Location: northbound entry slip from the A1307 .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 00:00 and 00:15 on 14 December 2025.
Normal traffic conditions are expected between 00:00 and 00:15 on 14 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.66 miles from Stebbing Green.

Location: northbound entry slip from the A505 .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 02:00 and 02:15 on 14 December 2025.
Normal traffic conditions are expected between 02:00 and 02:15 on 14 December 2025.
Lanes Closed : There are lane closures.
Nearest town: 19.05 miles from Stebbing Green.

Location: northbound at junction J7A .
Due to: Congestion.
Normal traffic conditions are expected between 23:15 and 23:30 on 13 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.16 miles from Stebbing Green.

Location: northbound between the junctions with the A1307 and the A14 .
Due to: Congestion.
Normal traffic conditions are expected between 20:45 and 21:00 on 13 December 2025.
Cause : Road traffic collision.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.42 miles from Stebbing Green.

Location: northbound between junctions J7A and J8 (Bishops Stortford) .
Due to: Roadworks.
Period : from 21:02 on 13 December 2025 to 05:00 on 14 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 12.42 miles from Stebbing Green.

Location: eastbound between the junctions with the M11 and the A131 South.
Due to: Roadworks.
Period : from 20:15 on 13 December 2025 to 06:00 on 14 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 2.78 miles from Stebbing Green.

Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lanes 2, 3 and 4 are closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 05:30 on 14 December 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 19.01 miles from Stebbing Green.

Location: southbound between junctions J7 (Chelmsford) and J6 (Hatfield) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 15:30 on 14 December 2025.
Nearest town: 17.58 miles from Stebbing Green.

Location: eastbound between the junctions with the M11 and the A131 South.
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 14 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.68 miles from Stebbing Green.

Location: northbound between junctions J7 (Chelmsford) and J7A .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 14 December 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.63 miles from Stebbing Green.

Location: southbound between junctions J8 (Bishops Stortford) and J7A .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 14 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 10.51 miles from Stebbing Green.

Location: southbound at junction J8 (Bishops Stortford) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 14 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.15 miles from Stebbing Green.

Location: southbound between junctions J16 and J15 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.24 miles from Stebbing Green.

Location: northbound between junctions J12 and J15 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.14 miles from Stebbing Green.

Location: northbound between junctions J12 and J15 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.91 miles from Stebbing Green.

Location: northbound between junctions J12 and J15 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.63 miles from Stebbing Green.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:30 on 18 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.51 miles from Stebbing Green.

Location: westbound between the A131 South and the junction with the M11 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.09 miles from Stebbing Green.

Location: westbound between the A131 North and the junction with the A131 South.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.21 miles from Stebbing Green.

Location: eastbound between the junctions with the A131 South and the A131 North.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.13 miles from Stebbing Green.

Location: southbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.95 miles from Stebbing Green.

Location: northbound entry slip at junction J6 (Hatfield) from M25 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.28 miles from Stebbing Green.

Location: anticlockwise entry slip at junction J27 (Stansted) From M11 North.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.52 miles from Stebbing Green.

Location: anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.53 miles from Stebbing Green.

Location: anticlockwise at junction J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.16 miles from Stebbing Green.

Location: anticlockwise exit slip at junction J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.16 miles from Stebbing Green.

Location: southbound entry slip at junction J6 (Hatfield) from M25 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.28 miles from Stebbing Green.

Location: anticlockwise entry slip at junction J27 (Stansted) From M11 South.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.16 miles from Stebbing Green.

Location: northbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.74 miles from Stebbing Green.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:30 on 19 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.09 miles from Stebbing Green.

Location: northbound between junctions J19 and J20B .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.2 miles from Stebbing Green.

Location: southbound between junctions J20B and J19 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.44 miles from Stebbing Green.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.77 miles from Stebbing Green.

Location: southbound between junctions J22 and J21 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.69 miles from Stebbing Green.

Location: northbound between junctions J20A and J22 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.98 miles from Stebbing Green.

Location: southbound between junctions J10 (Saffron Walden) and J9 (Newmarket) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.99 miles from Stebbing Green.

Location: northbound between junctions J9 (Newmarket) and J10 (Saffron Walden) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.45 miles from Stebbing Green.

Location: northbound between junctions J21 and J22 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.8 miles from Stebbing Green.

Location: northbound between junctions J22 and J24 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.39 miles from Stebbing Green.

Location: northbound between junctions J18 and J19 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.41 miles from Stebbing Green.

Location: northbound entry slip at junction J22 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.34 miles from Stebbing Green.

Location: northbound exit slip at junction J23 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.1 miles from Stebbing Green.

Location: anticlockwise between junctions J27 (Stansted) and J26 (Waltham Abbey) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 15 December 2025 to 05:30 on 16 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.66 miles from Stebbing Green.

Location: northbound between junctions J8A (Stansted) and J10 (Saffron Walden) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.55 miles from Stebbing Green.

Location: southbound between junctions J12 and J11 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.38 miles from Stebbing Green.

Location: northbound between junctions J11 and J12 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.39 miles from Stebbing Green.

Location: southbound between junctions J12 and J11 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.08 miles from Stebbing Green.

Location: southbound between junctions J12 and J11 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.63 miles from Stebbing Green.

Location: southbound between junctions J16 and J15 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.24 miles from Stebbing Green.

Location: northbound between junctions J11 and J12 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.45 miles from Stebbing Green.

Location: southbound between junctions J13 and J12 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.66 miles from Stebbing Green.

Location: northbound between junctions J8A (Stansted) and J10 (Saffron Walden) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.64 miles from Stebbing Green.

Location: northbound between junctions J15 and J16 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.77 miles from Stebbing Green.

Location: northbound between junctions J25 and J26 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.7 miles from Stebbing Green.

Location: northbound between junctions J23 and J25 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.42 miles from Stebbing Green.

Location: northbound exit slip at junction J26 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.34 miles from Stebbing Green.

Location: northbound between junctions J23 and J25 .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 December 2025 to 05:00 on 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.13 miles from Stebbing Green.

Location: southbound between junctions J7A and J7 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.54 miles from Stebbing Green.

Location: clockwise exit slip at junction J27 (Stansted) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.53 miles from Stebbing Green.

Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 December 2025 to 19 December 2025.
Schedule : From 23:00 on 19 December 2025 to 06:00 on 20 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.06 miles from Stebbing Green.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.72 miles from Stebbing Green.

Location: southbound exit slip at junction J19 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.15 miles from Stebbing Green.

Location: southbound between junctions J20B and J19 .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 15 December 2025 to 05:00 on 16 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.16 miles from Stebbing Green.

Location: southbound between junctions J26 and J25 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.59 miles from Stebbing Green.

Location: southbound at junction J8 (Bishops Stortford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.15 miles from Stebbing Green.

Location: northbound at junction J8A (Stansted) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.41 miles from Stebbing Green.

Location: northbound exit slip at junction J8 (Bishops Stortford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.47 miles from Stebbing Green.

Location: northbound between junctions J15 and J16 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.7 miles from Stebbing Green.

Location: southbound between junctions J12 and J11 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 2 January 2026 to 05:00 on 3 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 January 2026 to 10 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 January 2026 to 17 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 19 January 2026 to 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.96 miles from Stebbing Green.

Location: northbound between junctions J11 and J12 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 2 January 2026 to 05:00 on 3 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 January 2026 to 10 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 January 2026 to 17 January 2026.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 19 January 2026 to 24 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.97 miles from Stebbing Green.

Location: southbound between junctions J25 and J23 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 December 2025 to 17 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.81 miles from Stebbing Green.