Location: eastbound between junctions J3 (Newent) and J2 (Hereford) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2026 to 06:00 on 26 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.7 miles from Trow Green.

Location: westbound at junction J22 (Avonmouth) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 12.63 miles from Trow Green.

Location: eastbound between the junctions with the A48 and the A417 west of Gloucester.
Due to: Roadworks scheme.
Period : from 20:10 on 24 April 2026 to 06:00 on 28 April 2026.
Nearest town: 17.41 miles from Trow Green.

Location: eastbound at junction J20 (Bristol) .
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 13.87 miles from Trow Green.

Location: westbound at junction J20 (Bristol) .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.45 miles from Trow Green.

Location: westbound between junctions J19 (Bristol) and J20 (Bristol) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 16.04 miles from Trow Green.

Location: eastbound between junctions J22 (Avonmouth) and J20 (Bristol) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 25 April 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.18 miles from Trow Green.

Location: northbound between junctions J13 (Stroud) and J11A (Gloucester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.01 miles from Trow Green.

Location: northbound entry slip at junction J12 (Gloucester) .
Due to: Roadworks scheme.
Period : from 21:15 on 20 April 2026 to 06:00 on 28 April 2026.
Nearest town: 14.71 miles from Trow Green.

Location: westbound between the A49 and the junction with the A466 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 May 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.88 miles from Trow Green.

Location: eastbound.
Due to: Roadworks scheme.
Period : from 20:08 on 20 April 2026 to 06:00 on 1 May 2026.
Nearest town: 6.32 miles from Trow Green.

Location: southbound between junctions J13 (Stroud) and J14 (Dursley) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 1 June 2026.
Nearest town: 12.23 miles from Trow Green.

Location: southbound between junctions J13 (Stroud) and J14 (Dursley) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 5 December 2026.
Nearest town: 12.3 miles from Trow Green.

Location: westbound between the A49 and the junction with the A466 .
Due to: Roadworks scheme.
Period : from 16:03 on 17 November 2025 to 06:00 on 18 May 2026.
Nearest town: 7.88 miles from Trow Green.

Location: southbound between the M4 and the junction with the M5 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2026 to 06:00 on 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 May 2026 to 9 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.74 miles from Trow Green.

Location: northbound at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2026 to 06:00 on 2 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.86 miles from Trow Green.

Location: southbound at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2026 to 06:00 on 2 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.68 miles from Trow Green.

Location: southbound between junctions J2 (Stapleton) and J3 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2026 to 06:00 on 2 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.46 miles from Trow Green.

Location: southbound at junction J2 (Stapleton) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2026 to 06:00 on 2 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.26 miles from Trow Green.

Location: eastbound at junction J22 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.65 miles from Trow Green.

Location: westbound between junctions J21 (Chepstow) and J22 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.45 miles from Trow Green.

Location: northbound entry slip at junction J12 (Gloucester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2026 to 06:00 on 1 May 2026.
Nearest town: 14.71 miles from Trow Green.

Location: northbound entry slip at junction J12 (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.71 miles from Trow Green.

Location: northbound entry slip at junction J12 (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.71 miles from Trow Green.

Location: northbound between junctions J13 (Stroud) and J12 (Gloucester) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.88 miles from Trow Green.

Location: northbound between junctions J13 (Stroud) and J11A (Gloucester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2026 to 06:00 on 1 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.01 miles from Trow Green.

Location: southbound between junctions J13 (Stroud) and J14 (Dursley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 29 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.61 miles from Trow Green.

Location: northbound between junctions J14 (Dursley) and J13 (Stroud) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2026 to 29 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.65 miles from Trow Green.

Location: southbound exit slip at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2026 to 02:00 on 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.7 miles from Trow Green.

Location: southbound between junctions J13 (Stroud) and J14 (Dursley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2026 to 2 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.61 miles from Trow Green.

Location: northbound between junctions J3 and J2 (Stapleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 19 May 2026 to 06:00 on 20 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.84 miles from Trow Green.

Location: northbound exit slip at junction J2 (Stapleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 19 May 2026 to 06:00 on 20 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.46 miles from Trow Green.

Location: northbound entry slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 19 May 2026 to 06:00 on 20 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.78 miles from Trow Green.

Location: eastbound exit slip at junction J20 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.95 miles from Trow Green.

Location: northbound entry slip at junction J15 (Almondsbury) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2026 to 06:00 on 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.99 miles from Trow Green.

Location: The junction of the M5 J12 (Gloucester) and the A38 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2026 to 06:00 on 8 May 2026.
Nearest town: 14.59 miles from Trow Green.

Location: northbound exit slip at junction J12 (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 May 2026 to 8 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.69 miles from Trow Green.

Location: The junction of the M5 J12 (Gloucester) and the A38 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 2 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 May 2026 to 8 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.59 miles from Trow Green.

Location: northbound between junctions J13 (Stroud) and J11A (Gloucester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 April 2026 to 30 April 2026.
Schedule : From 20:00 on 1 May 2026 to 06:00 on 2 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.01 miles from Trow Green.

Location: eastbound between junctions J20 (Bristol) and J19 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 April 2026 to 2 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.68 miles from Trow Green.

Location: westbound at junction J1 (Avonmouth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 April 2026 to 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.47 miles from Trow Green.

Location: westbound between the M4 and junction J1 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 April 2026 to 1 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.04 miles from Trow Green.

Location: westbound between junctions J20 (Bristol) and J21 (Chepstow) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 April 2026 to 1 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.13 miles from Trow Green.

Location: westbound between junctions J21 (Chepstow) and J22 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 21:00 from 28 April 2026 to 30 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.73 miles from Trow Green.

Location: westbound entry slip at junction J22 (Avonmouth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2026 to 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.67 miles from Trow Green.

Location: northbound between the junctions with the M5 and the M4 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 April 2026 to 1 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.98 miles from Trow Green.

Location: eastbound between junctions J3 (Newent) and J2 (Hereford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 5 May 2026 to 8 May 2026.
Schedule : From 09:00 on 11 May 2026 to 18:00 on 11 May 2026.
Nearest town: 17.13 miles from Trow Green.

Location: westbound between junctions J2 (Hereford) and J3 (Newent) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 5 May 2026 to 8 May 2026.
Schedule : From 09:00 on 11 May 2026 to 18:00 on 11 May 2026.
Nearest town: 17.44 miles from Trow Green.

Location: southbound between junctions J19 (Portishead) and J20 (Nailsea) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 8 May 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.42 miles from Trow Green.

Location: southbound at junction J19 (Portishead) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 8 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.18 miles from Trow Green.

Location: southbound between junctions J18 (Bristol) and J19 (Portishead) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2026 to 8 May 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.97 miles from Trow Green.

Location: westbound at junction J1 (Avonmouth) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 15:00 from 28 April 2026 to 29 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.35 miles from Trow Green.

Location: eastbound at junction J22 (Avonmouth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 April 2026 to 4 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.65 miles from Trow Green.

Location: northbound between the junctions with the A4137 and the A466 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2026 to 06:00 on 28 April 2026.
Nearest town: 15.82 miles from Trow Green.

Location: northbound between junctions J19 (Portishead) and J18 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.79 miles from Trow Green.

Location: southbound between the junctions with the A466 and the A4137 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2026 to 06:00 on 28 April 2026.
Nearest town: 15.92 miles from Trow Green.

Location: southbound between the junctions with the A4137 and the A40 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:30 and 18:00 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 08:30 and 18:00 from 5 May 2026 to 8 May 2026.
Schedule : Expect disruption everyday between 08:30 and 18:00 from 11 May 2026 to 15 May 2026.
Schedule : Expect disruption everyday between 08:30 and 18:00 from 18 May 2026 to 22 May 2026.
Nearest town: 11.45 miles from Trow Green.

Location: southbound between the junctions with the A4137 and the A40 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 5 May 2026 to 8 May 2026.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 11 May 2026 to 15 May 2026.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 18 May 2026 to 22 May 2026.
Nearest town: 11.45 miles from Trow Green.

Location: northbound between the junctions with the A40 and the A4137 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:30 and 18:00 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 08:30 and 18:00 from 5 May 2026 to 8 May 2026.
Schedule : Expect disruption everyday between 08:30 and 18:00 from 11 May 2026 to 15 May 2026.
Schedule : Expect disruption everyday between 08:30 and 18:00 from 18 May 2026 to 22 May 2026.
Nearest town: 11.46 miles from Trow Green.

Location: northbound between the junctions with the A40 and the A4137 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 27 April 2026 to 1 May 2026.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 5 May 2026 to 8 May 2026.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 11 May 2026 to 15 May 2026.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 18 May 2026 to 22 May 2026.
Nearest town: 11.46 miles from Trow Green.

Location: southbound between junctions J19 (Portishead) and J20 (Nailsea) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2026 to 06:00 on 27 April 2026.
Nearest town: 19.26 miles from Trow Green.

Location: southbound entry slip at junction J19 (Portishead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2026 to 06:00 on 27 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.33 miles from Trow Green.

Location: southbound between junctions J19 (Portishead) and J20 (Nailsea) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2026 to 06:00 on 27 April 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.42 miles from Trow Green.

Location: southbound at junction J19 (Portishead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2026 to 06:00 on 27 April 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.26 miles from Trow Green.

Location: westbound between the junctions with the A38 and the A417 west of Gloucester.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Nearest town: 17.74 miles from Trow Green.

Location: eastbound between the junctions with the A48 and the A417 west of Gloucester.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.41 miles from Trow Green.

Location: eastbound between the junctions with the A417 west of Gloucester and the A38 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2026 to 06:00 on 28 April 2026.
Nearest town: 17.62 miles from Trow Green.

Location: northbound entry slip at junction J12 (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2026 to 06:00 on 25 April 2026.
Schedule : From 21:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.71 miles from Trow Green.

Location: northbound entry slip at junction J12 (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2026 to 06:00 on 28 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.71 miles from Trow Green.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2026 to 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.32 miles from Trow Green.

Location: eastbound between the A466 and the junction with the A49 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2026 to 1 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.64 miles from Trow Green.

Location: northbound between junctions J19 (Portishead) and J18 (Bristol) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 April 2026 to 27 April 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.08 miles from Trow Green.

Location: northbound at junction J19 (Portishead) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 April 2026 to 27 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Trow Green.