Location: southbound entry slip at junction J37 (Barnsley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.41 miles from Windhill.

Location: southbound between junctions J37 (Barnsley) and J36 (Barnsley) .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.28 miles from Windhill.

Location: southbound between junctions J29A (Markham Vale) and J29 (Chesterfield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.04 miles from Windhill.

Location: eastbound between junctions J35 (M18) and J36 (Goole) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.08 miles from Windhill.

Location: southbound between junctions J31 (Worksop) and J29A (Markham Vale) .
Due to: Roadworks scheme.
Period : from 20:07 on 13 March 2026 to 05:00 on 21 March 2026.
Nearest town: 13.57 miles from Windhill.

Location: westbound between junctions J2 and J1 .
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 15:00 on 29 May 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.32 miles from Windhill.

Location: The A1M northbound between junctions J34 and J35 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 15:00 on 30 September 2026.
Nearest town: 9.88 miles from Windhill.

Location: northbound between junctions J30 (Chesterfield) and J32 (Doncaster) .
Due to: Roadworks scheme.
Period : from 20:04 on 5 March 2026 to 06:00 on 24 March 2026.
Nearest town: 10.25 miles from Windhill.

Location: southbound exit slip at junction J34 (Meadowhall) .
Due to: Roadworks scheme.
Period : from 21:00 on 13 March 2026 to 06:00 on 22 March 2026.
Nearest town: 7.38 miles from Windhill.

Location: northbound between the A638 and the junction with the M62 .
Due to: Roadworks scheme.
Period : from 20:03 on 13 March 2026 to 06:00 on 28 March 2026.
Nearest town: 6.26 miles from Windhill.

Location: northbound between junctions J42 (Hull) and J44 (Leeds) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : There will be four of five lanes closed.
Nearest town: 19.44 miles from Windhill.

Location: northbound at junction J42 (Hull) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.03 miles from Windhill.

Location: northbound entry slip at junction J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.16 miles from Windhill.

Location: northbound entry slip at junction J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.01 miles from Windhill.

Location: eastbound between junctions J28 (Leeds) and J29 (M1) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.58 miles from Windhill.

Location: westbound between junctions J32 (Pontefract) and J31 (Normanton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.79 miles from Windhill.

Location: eastbound between junctions J31 (Normanton) and J32 (Pontefract) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 25 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.29 miles from Windhill.

Location: southbound between the junctions with the A614 and the A638 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.92 miles from Windhill.

Location: northbound entry slip at junction J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.96 miles from Windhill.

Location: northbound between junctions J42 (Hull) and J44 (Leeds) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be three of five lanes closed.
Nearest town: 19.84 miles from Windhill.

Location: eastbound exit slip at junction J29 (M1) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 06:00 on 16 March 2026 to 19:00 on 17 March 2026.
Nearest town: 19.21 miles from Windhill.

Location: northbound between junctions J42 (Hull) and J44 (Leeds) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 March 2026 to 21 March 2026.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 19.44 miles from Windhill.

Location: northbound entry slip at junction J42 (Hull) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.16 miles from Windhill.

Location: eastbound exit slip at junction J29 (M1) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.15 miles from Windhill.

Location: slip road to the M1 northbound .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.87 miles from Windhill.

Location: northbound at junction J42 (Hull) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.87 miles from Windhill.

Location: northbound entry slip at junction J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2026 to 21 March 2026.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.01 miles from Windhill.

Location: The A1M northbound between junctions J42 and J43 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 16 March 2026 to 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.48 miles from Windhill.

Location: southbound exit slip to the A638 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.53 miles from Windhill.

Location: The A1M northbound exit slip at junction J38 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.14 miles from Windhill.

Location: The A1M northbound between junctions J37 and J38 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 28 March 2026.
Nearest town: 5.49 miles from Windhill.

Location: The A1M northbound between junctions J37 and J38 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.49 miles from Windhill.

Location: northbound entry slip from the A638 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.26 miles from Windhill.

Location: The A1M southbound entry slip at junction J38 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.45 miles from Windhill.

Location: northbound between the A638 and the junction with the A639 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.37 miles from Windhill.

Location: The junction of the A638 and the A1M .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 28 March 2026.
Nearest town: 6.29 miles from Windhill.

Location: The junction of the A638 and the A1M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.36 miles from Windhill.

Location: The junction of the A638 and the A1M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.29 miles from Windhill.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.32 miles from Windhill.

Location: southbound exit slip to the A638 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.46 miles from Windhill.

Location: The A1M northbound between junctions J37 and J38 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.23 miles from Windhill.

Location: The A1M northbound exit slip at junction J37 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.33 miles from Windhill.

Location: The A1M southbound exit slip at junction J37 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.48 miles from Windhill.

Location: southbound between the junctions with the A639 and the A638 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.21 miles from Windhill.

Location: southbound between the junctions with the A639 and the A638 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.84 miles from Windhill.

Location: The A1M southbound entry slip at junction J38 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.45 miles from Windhill.

Location: northbound exit slip to the A1M .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.39 miles from Windhill.

Location: northbound between junctions J40 (Wakefield) and J41 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2026 to 21 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.36 miles from Windhill.

Location: northbound between junctions J41 (Wakefield) and J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2026 to 21 March 2026.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 18.61 miles from Windhill.

Location: northbound between junctions J37 (Barnsley) and J38 (Huddersfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.18 miles from Windhill.

Location: southbound entry slip at junction .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 05:00 on 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.83 miles from Windhill.

Location: westbound entry slip at junction J1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 05:00 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.45 miles from Windhill.

Location: eastbound between junctions J30 (Rothwell) and J31 (Normanton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.23 miles from Windhill.

Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.9 miles from Windhill.

Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 March 2026 to 06:00 on 29 March 2026.
Schedule : From 20:00 on 29 March 2026 to 06:00 on 30 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.39 miles from Windhill.

Location: southbound at junction J39 (Denby Dale) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.07 miles from Windhill.

Location: southbound entry slip at junction J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.85 miles from Windhill.

Location: southbound exit slip at Woolley Edge Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.2 miles from Windhill.

Location: southbound between junctions J39 (Denby Dale) and J38 (Huddersfield) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.89 miles from Windhill.

Location: southbound entry slip at Woolley Edge Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.09 miles from Windhill.

Location: southbound exit slip at junction J38 (Huddersfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.73 miles from Windhill.

Location: southbound at junction J34 (Meadowhall) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 April 2026 to 23 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 June 2026 to 11 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 30 July 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.38 miles from Windhill.

Location: southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 April 2026 to 23 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 June 2026 to 11 June 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 July 2026 to 30 July 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.48 miles from Windhill.

Location: southbound at junction J34 (Meadowhall) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 April 2026 to 06:00 on 24 April 2026.
Schedule : From 20:00 on 11 June 2026 to 06:00 on 12 June 2026.
Schedule : From 20:00 on 30 July 2026 to 06:00 on 31 July 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.38 miles from Windhill.

Location: southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 April 2026 to 06:00 on 24 April 2026.
Schedule : From 20:00 on 11 June 2026 to 06:00 on 12 June 2026.
Schedule : From 20:00 on 30 July 2026 to 06:00 on 31 July 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.48 miles from Windhill.

Location: southbound at junction J34 (Meadowhall) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 April 2026 to 06:00 on 24 April 2026.
Schedule : From 20:00 on 11 June 2026 to 06:00 on 12 June 2026.
Schedule : From 20:00 on 30 July 2026 to 06:00 on 31 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.39 miles from Windhill.

Location: northbound between the junctions with the A6178 and the A6109 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2026 to 06:00 on 20 June 2026.
Schedule : From 20:00 on 31 July 2026 to 06:00 on 1 August 2026.
Schedule : From 20:00 on 14 September 2026 to 06:00 on 15 September 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.58 miles from Windhill.

Location: northbound between the junctions with the A6178 and the A6109 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 June 2026 to 06:00 on 23 June 2026.
Schedule : From 20:00 on 3 August 2026 to 06:00 on 4 August 2026.
Schedule : From 20:00 on 15 September 2026 to 06:00 on 16 September 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.58 miles from Windhill.

Location: southbound between the junctions with the A6178 and the A6178 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 March 2026 to 06:00 on 31 March 2026.
Schedule : From 20:00 on 7 May 2026 to 06:00 on 8 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.4 miles from Windhill.

Location: southbound between the junctions with the A6178 and the A6178 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 March 2026 to 06:00 on 1 April 2026.
Schedule : From 20:00 on 8 May 2026 to 06:00 on 9 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.4 miles from Windhill.

Location: southbound between junctions J7 (Hull) and J6 (Selby) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 18 March 2026 to 15:00 on 18 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.24 miles from Windhill.

Location: southbound between junctions J31 (Worksop) and J30 (Chesterfield) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 20 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10 miles from Windhill.

Location: southbound entry slip at Woodall Services.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.49 miles from Windhill.

Location: southbound exit slip at Woodall Services.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.22 miles from Windhill.

Location: southbound between junctions J37 (Barnsley) and J36 (Barnsley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.79 miles from Windhill.

Location: northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.73 miles from Windhill.

Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 21 March 2026.
Nearest town: 16.71 miles from Windhill.

Location: southbound at junction J39 (Denby Dale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.07 miles from Windhill.

Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2026 to 21 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.71 miles from Windhill.

Location: northbound between the junctions with the A6178 and the A6109 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2026 to 06:00 on 16 September 2026.
Nearest town: 7.58 miles from Windhill.

Location: southbound between the junctions with the A6178 and the A6178 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 March 2026 to 06:00 on 9 May 2026.
Nearest town: 7.4 miles from Windhill.

Location: southbound between junctions J31 (Worksop) and J29A (Markham Vale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 16 March 2026 to 19 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.57 miles from Windhill.

Location: southbound.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.12 miles from Windhill.

Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:30 on 17 March 2026 to 06:00 on 18 March 2026.
Nearest town: 8.72 miles from Windhill.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.71 miles from Windhill.

Location: northbound between the A639 and the junction with the M62 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.7 miles from Windhill.

Location: northbound entry slip from the A639 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.72 miles from Windhill.

Location: northbound between the junctions with the A638 and the A639 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.22 miles from Windhill.

Location: southbound between junctions J36 (Barnsley) and J34 (Meadowhall) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2026 to 20 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.47 miles from Windhill.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 6.83 miles from Windhill.

Location: The A1M southbound between junctions J38 and J37 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2026 to 06:00 on 16 March 2026.
Nearest town: 6.1 miles from Windhill.

Location: southbound between junctions J39 (Denby Dale) and J38 (Huddersfield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 16 March 2026 to 06:00 on 17 March 2026.
Nearest town: 14.2 miles from Windhill.

Location: southbound between junctions J39 (Denby Dale) and J38 (Huddersfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.2 miles from Windhill.

Location: southbound exit slip at junction J38 (Huddersfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.73 miles from Windhill.

Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.41 miles from Windhill.

Location: northbound between junctions J30 (Chesterfield) and J31 (Worksop) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.71 miles from Windhill.

Location: northbound exit slip at junction J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.5 miles from Windhill.

Location: northbound between junctions J31 (Worksop) and J32 (Doncaster) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.56 miles from Windhill.

Location: northbound between junctions J29A (Markham Vale) and J32 (Doncaster) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 21 March 2026.
Nearest town: 15.41 miles from Windhill.

Location: northbound entry slip at junction J30 (Chesterfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.36 miles from Windhill.

Location: northbound at junction J32 (Doncaster) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.81 miles from Windhill.

Location: northbound entry slip at Woodall Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.24 miles from Windhill.

Location: northbound exit slip at Woodall Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.52 miles from Windhill.

Location: The A1M northbound entry slip at junction J41 .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.04 miles from Windhill.

Location: eastbound exit slip at junction J32A (A1M) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.98 miles from Windhill.

Location: eastbound between junctions J32 (Pontefract) and J32A (A1M) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.87 miles from Windhill.

Location: northbound entry slip at junction J42 (Hull) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.01 miles from Windhill.

Location: eastbound exit slip at junction J29 (M1) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 05:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.12 miles from Windhill.

Location: northbound between junctions J38 (Huddersfield) and J39 (Denby Dale) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Nearest town: 14.37 miles from Windhill.

Location: northbound between junctions J38 (Huddersfield) and J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.37 miles from Windhill.

Location: northbound exit slip at junction J39 (Denby Dale) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.71 miles from Windhill.

Location: southbound exit slip at junction J3 (Doncaster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.9 miles from Windhill.

Location: northbound exit slip at junction J3 (Doncaster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.47 miles from Windhill.

Location: westbound entry slip at junction J29 (M1) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.95 miles from Windhill.

Location: southbound between junctions J31 (Worksop) and J30 (Chesterfield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.6 miles from Windhill.

Location: westbound exit slip to the A629 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 05:00 on 17 March 2026.
Nearest town: 10.58 miles from Windhill.

Location: westbound entry slip from the A629 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 05:00 on 17 March 2026.
Nearest town: 10.52 miles from Windhill.

Location: northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Nearest town: 7.7 miles from Windhill.

Location: northbound exit slip at junction J34 (Meadowhall) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.66 miles from Windhill.

Location: northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.7 miles from Windhill.

Location: eastbound between junctions J35 (M18) and J36 (Goole) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 06:00 on 15 March 2026 to 15:00 on 15 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.08 miles from Windhill.

Location: westbound between junctions J30 (Rothwell) and J29 (M1) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Nearest town: 17.76 miles from Windhill.

Location: westbound at junction J29 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.66 miles from Windhill.

Location: westbound between junctions J30 (Rothwell) and J29 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.16 miles from Windhill.

Location: westbound between junctions J30 (Rothwell) and J29 (M1) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.92 miles from Windhill.

Location: westbound at junction J30 (Rothwell) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 March 2026 to 06:00 on 26 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.76 miles from Windhill.

Location: eastbound at junction J29 (M1) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 16 March 2026 to 18 March 2026.
Schedule : From 09:00 on 19 March 2026 to 06:00 on 21 March 2026.
Nearest town: 19.09 miles from Windhill.

Location: southbound at junction J42 (Hull) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 16 March 2026 to 18 March 2026.
Schedule : From 09:00 on 19 March 2026 to 06:00 on 21 March 2026.
Nearest town: 19.17 miles from Windhill.

Location: The A1M southbound between junctions J35 and J34 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 March 2026 to 28 March 2026.
Schedule : From 20:00 on 31 March 2026 to 06:00 on 1 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 April 2026 to 18 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.49 miles from Windhill.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 25 March 2026 to 06:00 on 30 March 2026.
Nearest town: 14.2 miles from Windhill.

Location: northbound entry slip at junction J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 March 2026 to 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.01 miles from Windhill.

Location: northbound entry slip at junction J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 March 2026 to 16 March 2026.
Schedule : From 20:00 on 21 March 2026 to 06:00 on 22 March 2026.
Schedule : From 22:00 on 22 March 2026 to 06:00 on 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.11 miles from Windhill.

Location: northbound between junctions J30 (Chesterfield) and J31 (Worksop) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 March 2026 to 16 March 2026.
Schedule : From 20:00 on 21 March 2026 to 06:00 on 22 March 2026.
Schedule : From 22:00 on 22 March 2026 to 06:00 on 23 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.25 miles from Windhill.

Location: northbound between the M1 and junction J1 (Rotherham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 March 2026 to 16 March 2026.
Schedule : From 20:00 on 21 March 2026 to 06:00 on 22 March 2026.
Schedule : From 22:00 on 22 March 2026 to 06:00 on 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.81 miles from Windhill.

Location: westbound between junctions J29 (M1) and J28 (Leeds) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 15 May 2026 to 06:00 on 16 May 2026.
Schedule : From 19:00 on 18 May 2026 to 06:00 on 19 May 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 10 June 2026 to 13 June 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 22 June 2026 to 24 June 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.8 miles from Windhill.

Location: westbound between junctions J29 (M1) and J28 (Leeds) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 1 April 2026 to 3 April 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 8 April 2026 to 11 April 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 13 April 2026 to 18 April 2026.
Schedule : From 19:00 on 20 April 2026 to 06:00 on 21 April 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.8 miles from Windhill.

Location: southbound exit slip to the A638 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 21 March 2026.
Nearest town: 9.04 miles from Windhill.

Location: northbound between junctions J34 (Meadowhall) and J36 (Barnsley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 05:00 on 19 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.45 miles from Windhill.

Location: southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 13 March 2026 to 06:00 on 14 March 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.35 miles from Windhill.

Location: southbound between junctions J36 (Barnsley) and J35 (Rotherham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2026 to 06:00 on 22 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.52 miles from Windhill.

Location: southbound entry slip at junction J35A (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2026 to 06:00 on 22 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.84 miles from Windhill.

Location: southbound between junctions J36 (Barnsley) and J35 (Rotherham) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.47 miles from Windhill.

Location: southbound entry slip at junction J35 (Rotherham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.34 miles from Windhill.

Location: southbound exit slip at junction J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.38 miles from Windhill.

Location: southbound exit slip at junction J31 (Worksop) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.84 miles from Windhill.

Location: northbound exit slip at junction J31 (Worksop) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.5 miles from Windhill.

Location: southbound entry slip at junction J34 (Meadowhall) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 11 April 2026 to 06:00 on 12 April 2026.
Schedule : From 20:00 on 18 April 2026 to 06:00 on 19 April 2026.
Schedule : From 20:00 on 4 July 2026 to 06:00 on 5 July 2026.
Schedule : From 20:00 on 11 July 2026 to 06:00 on 12 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.57 miles from Windhill.

Location: southbound at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 11 April 2026 to 06:00 on 12 April 2026.
Schedule : From 20:00 on 18 April 2026 to 06:00 on 19 April 2026.
Schedule : From 20:00 on 4 July 2026 to 06:00 on 5 July 2026.
Schedule : From 20:00 on 11 July 2026 to 06:00 on 12 July 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.4 miles from Windhill.

Location: southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 11 April 2026 to 06:00 on 12 April 2026.
Schedule : From 20:00 on 18 April 2026 to 06:00 on 19 April 2026.
Schedule : From 20:00 on 4 July 2026 to 06:00 on 5 July 2026.
Schedule : From 20:00 on 11 July 2026 to 06:00 on 12 July 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.71 miles from Windhill.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 11 April 2026 to 06:00 on 12 April 2026.
Schedule : From 20:00 on 18 April 2026 to 06:00 on 19 April 2026.
Schedule : From 20:00 on 4 July 2026 to 06:00 on 5 July 2026.
Schedule : From 20:00 on 11 July 2026 to 06:00 on 12 July 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 6.87 miles from Windhill.

Location: southbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 11 April 2026 to 06:00 on 12 April 2026.
Schedule : From 20:00 on 18 April 2026 to 06:00 on 19 April 2026.
Schedule : From 20:00 on 4 July 2026 to 06:00 on 5 July 2026.
Schedule : From 20:00 on 11 July 2026 to 06:00 on 12 July 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.4 miles from Windhill.

Location: northbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 11 April 2026 to 06:00 on 12 April 2026.
Schedule : From 20:00 on 18 April 2026 to 06:00 on 19 April 2026.
Schedule : From 20:00 on 4 July 2026 to 06:00 on 5 July 2026.
Schedule : From 20:00 on 11 July 2026 to 06:00 on 12 July 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.15 miles from Windhill.

Location: eastbound at junction J29 (M1) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 09:00 on 16 March 2026 to 06:00 on 21 March 2026.
Nearest town: 19.74 miles from Windhill.

Location: southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 April 2026 to 06:00 on 31 July 2026.
Nearest town: 7.48 miles from Windhill.