Location: eastbound between the junctions with the A1139 and the A141 .
Due to: Congestion.
Normal traffic conditions are expected between 06:15 and 06:30 on 30 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.84 miles from Black Bank.

Location: westbound between the A141 and the junction with the A1139 .
Due to: Roadworks.
Period : from 20:03 on 29 July 2025 to 06:00 on 30 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.93 miles from Black Bank.

Location: eastbound exit slip at junction J37 Newmarket West.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.42 miles from Black Bank.

Location: eastbound between junctions J35 Stow Cum Quy and J36 A11 Junction.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.77 miles from Black Bank.

Location: westbound at junction J36 A11 Junction.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.73 miles from Black Bank.

Location: eastbound entry slip at junction J35 Stow Cum Quy.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.73 miles from Black Bank.

Location: westbound exit slip at junction J35 Stow Cum Quy.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.72 miles from Black Bank.

Location: westbound between junctions J36 A11 Junction and J35 Stow Cum Quy.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.78 miles from Black Bank.

Location: eastbound between the junctions with the A1139 and the A141 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 30 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.37 miles from Black Bank.

Location: westbound between the junctions with the A141 and the A1139 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.78 miles from Black Bank.

Location: southbound between junctions J12 (Cambridge) and J10 (Saffron Walden) .
Due to: Roadworks scheme.
Period : from 21:00 on 28 July 2025 to 05:00 on 22 August 2025.
Nearest town: 18.87 miles from Black Bank.

Location: eastbound between the junctions with the A141 and the A1101 .
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 October 2025.
Nearest town: 14.44 miles from Black Bank.

Location: westbound between the junctions with the A1101 and the A141 .
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 October 2025.
Nearest town: 14.46 miles from Black Bank.

Location: eastbound between the A15 Peterborough West and the junction with the A17 .
Due to: Roadworks scheme.
Period : from 20:02 on 24 July 2025 to 06:00 on 22 August 2025.
Nearest town: 14.63 miles from Black Bank.

Location: eastbound between junctions J38 Newmarket East and J43 Bury St Edmunds Central.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 October 2025 to 11 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.37 miles from Black Bank.

Location: southbound between the A1101 and the junction with the A14 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.1 miles from Black Bank.

Location: southbound between the junctions with the A1101 and the A14 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.42 miles from Black Bank.

Location: eastbound between junctions J35 Stow Cum Quy and J36 A11 Junction.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 1 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 8 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.64 miles from Black Bank.

Location: northbound between the junctions with the A1304 and the A14 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 1 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 8 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Black Bank.

Location: westbound between junctions J39 Kentford and J36 A11 Junction.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 8 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.34 miles from Black Bank.

Location: eastbound between junctions J37 Newmarket West and J39 Kentford.
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 October 2025 to 11 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.71 miles from Black Bank.

Location: eastbound between junctions J34 Fen Ditton and J35 Stow Cum Quy.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 1 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 8 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.67 miles from Black Bank.

Location: westbound between junctions J39 Kentford and J37 Newmarket East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 8 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from Black Bank.

Location: westbound between junctions J40 and J37 Newmarket East.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 23 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.93 miles from Black Bank.

Location: southbound between the junctions with the A14 and the A1307 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 5 August 2025 to 05:00 on 6 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.49 miles from Black Bank.

Location: westbound between the junctions with the A17 and the A1101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Nearest town: 16.97 miles from Black Bank.

Location: eastbound between the junctions with the A1101 and the A17 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Nearest town: 16.94 miles from Black Bank.

Location: westbound between the junctions with the A141 and the A1139 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 6 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.89 miles from Black Bank.

Location: westbound between the A141 and the junction with the A1139 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.92 miles from Black Bank.

Location: eastbound between the junctions with the A1139 and the A141 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 6 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.91 miles from Black Bank.

Location: eastbound between the junctions with the A1139 and the A141 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.79 miles from Black Bank.

Location: westbound between the junctions with the A17 and the A1101 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.47 miles from Black Bank.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.55 miles from Black Bank.

Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 8 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.49 miles from Black Bank.

Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.67 miles from Black Bank.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 8 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.38 miles from Black Bank.

Location: northbound exit slip to the A1304 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Black Bank.

Location: eastbound between junctions J35 Stow Cum Quy and J37 Newmarket West.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.32 miles from Black Bank.

Location: westbound between the junctions with the M11 and the A1303 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 9 August 2025.
Nearest town: 16.61 miles from Black Bank.

Location: westbound between the junctions with the M11 and the A1303 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 8 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.61 miles from Black Bank.

Location: westbound between the junctions with the M11 and the A1303 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.61 miles from Black Bank.

Location: eastbound between the A1198 and the junction with the M11 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 August 2025 to 06:00 on 7 August 2025.
Nearest town: 18.43 miles from Black Bank.

Location: eastbound between the junctions with the A1303 and the M11 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 August 2025 to 06:00 on 7 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.12 miles from Black Bank.

Location: eastbound between the A1198 and the junction with the M11 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 August 2025 to 06:00 on 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.43 miles from Black Bank.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.54 miles from Black Bank.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.65 miles from Black Bank.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 05:00 on 5 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.6 miles from Black Bank.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 23:00 on 1 August 2025 to 02:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.56 miles from Black Bank.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 02:00 on 2 August 2025 to 05:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.62 miles from Black Bank.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 23:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.58 miles from Black Bank.

Location: eastbound between junctions J35 Stow Cum Quy and J37 Newmarket West.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 August 2025 to 8 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.91 miles from Black Bank.

Location: southbound at junction J12 (Cambridge) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.52 miles from Black Bank.

Location: southbound between junctions J12 (Cambridge) and J11 (Royston) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.87 miles from Black Bank.

Location: northbound between the A1065 and the junction with the A134 Thetford West.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.44 miles from Black Bank.

Location: northbound at the junction with the A1065 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.97 miles from Black Bank.

Location: southbound at the junction with the A1065 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.01 miles from Black Bank.

Location: southbound between the junctions with the A1101 and the A14 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.01 miles from Black Bank.

Location: southbound between the junctions with the A134 Thetford West and the A1065 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.17 miles from Black Bank.

Location: northbound between the A14 and the junction with the A134 Thetford West.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.71 miles from Black Bank.

Location: westbound entry slip at junction J37 Newmarket West.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.5 miles from Black Bank.

Location: westbound entry slip at junction J36 A11 Junction.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.78 miles from Black Bank.

Location: westbound entry slip at junction J35 Stow Cum Quy.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.81 miles from Black Bank.

Location: westbound entry slip at junction J34 Fen Ditton .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 5 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.01 miles from Black Bank.

Location: westbound exit slip at junction J33 Cambridge.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 5 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.71 miles from Black Bank.

Location: eastbound between junctions J34 Fen Ditton and J43 Bury St Edmunds Central.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 October 2025 to 06:00 on 20 December 2025.
Nearest town: 15.67 miles from Black Bank.

Location: eastbound between junctions J38 Newmarket East and J43 Bury St Edmunds Central.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.37 miles from Black Bank.

Location: southbound between the A1101 and the junction with the A14 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 27 September 2025.
Nearest town: 14.1 miles from Black Bank.

Location: southbound between the junctions with the A1101 and the A14 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.42 miles from Black Bank.

Location: southbound between the A1101 and the junction with the A14 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.1 miles from Black Bank.

Location: eastbound between junctions J35 Stow Cum Quy and J36 A11 Junction.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 1 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 8 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.64 miles from Black Bank.

Location: northbound between the junctions with the A1304 and the A14 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 1 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 8 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Black Bank.

Location: westbound between junctions J39 Kentford and J36 A11 Junction.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 8 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.34 miles from Black Bank.

Location: eastbound between junctions J37 Newmarket West and J39 Kentford.
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 October 2025 to 4 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.71 miles from Black Bank.

Location: eastbound between junctions J34 Fen Ditton and J35 Stow Cum Quy.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 1 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 8 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.67 miles from Black Bank.

Location: westbound between junctions J40 and J36 A11 Junction.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 27 September 2025.
Nearest town: 16.93 miles from Black Bank.

Location: westbound between junctions J39 Kentford and J37 Newmarket East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 8 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from Black Bank.

Location: westbound between junctions J40 and J37 Newmarket East.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 23 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.93 miles from Black Bank.

Location: westbound between junctions J39 Kentford and J37 Newmarket West.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.27 miles from Black Bank.

Location: eastbound between junctions J37 Newmarket West and J39 Kentford.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.69 miles from Black Bank.

Location: eastbound between the junctions with the A141 and the A1101 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Nearest town: 13.86 miles from Black Bank.

Location: westbound between the junctions with the A1101 and the A141 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Nearest town: 14.05 miles from Black Bank.

Location: westbound between the junctions with the A17 and the A1101 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.53 miles from Black Bank.

Location: eastbound between the junctions with the A1101 and the A17 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.74 miles from Black Bank.

Location: westbound between the junctions with the A17 and the A1101 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.52 miles from Black Bank.