Location: southbound between the junctions with the A5 and the A413 Silverstone.
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 25 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.83 miles from Upper Weedon.

Location: westbound between the junctions with the A508 Northampton and the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 25 July 2025.
Nearest town: 8.68 miles from Upper Weedon.

Location: westbound between the junctions with the M1 and the A45 .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 25 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.04 miles from Upper Weedon.

Location: westbound between the junctions with the A423 and the A46 Coventry East.
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 25 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.77 miles from Upper Weedon.

Location: westbound between the junctions with the A423 and the A46 Coventry East.
Due to: Congestion.
Normal traffic conditions are expected between 07:00 and 07:15 on 25 July 2025.
Nearest town: 19.16 miles from Upper Weedon.

Location: northbound between junctions J1 (Rugby) and J2 (Coventry) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 25 July 2025.
Delay : There are currently delays of 50 minutes against expected traffic.
Nearest town: 15.51 miles from Upper Weedon.

Location: southbound between the junctions with the A426 and the A428 DIRFT West.
Due to: Congestion.
Normal traffic conditions are expected between 05:15 and 05:30 on 25 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.13 miles from Upper Weedon.

Location: northbound between the junctions with the A422 and the A508 .
Lane Closures : Lane two is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 05:00 on 25 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.06 miles from Upper Weedon.

Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Nearest town: 7.37 miles from Upper Weedon.

Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Nearest town: 7.38 miles from Upper Weedon.

Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Emergency Roadside Equipment Maintenance.
Period : expect disruption until 05:00 on 25 July 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.54 miles from Upper Weedon.

Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 29 July 2025.
Nearest town: 16.36 miles from Upper Weedon.

Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 29 July 2025.
Nearest town: 16.02 miles from Upper Weedon.

Location: southbound between the junctions with the A5 and the A413 Silverstone.
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 18 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.25 miles from Upper Weedon.

Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : The hard shoulder is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 17:00 on 25 July 2025.
Nearest town: 13.65 miles from Upper Weedon.

Location: southbound exit slip at Newport Pagnell Services.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 25 July 2025 to 05:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.24 miles from Upper Weedon.

Location: southbound entry slip at Newport Pagnell Services.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 25 July 2025 to 05:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.39 miles from Upper Weedon.

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 25 July 2025 to 05:00 on 26 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.81 miles from Upper Weedon.

Location: northbound entry slip from the A422 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 July 2025 to 05:00 on 26 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.94 miles from Upper Weedon.

Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 05:00 on 26 July 2025.
Nearest town: 13.82 miles from Upper Weedon.

Location: northbound between the junctions with the A45 and the A361 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Nearest town: 6.8 miles from Upper Weedon.

Location: southbound between the junctions with the A361 and the A45 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Nearest town: 7.02 miles from Upper Weedon.

Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 05:00 on 26 July 2025.
Nearest town: 13.75 miles from Upper Weedon.

Location: northbound between the junctions with the A428 and the A426 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Nearest town: 14.21 miles from Upper Weedon.

Location: southbound between the junctions with the A426 and the A428 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 July 2025.
Nearest town: 14.22 miles from Upper Weedon.

Location: northbound between junctions J1 (Rugby) and J2 (Coventry) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 26 July 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 19.95 miles from Upper Weedon.

Location: westbound between the junctions with the M1 and the A45 .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 09:00 on 30 November 2025.
Nearest town: 10.01 miles from Upper Weedon.

Location: westbound between the junctions with the M1 and the A45 .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 09:00 on 30 November 2025.
Nearest town: 11.01 miles from Upper Weedon.

Location: southbound exit slip at junction J14 (Milton Keynes) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 31 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.81 miles from Upper Weedon.

Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.2 miles from Upper Weedon.

Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.77 miles from Upper Weedon.

Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.59 miles from Upper Weedon.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.9 miles from Upper Weedon.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.87 miles from Upper Weedon.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.41 miles from Upper Weedon.

Location: westbound entry slip from the A509 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.94 miles from Upper Weedon.

Location: The junction of the A45 and the A509 North.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.81 miles from Upper Weedon.

Location: The junction of the A45 and the A509 North.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.88 miles from Upper Weedon.

Location: westbound exit slip to the A509 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 August 2025 to 06:00 on 14 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.08 miles from Upper Weedon.

Location: eastbound exit slip to the A509 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.75 miles from Upper Weedon.

Location: eastbound exit slip to the A5001 West.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.91 miles from Upper Weedon.

Location: eastbound entry slip from the A509 South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.96 miles from Upper Weedon.

Location: eastbound between the A509 North and the junction with the A5001 East.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.89 miles from Upper Weedon.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.91 miles from Upper Weedon.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.74 miles from Upper Weedon.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.94 miles from Upper Weedon.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.78 miles from Upper Weedon.

Location: westbound at the junction with the A509 North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 August 2025 to 06:00 on 15 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.92 miles from Upper Weedon.

Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 30 July 2025 to 17:00 on 1 August 2025.
Nearest town: 6.77 miles from Upper Weedon.

Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 30 July 2025 to 17:00 on 1 August 2025.
Nearest town: 6.78 miles from Upper Weedon.

Location: southbound between the A421 and the junction with the M40 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.2 miles from Upper Weedon.

Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 30 July 2025 to 1 August 2025.
Nearest town: 7.89 miles from Upper Weedon.

Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:00 on 31 July 2025 to 23:59 on 1 August 2025.
Nearest town: 17.89 miles from Upper Weedon.

Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:00 on 31 July 2025 to 23:59 on 1 August 2025.
Nearest town: 17.68 miles from Upper Weedon.

Location: eastbound between junctions J4 and J7 Kettering North.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 9 August 2025.
Nearest town: 18.55 miles from Upper Weedon.

Location: eastbound between junctions J3 Rothwell and J7 Kettering North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.42 miles from Upper Weedon.

Location: westbound between junctions J8 Kettering Central and J7 Kettering North.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.12 miles from Upper Weedon.

Location: eastbound between junctions J2 Kelmarsh and J3 Rothwell.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 8 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.66 miles from Upper Weedon.

Location: eastbound entry slip at junction J3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.17 miles from Upper Weedon.

Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 30 July 2025 to 1 August 2025.
Nearest town: 7.87 miles from Upper Weedon.

Location: eastbound exit slip at Rothwell Lodge Services (J5).
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.7 miles from Upper Weedon.

Location: eastbound entry slip at Rothwell Lodge Services (J5).
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.73 miles from Upper Weedon.

Location: westbound between junctions J8 Kettering Central and J3 Rothwell.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2025 to 06:00 on 7 August 2025.
Nearest town: 19.12 miles from Upper Weedon.

Location: westbound between junctions J7 Kettering North and J3 Rothwell.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.4 miles from Upper Weedon.

Location: westbound between junctions J6 and J3 Rothwell.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.7 miles from Upper Weedon.

Location: eastbound exit slip at junction J3 Rothwell.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 August 2025 to 06:00 on 8 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Upper Weedon.

Location: eastbound entry slip at junction J4 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.55 miles from Upper Weedon.

Location: eastbound exit slip at junction J7 Kettering North.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.5 miles from Upper Weedon.

Location: westbound at junction J7 Kettering North.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 7 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.37 miles from Upper Weedon.

Location: westbound exit slip to the A508 Northampton.
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 20:00 on 1 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.66 miles from Upper Weedon.

Location: eastbound exit slip to the A508 Northampton.
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 20:00 on 30 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.42 miles from Upper Weedon.

Location: eastbound exit slip to the A508 Northampton.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.42 miles from Upper Weedon.

Location: westbound entry slip from the A508 Northampton.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.47 miles from Upper Weedon.

Location: eastbound entry slip from the A508 Northampton.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2025 to 1 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.45 miles from Upper Weedon.

Location: westbound exit slip to the A508 Northampton.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.66 miles from Upper Weedon.

Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:00 on 30 July 2025 to 23:59 on 31 July 2025.
Nearest town: 17.27 miles from Upper Weedon.

Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:00 on 30 July 2025 to 23:59 on 31 July 2025.
Nearest town: 17 miles from Upper Weedon.

Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:00 on 29 July 2025 to 23:59 on 30 July 2025.
Nearest town: 16.62 miles from Upper Weedon.

Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:00 on 29 July 2025 to 23:59 on 30 July 2025.
Nearest town: 16.86 miles from Upper Weedon.

Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 July 2025 to 05:00 on 30 July 2025.
Nearest town: 7.06 miles from Upper Weedon.

Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 July 2025 to 05:00 on 30 July 2025.
Nearest town: 7.1 miles from Upper Weedon.

Location: northbound between junctions J1 (Rugby) and J2 (Coventry) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 July 2025 to 31 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.36 miles from Upper Weedon.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.33 miles from Upper Weedon.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 August 2025 to 06:00 on 13 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.63 miles from Upper Weedon.

Location: westbound entry slip from the A5076 Northampton East.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 August 2025 to 06:00 on 14 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.32 miles from Upper Weedon.

Location: westbound between the A428 and the junction with the A508 Northampton.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 14 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.89 miles from Upper Weedon.

Location: westbound between the A5076 Northampton East and the junction with the A43 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 14 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.76 miles from Upper Weedon.

Location: eastbound between the M1 and the junction with the A508 North.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 8 August 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.5 miles from Upper Weedon.

Location: eastbound between the A43 and the junction with the A5076 Northampton East.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 8 August 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.86 miles from Upper Weedon.

Location: eastbound between the junctions with the A428 and the A43 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 8 August 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.79 miles from Upper Weedon.

Location: eastbound at the junction with the A428 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 8 August 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.6 miles from Upper Weedon.

Location: eastbound between the junctions with the A508 Northampton and the A428 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 August 2025 to 8 August 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.06 miles from Upper Weedon.

Location: eastbound exit slip to the A43 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.86 miles from Upper Weedon.

Location: eastbound entry slip from the A43 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.06 miles from Upper Weedon.

Location: eastbound exit slip to the A5076 Northampton East.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.09 miles from Upper Weedon.

Location: westbound exit slip to the A43 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 August 2025 to 06:00 on 14 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.36 miles from Upper Weedon.

Location: westbound entry slip from the A43 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 August 2025 to 06:00 on 14 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.06 miles from Upper Weedon.

Location: westbound exit slip to the A5076 Northampton East.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 August 2025 to 06:00 on 13 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.59 miles from Upper Weedon.

Location: westbound between the A428 and the junction with the A508 Northampton.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 6 August 2025 to 06:00 on 7 August 2025.
Schedule : From 05:58 on 16 August 2025 to 05:59 on 16 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.29 miles from Upper Weedon.

Location: westbound between the junctions with the A43 and the A428 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 6 August 2025 to 06:00 on 7 August 2025.
Schedule : From 05:58 on 16 August 2025 to 05:59 on 16 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.75 miles from Upper Weedon.

Location: eastbound between the junctions with the A428 and the A43 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 6 August 2025 to 06:00 on 7 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.88 miles from Upper Weedon.

Location: eastbound between the junctions with the A508 Northampton and the A428 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 6 August 2025 to 06:00 on 7 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.39 miles from Upper Weedon.

Location: eastbound entry slip from the A508 Northampton.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.45 miles from Upper Weedon.

Location: eastbound between the junctions with the A428 and the A43 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.88 miles from Upper Weedon.

Location: eastbound between the junctions with the A508 Northampton and the A428 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.38 miles from Upper Weedon.

Location: eastbound between the junctions with the A508 Northampton and the A428 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.73 miles from Upper Weedon.

Location: eastbound exit slip to the A428 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.46 miles from Upper Weedon.

Location: eastbound entry slip from the A428 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.56 miles from Upper Weedon.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.22 miles from Upper Weedon.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.06 miles from Upper Weedon.

Location: westbound exit slip to the A428 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.89 miles from Upper Weedon.

Location: westbound between the A428 and the junction with the A508 Northampton.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 August 2025 to 06:00 on 14 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.29 miles from Upper Weedon.

Location: westbound between the junctions with the A43 and the A428 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 13 August 2025 to 06:00 on 14 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.63 miles from Upper Weedon.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.23 miles from Upper Weedon.

Location: eastbound between the junctions with the A508 Northampton and the A428 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 06:00 on 29 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.71 miles from Upper Weedon.

Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.4 miles from Upper Weedon.

Location: eastbound entry slip from the A5076 Northampton East.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.33 miles from Upper Weedon.

Location: westbound entry slip from the A428 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.55 miles from Upper Weedon.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.51 miles from Upper Weedon.

Location: westbound entry slip from the A428 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.49 miles from Upper Weedon.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 05:59 on 16 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.37 miles from Upper Weedon.

Location: westbound between the junctions with the M1 and the A45 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.75 miles from Upper Weedon.

Location: westbound between the A45 and the junction with the A45 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.03 miles from Upper Weedon.

Location: eastbound between the A4071 and the junction with the M45 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.5 miles from Upper Weedon.

Location: eastbound between the A445 and the junction with the A4071 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.72 miles from Upper Weedon.

Location: eastbound exit slip to the A45 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.43 miles from Upper Weedon.

Location: westbound between the junctions with the M1 and the A45 .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 20:00 on 28 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.89 miles from Upper Weedon.

Location: eastbound between the A45 and the junction with the M1 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.72 miles from Upper Weedon.

Location: northbound entry slip at junction J16 (Northampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 July 2025 to 06:00 on 30 August 2025.
Nearest town: 3.38 miles from Upper Weedon.

Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 4 miles from Upper Weedon.

Location: northbound entry slip at junction J16 (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 8 August 2025.
Schedule : From 21:00 on 26 August 2025 to 06:00 on 27 August 2025.
Schedule : From 21:00 on 28 August 2025 to 06:00 on 29 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.38 miles from Upper Weedon.

Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 21 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 2.77 miles from Upper Weedon.

Location: southbound entry slip at junction J16 (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 21 August 2025.
Schedule : From 21:00 on 29 August 2025 to 06:00 on 30 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.48 miles from Upper Weedon.

Location: northbound exit slip at junction J16 (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 1 August 2025.
Schedule : From 21:00 on 21 August 2025 to 06:00 on 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.69 miles from Upper Weedon.

Location: northbound exit slip at junction J16 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 21 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.69 miles from Upper Weedon.

Location: southbound exit slip at junction J16 (Northampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 30 August 2025.
Nearest town: 3.19 miles from Upper Weedon.

Location: southbound exit slip at junction J16 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 8 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 21 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.19 miles from Upper Weedon.

Location: southbound exit slip at junction J16 (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 August 2025 to 06:00 on 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 14 August 2025.
Schedule : From 21:00 on 27 August 2025 to 06:00 on 28 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.19 miles from Upper Weedon.

Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 30 July 2025.
Schedule : From 20:00 on 11 August 2025 to 06:00 on 12 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.25 miles from Upper Weedon.

Location: northbound between the M1 and junction J1 (Rugby) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 05:00 on 29 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.29 miles from Upper Weedon.

Location: southbound between junction J1 (Rugby) and the M1 .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 00:00 on 28 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.48 miles from Upper Weedon.

Location: southbound between the junctions with the A426 and the A428 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2025 to 05:00 on 29 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.05 miles from Upper Weedon.

Location: eastbound exit slip to the A45 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 28 July 2025 to 17:00 on 8 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.43 miles from Upper Weedon.

Location: southbound between the A413 and the junction with the A422 Brackley South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.81 miles from Upper Weedon.

Location: northbound between the A421 and the junction with the A422 Brackley East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.01 miles from Upper Weedon.

Location: northbound entry slip at junction J15A (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 July 2025 to 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.26 miles from Upper Weedon.

Location: northbound between the junctions with the A5 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 July 2025 to 27 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.65 miles from Upper Weedon.

Location: westbound between junctions J2 Kelmarsh and M1 Catthorpe Interchange.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.16 miles from Upper Weedon.

Location: northbound between junctions J13 (Leamington) and J15 (Warwick) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 July 2025 to 06:00 on 26 July 2025.
Schedule : From 21:00 on 30 July 2025 to 06:00 on 31 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.92 miles from Upper Weedon.

Location: southbound entry slip at junction J1 (Rugby) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.72 miles from Upper Weedon.

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.86 miles from Upper Weedon.

Location: southbound entry slip at junction J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.95 miles from Upper Weedon.

Location: southbound between junctions J14 (Milton Keynes) and J11A .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 August 2025 to 05:00 on 16 August 2025.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.64 miles from Upper Weedon.

Location: southbound exit slip at junction J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 August 2025 to 05:00 on 1 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.81 miles from Upper Weedon.