Location: northbound between junctions J22 (Burnham on Sea) and J20 (Nailsea) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.95 miles from Cheddar.

Location: southbound between junctions J18 (Bristol) and J19 (Portishead) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.81 miles from Cheddar.

Location: southbound between junctions J17 (Bristol West) and J18 (Bristol) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 16:00 on 14 December 2025.
Nearest town: 17.9 miles from Cheddar.

Location: southbound between junctions J23 (Highbridge) and J24 (Bridgwater) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 20 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.7 miles from Cheddar.

Location: northbound between junctions J24 (Bridgwater) and J23 (Highbridge) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 20 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 12.72 miles from Cheddar.

Location: northbound between junctions J24 (Bridgwater) and J22 (Burnham on Sea) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 20 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.01 miles from Cheddar.

Location: northbound entry slip at junction J23 (Highbridge) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.76 miles from Cheddar.

Location: northbound between junctions J21 (Weston super Mare) and J20 (Nailsea) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 19 December 2025 to 06:00 on 20 December 2025.
Nearest town: 7.32 miles from Cheddar.

Location: northbound between junctions J21 (Weston super Mare) and J20 (Nailsea) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.32 miles from Cheddar.

Location: northbound entry slip at junction J21 (Weston super Mare) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.41 miles from Cheddar.

Location: northbound exit slip at junction J1 (Filton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 December 2025 to 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.68 miles from Cheddar.

Location: northbound between junctions J3 and J2 (Stapleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.49 miles from Cheddar.

Location: northbound exit slip at junction J2 (Stapleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.17 miles from Cheddar.

Location: northbound entry slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.56 miles from Cheddar.

Location: southbound between junctions J16 (Thornbury) and J17 (Bristol West) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.58 miles from Cheddar.

Location: southbound between junctions J19 (Portishead) and J20 (Nailsea) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.62 miles from Cheddar.

Location: southbound between junctions J19 (Portishead) and J20 (Nailsea) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.98 miles from Cheddar.

Location: southbound at junction J18 (Bristol) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 15 December 2025 to 20 December 2025.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 5 January 2026 to 7 January 2026.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 8 January 2026 to 10 January 2026.
Schedule : From 21:00 on 10 January 2026 to 06:00 on 11 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.11 miles from Cheddar.

Location: southbound at junction J18 (Bristol) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 January 2026 to 06:00 on 8 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.11 miles from Cheddar.

Location: southbound between junctions J18 (Bristol) and J19 (Portishead) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 15 December 2025 to 20 December 2025.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 5 January 2026 to 7 January 2026.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 8 January 2026 to 10 January 2026.
Schedule : From 21:00 on 10 January 2026 to 06:00 on 11 January 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.81 miles from Cheddar.

Location: southbound at junction J19 (Portishead) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 January 2026 to 06:00 on 8 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.01 miles from Cheddar.

Location: southbound between junctions J18 (Bristol) and J19 (Portishead) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 January 2026 to 06:00 on 8 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.81 miles from Cheddar.

Location: northbound between junctions J2 (Stapleton) and J1 (Filton) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.37 miles from Cheddar.

Location: northbound between junctions J3 and J2 (Stapleton) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.7 miles from Cheddar.

Location: northbound at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.48 miles from Cheddar.

Location: northbound exit slip at junction J2 (Stapleton) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.17 miles from Cheddar.

Location: southbound between the junctions with the M4 and the M5 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.27 miles from Cheddar.

Location: northbound between the junctions with the M5 and the M4 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.45 miles from Cheddar.

Location: northbound exit slip at junction J18A (South Wales) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.27 miles from Cheddar.

Location: northbound at junction J18 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 December 2025 to 19 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.54 miles from Cheddar.

Location: southbound exit slip at junction J18 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 December 2025 to 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.72 miles from Cheddar.

Location: southbound exit slip at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 December 2025 to 02:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.78 miles from Cheddar.

Location: westbound at the junction with the A37 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.5 miles from Cheddar.

Location: westbound between the junctions with the A359 South and the A37 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.48 miles from Cheddar.

Location: westbound at the junction with the A37 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.49 miles from Cheddar.

Location: eastbound between the junctions with the A37 Ilchester and the A372 Podimore.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.52 miles from Cheddar.

Location: eastbound at the junction with the A372 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.39 miles from Cheddar.

Location: northbound between junctions J22 (Burnham on Sea) and J20 (Nailsea) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.3 miles from Cheddar.

Location: westbound between the junctions with the A359 South and the A37 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.85 miles from Cheddar.

Location: westbound between the junctions with the A371 and the A359 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.39 miles from Cheddar.

Location: northbound exit slip at junction J1 (Filton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.68 miles from Cheddar.

Location: southbound between junctions J22 (Burnham on Sea) and J23 (Highbridge) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.92 miles from Cheddar.

Location: southbound entry slip at junction J23 (Highbridge) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.74 miles from Cheddar.

Location: northbound between junctions J25 (Taunton) and J24 (Bridgwater) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.35 miles from Cheddar.

Location: northbound at junction J24 (Bridgwater) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.46 miles from Cheddar.

Location: southbound between junctions J22 (Burnham on Sea) and J24 (Bridgwater) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 19 December 2025.
Nearest town: 10.92 miles from Cheddar.

Location: southbound between junctions J23 (Highbridge) and J24 (Bridgwater) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.74 miles from Cheddar.

Location: northbound between junctions J24 (Bridgwater) and J23 (Highbridge) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 20 December 2025.
Nearest town: 15.44 miles from Cheddar.

Location: northbound exit slip at junction J23 (Highbridge) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.9 miles from Cheddar.

Location: northbound between junctions J24 (Bridgwater) and J23 (Highbridge) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.44 miles from Cheddar.

Location: southbound exit slip at junction J24 (Bridgwater) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.18 miles from Cheddar.

Location: southbound between junctions J1 (Filton) and J2 (Stapleton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.18 miles from Cheddar.

Location: northbound between junctions J19 (Portishead) and J18 (Bristol) .
Lane Closures : The hard shoulder, lanes 1, 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 10:00 on 14 December 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 14.12 miles from Cheddar.

Location: northbound at junction J19 (Portishead) .
Due to: Roadworks.
Period : expect disruption until 10:00 on 14 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.89 miles from Cheddar.

Location: northbound between junctions J18A (South Wales) and J17 (Bristol West) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 15 December 2025 to 19 December 2025.
Nearest town: 17.4 miles from Cheddar.

Location: northbound at junction J20 (Nailsea) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 04:00 from 14 December 2025 to 28 March 2026.
Schedule : From 20:00 on 28 March 2026 to 04:00 on 29 March 2026.
Schedule : Expect disruption everyday between 20:00 and 04:00 from 29 March 2026 to 1 April 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.82 miles from Cheddar.