Location: eastbound between the junctions with the M11 and the A131 South.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 13 December 2025 to 06:00 on 14 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.84 miles from Chapel.

Location: westbound between the junctions with the A12 Colchester West and the A131 North.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 13 December 2025.
Nearest town: 6.79 miles from Chapel.

Location: eastbound between the junctions with the A131 North and the A12 Colchester West.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 13 December 2025.
Nearest town: 6.91 miles from Chapel.

Location: eastbound between the junctions with the A131 North and the A12 Colchester West.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 13 December 2025.
Nearest town: 2.92 miles from Chapel.

Location: westbound between the junctions with the A12 Colchester West and the A131 North.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 13 December 2025.
Nearest town: 2.89 miles from Chapel.

Location: westbound between the junctions with the A136 and the A12 .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 13 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.9 miles from Chapel.

Location: southbound between junctions J32A and J29 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 13 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.18 miles from Chapel.

Location: northbound between junctions J29 and J31 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 13 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.61 miles from Chapel.

Location: northbound between junctions J28 and J29 .
Due to: Roadworks scheme.
Period : from 21:00 on 14 November 2025 to 05:00 on 31 January 2026.
Nearest town: 6.08 miles from Chapel.

Location: westbound between the junctions with the A136 and the A133 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.63 miles from Chapel.

Location: westbound between the junctions with the A136 and the A133 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 December 2025 to 20 December 2025.
Nearest town: 12.9 miles from Chapel.

Location: eastbound between the junctions with the A133 and the A136 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 December 2025 to 20 December 2025.
Nearest town: 12.82 miles from Chapel.

Location: eastbound between the junctions with the A133 and the A136 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 December 2025 to 18 December 2025.
Nearest town: 18.91 miles from Chapel.

Location: eastbound between the junctions with the A133 and the A136 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Nearest town: 16.48 miles from Chapel.

Location: eastbound between the junctions with the A133 and the A136 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Nearest town: 15.17 miles from Chapel.

Location: eastbound between the junctions with the A133 and the A136 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Nearest town: 17.66 miles from Chapel.

Location: westbound between the junctions with the A136 and the A133 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 December 2025 to 18 December 2025.
Nearest town: 19.06 miles from Chapel.

Location: westbound between the junctions with the A136 and the A133 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Nearest town: 16.65 miles from Chapel.

Location: westbound between the junctions with the A136 and the A133 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Nearest town: 17.94 miles from Chapel.

Location: eastbound between the junctions with the A133 and the A136 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.63 miles from Chapel.

Location: westbound between the junctions with the A136 and the A133 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.65 miles from Chapel.

Location: westbound between the junctions with the A136 and the A133 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.89 miles from Chapel.

Location: westbound between the junctions with the A136 and the A133 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Nearest town: 15.31 miles from Chapel.

Location: westbound between the A131 South and the junction with the M11 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.32 miles from Chapel.

Location: westbound between the A131 North and the junction with the A131 South.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.32 miles from Chapel.

Location: eastbound between the junctions with the A131 South and the A131 North.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.58 miles from Chapel.

Location: northbound between junctions J19 and J20B .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.7 miles from Chapel.

Location: southbound between junctions J20B and J19 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.89 miles from Chapel.

Location: southbound between junctions J22 and J21 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.52 miles from Chapel.

Location: northbound between junctions J20A and J22 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.61 miles from Chapel.

Location: northbound between junctions J21 and J22 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.17 miles from Chapel.

Location: northbound between junctions J22 and J24 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.92 miles from Chapel.

Location: northbound between junctions J18 and J19 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.19 miles from Chapel.

Location: northbound entry slip at junction J22 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.93 miles from Chapel.

Location: northbound exit slip at junction J23 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.26 miles from Chapel.

Location: eastbound between junctions J54 Ipswich West and J55 Copdock.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.83 miles from Chapel.

Location: westbound between junctions J55 Copdock and J54 Ipswich West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.45 miles from Chapel.

Location: northbound between junctions J25 and J26 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.6 miles from Chapel.

Location: northbound between junctions J23 and J25 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.84 miles from Chapel.

Location: northbound exit slip at junction J26 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.99 miles from Chapel.

Location: northbound between junctions J23 and J25 .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.1 miles from Chapel.

Location: eastbound exit slip at junction J52 Claydon.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.54 miles from Chapel.

Location: southbound exit slip at junction J19 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.03 miles from Chapel.

Location: southbound between junctions J20B and J19 .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.31 miles from Chapel.

Location: eastbound between junctions J56 Ipswich Docks and J57 Ipswich East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.45 miles from Chapel.

Location: southbound between junctions J26 and J25 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.68 miles from Chapel.

Location: eastbound entry slip from the A12 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.2 miles from Chapel.

Location: southbound entry slip at junction J29 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.13 miles from Chapel.

Location: northbound entry slip at junction J29 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 15 December 2025 to 18 December 2025.
Schedule : From 20:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.17 miles from Chapel.

Location: westbound between junctions J52 Claydon and J51 Needham Market.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2025 to 05:00 on 15 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.34 miles from Chapel.

Location: westbound entry slip at junction J52 Claydon.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2025 to 05:00 on 15 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.38 miles from Chapel.

Location: southbound between junctions J25 and J23 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.61 miles from Chapel.

Location: northbound between junctions J29 and J31 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.28 miles from Chapel.

Location: northbound entry slip at junction J32B .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.57 miles from Chapel.

Location: westbound exit slip at junction J55 Copdock.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.34 miles from Chapel.

Location: northbound between junctions J32B and J33 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.35 miles from Chapel.

Location: southbound at junction J32B .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.52 miles from Chapel.

Location: southbound between junctions J33 and J32B .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.29 miles from Chapel.

Location: westbound exit slip at junction J55 Copdock.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.46 miles from Chapel.

Location: southbound between junctions J32A and J31 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.1 miles from Chapel.

Location: northbound between junctions J31 and J32A .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.98 miles from Chapel.

Location: southbound at junction J32A .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.1 miles from Chapel.

Location: northbound between junctions J31 and J32A .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.82 miles from Chapel.

Location: northbound between junctions J28 and J29 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 January 2026 to 10 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 January 2026 to 17 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 19 January 2026 to 24 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 26 January 2026 to 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.08 miles from Chapel.