The following traffic incidents and congestion for Grafton have been reported by Highways England, Traffic Scotland, Traffic Wales or Transport for London (TfL) in the last two hours:

ROAD WORKS
Location: The A45 eastbound between the A6 and the junction with the A14 .
Lane closures: Lane one will be closed.
Reason: Emergency road marking works are planned.
Status: Pending.
ScheduleFrom 20:00 on 26 Mar 2019 to 05:00 on 27 Mar 2019.
Lanes closed: There will be one of two lanes closed.
Nearest town: 5.46 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the junctions with the A14 and the A6 .
Lane closures: Lane one will be closed.
Reason: Emergency road marking works are planned.
Status: Pending.
ScheduleFrom 20:00 on 26 Mar 2019 to 05:00 on 27 Mar 2019.
Lanes closed: There will be one of two lanes closed.
Nearest town: 5.32 miles from Grafton.
CONGESTION
Location: The A1 northbound at the junction with the A605 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 15:15 and 15:30 on 26 Mar 2019.
Nearest town: 16.18 miles from Grafton.
CONGESTION
Location: The A45 eastbound entry slip from the A509 South.
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 14:30 and 14:45 on 26 Mar 2019.
Nearest town: 8.02 miles from Grafton. CLEARED @ 14:41
CONGESTION
Location: The A45 eastbound between the junctions with the A509 South and the A5001 West.
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 14:15 and 14:30 on 26 Mar 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.85 miles from Grafton. CLEARED @ 14:23
CONGESTION
Location: The A14 SPUR southbound exit slip to the A141 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 14:30 and 14:45 on 26 Mar 2019.
Delay: There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.29 miles from Grafton. CLEARED @ 14:41
CONGESTION
Location: The A1 southbound exit slip to the A1139 .
Reason: Congestion.
Status: Currently Active.
Return to normal: Normal traffic conditions are expected between 11:00 and 11:15 on 26 Mar 2019.
Nearest town: 16.16 miles from Grafton. CLEARED @ 11:05


There are no current incidents in this location.

Roadworks

ROAD WORKS
Location: The A14 westbound between junctions J21 A1 Junction and J20 Ellington.
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Nearest town: 16.83 miles from Grafton.
ROAD WORKS
Location: The A14 westbound between junctions J21 A1 Junction and J20 Ellington.
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.83 miles from Grafton.
ROAD WORKS
Location: The A14 westbound between junctions J22 Huntingdon Racecourse and J21 A1 Junction.
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.18 miles from Grafton.
ROAD WORKS
Location: The A1 northbound between the junctions with the A47 and the A43 .
Lane closures: Lane two will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.5 miles from Grafton.
ROAD WORKS
Location: The A1 southbound between the junctions with the A43 and the A47 .
Lane closures: Lane two will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.06 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the junctions with the A5001 West and the A509 South.
Lane closures: Lane one is closed.
Reason: Bridge repairs.
Status: Currently Active.
Period: expect disruption until 20:00 on 2 Apr 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 7.3 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the junctions with the A5001 West and the A5001 East.
Lane closures: Lane one is closed.
Reason: Bridge repairs.
Status: Currently Active.
Period: expect disruption until 20:00 on 2 Apr 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 6.88 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the A509 South and the junction with the A5001 West.
Lane closures: Lane two is closed.
Reason: Bridge repairs.
Status: Currently Active.
Period: expect disruption until 20:00 on 2 Apr 2019.
Lanes Closed: There is one of two lanes closed.
Nearest town: 7.95 miles from Grafton.
ROAD WORKS
Location: The A1 northbound between the A428 and the junction with the A14 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 16:22 on 22 Mar 2019 to 06:00 on 13 Apr 2019.
Nearest town: 18.46 miles from Grafton.
ROAD WORKS
Location: The A1 northbound between the A428 and the junction with the A14M .
Reason: Roadworks.
Status: Currently Active.
Period: from 16:31 on 22 Mar 2019 to 06:00 on 13 Apr 2019.
Nearest town: 17.57 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the M1 and the junction with the A508 North.
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.26 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the junctions with the A508 Northampton and the M1 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 18.09 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the A508 Northampton and the junction with the M1 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.9 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A508 Northampton and the A428 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 15.13 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A428 and the A43 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 15.56 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound at the junction with the A428 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 15.91 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A508 Northampton and the A428 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 16.28 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A508 Northampton and the A428 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 16.61 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound entry slip at junction J4 .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 26 Mar 2019 to 05:00 on 27 Mar 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 7.23 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J2 Kelmarsh and J6 .
Lane closures: Lane one will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 26 Mar 2019 to 05:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 8.47 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J21 A1 Junction and J22 Huntingdon Racecourse.
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 30 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.94 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J11 Cranford and J13 Thrapston.
Lane closures: Lane one will be closed.
Reason: Emergency litter clearance is planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 26 Mar 2019 to 28 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 1.87 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A509 South and the A5001 West.
Lane closures: Lane one will be closed.
Reason: Emergency litter clearance is planned.
Status: Pending.
Schedule: From 20:00 on 26 Mar 2019 to 04:00 on 27 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 7.95 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the A5076 Northampton East and the junction with the A43 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:06 on 18 Mar 2019 to 06:00 on 2 Apr 2019.
Nearest town: 12.69 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J19A and J21 A1 Junction.
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:00 on 25 Mar 2019 to 06:00 on 13 Apr 2019.
Nearest town: 13.91 miles from Grafton.
ROAD WORKS
Location: The A1 northbound.
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 21:00 on 22 Mar 2019 to 06:00 on 1 Apr 2019.
Nearest town: 17.01 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J21 A1 Junction and J22 Huntingdon Racecourse.
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:00 on 18 Mar 2019 to 06:00 on 30 Mar 2019.
Nearest town: 16.94 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the M1 and the junction with the A428 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:01 on 20 Mar 2019 to 06:00 on 4 Apr 2019.
Nearest town: 17.26 miles from Grafton.
ROAD WORKS
Location: The A45 westbound.
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:00 on 25 Mar 2019 to 06:00 on 6 Apr 2019.
Nearest town: 14.1 miles from Grafton.
ROAD WORKS
Location: The A1 southbound.
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 19:59 on 25 Mar 2019 to 06:00 on 13 Apr 2019.
Nearest town: 16.2 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15A (Northampton) and J15 (Northampton) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 26 Mar 2019 to 06:00 on 7 Apr 2019.
Nearest town: 18.46 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15A (Northampton) and J14 (Milton Keynes) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 22:00 on 26 Mar 2019 to 06:00 on 7 Apr 2019.
Nearest town: 18.43 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 06:00 on 24 Mar 2019 to 06:00 on 15 Apr 2019.
Nearest town: 19.58 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 06:00 on 24 Mar 2019 to 22:00 on 14 Apr 2019.
Nearest town: 18.54 miles from Grafton.
ROAD WORKS
Location: The A14 westbound between junctions J6 and J3 Rothwell.
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 28 Mar 2019 to 30 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 5.89 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J2 Kelmarsh and J6 .
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 28 Mar 2019 to 30 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 8.1 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the M1 and the junction with the A508 North.
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Schedule: From 20:00 on 31 Mar 2019 to 05:00 on 1 Apr 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.17 miles from Grafton.
ROAD WORKS
Location: The A45 westbound at the junction with the A508 Northampton.
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Schedule: From 20:00 on 31 Mar 2019 to 05:00 on 1 Apr 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.66 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the A428 and the junction with the A508 Northampton.
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Schedule: From 20:00 on 31 Mar 2019 to 05:00 on 1 Apr 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 15.91 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the A428 and the junction with the A508 Northampton.
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Schedule: From 20:00 on 31 Mar 2019 to 05:00 on 1 Apr 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 15.04 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A508 Northampton and the A428 .
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Schedule: From 20:00 on 31 Mar 2019 to 05:00 on 1 Apr 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 15.91 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A508 Northampton and the A428 .
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Schedule: From 20:00 on 31 Mar 2019 to 05:00 on 1 Apr 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.28 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A508 Northampton and the A428 .
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Schedule: From 20:00 on 31 Mar 2019 to 05:00 on 1 Apr 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 16.3 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the A428 and the junction with the A508 Northampton.
Lane closures: Lane three will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 15.93 miles from Grafton.
ROAD WORKS
Location: The A45 westbound between the junctions with the A43 and the A428 .
Lane closures: Lane three will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Mar 2019 to 29 Mar 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 14.95 miles from Grafton.
ROAD WORKS
Location: The A1 southbound between the A43 and the junction with the A605 .
Lane closures: Lane one will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 21:00 on 28 Mar 2019 to 05:00 on 29 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.06 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J15A (Northampton) and J16 (Northampton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 10:00 on 28 Mar 2019 to 13:00 on 28 Mar 2019.
Nearest town: 18.77 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J16 (Northampton) and J15A (Northampton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 09:00 on 27 Mar 2019 to 16:00 on 27 Mar 2019.
Nearest town: 18.89 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lane three is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 22:00 on 26 Mar 2019.
Lanes Closed: There is one of four lanes closed.
Nearest town: 19.61 miles from Grafton.
ROAD WORKS
Location: The M1 southbound.
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 6 Apr 2019 to 05:00 on 7 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 19.82 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 9 Apr 2019 to 12 Apr 2019.
Schedule: From 22:00 on 28 Aug 2019 to 05:00 on 29 Aug 2019.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 19.61 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15A (Northampton) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 27 Mar 2019 to 06:00 on 28 Mar 2019.
Schedule: From 22:00 on 2 Apr 2019 to 06:00 on 3 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.53 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15A (Northampton) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 7 Apr 2019 to 06:00 on 8 Apr 2019.
Schedule: From 22:00 on 14 Apr 2019 to 06:00 on 15 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 18.53 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Schedule: From 22:00 on 1 Apr 2019 to 06:00 on 2 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.48 miles from Grafton.
ROAD WORKS
Location: The M1 southbound entry slip at junction J15 (Northampton) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 6 Apr 2019 to 06:00 on 7 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 18.44 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15A (Northampton) and J14 (Milton Keynes) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 6 Apr 2019 to 06:00 on 7 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 18.43 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J15 (Northampton) and J15A (Northampton) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 28 Mar 2019 to 06:00 on 29 Mar 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.44 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15A (Northampton) and J15 (Northampton) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 6 Apr 2019 to 06:00 on 7 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.46 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15A (Northampton) and J15 (Northampton) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Schedule: Expect disruption everyday between 22:00 and 06:00 from 1 Apr 2019 to 3 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.46 miles from Grafton.
ROAD WORKS
Location: The M1 northbound exit slip at junction J15 (Northampton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 7 Apr 2019 to 06:00 on 8 Apr 2019.
Schedule: From 22:00 on 14 Apr 2019 to 06:00 on 15 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 18.51 miles from Grafton.
ROAD WORKS
Location: The A14 westbound between junctions J9 Kettering South and J8 Kettering Central.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 1 Apr 2019 to 06:00 on 2 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 4.02 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J7 Kettering North and J9 Kettering South.
Lane closures: Lanes 2 and 3 will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 2 Apr 2019 to 06:00 on 3 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 4.92 miles from Grafton.
ROAD WORKS
Location: The A14 westbound between junctions J9 Kettering South and J8 Kettering Central.
Lane closures: Lane two will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 2 Apr 2019 to 06:00 on 3 Apr 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 4.02 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J7 Kettering North and J9 Kettering South.
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 1 Apr 2019 to 06:00 on 2 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 4.92 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the A43 and the junction with the A509 North.
Lane closures: Lane one will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 3 Apr 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 13.95 miles from Grafton.
ROAD WORKS
Location: The A45 eastbound between the junctions with the A428 and the A43 .
Lane closures: Lane one will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 3 Apr 2019.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 14.28 miles from Grafton.
ROAD WORKS
Location: The A14 westbound between junctions J1 Welford and M1 Catthorpe Interchange.
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 4 Apr 2019 to 6 Apr 2019.
Schedule: From 20:00 on 8 Apr 2019 to 05:00 on 9 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 23 Apr 2019 to 26 Apr 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 19.33 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J15A (Northampton) and J16 (Northampton) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 28 Mar 2019 to 30 Mar 2019.
Schedule: From 22:00 on 3 Apr 2019 to 06:00 on 4 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.71 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J16 (Northampton) and J15A (Northampton) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 3 Apr 2019 to 06:00 on 4 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 19.72 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J15 (Northampton) and J16 (Northampton) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 28 Mar 2019 to 06:00 on 29 Mar 2019.
Schedule: From 22:00 on 2 Apr 2019 to 06:00 on 3 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.47 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane closures: Lane three is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 22:00 on 26 Mar 2019.
Lanes Closed: There is one of four lanes closed.
Nearest town: 19.58 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 27 Mar 2019 to 06:00 on 28 Mar 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 19.24 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 7 Apr 2019 to 06:00 on 8 Apr 2019.
Schedule: From 22:00 on 14 Apr 2019 to 06:00 on 15 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 19.58 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 6 Apr 2019 to 06:00 on 7 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 18.54 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lane three is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 22:00 on 26 Mar 2019.
Lanes Closed: There is one of four lanes closed.
Nearest town: 18.54 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 26 Mar 2019 to 06:00 on 27 Mar 2019.
Schedule: Expect disruption everyday between 22:00 and 06:00 from 1 Apr 2019 to 3 Apr 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.61 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J15 (Northampton) and J15A (Northampton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 09:00 on 27 Mar 2019 to 16:00 on 27 Mar 2019.
Nearest town: 18.4 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J16 (Northampton) and J15A (Northampton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 09:00 on 27 Mar 2019 to 16:00 on 27 Mar 2019.
Schedule: From 10:00 on 28 Mar 2019 to 13:00 on 28 Mar 2019.
Nearest town: 18.89 miles from Grafton. CLEARED @ 10:29
ROAD WORKS
Location: The A1 southbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 30 Mar 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.68 miles from Grafton.
ROAD WORKS
Location: The A1 southbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 30 Mar 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.93 miles from Grafton.
ROAD WORKS
Location: The A1 southbound.
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 30 Mar 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.2 miles from Grafton.
ROAD WORKS
Location: The A1 southbound between the A14M and the junction with the A428 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 30 Mar 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.25 miles from Grafton.
ROAD WORKS
Location: The A1 southbound exit slip to the A14 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 30 Mar 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.78 miles from Grafton.
ROAD WORKS
Location: The A1 southbound entry slip from the A14 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 30 Mar 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.94 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J2 Kelmarsh and J3 Rothwell.
Lane closures: Lane one will be closed.
Reason: Horticultural works are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 1 Apr 2019 to 4 Apr 2019.
Schedule: From 20:00 on 9 Apr 2019 to 05:00 on 10 Apr 2019.
Schedule: From 20:00 on 26 Apr 2019 to 05:00 on 27 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 29 Apr 2019 to 2 May 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 11.92 miles from Grafton.
ROAD WORKS
Location: The A1M northbound.
Lane closures: Lane one will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 Mar 2019 to 30 Mar 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.11 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 28 Aug 2019 to 05:00 on 29 Aug 2019.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 19.61 miles from Grafton. CLEARED @ 10:02
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lane three is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 22:00 on 26 Mar 2019.
Lanes Closed: There is one of four lanes closed.
Nearest town: 19.61 miles from Grafton. CLEARED @ 10:02
ROAD WORKS
Location: The A1 northbound between the A428 and the junction with the A14M .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.56 miles from Grafton.
ROAD WORKS
Location: The A1 northbound entry slip from the A14 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 1 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.83 miles from Grafton.
ROAD WORKS
Location: The A1 northbound between the A14 and the junction with the A14M .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 1 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 17.01 miles from Grafton.
ROAD WORKS
Location: The A1 northbound.
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 1 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.23 miles from Grafton.
ROAD WORKS
Location: The A1M northbound between junctions J16 and J17 .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 28 Mar 2019 to 06:00 on 29 Mar 2019.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 16.17 miles from Grafton.
ROAD WORKS
Location: The M1 southbound between junctions J15A (Northampton) and J15 (Northampton) .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 08:00 on 28 Mar 2019 to 17:00 on 28 Mar 2019.
Nearest town: 18.32 miles from Grafton.
ROAD WORKS
Location: The M1 northbound between junctions J15 (Northampton) and J15A (Northampton) .
Reason: Emergency roadworks are planned.
Status: Pending.
Schedule: From 08:00 on 27 Mar 2019 to 17:00 on 27 Mar 2019.
Nearest town: 18.4 miles from Grafton.
ROAD WORKS
Location: The A14 eastbound between junctions J19A and J21 A1 Junction.
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 26 Mar 2019 to 30 Mar 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 13.91 miles from Grafton.
ROAD WORKS
Location: The A1 northbound entry slip from the A14 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: All lanes will be closed.
Nearest town: 16.83 miles from Grafton.
ROAD WORKS
Location: The A1 northbound between the A428 and the junction with the A14 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 1 Apr 2019 to 6 Apr 2019.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 8 Apr 2019 to 13 Apr 2019.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 17.89 miles from Grafton.

Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location: eastbound between the A6 and the junction with the A14 .

Lane Closures : Lane one will be closed.

Due to: Emergency road marking works are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 05:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.46 miles from Grafton.

52.33--0.58

Location: westbound between the junctions with the A14 and the A6 .

Lane Closures : Lane one will be closed.

Due to: Emergency road marking works are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 05:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.32 miles from Grafton.

52.33--0.58

Location: northbound at the junction with the A605 .

Due to: Congestion.



Normal traffic conditions are expected between 15:15 and 15:30 on 26 March 2019.
Nearest town: 16.18 miles from Grafton.

52.55--0.33

Location: eastbound entry slip from the A509 South.

Due to: Congestion.



Normal traffic conditions are expected between 14:30 and 14:45 on 26 March 2019.
Nearest town: 8.02 miles from Grafton.

52.29--0.68

Location: eastbound between the junctions with the A509 South and the A5001 West.

Due to: Congestion.



Normal traffic conditions are expected between 14:15 and 14:30 on 26 March 2019.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.85 miles from Grafton.

52.29--0.67

Location: southbound exit slip to the A141 .

Due to: Congestion.



Normal traffic conditions are expected between 14:30 and 14:45 on 26 March 2019.

Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.29 miles from Grafton.

52.34--0.21

Location: southbound exit slip to the A1139 .

Due to: Congestion.



Normal traffic conditions are expected between 11:00 and 11:15 on 26 March 2019.
Nearest town: 16.16 miles from Grafton.

52.54--0.32

Location: westbound between junctions J21 A1 Junction and J20 Ellington.

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.
Nearest town: 16.83 miles from Grafton.

52.33--0.25

Location: westbound between junctions J21 A1 Junction and J20 Ellington.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.83 miles from Grafton.

52.33--0.25

Location: westbound between junctions J22 Huntingdon Racecourse and J21 A1 Junction.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.18 miles from Grafton.

52.33--0.24

Location: northbound between the junctions with the A47 and the A43 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.5 miles from Grafton.

52.6--0.43

Location: southbound between the junctions with the A43 and the A47 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.06 miles from Grafton.

52.62--0.46

Location: westbound between the junctions with the A5001 West and the A509 South.

Lane Closures : Lane one is closed.

Due to: Bridge repairs.



Period : expect disruption until 20:00 on 2 April 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 7.3 miles from Grafton.

52.29--0.64

Location: westbound between the junctions with the A5001 West and the A5001 East.

Lane Closures : Lane one is closed.

Due to: Bridge repairs.



Period : expect disruption until 20:00 on 2 April 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 6.88 miles from Grafton.

52.3--0.62

Location: eastbound between the A509 South and the junction with the A5001 West.

Lane Closures : Lane two is closed.

Due to: Bridge repairs.



Period : expect disruption until 20:00 on 2 April 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 7.95 miles from Grafton.

52.29--0.68

Location: northbound between the A428 and the junction with the A14 .

Due to: Roadworks scheme.



Period : from 16:22 on 22 March 2019 to 06:00 on 13 April 2019.
Nearest town: 18.46 miles from Grafton.

52.26--0.26

Location: northbound between the A428 and the junction with the A14M .

Due to: Roadworks.



Period : from 16:31 on 22 March 2019 to 06:00 on 13 April 2019.
Nearest town: 17.57 miles from Grafton.

52.29--0.26

Location: eastbound between the M1 and the junction with the A508 North.

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.26 miles from Grafton.

52.21--0.89

Location: westbound between the junctions with the A508 Northampton and the M1 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.09 miles from Grafton.

52.19--0.89

Location: westbound between the A508 Northampton and the junction with the M1 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.9 miles from Grafton.

52.21--0.89

Location: eastbound between the junctions with the A508 Northampton and the A428 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.13 miles from Grafton.

52.23--0.86

Location: eastbound between the junctions with the A428 and the A43 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.56 miles from Grafton.

52.23--0.87

Location: eastbound at the junction with the A428 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.91 miles from Grafton.

52.22--0.87

Location: eastbound between the junctions with the A508 Northampton and the A428 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.28 miles from Grafton.

52.22--0.88

Location: eastbound between the junctions with the A508 Northampton and the A428 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 06:00 on 27 March 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.61 miles from Grafton.

52.22--0.89

Location: eastbound entry slip at junction J4 .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 March 2019 to 05:00 on 27 March 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 7.23 miles from Grafton.

52.42--0.8

Location: eastbound between junctions J2 Kelmarsh and J6 .

Lane Closures : Lane one will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 March 2019 to 05:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.47 miles from Grafton.

52.41--0.83

Location: eastbound between junctions J21 A1 Junction and J22 Huntingdon Racecourse.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.94 miles from Grafton.

52.33--0.25

Location: eastbound between junctions J11 Cranford and J13 Thrapston.

Lane Closures : Lane one will be closed.

Due to: Emergency litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 March 2019 to 28 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.87 miles from Grafton.

52.39--0.59

Location: eastbound between the junctions with the A509 South and the A5001 West.

Lane Closures : Lane one will be closed.

Due to: Emergency litter clearance is planned.

Status : Pending.

Schedule : From 20:00 on 26 March 2019 to 04:00 on 27 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.95 miles from Grafton.

52.29--0.68

Location: westbound between the A5076 Northampton East and the junction with the A43 .

Due to: Roadworks scheme.



Period : from 20:06 on 18 March 2019 to 06:00 on 2 April 2019.
Nearest town: 12.69 miles from Grafton.

52.25--0.81

Location: eastbound between junctions J19A and J21 A1 Junction.

Due to: Roadworks scheme.



Period : from 20:00 on 25 March 2019 to 06:00 on 13 April 2019.
Nearest town: 13.91 miles from Grafton.

52.34--0.32

Location: northbound.

Due to: Roadworks scheme.



Period : from 21:00 on 22 March 2019 to 06:00 on 1 April 2019.
Nearest town: 17.01 miles from Grafton.

52.33--0.25

Location: eastbound between junctions J21 A1 Junction and J22 Huntingdon Racecourse.

Due to: Roadworks scheme.



Period : from 20:00 on 18 March 2019 to 06:00 on 30 March 2019.
Nearest town: 16.94 miles from Grafton.

52.33--0.25

Location: eastbound between the M1 and the junction with the A428 .

Due to: Roadworks scheme.



Period : from 20:01 on 20 March 2019 to 06:00 on 4 April 2019.
Nearest town: 17.26 miles from Grafton.

52.21--0.89

Location: westbound.

Due to: Roadworks scheme.



Period : from 20:00 on 25 March 2019 to 06:00 on 6 April 2019.
Nearest town: 14.1 miles from Grafton.

52.24--0.84

Location: southbound.

Due to: Roadworks scheme.



Period : from 19:59 on 25 March 2019 to 06:00 on 13 April 2019.
Nearest town: 16.2 miles from Grafton.

52.36--0.25

Location: southbound between junctions J15A (Northampton) and J15 (Northampton) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 26 March 2019 to 06:00 on 7 April 2019.
Nearest town: 18.46 miles from Grafton.

52.21--0.94

Location: southbound between junctions J15A (Northampton) and J14 (Milton Keynes) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 26 March 2019 to 06:00 on 7 April 2019.
Nearest town: 18.43 miles from Grafton.

52.19--0.9

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .

Due to: Roadworks scheme.



Period : from 06:00 on 24 March 2019 to 06:00 on 15 April 2019.
Nearest town: 19.58 miles from Grafton.

52.15--0.84

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Due to: Roadworks scheme.



Period : from 06:00 on 24 March 2019 to 22:00 on 14 April 2019.
Nearest town: 18.54 miles from Grafton.

52.18--0.89

Location: westbound between junctions J6 and J3 Rothwell.

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 28 March 2019 to 30 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.89 miles from Grafton.

52.41--0.77

Location: eastbound between junctions J2 Kelmarsh and J6 .

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 28 March 2019 to 30 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.1 miles from Grafton.

52.41--0.82

Location: eastbound between the M1 and the junction with the A508 North.

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Schedule : From 20:00 on 31 March 2019 to 05:00 on 1 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.17 miles from Grafton.

52.21--0.89

Location: westbound at the junction with the A508 Northampton.

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Schedule : From 20:00 on 31 March 2019 to 05:00 on 1 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.66 miles from Grafton.

52.22--0.89

Location: westbound between the A428 and the junction with the A508 Northampton.

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Schedule : From 20:00 on 31 March 2019 to 05:00 on 1 April 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.91 miles from Grafton.

52.22--0.87

Location: westbound between the A428 and the junction with the A508 Northampton.

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Schedule : From 20:00 on 31 March 2019 to 05:00 on 1 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.04 miles from Grafton.

52.23--0.86

Location: eastbound between the junctions with the A508 Northampton and the A428 .

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Schedule : From 20:00 on 31 March 2019 to 05:00 on 1 April 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.91 miles from Grafton.

52.22--0.87

Location: eastbound between the junctions with the A508 Northampton and the A428 .

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Schedule : From 20:00 on 31 March 2019 to 05:00 on 1 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.28 miles from Grafton.

52.22--0.88

Location: eastbound between the junctions with the A508 Northampton and the A428 .

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Schedule : From 20:00 on 31 March 2019 to 05:00 on 1 April 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.3 miles from Grafton.

52.22--0.88

Location: westbound between the A428 and the junction with the A508 Northampton.

Lane Closures : Lane three will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.93 miles from Grafton.

52.22--0.87

Location: westbound between the junctions with the A43 and the A428 .

Lane Closures : Lane three will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 March 2019 to 29 March 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.95 miles from Grafton.

52.23--0.86

Location: southbound between the A43 and the junction with the A605 .

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 28 March 2019 to 05:00 on 29 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.06 miles from Grafton.

52.62--0.46

Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 10:00 on 28 March 2019 to 13:00 on 28 March 2019.
Nearest town: 18.77 miles from Grafton.

52.21--0.96

Location: southbound between junctions J16 (Northampton) and J15A (Northampton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 27 March 2019 to 16:00 on 27 March 2019.
Nearest town: 18.89 miles from Grafton.

52.22--0.97

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lane three is closed.

Due to: Roadworks.



Period : expect disruption until 22:00 on 26 March 2019.

Lanes Closed : There is one of four lanes closed.
Nearest town: 19.61 miles from Grafton.

52.15--0.84

Location: southbound.

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 6 April 2019 to 05:00 on 7 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 19.82 miles from Grafton.

52.14--0.83

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 April 2019 to 12 April 2019.

Schedule : From 22:00 on 28 August 2019 to 05:00 on 29 August 2019.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.61 miles from Grafton.

52.15--0.84

Location: northbound between junctions J14 (Milton Keynes) and J15A (Northampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 March 2019 to 06:00 on 28 March 2019.

Schedule : From 22:00 on 2 April 2019 to 06:00 on 3 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.53 miles from Grafton.

52.18--0.89

Location: northbound between junctions J14 (Milton Keynes) and J15A (Northampton) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 7 April 2019 to 06:00 on 8 April 2019.

Schedule : From 22:00 on 14 April 2019 to 06:00 on 15 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 18.53 miles from Grafton.

52.18--0.89

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 March 2019 to 06:00 on 27 March 2019.

Schedule : From 22:00 on 1 April 2019 to 06:00 on 2 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.48 miles from Grafton.

52.19--0.9

Location: southbound entry slip at junction J15 (Northampton) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 6 April 2019 to 06:00 on 7 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 18.44 miles from Grafton.

52.19--0.89

Location: southbound between junctions J15A (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 6 April 2019 to 06:00 on 7 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 18.43 miles from Grafton.

52.19--0.9

Location: northbound between junctions J15 (Northampton) and J15A (Northampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 28 March 2019 to 06:00 on 29 March 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.44 miles from Grafton.

52.19--0.9

Location: southbound between junctions J15A (Northampton) and J15 (Northampton) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 6 April 2019 to 06:00 on 7 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.46 miles from Grafton.

52.21--0.94

Location: southbound between junctions J15A (Northampton) and J15 (Northampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 26 March 2019 to 06:00 on 27 March 2019.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 1 April 2019 to 3 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.46 miles from Grafton.

52.21--0.94

Location: northbound exit slip at junction J15 (Northampton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 7 April 2019 to 06:00 on 8 April 2019.

Schedule : From 22:00 on 14 April 2019 to 06:00 on 15 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 18.51 miles from Grafton.

52.18--0.89

Location: westbound between junctions J9 Kettering South and J8 Kettering Central.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 April 2019 to 06:00 on 2 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 4.02 miles from Grafton.

52.37--0.72

Location: eastbound between junctions J7 Kettering North and J9 Kettering South.

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 April 2019 to 06:00 on 3 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.92 miles from Grafton.

52.4--0.75

Location: westbound between junctions J9 Kettering South and J8 Kettering Central.

Lane Closures : Lane two will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 April 2019 to 06:00 on 3 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.02 miles from Grafton.

52.37--0.72

Location: eastbound between junctions J7 Kettering North and J9 Kettering South.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 April 2019 to 06:00 on 2 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.92 miles from Grafton.

52.4--0.75

Location: eastbound between the A43 and the junction with the A509 North.

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 3 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.95 miles from Grafton.

52.24--0.84

Location: eastbound between the junctions with the A428 and the A43 .

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 3 April 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.28 miles from Grafton.

52.24--0.85

Location: westbound between junctions J1 Welford and M1 Catthorpe Interchange.

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 4 April 2019 to 6 April 2019.

Schedule : From 20:00 on 8 April 2019 to 05:00 on 9 April 2019.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 April 2019 to 26 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.33 miles from Grafton.

52.39--1.09

Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 March 2019 to 30 March 2019.

Schedule : From 22:00 on 3 April 2019 to 06:00 on 4 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.71 miles from Grafton.

52.21--0.95

Location: southbound between junctions J16 (Northampton) and J15A (Northampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 3 April 2019 to 06:00 on 4 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.72 miles from Grafton.

52.23--1.01

Location: northbound between junctions J15 (Northampton) and J16 (Northampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 28 March 2019 to 06:00 on 29 March 2019.

Schedule : From 22:00 on 2 April 2019 to 06:00 on 3 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.47 miles from Grafton.

52.21--0.94

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .

Lane Closures : Lane three is closed.

Due to: Roadworks.



Period : expect disruption until 22:00 on 26 March 2019.

Lanes Closed : There is one of four lanes closed.
Nearest town: 19.58 miles from Grafton.

52.15--0.84

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 March 2019 to 06:00 on 28 March 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.24 miles from Grafton.

52.15--0.85

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 7 April 2019 to 06:00 on 8 April 2019.

Schedule : From 22:00 on 14 April 2019 to 06:00 on 15 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 19.58 miles from Grafton.

52.15--0.84

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 6 April 2019 to 06:00 on 7 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 18.54 miles from Grafton.

52.18--0.89

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lane three is closed.

Due to: Roadworks.



Period : expect disruption until 22:00 on 26 March 2019.

Lanes Closed : There is one of four lanes closed.
Nearest town: 18.54 miles from Grafton.

52.18--0.89

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 March 2019 to 06:00 on 27 March 2019.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 1 April 2019 to 3 April 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.61 miles from Grafton.

52.18--0.88

Location: northbound between junctions J15 (Northampton) and J15A (Northampton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 27 March 2019 to 16:00 on 27 March 2019.
Nearest town: 18.4 miles from Grafton.

52.19--0.91

Location: southbound between junctions J16 (Northampton) and J15A (Northampton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 09:00 on 27 March 2019 to 16:00 on 27 March 2019.

Schedule : From 10:00 on 28 March 2019 to 13:00 on 28 March 2019.
Nearest town: 18.89 miles from Grafton.

52.22--0.97

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.68 miles from Grafton.

52.3--0.25

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.93 miles from Grafton.

52.31--0.24

Location: southbound.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.2 miles from Grafton.

52.36--0.25

Location: southbound between the A14M and the junction with the A428 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.25 miles from Grafton.

52.36--0.25

Location: southbound exit slip to the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.78 miles from Grafton.

52.34--0.25

Location: southbound entry slip from the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.94 miles from Grafton.

52.33--0.25

Location: eastbound between junctions J2 Kelmarsh and J3 Rothwell.

Lane Closures : Lane one will be closed.

Due to: Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 1 April 2019 to 4 April 2019.

Schedule : From 20:00 on 9 April 2019 to 05:00 on 10 April 2019.

Schedule : From 20:00 on 26 April 2019 to 05:00 on 27 April 2019.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 April 2019 to 2 May 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.92 miles from Grafton.

52.4--0.92

Location: The A1M northbound.

Lane Closures : Lane one will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 March 2019 to 30 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.11 miles from Grafton.

52.53--0.32

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 August 2019 to 05:00 on 29 August 2019.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.61 miles from Grafton.

52.15--0.84

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lane three is closed.

Due to: Roadworks.



Period : expect disruption until 22:00 on 26 March 2019.

Lanes Closed : There is one of four lanes closed.
Nearest town: 19.61 miles from Grafton.

52.15--0.84

Location: northbound between the A428 and the junction with the A14M .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.56 miles from Grafton.

52.29--0.26

Location: northbound entry slip from the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 1 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.83 miles from Grafton.

52.33--0.25

Location: northbound between the A14 and the junction with the A14M .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 1 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.01 miles from Grafton.

52.33--0.25

Location: northbound.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 1 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.23 miles from Grafton.

52.36--0.25

Location: The A1M northbound between junctions J16 and J17 .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 28 March 2019 to 06:00 on 29 March 2019.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.17 miles from Grafton.

52.51--0.3

Location: southbound between junctions J15A (Northampton) and J15 (Northampton) .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 08:00 on 28 March 2019 to 17:00 on 28 March 2019.
Nearest town: 18.32 miles from Grafton.

52.2--0.92

Location: northbound between junctions J15 (Northampton) and J15A (Northampton) .

Due to: Emergency roadworks are planned.

Status : Pending.

Schedule : From 08:00 on 27 March 2019 to 17:00 on 27 March 2019.
Nearest town: 18.4 miles from Grafton.

52.19--0.91

Location: eastbound between junctions J19A and J21 A1 Junction.

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 13.91 miles from Grafton.

52.34--0.32

Location: northbound entry slip from the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.83 miles from Grafton.

52.33--0.25

Location: northbound between the A428 and the junction with the A14 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.89 miles from Grafton.

52.28--0.26

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.66 miles from Grafton.

52.3--0.25

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.92 miles from Grafton.

52.31--0.24

Location: northbound exit slip to the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2019 to 13 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.02 miles from Grafton.

52.33--0.25

Location: westbound between the A428 and the junction with the A508 Northampton.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 April 2019 to 6 April 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.91 miles from Grafton.

52.22--0.87

Location: westbound between the A428 and the junction with the A508 Northampton.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 April 2019 to 6 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.04 miles from Grafton.

52.23--0.86

Location: westbound between the junctions with the A43 and the A428 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 April 2019 to 6 April 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.1 miles from Grafton.

52.24--0.84

Location: westbound exit slip to the A508 Northampton.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.66 miles from Grafton.

52.22--0.89

Location: westbound at the junction with the M1 .

Lane Closures : Lane three will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 April 2019 to 4 April 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.44 miles from Grafton.

52.19--0.89

Location: eastbound at the junction with the M1 .

Lane Closures : Lane three will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 April 2019 to 4 April 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.52 miles from Grafton.

52.19--0.9

Location: westbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 2 April 2019 to 06:00 on 3 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.83 miles from Grafton.

52.2--0.89

Location: eastbound exit slip to the A1260 .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 15:30 on 26 March 2019.

Lanes Closed : There is one of two lanes closed.
Nearest town: 18.38 miles from Grafton.

52.57--0.3

Location: eastbound between junctions J20 Ellington and J21 A1 Junction.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2019 to 30 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.09 miles from Grafton.

52.33--0.27

Location: northbound between the junctions with the A428 and the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.58 miles from Grafton.

52.29--0.26

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:59 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.93 miles from Grafton.

52.31--0.24

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:59 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.68 miles from Grafton.

52.3--0.25

Location: southbound between the A14 and the junction with the A428 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.11 miles from Grafton.

52.33--0.25

Location: southbound exit slip to the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.78 miles from Grafton.

52.34--0.25

Location: southbound entry slip from the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.94 miles from Grafton.

52.33--0.25

Location: northbound entry slip from the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 16.83 miles from Grafton.

52.33--0.25

Location: northbound between the A428 and the junction with the A14 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 1 April 2019 to 06:00 on 6 April 2019.
Nearest town: 17.58 miles from Grafton.

52.29--0.26

Location: northbound between the A428 and the junction with the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.57 miles from Grafton.

52.29--0.26

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.66 miles from Grafton.

52.3--0.25

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.92 miles from Grafton.

52.31--0.24

Location: northbound exit slip to the A14 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 17.02 miles from Grafton.

52.33--0.25

Location: westbound between the A509 North and the junction with the A428 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 March 2019 to 31 March 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 12.35 miles from Grafton.

52.25--0.8

Location: westbound between the A509 North and the junction with the A5076 Northampton East.

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 1 April 2019 to 06:00 on 2 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.36 miles from Grafton.

52.25--0.76

Location: eastbound between the A5076 Northampton East and the junction with the A509 North.

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 March 2019 to 31 March 2019.

Schedule : From 20:00 on 1 April 2019 to 06:00 on 2 April 2019.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 April 2019 to 6 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.95 miles from Grafton.

52.26--0.79

Location: westbound entry slip from the A5076 Northampton East.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 March 2019 to 31 March 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 12.69 miles from Grafton.

52.25--0.81

Location: westbound exit slip to the A43 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 March 2019 to 31 March 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 13.46 miles from Grafton.

52.25--0.83

Location: eastbound exit slip to the A43 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 March 2019 to 29 March 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 13.95 miles from Grafton.

52.24--0.84

Location: eastbound exit slip to the A5076 Northampton East.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 April 2019 to 6 April 2019.

Lanes Closed : All lanes will be closed.
Nearest town: 12.89 miles from Grafton.

52.25--0.81

Location: westbound between the A509 North and the junction with the A43 .

Lane Closures : Lane one will be closed.

Due to: Emergency litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 26 March 2019 to 30 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.35 miles from Grafton.

52.25--0.8

Location: eastbound between the junctions with the A508 Northampton and the A428 .

Lane Closures : Lane one will be closed.

Due to: Emergency litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 26 March 2019 to 30 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.28 miles from Grafton.

52.22--0.88

Location: eastbound between the junctions with the A508 Northampton and the A428 .

Lane Closures : Lane one will be closed.

Due to: Emergency litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 26 March 2019 to 30 March 2019.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.61 miles from Grafton.

52.22--0.89

Location: eastbound at the junction with the A508 North.

Lane Closures : Lane one will be closed.

Due to: Emergency litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 26 March 2019 to 30 March 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.62 miles from Grafton.

52.22--0.89

Location: northbound between junctions J15 (Northampton) and J16 (Northampton) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 28 March 2019 to 06:00 on 3 April 2019.
Nearest town: 18.47 miles from Grafton.

52.21--0.94

Location: southbound between the A14 and the junction with the A428 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 26 March 2019 to 30 March 2019.

Schedule : From 21:00 on 1 April 2019 to 05:00 on 2 April 2019.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.51 miles from Grafton.

52.3--0.26

Location: eastbound between the A5076 Northampton East and the junction with the A509 North.

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 27 March 2019 to 06:00 on 6 April 2019.
Nearest town: 11.95 miles from Grafton.

52.26--0.79

Location: southbound between the A14 and the junction with the A428 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 1 April 2019 to 06:00 on 6 April 2019.
Nearest town: 16.94 miles from Grafton.

52.33--0.25

Location: northbound between junctions J14 (Milton Keynes) and J15A (Northampton) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 27 March 2019 to 06:00 on 15 April 2019.
Nearest town: 18.53 miles from Grafton.

52.18--0.89