Location: northbound between junctions J10A (Wolverhampton) and J11 (Cannock) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Vehicle tyre change.
Time To Clear : The event is expected to clear between 08:00 and 08:15 on 14 March 2026.
Normal traffic conditions are expected between 08:00 and 08:15 on 14 March 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 9.03 miles from Footherley.

Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.35 miles from Footherley.

Location: slip road to the M42 southbound .
Due to: Roadworks.
Period : from 23:23 on 13 March 2026 to 05:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.71 miles from Footherley.

Location: southbound entry slip at junction J7 (M6N) .
Due to: Roadworks.
Period : from 22:47 on 13 March 2026 to 05:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 11.49 miles from Footherley.

Location: southbound entry slip at junction J8 (Birmingham E) .
Due to: Roadworks.
Period : from 21:51 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 9.29 miles from Footherley.

Location: northbound entry slip at junction J8 (Birmingham E) .
Due to: Roadworks.
Period : from 21:50 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 8.99 miles from Footherley.

Location: southbound exit slip at junction J4A .
Due to: Roadworks.
Period : from 21:47 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 8.92 miles from Footherley.

Location: southbound between junctions J7A (M1/M6) and J5A .
Due to: Roadworks.
Period : from 21:31 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 9.99 miles from Footherley.

Location: northbound between junctions J5 (Birmingham) and J6 (Birmingham) .
Due to: Roadworks.
Period : from 21:03 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 7.72 miles from Footherley.

Location: northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .
Due to: Road repairs.
Period : from 20:55 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 17.96 miles from Footherley.

Location: southbound between the junctions with the A4601 and the A34 .
Due to: Emergency roadworks.
Period : expect disruption until 00:00 on 18 March 2026.
Nearest town: 9.1 miles from Footherley.

Location: northbound between the junctions with the A34 and the A4601 .
Due to: Emergency roadworks.
Period : expect disruption until 00:00 on 18 March 2026.
Nearest town: 9.05 miles from Footherley.

Location: southbound between the junctions with the A449 and the M6 .
Due to: Emergency roadworks.
Period : expect disruption until 00:00 on 17 March 2026.
Nearest town: 12.49 miles from Footherley.

Location: northbound between the junctions with the M6 and the A449 .
Due to: Emergency roadworks.
Period : expect disruption until 00:00 on 17 March 2026.
Nearest town: 12.46 miles from Footherley.

Location: northbound between the A34 and the junction with the A4601 .
Due to: Roadworks scheme.
Period : from 20:02 on 11 March 2026 to 06:00 on 28 March 2026.
Nearest town: 8.18 miles from Footherley.

Location: southbound between the junctions with the A4601 and the A34 .
Due to: Roadworks scheme.
Period : from 20:02 on 11 March 2026 to 06:00 on 28 March 2026.
Nearest town: 8.52 miles from Footherley.

Location: eastbound.
Due to: Roadworks.
Period : from 23:22 on 10 March 2026 to 05:00 on 22 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 13.68 miles from Footherley.

Location: southbound between the junctions with the M42 and the A444 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.96 miles from Footherley.

Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 6 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.64 miles from Footherley.

Location: southbound at junction J3A (M40) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.21 miles from Footherley.

Location: southbound between junctions J4 (Shirley) and J3A (M40) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.34 miles from Footherley.

Location: northbound between junctions M5 and J3 (Birmingham S) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.3 miles from Footherley.

Location: southbound between junctions J3 (Birmingham S) and J1 (Bromsgrove) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.25 miles from Footherley.

Location: southbound between the A452 and the junction with the A461 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.91 miles from Footherley.

Location: northbound exit slip at junction J8 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 March 2026 to 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.9 miles from Footherley.

Location: northbound between the A513 and the junction with the A5121 Burton Upon Trent South.
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.1 miles from Footherley.

Location: southbound between the A5121 Burton upon Trent South and the junction with the A513 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.07 miles from Footherley.

Location: southbound exit slip at junction J11 (Cannock) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 14 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.47 miles from Footherley.

Location: northbound exit slip at junction J11 (Cannock) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 14 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.16 miles from Footherley.

Location: northbound between junctions J12 (Telford) and J13 (Stafford) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There are three of four lanes closed.
Nearest town: 12.75 miles from Footherley.

Location: eastbound between junctions J2 (Wolverhampton) and J1 (Cannock) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 10.83 miles from Footherley.

Location: eastbound between junction J1 (Cannock) and the M6 .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 10.16 miles from Footherley.

Location: southbound at junction J8 (Birmingham E) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 14 March 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 9.19 miles from Footherley.

Location: eastbound exit slip to the A452 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 21 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.5 miles from Footherley.

Location: eastbound between the junctions with the M42 and the A452 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 21 March 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.47 miles from Footherley.

Location: southbound between the junctions with the A446 and the A45 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 21 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.61 miles from Footherley.

Location: northbound between the junctions with the A34 and the A4601 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 March 2026.
Nearest town: 8.18 miles from Footherley.

Location: southbound between the junctions with the A4601 and the A34 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 March 2026.
Nearest town: 8.27 miles from Footherley.

Location: southbound between junctions J8 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 March 2026 to 16 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.75 miles from Footherley.

Location: southbound entry slip at junction J8 (Birmingham) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 March 2026 to 16 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.3 miles from Footherley.

Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 7.35 miles from Footherley.

Location: westbound between the M6 and junction J1 (Cannock) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 14 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.34 miles from Footherley.

Location: southbound between junctions J7 (Birmingham) and J5 (Birmingham) .
Due to: Roadworks scheme.
Period : from 21:02 on 13 March 2026 to 06:00 on 21 March 2026.
Nearest town: 6.4 miles from Footherley.

Location: southbound exit slip to the A5127 .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 22 December 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 6.16 miles from Footherley.

Location: southbound between junctions J12 (Telford) and J11 (Cannock) .
Due to: Roadworks scheme.
Period : from 21:00 on 13 March 2026 to 05:00 on 2 April 2026.
Nearest town: 11.15 miles from Footherley.

Location: southbound between junctions J4 (Shirley) and J3A (M40) .
Due to: Roadworks scheme.
Period : from 21:00 on 13 March 2026 to 06:00 on 28 March 2026.
Nearest town: 17.34 miles from Footherley.

Location: southbound between the M42 southbound and junction J15 (Warwick) .
Due to: Roadworks scheme.
Period : from 21:00 on 13 March 2026 to 06:00 on 28 March 2026.
Nearest town: 18.21 miles from Footherley.

Location: northbound exit slip at junction J5 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.84 miles from Footherley.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 9 April 2026 to 05:00 on 10 April 2026.
Schedule : From 22:00 on 7 May 2026 to 05:00 on 8 May 2026.
Schedule : From 22:00 on 4 June 2026 to 05:00 on 5 June 2026.
Schedule : From 22:00 on 2 July 2026 to 05:00 on 3 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.14 miles from Footherley.

Location: northbound between junctions J9 (Lichfield) and J11 (Burton upon Trent) .
Due to: Roadworks scheme.
Period : from 20:02 on 13 March 2026 to 06:00 on 17 April 2026.
Nearest town: 8.76 miles from Footherley.

Location: southbound between junctions J11 (Burton upon Trent) and J10 (Tamworth) .
Due to: Roadworks scheme.
Period : from 20:02 on 13 March 2026 to 06:00 on 27 March 2026.
Nearest town: 13.78 miles from Footherley.

Location: southbound between junctions J6 (Birmingham E) and J5 (Solihull) .
Due to: Roadworks scheme.
Period : from 18:01 on 22 July 2024 to 23:59 on 31 March 2026.
Nearest town: 14.08 miles from Footherley.

Location: northbound between junctions J5 (Solihull) and J6 (Birmingham E) .
Due to: Roadworks scheme.
Period : from 11:20 on 20 August 2024 to 23:59 on 31 March 2026.
Nearest town: 15.15 miles from Footherley.

Location: southbound between junctions J6 (Birmingham E) and J5 (Solihull) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 14.08 miles from Footherley.

Location: northbound between junctions J5 (Solihull) and J6 (Birmingham E) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 14.86 miles from Footherley.

Location: northbound.
Due to: Roadworks scheme.
Period : from 20:00 on 13 March 2026 to 06:00 on 21 March 2026.
Nearest town: 16.92 miles from Footherley.

Location: northbound entry slip at junction J5 (Solihull) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.15 miles from Footherley.

Location: southbound between junctions J3 (Kidderminster) and J4 (Bromsgrove) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.97 miles from Footherley.

Location: southbound between the junctions with the A444 and the A47 Nuneaton.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 15 March 2026 to 15:30 on 15 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.14 miles from Footherley.

Location: southbound between the junctions with the A444 and the A47 Nuneaton.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 15 March 2026 to 15:30 on 15 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.67 miles from Footherley.

Location: southbound entry slip at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 March 2026 to 05:00 on 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 May 2026 to 3 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.02 miles from Footherley.

Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 March 2026 to 05:00 on 27 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2026 to 3 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 May 2026 to 5 May 2026.
Schedule : From 21:00 on 5 May 2026 to 05:00 on 6 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.64 miles from Footherley.

Location: southbound between junctions J10 (Tamworth) and J9 (Lichfield) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2026 to 19 April 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2026 to 6 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 May 2026 to 8 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.36 miles from Footherley.

Location: northbound between junctions J4 (Shirley) and J5 (Solihull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.76 miles from Footherley.

Location: northbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 April 2026 to 11 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.39 miles from Footherley.

Location: northbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 April 2026 to 11 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.33 miles from Footherley.

Location: northbound entry slip at junction J6 (Birmingham) from A5127 southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 April 2026 to 11 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.28 miles from Footherley.

Location: northbound between the junctions with the A4601 and the M6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Nearest town: 10.54 miles from Footherley.

Location: southbound between the junctions with the M6 and the A4601 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Nearest town: 10.58 miles from Footherley.

Location: southbound between junctions J10 (Tamworth) and J9 (Lichfield) .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.39 miles from Footherley.

Location: northbound between junctions J9 (Lichfield) and J10 (Tamworth) .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.33 miles from Footherley.

Location: southbound between junctions J6 (Birmingham) and J5 (Birmingham) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.42 miles from Footherley.

Location: southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.4 miles from Footherley.

Location: eastbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 19 March 2026 to 22 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.41 miles from Footherley.

Location: eastbound between the A511 and the junction with the A516 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 19 March 2026 to 22 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.37 miles from Footherley.

Location: southbound at junction J11 (Burton upon Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.89 miles from Footherley.

Location: northbound exit slip at junction J11 (Burton upon Trent) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 April 2026 to 17 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.6 miles from Footherley.

Location: northbound between junctions J9 (Lichfield) and J11 (Burton upon Trent) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 19 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.57 miles from Footherley.

Location: northbound between junctions J10 (Tamworth) and J11 (Burton upon Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 April 2026 to 17 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.76 miles from Footherley.

Location: southbound between junction J12 and the M42 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.99 miles from Footherley.

Location: southbound between junctions J11 (Burton upon Trent) and J10 (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 March 2026 to 06:00 on 14 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.78 miles from Footherley.

Location: northbound entry slip at junction J10 (Tamworth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 April 2026 to 17 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.94 miles from Footherley.

Location: southbound exit slip at junction J10 (Tamworth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.07 miles from Footherley.

Location: northbound between junctions J3 (Coventry) and J4 (Lichfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.39 miles from Footherley.

Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.08 miles from Footherley.

Location: southbound between the junctions with the A5121 Burton upon Trent North and the A5121 Burton upon Trent South.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.04 miles from Footherley.

Location: northbound between the A47 Hinckley and the junction with the A444 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 March 2026 to 26 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19 miles from Footherley.

Location: southbound between the A444 and the junction with the A47 Hinckley.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 March 2026 to 26 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.81 miles from Footherley.

Location: southbound between the A47 Nuneaton and the junction with the M69 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.39 miles from Footherley.

Location: northbound between the junctions with the A34 and the A4601 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Nearest town: 8.18 miles from Footherley.

Location: northbound between the A34 and the junction with the A4601 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 28 March 2026.
Nearest town: 8.28 miles from Footherley.

Location: southbound between the junctions with the A4601 and the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Nearest town: 8.27 miles from Footherley.

Location: southbound between the junctions with the A4601 and the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 28 March 2026.
Nearest town: 8.52 miles from Footherley.

Location: southbound between junctions J2 (Birmingham S) and J1 (Bromsgrove) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 18 March 2026 to 15:00 on 18 March 2026.
Nearest town: 18.39 miles from Footherley.

Location: southbound between junction J2 (Birmingham S) and the M5 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2026 to 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.25 miles from Footherley.

Location: northbound between the M5 and junction J1 (Bromsgrove) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2026 to 20 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.86 miles from Footherley.

Location: southbound between junctions J10 (Tamworth) and J9 (Lichfield) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.38 miles from Footherley.

Location: southbound between junction J2 (Birmingham S) and the M5 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2026 to 06:00 on 20 March 2026.
Nearest town: 19.25 miles from Footherley.

Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : Lane one will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.07 miles from Footherley.

Location: northbound at junction J9 (Lichfield) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.51 miles from Footherley.

Location: northbound exit slip at junction J2 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.07 miles from Footherley.

Location: northbound between junctions M5 and J2 (Birmingham S) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.32 miles from Footherley.

Location: northbound between the M42 and junction J12 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 05:00 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.96 miles from Footherley.

Location: northbound at junction J11 (Burton upon Trent) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 05:00 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.8 miles from Footherley.

Location: eastbound between junction J2 (Wolverhampton) and the M6 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Nearest town: 10.91 miles from Footherley.

Location: southbound between junctions J6 (Birmingham E) and J5 (Solihull) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 21 March 2026.
Nearest town: 13.32 miles from Footherley.

Location: southbound between junctions J6 (Birmingham E) and J5 (Solihull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.86 miles from Footherley.

Location: northbound between junctions J5 (Solihull) and J6 (Birmingham E) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 21 March 2026.
Nearest town: 15.19 miles from Footherley.

Location: northbound between junctions J5 (Solihull) and J6 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.19 miles from Footherley.

Location: southbound entry slip at junction J6 (Birmingham E) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.32 miles from Footherley.

Location: northbound entry slip at junction J5 (Solihull) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.15 miles from Footherley.

Location: southbound exit slip at junction J10 (Tamworth) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 25 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.07 miles from Footherley.

Location: northbound entry slip at junction J4 (Bromsgrove) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 March 2026 to 3 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2026 to 9 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.26 miles from Footherley.

Location: northbound exit slip at Frankley Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 March 2026 to 3 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2026 to 9 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.77 miles from Footherley.

Location: northbound entry slip at Frankley Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 March 2026 to 3 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2026 to 9 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.58 miles from Footherley.

Location: northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 March 2026 to 3 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2026 to 9 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.52 miles from Footherley.

Location: northbound exit slip at junction J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 March 2026 to 3 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2026 to 9 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.57 miles from Footherley.

Location: southbound entry slip at junction J8 (Birmingham E) .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 6 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.02 miles from Footherley.

Location: northbound between junctions J4 (Bromsgrove) and J2 (Dudley) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.04 miles from Footherley.

Location: northbound between junctions J10A (Wolverhampton) and J11 (Cannock) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Nearest town: 8.25 miles from Footherley.

Location: northbound entry slip at junction J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.36 miles from Footherley.

Location: northbound at junction J11A (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.46 miles from Footherley.

Location: northbound between junctions J10A (Wolverhampton) and J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.25 miles from Footherley.

Location: northbound exit slip at junction J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.16 miles from Footherley.

Location: eastbound between junction J1 (Cannock) and the M6 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.16 miles from Footherley.

Location: eastbound between junctions J2 (Wolverhampton) and J1 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.91 miles from Footherley.

Location: eastbound entry slip at junction J1 (Cannock) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.88 miles from Footherley.

Location: eastbound exit slip at junction J1 (Cannock) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.2 miles from Footherley.

Location: northbound exit slip at junction J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.57 miles from Footherley.

Location: northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.68 miles from Footherley.

Location: northbound between the junctions with the A444 and the M42 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.19 miles from Footherley.

Location: northbound between junctions J6 (Birmingham E) and J8 (Birmingham E) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 21 March 2026.
Nearest town: 13.18 miles from Footherley.

Location: northbound between junctions J5A and J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.74 miles from Footherley.

Location: northbound entry slip at junction J6 (Birmingham E) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.18 miles from Footherley.

Location: southbound exit slip at junction J10 (Tamworth) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.07 miles from Footherley.

Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.35 miles from Footherley.

Location: westbound exit slip at junction J1 (Cannock) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.51 miles from Footherley.

Location: westbound between the M6 and junction J1 (Cannock) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.34 miles from Footherley.

Location: southbound at junction J3A (M40) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 24 March 2026.
Schedule : From 21:00 on 27 March 2026 to 06:00 on 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Footherley.

Location: southbound between junctions J4 (Shirley) and J3A (M40) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 24 March 2026.
Schedule : From 21:00 on 27 March 2026 to 06:00 on 28 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.34 miles from Footherley.

Location: northbound at junction J3A (M40) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 24 March 2026.
Schedule : From 21:00 on 27 March 2026 to 06:00 on 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.59 miles from Footherley.

Location: northbound between junctions J3 (Birmingham S) and J3A (M40) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 24 March 2026.
Schedule : From 21:00 on 27 March 2026 to 06:00 on 28 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.41 miles from Footherley.

Location: southbound between the M42 northbound and junction J15 (Warwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 21 March 2026.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 24 March 2026.
Schedule : From 21:00 on 27 March 2026 to 06:00 on 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.59 miles from Footherley.

Location: southbound between the M42 southbound and junction J15 (Warwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 13 March 2026 to 05:00 on 14 March 2026.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Footherley.

Location: northbound exit slip at junction J3 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 April 2026 to 15 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.09 miles from Footherley.

Location: southbound exit slip at junction J3 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 June 2026 to 13 June 2026.
Schedule : From 21:00 on 15 June 2026 to 06:00 on 16 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.08 miles from Footherley.

Location: southbound exit slip at junction J3 (Birmingham S) To A435 south.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 June 2026 to 13 June 2026.
Schedule : From 21:00 on 15 June 2026 to 06:00 on 16 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.06 miles from Footherley.

Location: southbound at junction J3A (M40) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2026 to 20 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Footherley.

Location: southbound between junctions J4 (Shirley) and J3A (M40) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 April 2026 to 18 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 April 2026 to 22 April 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.89 miles from Footherley.

Location: slip road to the M42 southbound .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 April 2026 to 06:00 on 25 April 2026.
Schedule : From 21:00 on 8 May 2026 to 06:00 on 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2026 to 13 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.76 miles from Footherley.

Location: slip road to the M42 northbound .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2026 to 06:00 on 10 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.76 miles from Footherley.

Location: southbound between the M42 northbound and junction J15 (Warwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 May 2026 to 06:00 on 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2026 to 13 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.59 miles from Footherley.

Location: southbound between the M42 and junction J15 (Warwick) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 April 2026 to 18 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 April 2026 to 22 April 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.82 miles from Footherley.

Location: southbound between the M42 southbound and junction J15 (Warwick) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 April 2026 to 18 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 April 2026 to 22 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.21 miles from Footherley.

Location: southbound exit slip at junction J16 (Henley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 April 2026 to 18 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 April 2026 to 22 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.54 miles from Footherley.

Location: northbound entry slip at junction J3 (Birmingham S) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 April 2026 to 15 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.01 miles from Footherley.

Location: southbound between junctions J10 (Tamworth) and J9 (Lichfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.37 miles from Footherley.

Location: southbound between junctions J10 (Tamworth) and J9 (Lichfield) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.92 miles from Footherley.

Location: northbound between junctions J9 (Lichfield) and J10 (Tamworth) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.64 miles from Footherley.

Location: southbound at junction J11A (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.21 miles from Footherley.

Location: southbound at junction J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.94 miles from Footherley.

Location: southbound between junctions J12 (Telford) and J11A (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.8 miles from Footherley.

Location: northbound entry slip at junction J12 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2026 to 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.13 miles from Footherley.

Location: northbound between the M42 and junction J13 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.78 miles from Footherley.

Location: southbound between junctions J3 (Birmingham S) and J2 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 16 March 2026 to 20 March 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 23 March 2026 to 27 March 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 30 March 2026 to 31 March 2026.
Nearest town: 17.96 miles from Footherley.

Location: northbound at junction J2 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 16 March 2026 to 20 March 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 23 March 2026 to 27 March 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 30 March 2026 to 31 March 2026.
Nearest town: 18.06 miles from Footherley.

Location: southbound exit slip at junction J8 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.55 miles from Footherley.

Location: southbound exit slip at junction J9 (Wednesbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.23 miles from Footherley.

Location: southbound entry slip at junction J10 (Walsall) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.02 miles from Footherley.

Location: southbound between junctions J9 (Wednesbury) and J8 (Birmingham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 28 March 2026.
Nearest town: 7.1 miles from Footherley.

Location: southbound between junctions J11 (Cannock) and J10 (Walsall) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.91 miles from Footherley.

Location: southbound entry slip at junction J9 (Wednesbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.1 miles from Footherley.

Location: southbound between junctions J10 (Walsall) and J8 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.98 miles from Footherley.

Location: northbound between junctions J8 (Birmingham) and J10 (Walsall) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.38 miles from Footherley.

Location: southbound exit slip at junction J4 (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 05:00 on 11 April 2026 to 22:00 on 12 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.62 miles from Footherley.

Location: northbound between junctions J2 (Dudley) and J1 (West Bromwich) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 16 March 2026 to 20 March 2026.
Nearest town: 10.24 miles from Footherley.

Location: southbound between junctions J1 (West Bromwich) and J2 (Dudley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 16 March 2026 to 20 March 2026.
Nearest town: 9.95 miles from Footherley.

Location: southbound entry slip at junction J7 (Birmingham) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 March 2026 to 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.41 miles from Footherley.

Location: southbound exit slip at junction J6 (Birmingham) for A38M.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 March 2026 to 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.01 miles from Footherley.

Location: northbound exit slip at junction J3 (Birmingham S) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 8 April 2026 to 06:00 on 15 April 2026.
Nearest town: 18.09 miles from Footherley.

Location: southbound between the M42 southbound and junction J13 (Leamington) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 March 2026 to 06:00 on 13 May 2026.
Nearest town: 18.21 miles from Footherley.

Location: southbound between the junctions with the A513 and the A5192 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 27 March 2026.
Schedule : From 21:00 on 27 March 2026 to 05:00 on 8 April 2026.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 29 May 2027.
Lanes Closed : All lanes will be closed.
Nearest town: 6.97 miles from Footherley.

Location: northbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 March 2026 to 25 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 27 March 2026.
Schedule : From 21:00 on 27 March 2026 to 05:00 on 8 April 2026.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.9 miles from Footherley.

Location: northbound between the A5148 and the junction with the A513 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 March 2026 to 25 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 27 March 2026.
Schedule : From 21:00 on 27 March 2026 to 05:00 on 8 April 2026.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.99 miles from Footherley.

Location: northbound entry slip from the A5127 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 March 2026 to 25 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 27 March 2026.
Schedule : From 21:00 on 27 March 2026 to 05:00 on 8 April 2026.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.94 miles from Footherley.

Location: southbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 27 March 2026.
Schedule : From 21:00 on 27 March 2026 to 05:00 on 8 April 2026.
Schedule : From 21:00 on 22 May 2026 to 05:00 on 29 May 2027.
Lanes Closed : All lanes will be closed.
Nearest town: 6.95 miles from Footherley.

Location: southbound entry slip at junction J6 (Birmingham E) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 March 2026 to 06:00 on 14 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.32 miles from Footherley.

Location: southbound at junction J11A (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2026 to 2 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.21 miles from Footherley.

Location: northbound between junctions J10A (Wolverhampton) and J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2026 to 2 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.71 miles from Footherley.

Location: southbound at junction J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2026 to 2 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.94 miles from Footherley.

Location: southbound between junctions J12 (Telford) and J11A (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2026 to 2 April 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.15 miles from Footherley.

Location: southbound between junctions J4 (Shirley) and J3 (Birmingham S) To A435 south.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 16 April 2026 to 06:00 on 20 June 2026.
Nearest town: 18.21 miles from Footherley.

Location: northbound between junctions J6 (Birmingham) from A38(M) northbound and J7 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.22 miles from Footherley.

Location: northbound between junctions J3 (Birmingham S) and J3A (M40) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 28 March 2026.
Nearest town: 18.33 miles from Footherley.

Location: northbound exit slip at junction J7 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2026 to 06:00 on 22 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.34 miles from Footherley.

Location: southbound between junctions J8 (Birmingham) and J7 (Birmingham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 March 2026 to 06:00 on 30 March 2026.
Nearest town: 6.55 miles from Footherley.

Location: southbound entry slip at junction J8 (Birmingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 March 2026 to 06:00 on 29 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.03 miles from Footherley.

Location: southbound entry slip at junction J8 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 March 2026 to 06:00 on 30 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.34 miles from Footherley.

Location: southbound between junctions J8 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 March 2026 to 06:00 on 30 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.55 miles from Footherley.

Location: The junction of the M6 J4 (Lichfield) and the A446 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.32 miles from Footherley.

Location: southbound exit slip to the A452 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.83 miles from Footherley.

Location: southbound exit slip at junction J4 (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.62 miles from Footherley.

Location: southbound at junction J9 (Lichfield) .
Due to: Emergency litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 16 March 2026 to 20 March 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 23 March 2026 to 27 March 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 30 March 2026 to 31 March 2026.
Nearest town: 7.47 miles from Footherley.

Location: northbound at junction J9 (Lichfield) .
Due to: Emergency litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 16 March 2026 to 20 March 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 23 March 2026 to 27 March 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 30 March 2026 to 31 March 2026.
Nearest town: 7.65 miles from Footherley.

Location: southbound at junction J6 (Birmingham) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 March 2026 to 1 April 2026.
Nearest town: 7.01 miles from Footherley.

Location: southbound between junctions J6 (Birmingham) and J5 (Birmingham) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 March 2026 to 1 April 2026.
Nearest town: 7.42 miles from Footherley.

Location: southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 March 2026 to 1 April 2026.
Nearest town: 6.26 miles from Footherley.

Location: northbound exit slip at junction J6 (Birmingham) for A38(M) south.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 9 April 2026 to 05:00 on 10 April 2026.
Schedule : From 22:00 on 7 May 2026 to 05:00 on 8 May 2026.
Schedule : From 22:00 on 4 June 2026 to 05:00 on 5 June 2026.
Schedule : From 22:00 on 2 July 2026 to 05:00 on 3 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.34 miles from Footherley.

Location: northbound between junctions J3 (Coventry) and J4 (Lichfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 7 April 2026 to 10 April 2026.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 April 2026 to 17 April 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.56 miles from Footherley.

Location: northbound exit slip at junction J3 (Coventry) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.71 miles from Footherley.

Location: southbound exit slip at junction J3 (Coventry) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.11 miles from Footherley.

Location: southbound between junctions J4 (Lichfield) and J3 (Coventry) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.01 miles from Footherley.
