miles from Holmbury St Mary.

51.38--0.6

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Lane Closures : Lanes 2, 3 and 4 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 1 August 2025.

Lanes Closed : There are three of four lanes closed.
Nearest town: 15.53 miles from Holmbury St Mary.

51.38--0.6

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .

Lane Closures : Lanes 1, 2 and 3 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 1 August 2025.

Lanes Closed : There are three of four lanes closed.
Nearest town: 15.9 miles from Holmbury St Mary.

51.36--0.65

Location: clockwise between junctions J8 (Reigate) and J10 (Guildford) .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.88 miles from Holmbury St Mary.

51.3--0.31

Location: westbound at junction J3 (Woking) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 6 August 2025 to 06:00 on 7 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.43 miles from Holmbury St Mary.

51.36--0.67

Location: southbound.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 6 August 2025 to 05:00 on 7 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.71 miles from Holmbury St Mary.

51.16--0.17

Location: southbound between the A244 and the junction with the M25 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 5 August 2025 to 8 August 2025.

Schedule : From 22:00 on 11 August 2025 to 05:30 on 12 August 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.78 miles from Holmbury St Mary.

51.34--0.41

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.68 miles from Holmbury St Mary.

51.31--0.42

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 30 July 2025 to 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.47 miles from Holmbury St Mary.

51.32--0.44

Location: anticlockwise at junction J11 (Chertsey) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.02 miles from Holmbury St Mary.

51.38--0.51

Location: anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.94 miles from Holmbury St Mary.

51.39--0.53

Location: clockwise entry slip at junction J10 (Guildford) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.65 miles from Holmbury St Mary.

51.32--0.45

Location: northbound between the junctions with the A247 and the M25 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.02 miles from Holmbury St Mary.

51.31--0.47

Location: anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.77 miles from Holmbury St Mary.

51.37--0.51

Location: northbound exit slip to the M25 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.48 miles from Holmbury St Mary.

51.32--0.45

Location: northbound.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.93 miles from Holmbury St Mary.

51.31--0.48

Location: anticlockwise exit slip at junction J10 (Guildford) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.79 miles from Holmbury St Mary.

51.32--0.46

Location: clockwise exit slip at junction J11 (Chertsey) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Schedule : From 22:00 on 6 August 2025 to 05:30 on 7 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.52 miles from Holmbury St Mary.

51.37--0.51

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.
Nearest town: 16.75 miles from Holmbury St Mary.

51.34--0.71

Location: westbound at junction J4 (Guildford) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.39 miles from Holmbury St Mary.

51.32--0.76

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.75 miles from Holmbury St Mary.

51.34--0.71

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.55 miles from Holmbury St Mary.

51.21--0.13

Location: anticlockwise between junctions J8 (Reigate) and J7 (Gatwick) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 5 August 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.46 miles from Holmbury St Mary.

51.27--0.16

Location: clockwise at junction J6 (East Grinstead) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 8 August 2025.

Schedule : From 23:00 on 8 August 2025 to 06:00 on 9 August 2025.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 13 August 2025 to 15 August 2025.

Schedule : From 23:00 on 15 August 2025 to 06:00 on 16 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.19 miles from Holmbury St Mary.

51.26--0.06

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 8 August 2025.

Schedule : From 23:00 on 8 August 2025 to 06:00 on 9 August 2025.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 13 August 2025 to 15 August 2025.

Schedule : From 23:00 on 15 August 2025 to 06:00 on 16 August 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.43 miles from Holmbury St Mary.

51.26--0.03

Location: clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 7 August 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.55 miles from Holmbury St Mary.

51.27--0.01

Location: clockwise between junctions J5 (Sevenoaks) and J7 (Gatwick) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 4 August 2025 to 05:30 on 22 August 2025.
Nearest town: 17.43 miles from Holmbury St Mary.

51.26--0.03

Location: clockwise between junctions J6 (East Grinstead) and J7 (Gatwick) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 August 2025 to 8 August 2025.

Schedule : From 23:00 on 8 August 2025 to 06:00 on 9 August 2025.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 13 August 2025 to 15 August 2025.

Schedule : From 23:00 on 15 August 2025 to 06:00 on 16 August 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.42 miles from Holmbury St Mary.

51.26--0.08

Location: clockwise between junctions J13 (A30) and J14 (Heathrow Airport) .

Lane Closures : Lanes 1, 2, 3 and 4 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 8 August 2025.

Schedule : From 23:00 on 8 August 2025 to 05:00 on 9 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.65 miles from Holmbury St Mary.

51.44--0.53

Location: clockwise at junction J13 (A30) .

Lane Closures : Lane four will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 8 August 2025.

Schedule : From 23:00 on 8 August 2025 to 05:00 on 9 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.36 miles from Holmbury St Mary.

51.44--0.53

Location: clockwise entry slip at junction J13 (A30) .

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 8 August 2025.

Schedule : From 23:00 on 8 August 2025 to 05:00 on 9 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.7 miles from Holmbury St Mary.

51.45--0.53

Location: southbound entry slip from the A244 .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 12 August 2025 to 05:30 on 13 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.52 miles from Holmbury St Mary.

51.35--0.36

Location: southbound between the A244 and the junction with the A245 .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 12 August 2025 to 05:30 on 13 August 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.61 miles from Holmbury St Mary.

51.35--0.36

Location: clockwise between junctions J12 (Basingstoke) and J13 (A30) .

Lane Closures : Lanes 4 and 5 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 August 2025 to 8 August 2025.

Schedule : From 23:00 on 8 August 2025 to 05:00 on 9 August 2025.

Lanes Closed : There will be two of five lanes closed.
Nearest town: 16.4 miles from Holmbury St Mary.

51.41--0.54

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 7 August 2025 to 05:30 on 8 August 2025.

Schedule : From 23:00 on 8 August 2025 to 06:00 on 9 August 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.26 miles from Holmbury St Mary.

51.35--0.49

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lanes 3 and 4 will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 4 August 2025 to 05:00 on 5 August 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.53 miles from Holmbury St Mary.

51.21--0.13

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .

Lane Closures : Lane four will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 20:00 on 4 August 2025 to 05:00 on 5 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.61 miles from Holmbury St Mary.

51.21--0.13

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 6 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.52 miles from Holmbury St Mary.

51.38--0.6

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 3 August 2025 to 06:00 on 4 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.55 miles from Holmbury St Mary.

51.21--0.13

Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 2 August 2025 to 06:00 on 3 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.37 miles from Holmbury St Mary.

51.18--0.13

Location: southbound between junctions J8 (Reigate) and J9 (Gatwick Airport) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 2 August 2025 to 06:00 on 3 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.49 miles from Holmbury St Mary.

51.21--0.13

Location: northbound between junctions J8 (Reigate) and J7 (Crawley) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 23:00 on 1 August 2025 to 06:00 on 2 August 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.96 miles from Holmbury St Mary.

51.27--0.15

Location: northbound between junctions J8 (Reigate) and J7 (Crawley) .

Lane Closures : Lane two will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 23:00 on 1 August 2025 to 06:00 on 2 August 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.9 miles from Holmbury St Mary.

51.27--0.15

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 August 2025 to 06:00 on 4 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 8.98 miles from Holmbury St Mary.

51.31--0.47

Location: southbound at the junction with the M25 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 August 2025 to 06:00 on 4 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.81 miles from Holmbury St Mary.

51.32--0.45

Location: southbound between the A244 and the junction with the M25 .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 August 2025 to 06:00 on 4 August 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.78 miles from Holmbury St Mary.

51.34--0.41

Location: southbound between the A244 and the junction with the A247 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 1 August 2025 to 06:00 on 4 August 2025.
Nearest town: 10.78 miles from Holmbury St Mary.

51.34--0.41

Location: southbound between the M25 and the junction with the A247 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 August 2025 to 06:00 on 4 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.6 miles from Holmbury St Mary.

51.32--0.45

Location: southbound at junction J10 (Crawley) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 August 2025 to 11 August 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 August 2025 to 18 August 2025.

Schedule : From 20:00 on 19 August 2025 to 06:00 on 20 August 2025.

Schedule : From 20:00 on 6 September 2025 to 06:00 on 7 September 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.29 miles from Holmbury St Mary.

51.14--0.14

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.

Schedule : From 20:00 on 9 August 2025 to 06:00 on 10 August 2025.

Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.

Schedule : From 20:00 on 2 September 2025 to 06:00 on 3 September 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.52 miles from Holmbury St Mary.

51.09--0.2

Location: northbound at junction J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.

Schedule : From 20:00 on 9 August 2025 to 06:00 on 10 August 2025.

Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.

Schedule : From 20:00 on 2 September 2025 to 06:00 on 3 September 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.53 miles from Holmbury St Mary.

51.08--0.2

Location: northbound between the junctions with the A272 and the M23 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 August 2025 to 4 August 2025.

Schedule : From 20:00 on 9 August 2025 to 06:00 on 10 August 2025.

Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.

Schedule : From 20:00 on 2 September 2025 to 06:00 on 3 September 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.54 miles from Holmbury St Mary.

51.08--0.2

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 August 2025 to 11 August 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 August 2025 to 18 August 2025.

Schedule : From 20:00 on 19 August 2025 to 06:00 on 20 August 2025.

Schedule : From 20:00 on 6 September 2025 to 06:00 on 7 September 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.37 miles from Holmbury St Mary.

51.13--0.14

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 August 2025 to 11 August 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 August 2025 to 18 August 2025.

Schedule : From 20:00 on 19 August 2025 to 06:00 on 20 August 2025.

Schedule : From 20:00 on 6 September 2025 to 06:00 on 7 September 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.55 miles from Holmbury St Mary.

51.08--0.2

Location: southbound at junction J10 (Crawley) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 September 2025 to 8 September 2025.

Schedule : From 20:00 on 14 September 2025 to 06:00 on 15 September 2025.

Schedule : From 20:00 on 21 September 2025 to 06:00 on 22 September 2025.

Schedule : From 20:00 on 4 October 2025 to 20:00 on 5 October 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.29 miles from Holmbury St Mary.

51.14--0.14

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 15 September 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 October 2025 to 6 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 22 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.52 miles from Holmbury St Mary.

51.09--0.2

Location: northbound at junction J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 15 September 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 October 2025 to 6 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 22 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.53 miles from Holmbury St Mary.

51.08--0.2

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 September 2025 to 8 September 2025.

Schedule : From 20:00 on 14 September 2025 to 06:00 on 15 September 2025.

Schedule : From 20:00 on 21 September 2025 to 06:00 on 22 September 2025.

Schedule : From 20:00 on 4 October 2025 to 20:00 on 5 October 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 12.37 miles from Holmbury St Mary.

51.13--0.14

Location: northbound between the junctions with the A272 and the M23 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 15 September 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 October 2025 to 6 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 22 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.54 miles from Holmbury St Mary.

51.08--0.2

Location: southbound between the junctions with the M23 and the A272 .

Lane Closures : Lane three will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 22 October 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.67 miles from Holmbury St Mary.

51.08--0.2

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 September 2025 to 8 September 2025.

Schedule : From 20:00 on 14 September 2025 to 06:00 on 15 September 2025.

Schedule : From 20:00 on 21 September 2025 to 06:00 on 22 September 2025.

Schedule : From 20:00 on 4 October 2025 to 20:00 on 5 October 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.55 miles from Holmbury St Mary.

51.08--0.2

Location: northbound between the A244 and the junction with the A309 .

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:30 on 1 August 2025.

Schedule : From 23:00 on 1 August 2025 to 06:00 on 2 August 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.78 miles from Holmbury St Mary.

51.35--0.34

Location: anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 30 July 2025 to 1 August 2025.

Schedule : From 23:00 on 1 August 2025 to 05:00 on 2 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 15.67 miles from Holmbury St Mary.

51.26--0.07

Location: anticlockwise at junction J6 (East Grinstead) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.

Schedule : From 23:00 on 1 August 2025 to 05:00 on 2 August 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.62 miles from Holmbury St Mary.

51.26--0.07

Location: anticlockwise between junctions J7 (Gatwick) and J6 (East Grinstead) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.

Schedule : From 23:00 on 1 August 2025 to 05:00 on 2 August 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.15 miles from Holmbury St Mary.

51.26--0.11

Location: anticlockwise entry slip at junction J6 (East Grinstead) .

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 31 July 2025 to 05:00 on 1 August 2025.

Schedule : From 23:00 on 1 August 2025 to 05:00 on 2 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.01 miles from Holmbury St Mary.

51.26--0.06

Location: westbound entry slip at junction J3 (Woking) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 12:00 on 8 August 2025 to 21:00 on 8 August 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.5 miles from Holmbury St Mary.

51.35--0.68

Location: clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Due to: Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 1 August 2025 to 16:00 on 1 August 2025.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 4 August 2025 to 6 August 2025.
Nearest town: 9.62 miles from Holmbury St Mary.

51.31--0.33

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 2 August 2025 to 06:00 on 3 September 2025.
Nearest town: 11.52 miles from Holmbury St Mary.

51.09--0.2

Location: westbound entry slip at junction J3 (Woking) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 12:00 on 8 August 2025 to 21:00 on 8 August 2025.
Nearest town: 16.54 miles from Holmbury St Mary.

51.36--0.68

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.75 miles from Holmbury St Mary.

51.34--0.71

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 9 August 2025 to 06:00 on 21 September 2025.
Nearest town: 12.37 miles from Holmbury St Mary.

51.13--0.14

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 9 August 2025 to 06:00 on 21 September 2025.
Nearest town: 11.55 miles from Holmbury St Mary.

51.08--0.2

Location: northbound between junctions J11 (Brighton) and J10A (Crawley) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 8 September 2025 to 06:00 on 12 December 2025.
Nearest town: 11.52 miles from Holmbury St Mary.

51.09--0.2

Location: southbound between junctions J10 (Crawley) and J11 (Brighton) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 6 September 2025 to 06:00 on 16 December 2025.
Nearest town: 12.37 miles from Holmbury St Mary.

51.13--0.14

Location: southbound between the junctions with the M23 and the A272 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 6 September 2025 to 06:00 on 16 December 2025.
Nearest town: 11.55 miles from Holmbury St Mary.

51.08--0.2