Location: eastbound.
Due to: Roadworks.
Period : from 19:59 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.44 miles from Graveney.

Location: eastbound between junctions J7 (Maidstone) and J9 (Ashford) .
Due to: Roadworks.
Period : from 19:35 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 16.21 miles from Graveney.

Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.97 miles from Graveney.

Location: eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.62 miles from Graveney.

Location: eastbound between junctions J7 (Maidstone) and J8 (Maidstone) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 16.57 miles from Graveney.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 11.25 miles from Graveney.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.23 miles from Graveney.

Location: eastbound at junction J7 (Maidstone) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 16.91 miles from Graveney.

Location: eastbound between junctions J6 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lanes 2, 3 and 4 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 17.6 miles from Graveney.

Location: eastbound between junctions J10A and J12 (Cheriton) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.75 miles from Graveney.

Location: westbound between junctions J12 (Cheriton) and J10A .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.95 miles from Graveney.

Location: eastbound between junctions J10A and J11 (Canterbury) .
Lane Closures : Lane three is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 28 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.18 miles from Graveney.

Location: westbound between junctions J11 (Canterbury) and J10A .
Lane Closures : Lane three is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 28 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 16.07 miles from Graveney.

Location: eastbound between the A2050 Canterbury South and the junction with the A256 Whitfield West .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.12 miles from Graveney.

Location: eastbound.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.41 miles from Graveney.

Location: eastbound exit slip at junction J6 (Maidstone) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 June 2025.
Nearest town: 19.37 miles from Graveney.

Location: westbound between junctions J6 (Maidstone) and J6 (Maidstone) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2025.
Nearest town: 18.95 miles from Graveney.

Location: eastbound exit slip at junction J5 (Aylesford) .
Due to: Roadworks scheme.
Period : from 10:11 on 19 May 2025 to 06:00 on 23 June 2025.
Nearest town: 19.67 miles from Graveney.

Location: westbound exit slip at junction J5 (Aylesford) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.05 miles from Graveney.

Location: northbound exit slip to the M2 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.03 miles from Graveney.

Location: northbound between the junctions with the A2042 and the M20 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 2 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.19 miles from Graveney.

Location: eastbound between junctions J6 (Maidstone) and J8 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:08 on 21 May 2025 to 06:00 on 28 May 2025.
Nearest town: 17.6 miles from Graveney.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:08 on 21 May 2025 to 06:00 on 28 May 2025.
Nearest town: 11.25 miles from Graveney.

Location: northbound.
Due to: Roadworks.
Period : expect disruption until 05:00 on 20 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.41 miles from Graveney.

Location: westbound between junctions J6 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.94 miles from Graveney.

Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18.45 miles from Graveney.

Location: westbound between junctions J5 (Aylesford) and J4 (West Malling) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 19.43 miles from Graveney.

Location: eastbound between the A2050 Canterbury South and the junction with the A260 .
Due to: Roadworks scheme.
Period : from 20:06 on 16 May 2025 to 06:00 on 2 June 2025.
Nearest town: 8.76 miles from Graveney.

Location: eastbound between the A2050 Canterbury South and the junction with the A260 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.16 miles from Graveney.

Location: westbound exit slip at junction J5 (Aylesford) .
Due to: Roadworks scheme.
Period : from 20:04 on 20 May 2025 to 06:00 on 16 June 2025.
Nearest town: 17.48 miles from Graveney.

Location: westbound exit slip at junction J5 (Aylesford) .
Due to: Roadworks scheme.
Period : from 20:04 on 20 May 2025 to 06:00 on 16 June 2025.
Nearest town: 19.05 miles from Graveney.

Location: southbound entry slip from the A2 .
Due to: Roadworks.
Period : expect disruption until 18:00 on 30 August 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.32 miles from Graveney.

Location: northbound.
Due to: Roadworks scheme.
Period : from 05:02 on 20 December 2024 to 20:00 on 2 July 2025.
Nearest town: 9.38 miles from Graveney.

Location: northbound.
Due to: Roadworks.
Period : expect disruption until 20:00 on 2 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.41 miles from Graveney.

Location: northbound.
Due to: Roadworks.
Period : expect disruption until 20:00 on 2 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.38 miles from Graveney.

Location: southbound.
Due to: Roadworks scheme.
Period : from 05:02 on 20 December 2024 to 20:00 on 2 July 2025.
Nearest town: 9.26 miles from Graveney.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 20:00 on 2 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.26 miles from Graveney.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 20:00 on 2 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.33 miles from Graveney.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.13 miles from Graveney.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.45 miles from Graveney.

Location: eastbound between the A260 and the junction with the A256 Dover West.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.23 miles from Graveney.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.06 miles from Graveney.

Location: eastbound between the M2 and the junction with the A28 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Nearest town: 1.85 miles from Graveney.

Location: eastbound between the M2 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.85 miles from Graveney.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.03 miles from Graveney.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.06 miles from Graveney.

Location: westbound between junctions J3 (Maidstone) and J2 (Strood) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:15 on 29 May 2025 to 01:00 on 30 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.35 miles from Graveney.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 12 July 2025.
Nearest town: 12.75 miles from Graveney.

Location: southbound between the M20 and the junction with the A2042 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.23 miles from Graveney.

Location: northbound between the A2042 and the junction with the M20 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.41 miles from Graveney.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.48 miles from Graveney.

Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 12 July 2025.
Nearest town: 12.79 miles from Graveney.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.79 miles from Graveney.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.75 miles from Graveney.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.78 miles from Graveney.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.75 miles from Graveney.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.2 miles from Graveney.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.79 miles from Graveney.

Location: eastbound between the M2 and the junction with the A28 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Nearest town: 1.1 miles from Graveney.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.11 miles from Graveney.

Location: eastbound between the M2 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.1 miles from Graveney.

Location: westbound between the A256 Dover West and the junction with the M20 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.5 miles from Graveney.

Location: eastbound between the M20 and the junction with the A256 Dover West.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.13 miles from Graveney.

Location: eastbound between junctions J10A and J11 (Canterbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.49 miles from Graveney.

Location: eastbound between junctions J10A and J11 (Canterbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 8 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.49 miles from Graveney.

Location: The junction of the M20 J8 (Maidstone) and the A20 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.3 miles from Graveney.

Location: eastbound between junctions J11A (Channel Tunnel) and J12 (Cheriton) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.38 miles from Graveney.

Location: eastbound between junctions J6 (Faversham) and J7 (Canterbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.99 miles from Graveney.

Location: westbound between junctions J7 (Canterbury) and J6 (Faversham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.09 miles from Graveney.

Location: eastbound at junction J3 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:15 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.53 miles from Graveney.

Location: westbound between junctions J4 (Gillingham) and J3 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:15 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.55 miles from Graveney.

Location: westbound between junctions J12 (Cheriton) and J11 (Canterbury) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.69 miles from Graveney.

Location: westbound at junction J12 (Cheriton) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.74 miles from Graveney.

Location: eastbound between junctions J11 (Canterbury) and J12 (Cheriton) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.81 miles from Graveney.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.09 miles from Graveney.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.09 miles from Graveney.

Location: eastbound between the M2 and the junction with the A28 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 2.4 miles from Graveney.

Location: westbound between the A256 Whitfield West and the junction with the A260 .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.91 miles from Graveney.

Location: eastbound between junctions J5 (Aylesford) and J6 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 24 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.39 miles from Graveney.

Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.92 miles from Graveney.

Location: eastbound entry slip at junction J5 (Aylesford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.4 miles from Graveney.

Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.84 miles from Graveney.

Location: westbound between junctions J7 (Maidstone) and J6 (Maidstone) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 17.48 miles from Graveney.

Location: westbound entry slip at junction J6 (Maidstone) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 May 2025 to 1 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 8 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 12 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.19 miles from Graveney.

Location: westbound between junctions J6 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.62 miles from Graveney.

Location: eastbound exit slip at junction J5 (Aylesford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.67 miles from Graveney.

Location: westbound exit slip at junction J5 (Aylesford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.05 miles from Graveney.

Location: westbound exit slip at junction J6 (Maidstone) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 May 2025 to 1 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 8 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 12 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.1 miles from Graveney.

Location: southbound exit slip to the M2 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.64 miles from Graveney.

Location: westbound entry slip at junction J5 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.74 miles from Graveney.

Location: southbound between the junctions with the M20 and the A2042 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.06 miles from Graveney.

Location: northbound between the junctions with the A2042 and the M20 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 9 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.17 miles from Graveney.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.19 miles from Graveney.

Location: eastbound entry slip from the A2050 Canterbury South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.76 miles from Graveney.

Location: westbound between the junctions with the A260 and the A28 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.42 miles from Graveney.