Location: northbound between the junctions with the A61 Derby and the A610 .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 23:30 and 23:45 on 23 July 2025.
Normal traffic conditions are expected between 23:30 and 23:45 on 23 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.06 miles from Ashgate.

Location: southbound between the junctions with the A610 and the A61 Derby.
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 21:45 and 22:00 on 23 July 2025.
Normal traffic conditions are expected between 21:45 and 22:00 on 23 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.75 miles from Ashgate.

Location: northbound entry slip at junction J31 (Worksop) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 21:45 and 22:00 on 23 July 2025.
Normal traffic conditions are expected between 21:45 and 22:00 on 23 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.56 miles from Ashgate.

Location: northbound between the junctions with the A61 Alfreton and the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 22:30 and 22:45 on 23 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.95 miles from Ashgate.

Location: northbound entry slip at junction J26 (Nottingham) .
Due to: Roadworks.
Period : from 20:29 on 23 July 2025 to 05:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.31 miles from Ashgate.

Location: northbound exit slip at junction J26 (Nottingham) .
Due to: Roadworks.
Period : from 20:28 on 23 July 2025 to 05:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.42 miles from Ashgate.

Location: southbound entry slip at junction J28 (Matlock) .
Due to: Roadworks.
Period : from 20:10 on 23 July 2025 to 05:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 11.03 miles from Ashgate.

Location: northbound between junctions J30 (Chesterfield) and J31 (Worksop) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 05:00 on 24 July 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 10.35 miles from Ashgate.

Location: southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 24 July 2025 to 06:00 on 26 July 2025.
Nearest town: 11.93 miles from Ashgate.

Location: northbound between the junctions with the A61 Derby and the A610 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 24 July 2025 to 05:00 on 25 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.56 miles from Ashgate.

Location: northbound between the A61 Alfreton and the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.81 miles from Ashgate.

Location: northbound entry slip at junction J28 (Matlock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.81 miles from Ashgate.

Location: southbound entry slip at junction J28 (Matlock) (fast slip).
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.85 miles from Ashgate.

Location: southbound entry slip at junction J28 (Matlock) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.87 miles from Ashgate.

Location: southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 13.85 miles from Ashgate.

Location: southbound at junction J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.3 miles from Ashgate.

Location: southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 13.75 miles from Ashgate.

Location: northbound between the junctions with the A61 Derby and the A610 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 24 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.56 miles from Ashgate.

Location: northbound between the junctions with the A616 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 July 2025 to 22:00 on 23 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.91 miles from Ashgate.

Location: northbound exit slip to the A620 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.77 miles from Ashgate.

Location: northbound between the A614 and the junction with the A620 .
Due to: Roadworks scheme.
Period : from 20:09 on 21 July 2025 to 06:00 on 26 July 2025.
Nearest town: 18.26 miles from Ashgate.

Location: southbound entry slip at junction J26 (Nottingham) .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.43 miles from Ashgate.

Location: southbound between junctions J27 (Mansfield) and J26 (Nottingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.84 miles from Ashgate.

Location: southbound exit slip at junction J26 (Nottingham) .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.27 miles from Ashgate.

Location: northbound entry slip at junction J34 (Meadowhall) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 13.08 miles from Ashgate.

Location: northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 13.42 miles from Ashgate.

Location: northbound at junction J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 12.72 miles from Ashgate.

Location: northbound entry slip at junction J35 (Rotherham) .
Due to: Roadworks scheme.
Period : from 20:08 on 22 July 2025 to 06:00 on 25 July 2025.
Nearest town: 15.31 miles from Ashgate.

Location: northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.45 miles from Ashgate.

Location: northbound entry slip at junction J35 (Rotherham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 July 2025 to 06:00 on 25 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.31 miles from Ashgate.

Location: southbound between the A61 Alfreton and the junction with the A61 Derby.
Due to: Roadworks scheme.
Period : from 20:09 on 18 July 2025 to 06:00 on 8 August 2025.
Nearest town: 11.8 miles from Ashgate.

Location: northbound between the A61 Alfreton and the junction with the M1 .
Due to: Roadworks scheme.
Period : from 20:01 on 17 July 2025 to 06:00 on 9 August 2025.
Nearest town: 10.81 miles from Ashgate.

Location: southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 October 2025 to 06:00 on 5 October 2025.
Schedule : From 20:00 on 11 October 2025 to 06:00 on 12 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.17 miles from Ashgate.

Location: southbound entry slip at junction J34 (Meadowhall) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 October 2025 to 06:00 on 5 October 2025.
Schedule : From 20:00 on 11 October 2025 to 06:00 on 12 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.55 miles from Ashgate.

Location: southbound exit slip at junction J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:01 on 17 July 2025 to 06:00 on 9 August 2025.
Nearest town: 10.42 miles from Ashgate.

Location: northbound entry slip at junction J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:01 on 17 July 2025 to 06:00 on 9 August 2025.
Nearest town: 10.81 miles from Ashgate.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.59 miles from Ashgate.

Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.39 miles from Ashgate.

Location: southbound between junctions J36 (Barnsley) and J35 (Rotherham) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 05:00 on 31 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.27 miles from Ashgate.

Location: northbound between junctions J35A (Manchester) and J37 (Barnsley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 05:00 on 26 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.94 miles from Ashgate.

Location: northbound between junctions J35A (Manchester) and J37 (Barnsley) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 05:00 on 26 July 2025 to 09:00 on 26 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.94 miles from Ashgate.

Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 July 2025 to 06:00 on 30 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.11 miles from Ashgate.

Location: southbound entry slip at junction J34 (Meadowhall) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.56 miles from Ashgate.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2025 to 31 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.67 miles from Ashgate.

Location: southbound between junctions J27 (Mansfield) and J26 (Nottingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : From 20:00 on 12 August 2025 to 06:00 on 13 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.09 miles from Ashgate.

Location: northbound entry slip at junction J27 (Mansfield) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.25 miles from Ashgate.

Location: northbound between junctions J26 (Nottingham) and J27 (Mansfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 06:00 on 30 July 2025.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.4 miles from Ashgate.

Location: southbound entry slip at junction J27 (Mansfield) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.34 miles from Ashgate.

Location: southbound exit slip at junction J27 (Mansfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 August 2025 to 06:00 on 13 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.01 miles from Ashgate.

Location: northbound exit slip at junction J27 (Mansfield) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.55 miles from Ashgate.

Location: The A1M northbound at junction J34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.5 miles from Ashgate.

Location: northbound between the junctions with the A634 and the A614 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 31 July 2025.
Nearest town: 19.63 miles from Ashgate.

Location: northbound between the junctions with the A634 and the A614 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.62 miles from Ashgate.

Location: northbound between the junctions with the A634 and the A614 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.63 miles from Ashgate.

Location: The A1M northbound between junctions J34 and J35 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 31 July 2025.
Nearest town: 19.52 miles from Ashgate.

Location: The A1M northbound between junctions J34 and J35 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.52 miles from Ashgate.

Location: southbound between junctions J30 (Chesterfield) and J29A (Markham Vale) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.47 miles from Ashgate.

Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 5.39 miles from Ashgate.

Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 06:00 on 30 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 5.39 miles from Ashgate.

Location: southbound between junctions J30 (Chesterfield) and J29A (Markham Vale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.47 miles from Ashgate.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.85 miles from Ashgate.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.59 miles from Ashgate.

Location: northbound between junctions J31 (Worksop) and J32 (Doncaster) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.42 miles from Ashgate.

Location: southbound between junctions J31 (Worksop) and J30 (Chesterfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.25 miles from Ashgate.

Location: southbound between junctions J31 (Worksop) and J30 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.25 miles from Ashgate.

Location: southbound at junction J32 (Doncaster) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.22 miles from Ashgate.

Location: northbound at junction J32 (Doncaster) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.66 miles from Ashgate.

Location: southbound at junction J33 (Sheffield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 July 2025 to 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.09 miles from Ashgate.

Location: southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 July 2025 to 26 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.93 miles from Ashgate.

Location: southbound entry slip at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 July 2025 to 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.28 miles from Ashgate.

Location: southbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 July 2025 to 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.09 miles from Ashgate.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 July 2025 to 26 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.36 miles from Ashgate.

Location: southbound between junctions J33 (Sheffield) and J31 (Worksop) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.9 miles from Ashgate.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.59 miles from Ashgate.

Location: northbound between junctions J31 (Worksop) and J32 (Doncaster) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.45 miles from Ashgate.

Location: northbound between junctions J30 (Chesterfield) and J32 (Doncaster) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.7 miles from Ashgate.

Location: The A1M northbound between junctions J34 and J35 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.47 miles from Ashgate.

Location: The A1M southbound between junctions J35 and J34 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.53 miles from Ashgate.

Location: southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.48 miles from Ashgate.

Location: southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Nearest town: 14.48 miles from Ashgate.

Location: southbound at junction J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.3 miles from Ashgate.

Location: southbound exit slip at junction J36 (Barnsley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.29 miles from Ashgate.

Location: southbound between the A61 Alfreton and the junction with the A61 Derby.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.8 miles from Ashgate.

Location: northbound at the junction with the A61 Derby.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 06:00 on 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.25 miles from Ashgate.

Location: southbound between the junctions with the A610 and the A61 Derby.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.74 miles from Ashgate.

Location: southbound at the junction with the A61 Derby.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2025 to 06:00 on 30 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.27 miles from Ashgate.

Location: southbound between the junctions with the M1 and the A61 Alfreton.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.91 miles from Ashgate.

Location: northbound between the junctions with the A61 Alfreton and the M1 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11 miles from Ashgate.

Location: northbound exit slip at junction J28 (Matlock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.13 miles from Ashgate.

Location: northbound exit slip at junction J28 (Matlock) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.13 miles from Ashgate.

Location: southbound exit slip at junction J28 (Matlock) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.42 miles from Ashgate.

Location: southbound exit slip to the A614 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.34 miles from Ashgate.

Location: southbound between the A620 and the junction with the A638 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.78 miles from Ashgate.

Location: southbound between the A634 and the junction with the A620 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.85 miles from Ashgate.

Location: southbound entry slip from the A620 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 August 2025 to 9 August 2025.
Nearest town: 18.84 miles from Ashgate.

Location: northbound between the A614 and the junction with the A620 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.26 miles from Ashgate.

Location: northbound at the junction with the A614 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.52 miles from Ashgate.

Location: northbound entry slip from the A620 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Nearest town: 18.67 miles from Ashgate.

Location: southbound exit slip to the A620 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 August 2025 to 9 August 2025.
Nearest town: 18.77 miles from Ashgate.

Location: northbound exit slip to the A620 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 July 2025.
Nearest town: 18.76 miles from Ashgate.

Location: southbound between the A634 and the junction with the A620 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 9 August 2025.
Nearest town: 18.85 miles from Ashgate.

Location: northbound between junctions J30 (Chesterfield) and J31 (Worksop) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 05:00 on 28 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.12 miles from Ashgate.

Location: southbound between junctions J31 (Worksop) and J30 (Chesterfield) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 26 July 2025 to 18:00 on 26 July 2025.
Schedule : From 09:00 on 27 July 2025 to 20:00 on 27 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.02 miles from Ashgate.

Location: southbound between junctions J31 (Worksop) and J30 (Chesterfield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 08:00 on 26 July 2025.
Schedule : From 18:00 on 26 July 2025 to 09:00 on 27 July 2025.
Schedule : From 20:00 on 27 July 2025 to 05:00 on 28 July 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.02 miles from Ashgate.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 August 2025 to 06:00 on 22 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.56 miles from Ashgate.

Location: southbound between junction J1 (Rotherham) and the M1 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 August 2025 to 06:00 on 22 August 2025.
Nearest town: 14.8 miles from Ashgate.

Location: southbound between junction J1 (Rotherham) and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 20 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.8 miles from Ashgate.

Location: slip road to the M1 northbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 August 2025 to 06:00 on 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.98 miles from Ashgate.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 21 August 2025 to 06:00 on 22 August 2025.
Nearest town: 12.56 miles from Ashgate.

Location: southbound at junction J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 August 2025 to 06:00 on 22 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.22 miles from Ashgate.

Location: northbound between the M1 southbound and junction J1 (Rotherham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 20 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.22 miles from Ashgate.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 October 2025 to 06:00 on 5 October 2025.
Schedule : From 20:00 on 11 October 2025 to 06:00 on 12 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.76 miles from Ashgate.

Location: southbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 October 2025 to 06:00 on 5 October 2025.
Schedule : From 20:00 on 11 October 2025 to 06:00 on 12 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.09 miles from Ashgate.

Location: northbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 October 2025 to 06:00 on 5 October 2025.
Schedule : From 20:00 on 11 October 2025 to 06:00 on 12 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.33 miles from Ashgate.