Location: eastbound exit slip at junction J12 (Cheriton) .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 09:30 and 09:45 on 26 June 2025.
Normal traffic conditions are expected between 09:30 and 09:45 on 26 June 2025.
Lanes Closed : There are lane closures.
Nearest town: 15.71 miles from Townland Green.

Location: westbound between the junctions with the A28 and the M2 .
Due to: Congestion.
Normal traffic conditions are expected between 13:30 and 13:45 on 26 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.25 miles from Townland Green.

Location: eastbound exit slip to the A260 .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 26 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.69 miles from Townland Green.

Location: northbound between the junctions with the A262 and the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Nearest town: 16.14 miles from Townland Green.

Location: southbound between the junctions with the A228 and the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Nearest town: 18.5 miles from Townland Green.

Location: westbound between junctions J4 (Gillingham) and J3 (Maidstone) .
Lane Closures : The hard shoulder is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 15:00 on 26 June 2025.
Nearest town: 19.84 miles from Townland Green.

Location: westbound between the A2050 Canterbury South and the junction with the A28 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.67 miles from Townland Green.

Location: eastbound between the junctions with the A28 and the A2050 Canterbury South.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.56 miles from Townland Green.

Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Emergency roadworks.
Period : expect disruption until 12:20 on 30 June 2025.
Nearest town: 8.27 miles from Townland Green.

Location: westbound between the junctions with the A2070 and the A268 .
Due to: Emergency roadworks.
Period : expect disruption until 12:20 on 30 June 2025.
Nearest town: 8.25 miles from Townland Green.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.38 miles from Townland Green.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.43 miles from Townland Green.

Location: eastbound between the junctions with the M20 and the A260 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 04:00 on 27 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.05 miles from Townland Green.

Location: eastbound at junction J13 (Folkestone) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 04:00 on 27 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.83 miles from Townland Green.

Location: eastbound at junction J7 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.83 miles from Townland Green.

Location: eastbound between junctions J6 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.62 miles from Townland Green.

Location: eastbound between junctions J5 (Aylesford) and J6 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.42 miles from Townland Green.

Location: westbound between junctions J7 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.93 miles from Townland Green.

Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 June 2025 to 06:00 on 27 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.16 miles from Townland Green.

Location: eastbound between junctions J6 (Maidstone) and J8 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:08 on 24 June 2025 to 06:00 on 2 July 2025.
Nearest town: 18.36 miles from Townland Green.

Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:06 on 24 June 2025 to 06:00 on 2 July 2025.
Nearest town: 15.41 miles from Townland Green.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Due to: Roadworks scheme.
Period : from 20:07 on 16 June 2025 to 06:00 on 21 July 2025.
Nearest town: 15.5 miles from Townland Green.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 July 2025 to 06:00 on 21 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.5 miles from Townland Green.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.5 miles from Townland Green.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:07 on 16 June 2025 to 06:00 on 5 August 2025.
Nearest town: 16.56 miles from Townland Green.

Location: westbound between junctions J11 (Canterbury) and J9 (Ashford) .
Due to: Roadworks scheme.
Period : from 20:05 on 16 June 2025 to 06:00 on 3 July 2025.
Nearest town: 8.07 miles from Townland Green.

Location: eastbound between junctions J8 (Maidstone) and J10A .
Due to: Roadworks scheme.
Period : from 20:08 on 9 June 2025 to 06:00 on 3 July 2025.
Nearest town: 7.69 miles from Townland Green.

Location: northbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 August 2025.
Nearest town: 15.66 miles from Townland Green.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 August 2025.
Nearest town: 15.5 miles from Townland Green.

Location: northbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 August 2025.
Nearest town: 15.66 miles from Townland Green.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 August 2025.
Nearest town: 15.6 miles from Townland Green.

Location: southbound.
Due to: Roadworks scheme.
Period : from 20:02 on 20 June 2025 to 06:00 on 12 July 2025.
Nearest town: 7.48 miles from Townland Green.

Location: northbound.
Due to: Roadworks scheme.
Period : from 20:02 on 23 June 2025 to 06:00 on 15 July 2025.
Nearest town: 7.38 miles from Townland Green.

Location: southbound entry slip from the A2 .
Due to: Roadworks.
Period : expect disruption until 18:00 on 30 August 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.11 miles from Townland Green.

Location: northbound between the A268 and the junction with the A262 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 05:00 on 1 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.2 miles from Townland Green.

Location: southbound between the junctions with the A262 and the A268 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 05:00 on 1 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.19 miles from Townland Green.

Location: eastbound at junction J10A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 3 July 2025 to 15:30 on 3 July 2025.
Nearest town: 7.77 miles from Townland Green.

Location: eastbound between junctions J5 (Aylesford) and J6 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 05:00 on 3 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.7 miles from Townland Green.

Location: eastbound exit slip at junction J6 (Maidstone) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 05:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.23 miles from Townland Green.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.64 miles from Townland Green.

Location: westbound entry slip from the A260 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.84 miles from Townland Green.

Location: westbound between the A260 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.91 miles from Townland Green.

Location: eastbound at junction J4 (Gillingham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 8 July 2025.
Nearest town: 19.88 miles from Townland Green.

Location: eastbound at junction J4 (Gillingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 July 2025 to 06:00 on 5 July 2025.
Schedule : From 20:00 on 7 July 2025 to 06:00 on 8 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.88 miles from Townland Green.

Location: eastbound at junction J4 (Gillingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 July 2025 to 4 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.88 miles from Townland Green.

Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 4 July 2025 to 06:00 on 10 July 2025.
Nearest town: 19.82 miles from Townland Green.

Location: westbound entry slip at junction J4 (Gillingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 10 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.84 miles from Townland Green.

Location: westbound at junction J4 (Gillingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 July 2025 to 06:00 on 5 July 2025.
Schedule : From 20:00 on 7 July 2025 to 06:00 on 8 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.85 miles from Townland Green.

Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 10 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.82 miles from Townland Green.

Location: eastbound exit slip at junction J4 (Gillingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 July 2025 to 4 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.88 miles from Townland Green.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Nearest town: 14.4 miles from Townland Green.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.43 miles from Townland Green.

Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Nearest town: 15.66 miles from Townland Green.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Nearest town: 15.66 miles from Townland Green.

Location: eastbound entry slip from the M20 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.91 miles from Townland Green.

Location: eastbound entry slip from the A260 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.67 miles from Townland Green.

Location: eastbound at junction J13 (Folkestone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.81 miles from Townland Green.

Location: eastbound between the M20 and the junction with the A256 Dover West.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.05 miles from Townland Green.

Location: eastbound exit slip to the A260 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.64 miles from Townland Green.

Location: eastbound between the M2 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.25 miles from Townland Green.

Location: eastbound between the junctions with the A2050 Canterbury South and the A260 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 04:00 on 3 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.79 miles from Townland Green.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Nearest town: 14.44 miles from Townland Green.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.6 miles from Townland Green.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Nearest town: 14.51 miles from Townland Green.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Nearest town: 14.51 miles from Townland Green.

Location: northbound between the junctions with the A268 and the A262 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 03:00 on 1 July 2025.
Nearest town: 15.24 miles from Townland Green.

Location: southbound between the junctions with the A262 and the A268 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 03:00 on 1 July 2025.
Nearest town: 15.29 miles from Townland Green.

Location: eastbound between the A2101 and the junction with the A268 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 3 July 2025.
Nearest town: 10.93 miles from Townland Green.

Location: eastbound between the A2101 and the junction with the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Nearest town: 10.93 miles from Townland Green.

Location: eastbound between the junctions with the A2101 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Nearest town: 10.84 miles from Townland Green.

Location: westbound between the A268 and the junction with the A2101 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 3 July 2025.
Nearest town: 10.76 miles from Townland Green.

Location: westbound between the A268 and the junction with the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Nearest town: 10.85 miles from Townland Green.

Location: westbound between the junctions with the A268 and the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Nearest town: 10.76 miles from Townland Green.

Location: eastbound between junctions J9 (Ashford) and J10 (Ashford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 2 July 2025 to 15:30 on 2 July 2025.
Nearest town: 7.56 miles from Townland Green.

Location: northbound between the junctions with the A262 and the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 05:00 on 2 July 2025.
Nearest town: 18.04 miles from Townland Green.

Location: southbound between the junctions with the A228 and the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 05:00 on 2 July 2025.
Nearest town: 18.08 miles from Townland Green.

Location: eastbound between the junctions with the A2101 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 3 July 2025.
Nearest town: 9.17 miles from Townland Green.

Location: westbound between the junctions with the A268 and the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 3 July 2025.
Nearest town: 9.1 miles from Townland Green.

Location: westbound exit slip to the A2050 Canterbury South.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.77 miles from Townland Green.

Location: westbound between the A260 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.62 miles from Townland Green.

Location: eastbound between the junctions with the A28 and the A2050 Canterbury South.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.62 miles from Townland Green.

Location: westbound exit slip to the A260 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.92 miles from Townland Green.

Location: eastbound between the junctions with the M2 and the A28 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 27 June 2025 to 05:00 on 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.34 miles from Townland Green.

Location: westbound entry slip at junction J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.83 miles from Townland Green.

Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 3 July 2025.
Nearest town: 14.75 miles from Townland Green.

Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 3 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.75 miles from Townland Green.

Location: eastbound at the junction with the A269 Bexhill East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 1 July 2025 to 2 July 2025.
Nearest town: 19.94 miles from Townland Green.

Location: eastbound between the junctions with the A269 Bexhill East and the A2036 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 1 July 2025 to 2 July 2025.
Nearest town: 19.94 miles from Townland Green.

Location: westbound between the A2036 and the junction with the A27 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 09:30 on 1 July 2025 to 15:30 on 2 July 2025.
Nearest town: 19.93 miles from Townland Green.

Location: westbound between the A269 Bexhill East and the junction with the A269 Bexhill West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 1 July 2025 to 2 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.94 miles from Townland Green.

Location: westbound between the junctions with the A2036 and the A269 Bexhill East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 1 July 2025 to 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.94 miles from Townland Green.

Location: westbound between the junctions with the A2036 and the A269 Bexhill East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 1 July 2025 to 2 July 2025.
Nearest town: 19.93 miles from Townland Green.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 1 July 2025 to 15:30 on 1 July 2025.
Nearest town: 7.97 miles from Townland Green.

Location: eastbound between junctions J6 (Faversham) and J7 (Canterbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 1 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.64 miles from Townland Green.

Location: southbound between the junctions with the A228 and the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 2 July 2025.
Nearest town: 16.45 miles from Townland Green.

Location: northbound between the junctions with the A262 and the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 2 July 2025.
Nearest town: 16.27 miles from Townland Green.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 23:30 on 30 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.65 miles from Townland Green.

Location: westbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:30 on 30 June 2025 to 06:00 on 1 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.62 miles from Townland Green.

Location: eastbound between the A2050 Canterbury South and the junction with the A260 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 23:30 on 30 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.83 miles from Townland Green.

Location: eastbound between the A28 and the junction with the A260 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.27 miles from Townland Green.

Location: westbound between the junctions with the A260 and the A28 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.88 miles from Townland Green.

Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 4 July 2025 to 06:00 on 5 July 2025.
Nearest town: 6.53 miles from Townland Green.

Location: westbound between the junctions with the A2070 and the A268 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 4 July 2025 to 06:00 on 5 July 2025.
Nearest town: 6.42 miles from Townland Green.

Location: northbound between the junctions with the A262 and the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 30 June 2025 to 15:30 on 30 June 2025.
Nearest town: 16.63 miles from Townland Green.

Location: southbound between the junctions with the A228 and the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 30 June 2025 to 15:30 on 30 June 2025.
Nearest town: 17.8 miles from Townland Green.

Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 30 June 2025 to 15:30 on 30 June 2025.
Nearest town: 16.05 miles from Townland Green.

Location: eastbound between junctions J7 (Maidstone) and J10 (Ashford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 11 July 2025.
Nearest town: 16.86 miles from Townland Green.

Location: eastbound between junctions J9 (Ashford) and J10 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 July 2025 to 06:00 on 10 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.49 miles from Townland Green.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 July 2025 to 06:00 on 8 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.29 miles from Townland Green.

Location: eastbound between junctions J7 (Maidstone) and J8 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 July 2025 to 5 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.5 miles from Townland Green.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.23 miles from Townland Green.

Location: eastbound between junctions J7 (Maidstone) and J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 1 July 2025.
Schedule : From 20:00 on 8 July 2025 to 06:00 on 9 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.86 miles from Townland Green.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 July 2025 to 06:00 on 10 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.82 miles from Townland Green.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11 miles from Townland Green.

Location: westbound between junctions J10 (Ashford) and J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 July 2025 to 06:00 on 6 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.57 miles from Townland Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.33 miles from Townland Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 July 2025 to 06:00 on 8 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.48 miles from Townland Green.

Location: westbound between junctions J10 (Ashford) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 July 2025 to 06:00 on 10 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.61 miles from Townland Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.47 miles from Townland Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 July 2025 to 06:00 on 10 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.73 miles from Townland Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.55 miles from Townland Green.

Location: westbound between junctions J10 (Ashford) and J7 (Maidstone) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 11 July 2025.
Nearest town: 7.61 miles from Townland Green.

Location: westbound between junctions J9 (Ashford) and J7 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 July 2025 to 5 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.16 miles from Townland Green.

Location: northbound between the A229 and the junction with the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 3 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 July 2025 to 6 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.04 miles from Townland Green.

Location: southbound between the A262 and the junction with the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 3 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 July 2025 to 6 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.19 miles from Townland Green.

Location: westbound exit slip at junction J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 June 2025 to 06:00 on 30 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.57 miles from Townland Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 June 2025 to 06:00 on 30 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.91 miles from Townland Green.

Location: eastbound entry slip at junction J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 June 2025 to 06:00 on 29 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.79 miles from Townland Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.91 miles from Townland Green.

Location: eastbound between junctions J7 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 June 2025 to 06:00 on 29 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.65 miles from Townland Green.

Location: eastbound between junctions J7 (Maidstone) and J9 (Ashford) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.65 miles from Townland Green.

Location: northbound between the A2042 and the junction with the M20 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.99 miles from Townland Green.

Location: eastbound between the A260 and the junction with the A256 Dover West.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 June 2025 to 05:00 on 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.5 miles from Townland Green.

Location: westbound exit slip at junction J7 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 June 2025 to 1 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.43 miles from Townland Green.

Location: eastbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 June 2025 to 1 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.67 miles from Townland Green.

Location: northbound between the A2042 and the junction with the M20 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 06:00 on 15 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.99 miles from Townland Green.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.61 miles from Townland Green.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.38 miles from Townland Green.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.42 miles from Townland Green.

Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 1 July 2025.
Nearest town: 6.13 miles from Townland Green.

Location: westbound between the junctions with the A2070 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 1 July 2025.
Nearest town: 5.93 miles from Townland Green.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.28 miles from Townland Green.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.82 miles from Townland Green.

Location: eastbound between junctions J7 (Maidstone) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.76 miles from Townland Green.

Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.41 miles from Townland Green.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 5 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.62 miles from Townland Green.

Location: eastbound between junctions J8 (Maidstone) and J10 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 1 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.69 miles from Townland Green.

Location: westbound between junctions J10A and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 3 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.87 miles from Townland Green.

Location: westbound between junctions J10 (Ashford) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 1 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.65 miles from Townland Green.

Location: eastbound between junctions J9 (Ashford) and J10A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 3 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.55 miles from Townland Green.

Location: westbound between the junctions with the A268 and the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.64 miles from Townland Green.

Location: westbound between the junctions with the A268 and the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.7 miles from Townland Green.

Location: westbound between the junctions with the A2070 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.24 miles from Townland Green.

Location: eastbound between the A2101 and the junction with the A268 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 September 2025 to 06:00 on 5 October 2025.
Nearest town: 8.85 miles from Townland Green.

Location: eastbound between the junctions with the A2101 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.64 miles from Townland Green.

Location: eastbound between the junctions with the A2101 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.64 miles from Townland Green.

Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.37 miles from Townland Green.

Location: eastbound between the A2101 and the junction with the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.85 miles from Townland Green.

Location: westbound between the A268 and the junction with the A2101 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 September 2025 to 06:00 on 5 October 2025.
Nearest town: 8.64 miles from Townland Green.

Location: westbound between the A268 and the junction with the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 5 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.64 miles from Townland Green.