Route Planner to Avoid Traffic
START
FINISH
Loading Traffic Details

Traffic Whinney Hill

SLIGHT
SEVERE
FULL SCREENUPDATED: 15:30
×
×

Current traffic in Whinney Hill

CONGESTIONLocation : The A616 westbound between the junctions with the M1 and the A61 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:15 and 15:30 on 19 Oct 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

7.05 miles from Whinney Hill.

BROKEN DOWN VEHICLECLEARED @ 14:41Location : The M1 southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lane one is closed.
Reason : Broken down vehicle.
Status : Currently Active.
Time To Clear : The event is expected to clear between 15:30 and 15:45 on 19 Oct 2018.
Return To Normal : Normal traffic conditions are expected between 15:30 and 15:45 on 19 Oct 2018.
Lanes Closed : There is one of four lanes closed.

2.9 miles from Whinney Hill. CLEARED @ 14:41

ACCIDENTCLEARED @ 09:54Location : The M1 southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .
Lane Closures : Lane one is closed.
Reason : Road traffic collision.
Status : Currently Active.
Time To Clear : The event is expected to clear between 11:45 and 12:00 on 19 Oct 2018.
Return To Normal : Normal traffic conditions are expected between 11:45 and 12:00 on 19 Oct 2018.
Lanes Closed : There is one of four lanes closed.

4.91 miles from Whinney Hill. CLEARED @ 09:54

CONGESTIONCLEARED @ 15:08Location : The A631 northbound between the junctions with the A6178 and the A6109 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:00 and 15:15 on 19 Oct 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

3.77 miles from Whinney Hill. CLEARED @ 15:08

CONGESTIONCLEARED @ 14:23Location : The A631 northbound between the junctions with the A6178 and the A6109 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:15 and 14:30 on 19 Oct 2018.

3.77 miles from Whinney Hill. CLEARED @ 14:23

CONGESTIONCLEARED @ 13:56Location : The A1M northbound entry slip at junction J35 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:00 and 14:15 on 19 Oct 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

7.66 miles from Whinney Hill. CLEARED @ 13:56

CONGESTIONCLEARED @ 13:47Location : The A1M northbound entry slip at junction J36 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 19 Oct 2018.

7.4 miles from Whinney Hill. CLEARED @ 13:47

CONGESTIONCLEARED @ 12:26Location : The M18 northbound exit slip at junction J1 (Rotherham) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:15 and 12:30 on 19 Oct 2018.

3.21 miles from Whinney Hill. CLEARED @ 12:26

CONGESTIONCLEARED @ 12:17Location : The M1 northbound exit slip at junction J31 (Worksop) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:15 and 12:30 on 19 Oct 2018.

5.87 miles from Whinney Hill. CLEARED @ 12:17

CONGESTIONCLEARED @ 10:47Location : The M1 southbound exit slip at junction J36 (Barnsley) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 10:45 and 11:00 on 19 Oct 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

7.45 miles from Whinney Hill. CLEARED @ 10:47

Roadworks

ROAD WORKSCLEARED @ 10:47Location : northbound entry slip at junction J31 (Worksop) .

Lane Closures : Lane one is closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 15:30 on 19 Oct 2018.

Lanes Closed : There is one of two lanes closed.

5.63 miles from Whinney Hill.

ROAD WORKSLocation : The A1M southbound between junctions J35 and J34 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 19 Oct 2018 to 06:00 on 20 Oct 2018.

Lanes Closed : There will be one of two lanes closed.

8.63 miles from Whinney Hill.

ROAD WORKSLocation : The A1M northbound between junctions J34 and J35 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 23:59 on 19 Oct 2018 to 05:00 on 20 Oct 2018.

Lanes Closed : There will be one of two lanes closed.

8.15 miles from Whinney Hill.

ROAD WORKSLocation : The A1M northbound between junctions J34 and J35 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 23:59 on 19 Oct 2018 to 06:00 on 20 Oct 2018.

Lanes Closed : There will be one of two lanes closed.

9.41 miles from Whinney Hill.

ROAD WORKSLocation : northbound between the junctions with the A6178 and the A6109 .

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 4 Nov 2018.

Lanes Closed : All lanes are closed.

3.74 miles from Whinney Hill.

ROAD WORKSLocation : northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .

Lane Closures : Lane one will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 25 Oct 2018 to 06:00 on 26 Oct 2018.

Lanes Closed : There will be one of four lanes closed.

3.29 miles from Whinney Hill.

ROAD WORKSLocation : northbound at junction J33 (Sheffield) .

Lane Closures : Lane one will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 25 Oct 2018 to 06:00 on 26 Oct 2018.

Lanes Closed : There will be one of three lanes closed.

3.13 miles from Whinney Hill.

ROAD WORKSLocation : northbound entry slip at junction J33 (Sheffield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 25 Oct 2018 to 06:00 on 26 Oct 2018.

Lanes Closed : All lanes will be closed.

3.17 miles from Whinney Hill.


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

CLEARED @ 14:41Location : southbound between junctions J33 (Sheffield) and J32 (Doncaster) .

Lane Closures : Lane one is closed.

Reason : Broken down vehicle.

Status : Currently Active.

Time To Clear : The event is expected to clear between 15:30 and 15:45 on 19 October 2018.

Return To Normal : Normal traffic conditions are expected between 15:30 and 15:45 on 19 October 2018.

Lanes Closed : There is one of four lanes closed.

2.9 miles from Whinney Hill.

53.4--1.33

CLEARED @ 09:54Location : southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .

Lane Closures : Lane one is closed.

Reason : Road traffic collision.

Status : Currently Active.

Time To Clear : The event is expected to clear between 11:45 and 12:00 on 19 October 2018.

Return To Normal : Normal traffic conditions are expected between 11:45 and 12:00 on 19 October 2018.

Lanes Closed : There is one of four lanes closed.

4.91 miles from Whinney Hill.

53.45--1.44

Location : westbound between the junctions with the M1 and the A61 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:15 and 15:30 on 19 October 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

7.05 miles from Whinney Hill.

53.48--1.48

CLEARED @ 15:08Location : northbound between the junctions with the A6178 and the A6109 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:00 and 15:15 on 19 October 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

3.77 miles from Whinney Hill.

53.42--1.41

CLEARED @ 14:23Location : northbound between the junctions with the A6178 and the A6109 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:15 and 14:30 on 19 October 2018.

3.77 miles from Whinney Hill.

53.42--1.41

CLEARED @ 13:56Location : The A1M northbound entry slip at junction J35 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:00 and 14:15 on 19 October 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

7.66 miles from Whinney Hill.

53.48--1.15

CLEARED @ 13:47Location : The A1M northbound entry slip at junction J36 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 19 October 2018.

7.4 miles from Whinney Hill.

53.5--1.18

CLEARED @ 12:26Location : northbound exit slip at junction J1 (Rotherham) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:15 and 12:30 on 19 October 2018.

3.21 miles from Whinney Hill.

53.42--1.25

CLEARED @ 12:17Location : northbound exit slip at junction J31 (Worksop) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:15 and 12:30 on 19 October 2018.

5.87 miles from Whinney Hill.

53.36--1.28

CLEARED @ 10:47Location : southbound exit slip at junction J36 (Barnsley) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 10:45 and 11:00 on 19 October 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

7.45 miles from Whinney Hill.

53.5--1.48

CLEARED @ 10:47Location : northbound entry slip at junction J31 (Worksop) .

Lane Closures : Lane one is closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 15:30 on 19 October 2018.

Lanes Closed : There is one of two lanes closed.

5.63 miles from Whinney Hill.

53.36--1.28

Location : The A1M southbound between junctions J35 and J34 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 19 October 2018 to 06:00 on 20 October 2018.

Lanes Closed : There will be one of two lanes closed.

8.63 miles from Whinney Hill.

53.45--1.12

Location : The A1M northbound between junctions J34 and J35 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 23:59 on 19 October 2018 to 05:00 on 20 October 2018.

Lanes Closed : There will be one of two lanes closed.

8.15 miles from Whinney Hill.

53.46--1.13

Location : The A1M northbound between junctions J34 and J35 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 23:59 on 19 October 2018 to 06:00 on 20 October 2018.

Lanes Closed : There will be one of two lanes closed.

9.41 miles from Whinney Hill.

53.43--1.1

Location : northbound between the junctions with the A6178 and the A6109 .

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 4 November 2018.

Lanes Closed : All lanes are closed.

3.74 miles from Whinney Hill.

53.41--1.4

Location : northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .

Lane Closures : Lane one will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 25 October 2018 to 06:00 on 26 October 2018.

Lanes Closed : There will be one of four lanes closed.

3.29 miles from Whinney Hill.

53.4--1.36

Location : northbound at junction J33 (Sheffield) .

Lane Closures : Lane one will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 25 October 2018 to 06:00 on 26 October 2018.

Lanes Closed : There will be one of three lanes closed.

3.13 miles from Whinney Hill.

53.4--1.35

Location : northbound entry slip at junction J33 (Sheffield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 25 October 2018 to 06:00 on 26 October 2018.

Lanes Closed : All lanes will be closed.

3.17 miles from Whinney Hill.

53.4--1.35

Location : The A1M northbound between junctions J37 and J38 .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 22 October 2018 to 05:00 on 23 October 2018.

Lanes Closed : There will be one of two lanes closed.

9.4 miles from Whinney Hill.

53.56--1.22

Location : southbound at junction J34 (Meadowhall) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 24 October 2018 to 06:00 on 25 October 2018.

Lanes Closed : There will be two of three lanes closed.

3.88 miles from Whinney Hill.

53.43--1.41

Location : southbound between junctions J35 (Rotherham) and J34 (Meadowhall) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 24 October 2018 to 06:00 on 25 October 2018.

Lanes Closed : There will be two of four lanes closed.

4.33 miles from Whinney Hill.

53.44--1.43

Location : southbound between junctions J2 and J1 (Rotherham) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 24 October 2018 to 06:00 on 25 October 2018.

Lanes Closed : There will be one of three lanes closed.

6 miles from Whinney Hill.

53.46--1.18

Location : northbound between junctions J1 (Rotherham) and J2 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 24 October 2018 to 06:00 on 25 October 2018.

Lanes Closed : There will be one of three lanes closed.

5.14 miles from Whinney Hill.

53.46--1.2

Location : The A1M southbound exit slip at junction J35 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road marking works are planned.

Status : Pending.

Schedule : From 20:00 on 19 October 2018 to 06:00 on 20 October 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 October 2018 to 24 October 2018.

Lanes Closed : All lanes will be closed.

7.65 miles from Whinney Hill.

53.48--1.15

Location : The A1M southbound between junctions J37 and J36 .

Lane Closures : Lane two will be closed.

Reason : Road marking works are planned.

Status : Pending.

Schedule : From 20:00 on 19 October 2018 to 06:00 on 20 October 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 October 2018 to 24 October 2018.

Lanes Closed : There will be one of two lanes closed.

7.86 miles from Whinney Hill.

53.51--1.18

Location : The A1M southbound between junctions J37 and J35 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road marking works are planned.

Status : Pending.

Schedule : From 20:00 on 19 October 2018 to 06:00 on 20 October 2018.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 October 2018 to 24 October 2018.

Lanes Closed : All lanes will be closed.

7.46 miles from Whinney Hill.

53.5--1.18

Location : northbound entry slip at junction J35 (Rotherham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 23 October 2018 to 06:00 on 24 October 2018.

Lanes Closed : All lanes will be closed.

5.15 miles from Whinney Hill.

53.46--1.45

Location : northbound between junctions J30 (Chesterfield) and J32 (Doncaster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 October 2018 to 06:00 on 23 October 2018.

Lanes Closed : There will be two of four lanes closed.

6.57 miles from Whinney Hill.

53.35--1.29

Location : northbound at junction J34 (Meadowhall) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 October 2018 to 06:00 on 27 October 2018.

3.71 miles from Whinney Hill.

53.41--1.4

Location : northbound between junctions J34 (Meadowhall) and J36 (Barnsley) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 23 October 2018 to 06:00 on 24 October 2018.

Lanes Closed : There will be two of four lanes closed.

4.16 miles from Whinney Hill.

53.43--1.42

Location : northbound between junctions J32 (Doncaster) and J33 (Sheffield) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 06:00 on 20 October 2018 to 09:00 on 20 October 2018.

Lanes Closed : There will be one of four lanes closed.

3.16 miles from Whinney Hill.

53.4--1.3

Location : southbound between junctions J32 (Doncaster) and J31 (Worksop) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 October 2018 to 06:00 on 23 October 2018.

Lanes Closed : There will be two of four lanes closed.

4.49 miles from Whinney Hill.

53.38--1.28

Location : southbound at junction J32 (Doncaster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 October 2018 to 06:00 on 23 October 2018.

Lanes Closed : There will be two of three lanes closed.

3.96 miles from Whinney Hill.

53.39--1.28

Location : slip road to the M1 northbound .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 06:00 on 20 October 2018 to 09:00 on 20 October 2018.

Lanes Closed : There will be one of two lanes closed.

3.72 miles from Whinney Hill.

53.4--1.27

Location : northbound between junctions J32 (Doncaster) and J33 (Sheffield) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 06:00 on 20 October 2018 to 09:00 on 20 October 2018.

3.18 miles from Whinney Hill.

53.4--1.3

Location : northbound at junction J32 (Doncaster) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 06:00 on 20 October 2018 to 09:00 on 20 October 2018.

Lanes Closed : There will be one of three lanes closed.

3.18 miles from Whinney Hill.

53.4--1.3

CLEARED @ 11:32Location : southbound between junctions J4 (Doncaster) and J3 (Doncaster) .

Lane Closures : Lane one will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 22 October 2018 to 06:00 on 23 October 2018.

Lanes Closed : There will be one of two lanes closed.

9.71 miles from Whinney Hill.

53.49--1.1

CLEARED @ 11:32Location : southbound between junctions J4 (Doncaster) and J3 (Doncaster) .

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 06:00 on 23 October 2018 to 15:00 on 23 October 2018.

9.71 miles from Whinney Hill.

53.49--1.1

Location : southbound between junctions J31 (Worksop) and J30 (Chesterfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 22 October 2018 to 06:00 on 23 October 2018.

Lanes Closed : There will be two of four lanes closed.

7.49 miles from Whinney Hill.

53.33--1.29

Location : southbound between the junctions with the A6178 and the A6178 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 4 February 2019 to 06:00 on 27 April 2019.

Lanes Closed : All lanes will be closed.

3.77 miles from Whinney Hill.

53.42--1.41