Location: southbound between the junctions with the M23 and the A272 .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 10:15 and 10:30 on 25 April 2026.
Normal traffic conditions are expected between 10:15 and 10:30 on 25 April 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.31 miles from Beacon Down.

Location: southbound exit slip at junction J10 (Crawley) .
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 25 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.97 miles from Beacon Down.

Location: westbound between the junctions with the A2270 and the A26 South.
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 25 April 2026.
Nearest town: 9.74 miles from Beacon Down.

Location: westbound at the junction with the A2270 .
Due to: Congestion.
Normal traffic conditions are expected between 10:30 and 10:45 on 25 April 2026.
Nearest town: 10.23 miles from Beacon Down.

Location: northbound entry slip from the A27 .
Due to: Congestion.
Normal traffic conditions are expected between 10:30 and 10:45 on 25 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.1 miles from Beacon Down.

Location: eastbound between the A23 and the junction with the A277 .
Due to: Congestion.
Normal traffic conditions are expected between 11:45 and 12:00 on 25 April 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.6 miles from Beacon Down.

Location: The junction of the A2270 and the A27 .
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 25 April 2026.
Nearest town: 10.27 miles from Beacon Down.

Location: westbound between the junctions with the A2270 and the A26 South.
Due to: Congestion.
Normal traffic conditions are expected between 10:30 and 10:45 on 25 April 2026.
Nearest town: 9.74 miles from Beacon Down.

Location: southbound exit slip at junction J10 (Crawley) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 25 April 2026.
Nearest town: 18.97 miles from Beacon Down.

Location: eastbound between the junctions with the A26 South and the A2270 .
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 27 April 2026.
Nearest town: 9.29 miles from Beacon Down.

Location: westbound between the junctions with the A2270 and the A26 South.
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 27 April 2026.
Nearest town: 9.3 miles from Beacon Down.

Location: southbound entry slip from the A26 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 15.17 miles from Beacon Down.

Location: northbound between the A228 and the junction with the A26 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.99 miles from Beacon Down.

Location: northbound.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 13.73 miles from Beacon Down.

Location: southbound.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 14.02 miles from Beacon Down.

Location: southbound between the A26 and the junction with the A228 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.09 miles from Beacon Down.

Location: southbound between the A26 Tonbridge West and the junction with the A26 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.02 miles from Beacon Down.

Location: northbound between the A26 and the junction with the A225 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15 miles from Beacon Down.

Location: southbound entry slip from the A225 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.82 miles from Beacon Down.

Location: northbound exit slip to the A26 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 15.08 miles from Beacon Down.

Location: northbound entry slip from the A26 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 15.07 miles from Beacon Down.

Location: southbound exit slip to the A26 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 15.07 miles from Beacon Down.

Location: eastbound entry slip from the A2038 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 April 2026 to 27 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 May 2026 to 4 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.28 miles from Beacon Down.

Location: eastbound between the A2038 and the junction with the A23 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2026 to 06:00 on 4 May 2026.
Nearest town: 18.28 miles from Beacon Down.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 April 2026.
Nearest town: 14.58 miles from Beacon Down.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 April 2026.
Nearest town: 14.62 miles from Beacon Down.

Location: eastbound at the junction with the A23 .
Lane Closures : Lane two is closed.
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.48 miles from Beacon Down.

Location: westbound between the A2038 and the junction with the A293 .
Lane Closures : Lane two is closed.
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.1 miles from Beacon Down.

Location: westbound between the A270 Brighton East and the junction with the A23 .
Lane Closures : Lane two is closed.
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.28 miles from Beacon Down.

Location: westbound between the junctions with the A23 and the A2038 .
Lane Closures : Lane two is closed.
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.21 miles from Beacon Down.

Location: eastbound between the A293 and the junction with the A2038 .
Lane Closures : Lane two is closed.
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.86 miles from Beacon Down.

Location: eastbound between the junctions with the A2038 and the A23 .
Lane Closures : Lane two is closed.
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.12 miles from Beacon Down.

Location: southbound between the A2100 north of Battle and the junction with the A28 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 April 2026.
Nearest town: 13.27 miles from Beacon Down.

Location: northbound between the A28 and the junction with the A2100 north of Battle.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 April 2026.
Nearest town: 15.02 miles from Beacon Down.

Location: southbound between the A2100 north of Battle and the junction with the A28 .
Due to: Roadworks scheme.
Period : from 20:09 on 8 April 2026 to 06:00 on 25 April 2026.
Nearest town: 13.27 miles from Beacon Down.

Location: northbound between the A28 and the junction with the A2100 north of Battle.
Due to: Roadworks scheme.
Period : from 20:09 on 8 April 2026 to 06:00 on 25 April 2026.
Nearest town: 15.02 miles from Beacon Down.

Location: southbound between junctions J9 (Gatwick Airport) and J11 (Brighton) .
Due to: Roadworks scheme.
Period : from 21:00 on 13 April 2026 to 06:00 on 2 May 2026.
Nearest town: 19.8 miles from Beacon Down.

Location: southbound exit slip to the A26 .
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 May 2026.
Lanes Closed : All lanes are closed.
Nearest town: 15.07 miles from Beacon Down.

Location: northbound exit slip at junction J10 (Crawley) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 February 2027.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.77 miles from Beacon Down.

Location: northbound between the A2100 north of Battle and the junction with the A229 .
Due to: Roadworks.
Period : expect disruption until 20:00 on 29 May 2026.
Nearest town: 12.01 miles from Beacon Down.

Location: southbound between the A229 and the junction with the A2100 north of Battle.
Due to: Roadworks.
Period : expect disruption until 20:00 on 29 May 2026.
Nearest town: 12.03 miles from Beacon Down.

Location: eastbound between the A26 South and the junction with the A2270 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2026 to 06:00 on 2 May 2026.
Nearest town: 9.26 miles from Beacon Down.

Location: westbound between the A2270 and the junction with the A26 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2026 to 06:00 on 2 May 2026.
Nearest town: 9.51 miles from Beacon Down.

Location: southbound between the junctions with the A27 and the A259 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:15 on 1 May 2026 to 05:00 on 2 May 2026.
Nearest town: 12.74 miles from Beacon Down.

Location: southbound between the junctions with the A27 and the A259 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:15 on 1 May 2026 to 05:00 on 2 May 2026.
Nearest town: 12.72 miles from Beacon Down.

Location: northbound between the junctions with the A259 and the A27 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:15 on 1 May 2026 to 05:00 on 2 May 2026.
Nearest town: 12.89 miles from Beacon Down.

Location: northbound between the junctions with the A259 and the A27 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:15 on 1 May 2026 to 05:00 on 2 May 2026.
Nearest town: 12.74 miles from Beacon Down.

Location: northbound between the junctions with the A262 and the A228 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Nearest town: 12.75 miles from Beacon Down.

Location: southbound between the junctions with the A228 and the A262 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Nearest town: 12.83 miles from Beacon Down.

Location: eastbound at the junction with the A2038 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:30 on 30 April 2026 to 04:00 on 1 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.27 miles from Beacon Down.

Location: eastbound entry slip from the A2038 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:30 on 30 April 2026 to 04:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.28 miles from Beacon Down.

Location: eastbound between the junctions with the A2038 and the A23 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:30 on 30 April 2026 to 04:00 on 1 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.12 miles from Beacon Down.

Location: southbound entry slip from the A281 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 05:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.53 miles from Beacon Down.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 05:00 on 1 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.15 miles from Beacon Down.

Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 06:00 on 1 May 2026.
Nearest town: 12.03 miles from Beacon Down.

Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 06:00 on 1 May 2026.
Nearest town: 12.17 miles from Beacon Down.

Location: southbound exit slip to the A228 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 05:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.97 miles from Beacon Down.

Location: southbound entry slip from the A228 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 05:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.99 miles from Beacon Down.

Location: southbound between the A26 and the junction with the A262 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 05:00 on 1 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.99 miles from Beacon Down.

Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2026 to 05:00 on 29 April 2026.
Nearest town: 13.44 miles from Beacon Down.

Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2026 to 05:00 on 29 April 2026.
Nearest town: 13.48 miles from Beacon Down.

Location: westbound between the junctions with the A268 and the A2101 .
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 06:00 on 30 April 2026.
Nearest town: 19.19 miles from Beacon Down.

Location: eastbound between the junctions with the A2101 and the A268 .
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 06:00 on 30 April 2026.
Nearest town: 19.22 miles from Beacon Down.

Location: northbound between the junctions with the A262 and the A228 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 05:00 on 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.17 miles from Beacon Down.

Location: southbound between the A26 and the junction with the A262 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 05:00 on 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.77 miles from Beacon Down.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 05:00 on 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.04 miles from Beacon Down.

Location: southbound entry slip at junction J10 (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 May 2026 to 06:00 on 27 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.85 miles from Beacon Down.

Location: northbound entry slip at junction J10 (Crawley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2026 to 29 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.97 miles from Beacon Down.

Location: northbound exit slip at junction J10 (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2026 to 06:00 on 27 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.77 miles from Beacon Down.

Location: northbound exit slip to the A264 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 29 April 2026 to 14:30 on 29 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.42 miles from Beacon Down.

Location: eastbound between the A2038 and the junction with the A23 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 06:00 on 1 May 2026.
Nearest town: 17.64 miles from Beacon Down.

Location: eastbound entry slip from the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.99 miles from Beacon Down.

Location: eastbound exit slip to the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.22 miles from Beacon Down.

Location: eastbound between the A2038 and the junction with the A270 Brighton East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.64 miles from Beacon Down.

Location: eastbound exit slip to the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.22 miles from Beacon Down.

Location: southbound between the M23 and the junction with the A272 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.18 miles from Beacon Down.

Location: northbound between the A272 and the junction with the M23 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2026 to 06:00 on 29 April 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.76 miles from Beacon Down.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.7 miles from Beacon Down.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.02 miles from Beacon Down.

Location: southbound between the A26 and the junction with the A228 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.77 miles from Beacon Down.

Location: eastbound between the junctions with the A26 South and the A2270 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 04:00 from 27 April 2026 to 1 May 2026.
Nearest town: 9.61 miles from Beacon Down.

Location: westbound between the junctions with the A2270 and the A26 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 04:00 from 27 April 2026 to 1 May 2026.
Nearest town: 9.93 miles from Beacon Down.

Location: southbound between the junctions with the A262 and the A268 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.18 miles from Beacon Down.

Location: eastbound between the junctions with the A2038 and the A23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 April 2026 to 27 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 May 2026 to 4 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.99 miles from Beacon Down.

Location: southbound between the A2300 and the junction with the A273 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 June 2026 to 6 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 June 2026 to 10 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2026 to 13 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.57 miles from Beacon Down.

Location: northbound between the A273 and the junction with the A2300 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 June 2026 to 6 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 June 2026 to 10 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2026 to 13 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.9 miles from Beacon Down.

Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2026 to 06:00 on 20 June 2026.
Nearest town: 17.33 miles from Beacon Down.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 29 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.67 miles from Beacon Down.

Location: northbound between the A281 and the junction with the A2300 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 June 2026 to 6 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 June 2026 to 10 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2026 to 13 June 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 June 2026 to 20 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.74 miles from Beacon Down.

Location: northbound between the A281 and the junction with the A2300 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 May 2026 to 7 May 2026.
Schedule : From 21:00 on 8 May 2026 to 06:00 on 9 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2026 to 16 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.78 miles from Beacon Down.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 27 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 5 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 11 May 2026 to 15 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.46 miles from Beacon Down.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 27 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 5 May 2026 to 9 May 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 11 May 2026 to 15 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.59 miles from Beacon Down.

Location: eastbound between the junctions with the A277 and the A26 North.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 May 2026 to 16 May 2026.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.12 miles from Beacon Down.

Location: eastbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 May 2026 to 16 May 2026.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.39 miles from Beacon Down.

Location: eastbound between the A23 and the junction with the A277 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 May 2026 to 16 May 2026.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.58 miles from Beacon Down.

Location: westbound between the junctions with the A259 and the A22 Polegate East.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 2 May 2026.
Nearest town: 11.68 miles from Beacon Down.

Location: westbound between the junctions with the A259 and the A22 Polegate East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 2 May 2026.
Nearest town: 11.67 miles from Beacon Down.

Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 2 May 2026.
Nearest town: 11.69 miles from Beacon Down.

Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 2 May 2026.
Nearest town: 11.69 miles from Beacon Down.

Location: eastbound between the junctions with the A22 Polegate East and the A259 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 2 May 2026.
Nearest town: 10.56 miles from Beacon Down.

Location: eastbound between the junctions with the A22 Polegate East and the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 2 May 2026.
Nearest town: 11.6 miles from Beacon Down.

Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 2 May 2026.
Nearest town: 11.7 miles from Beacon Down.

Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 2 May 2026.
Nearest town: 11.7 miles from Beacon Down.

Location: southbound entry slip at junction J10 (Crawley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 2 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.85 miles from Beacon Down.

Location: southbound at junction J9 (Gatwick Airport) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 2 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.91 miles from Beacon Down.

Location: southbound between junctions J9 (Gatwick Airport) and J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2026 to 06:00 on 25 April 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 2 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.8 miles from Beacon Down.

Location: southbound between the junctions with the M23 and the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 2 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.41 miles from Beacon Down.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 27 April 2026 to 2 May 2026.
Nearest town: 15.04 miles from Beacon Down.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 27 April 2026 to 2 May 2026.
Nearest town: 15.14 miles from Beacon Down.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 27 April 2026 to 30 April 2026.
Nearest town: 14.18 miles from Beacon Down.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 27 April 2026 to 30 April 2026.
Nearest town: 14.24 miles from Beacon Down.