Location: northbound between junctions J9 (Bicester) and J10 (Northampton) .
Lane Closures : Lane three is closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 12:45 and 13:00 on 13 December 2025.
Normal traffic conditions are expected between 13:45 and 14:00 on 13 December 2025.
Delay : There are currently delays of 30 minutes against expected traffic.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.57 miles from Waterperry.

Location: northbound between junctions J9 (Bicester) and J10 (Northampton) .
Due to: Congestion.
Normal traffic conditions are expected between 12:00 and 12:15 on 13 December 2025.
Cause : Road traffic collision.
Delay : There are currently delays of 20 minutes against expected traffic.
Nearest town: 11.81 miles from Waterperry.

Location: southbound exit slip to the A423 north of Kennington.
Due to: Congestion.
Normal traffic conditions are expected between 12:00 and 12:15 on 13 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.85 miles from Waterperry.

Location: northbound at the junction with the M40 .
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 13 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.29 miles from Waterperry.

Location: southbound between the junctions with the A44 and the A420 .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 13 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.81 miles from Waterperry.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 15 December 2025.
Nearest town: 18.54 miles from Waterperry.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 13 December 2025.
Nearest town: 18.54 miles from Waterperry.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 13 December 2025.
Nearest town: 10.84 miles from Waterperry.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 13 December 2025 to 06:00 on 14 December 2025.
Nearest town: 11.45 miles from Waterperry.

Location: southbound between junctions J8A (Thame) and J6 (Thame) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 13 December 2025 to 06:00 on 14 December 2025.
Nearest town: 2.56 miles from Waterperry.

Location: southbound entry slip at junction J7 (Thame) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 13 December 2025 to 06:00 on 14 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.64 miles from Waterperry.

Location: southbound between junctions J10 (Northampton) and J9 (Bicester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 December 2025 to 06:00 on 14 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.23 miles from Waterperry.

Location: northbound at junction J4 (High Wycombe) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 December 2025 to 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.23 miles from Waterperry.

Location: northbound between junctions J7 (Thame) and J8A (Thame) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 19 December 2025.
Nearest town: 2.19 miles from Waterperry.

Location: southbound at junction J9 (Bicester) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 13 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.55 miles from Waterperry.

Location: southbound between junctions J10 (Northampton) and J9 (Bicester) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 13 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 10.88 miles from Waterperry.

Location: northbound between junctions J9 (Bicester) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 January 2026 to 8 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.3 miles from Waterperry.

Location: southbound between junctions J10 (Northampton) and J9 (Bicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.67 miles from Waterperry.

Location: northbound.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.36 miles from Waterperry.

Location: northbound between the junctions with the A4155 and the M40 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.85 miles from Waterperry.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.12 miles from Waterperry.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.26 miles from Waterperry.

Location: northbound at the junction with the A308 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.47 miles from Waterperry.

Location: northbound between the junctions with the A4130 and the A308 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.58 miles from Waterperry.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.89 miles from Waterperry.

Location: northbound at junction J4 (High Wycombe) .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.22 miles from Waterperry.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.45 miles from Waterperry.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.37 miles from Waterperry.

Location: northbound between junctions J8A (Thame) and J9 (Bicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:15 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 1.58 miles from Waterperry.

Location: southbound between junctions J9 (Bicester) and J8A (Thame) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.38 miles from Waterperry.

Location: northbound between junctions J8A (Thame) and J9 (Bicester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 1.4 miles from Waterperry.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.54 miles from Waterperry.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.06 miles from Waterperry.

Location: southbound between junctions J8A (Thame) and J6 (Thame) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.91 miles from Waterperry.

Location: northbound between junctions J6 (Thame) and J8A (Thame) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 06:00 on 18 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.15 miles from Waterperry.

Location: southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.93 miles from Waterperry.

Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 16 December 2025 to 23:59 on 16 December 2025.
Nearest town: 16.03 miles from Waterperry.

Location: southbound exit slip at junction J10 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.94 miles from Waterperry.

Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.59 miles from Waterperry.

Location: southbound between junctions J10 (Northampton) and J9 (Bicester) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.28 miles from Waterperry.

Location: northbound between junctions J8A (Thame) and J10 (Northampton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.22 miles from Waterperry.

Location: southbound entry slip from the M40 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:15 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.27 miles from Waterperry.

Location: northbound exit slip at junction J4 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:15 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.38 miles from Waterperry.

Location: northbound between the M4 and the junction with the A4185 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.54 miles from Waterperry.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.25 miles from Waterperry.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 December 2025 to 06:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.29 miles from Waterperry.

Location: northbound between junctions J9 (Bicester) and J10 (Northampton) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 14 December 2025 to 23:59 on 15 December 2025.
Nearest town: 11.57 miles from Waterperry.

Location: southbound between junctions J9 (Bicester) and J8A (Thame) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.84 miles from Waterperry.

Location: southbound between junctions J10 (Northampton) and J9 (Bicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.43 miles from Waterperry.

Location: southbound between the A4183 south of Kennington and the junction with the A4130 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 19 December 2025.
Nearest town: 9.88 miles from Waterperry.

Location: southbound between the A4183 south of Kennington and the junction with the A4130 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.88 miles from Waterperry.

Location: northbound exit slip to the A415 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 15 December 2025 to 06:00 on 19 December 2025.
Nearest town: 10.63 miles from Waterperry.

Location: northbound exit slip to the A415 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.63 miles from Waterperry.

Location: southbound entry slip from the A415 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.47 miles from Waterperry.

Location: northbound between the A4130 and the junction with the A415 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.03 miles from Waterperry.

Location: northbound between the junctions with the A44 and the M40 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.05 miles from Waterperry.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 14 December 2025 to 23:59 on 18 December 2025.
Nearest town: 17.92 miles from Waterperry.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 December 2025 to 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.89 miles from Waterperry.

Location: southbound between junctions J10 (Northampton) and J9 (Bicester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 January 2026 to 8 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.86 miles from Waterperry.

Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 January 2026 to 8 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.22 miles from Waterperry.